Weitere ähnliche Inhalte
Mehr von Gert Buitendach (9)
Kürzlich hochgeladen (20)
Project-sheet Blinkwater TSF
- 1. www.construction.murrob.com
BLINKWATER
Mokopane, Mogalakwena Mine
PROJECT TYPE: EARTHWORKS
CLIENT:
Anglo Platinum
VALUE:
R 129 Million
CONSULTANTS:
None
PROJECT DURATION:
36 Months
DATE OF PROJECT:
January 2013
PROJECT DESCRIPTION:
Load & Haul of waste material to construct
tailings impoundment dam.
Approximate volumes mined for the project:-
• Topsoil Stripped 379,254m³
• Dam wall 2,322,515m³
• Interface 580,000m³