George Jason Facturan has over 4 years of experience in construction project planning, management, and quality control, and is currently working as a Quality Control Engineer at Econ Precast where he performs inspections and ensures quality standards are met. He has previously held roles as a Precast Production Engineer and Quality Inspector at Hong Leong Building Materials, and has experience supervising site works and preparing reports at other construction firms. He includes details of his educational background and references in civil engineering.
1. GEORGE JASON FACTURAN INTING
164 Lentor Loop, Bullion Park Condo 02-04
E-mail add: georgejasoni@ymail.com
Mobile Phone No. +6581834393
PROFESSIONAL STRENGTH
4 years of Professional Experience in actual construction, Planning and Management.
Supervising and Coordinating the activities at the project site. Maintaining the daily and
monthly reports of working.
With a good working knowledge in Architectural and Engineering software AutoCAD. Proficient
in Microsoft office applications (Microsoft word, Microsoft Excel, Microsoft PowerPoint, MS
Project). Flexible personality comfortable with a multi-tasking role and founded on honest,
ambitious and hardworking character traits.
PROFESSIONAL PROFILE
Econ Precast Pte. Ltd.
Precast Division
26 Kranji way Singapore 739436
Quality Control Engineer (March 2015 to recent)
Perform all daily inspection(rebar inspection, mould inspection, pre and post-pour
inspection, coating inspection, dry and wet film test, final-epoxy coating inspection, pull-
out test and delivery inspection) to achieve the quality of the segments required in the
drawings and specifications for all works under the contract.
Coordinate with the Resident Technical Officer and Production Engineer for inspection
and meeting about quality problems include closure of Non-Conformance Report(NCR)
Taking care of all QC documents of the entire project including segments coating list,
pull-out test, dry and wet film test, Inspection requests, Non Conformance Report and
photos of every segment.
Compiles and writes training material and conducts training sessions on quality control
activities.
Develops and implements methods and procedures for disposition of discrepant
material and devises methods to assess cost and responsibility.
Devises sampling procedures and designs and develops forms and instructions for
recording, evaluating, and reporting quality and reliability data.
2. Attend site meeting about quality issues.
Verify product dimensions, color, texture and strength and locate imperfections.
Establishes program to evaluate precision and accuracy of production equipment and
testing, measurement, and analytical equipment and facilities.
May manage quality control program.
On-Going Projects:
Singapore Power Power Assets(SPPA-JIPCT) – Tunnel going to Jurong Island
Land Transport Authority(T202) - Construction of Woodlands North Station and
Tunnel for Thomson East Coast Line(Brown line)
Hong Leong Building Materials Pte. Ltd.
Precast Division
7A Tuas Ave 13 Singapore 638979
Precast Production Engineer / cum QC Inspector (April 2013 to 2015)
Preparation and planning of works, According to priority level of the on-going projects
Ensure that the actual precast panel was done according to the drawing.
Monitoring and ordering of precast materials like rebars, wire mesh and cast-in items to
make sure that the site has sufficient stock to carry on for the work
Prepares and submits necessary documents / reports required by management
Coordinates with Auditors, Inspectors and RTO during jobsite inspections and audits.
Ensure all findings with recommendation shall implement / rectify.
Performs other management mandated functions
Prepare daily production reports and schedule, making sure that the panels need to
cast will be casted, and panels need to be delivered will be delivered
Prepare monthly salary for workers
Jobs completed / Participated
Choa Chu Kang (CCKN8C1)
Choa Chu Kang (CCKN8C9/C10)
Bukit Merah (C52)
Hougang (N5C23)
Punggol West (PW C37)
Bukit Batok (BBN1C13/N2C23),
3. Bedok (BDKN8C20),
Bedok (BDKN6C17),
Woodlands (WLN726/N728) and
Tampiness Trilliant.
Yale Nus College Campus
GILFER CONSTRUCTION
*Site Supervisor/Estimator/Inspector (April 2011 to January 2013)
Prepare Master program and ensure work progresses in accordance with schedule
Prepare and Update Site Daily Report
Delegate and assign duties to site staff
Responsible for all site document filing and record keeping on site
Liaise with consultants & local authorities to regarding Civil & Structural matters
Assist in the requisition of resources for the project such as labour, materials, equipment
and others
Assist in handling / storing or materials / equipments
Ensure safety practices are followed
Conduct quality checks on work done by workers
Arrange for overtime if necessary
Raise non-conformance product report for nonconforming products
Carry out assignments as detailed by the senior Manager/ Project manager/ Assistant
project Manager
- On the Job training
PHILSOUTH CONSTRUCTION (April 2010 to May 2010)
* Supervise and ensure proper maintenance of materials.
* Checking the Quality of concrete strengths regarding the grade, 7 days and 28 days
test.
* Supervise the work of workers.
ORGANIZATIONS
2009-2011 Member, Philippine Institute of Civil
Engineering
Silliman University
2010-2011 Habitat for Humanity Silliman University
Chapter Silliman University
4. EDUCATIONAL BACKGROUND
S.Y. 2005-2011 Bachelor of Science in Civil Engineering
Silliman University
Dumaguete City, Negros Oriental
S.Y. 2001-2005 Secondary Education
Mabinay National High School
Poblacion, Mabinay, Negros Oriental
REFERENCES
Engr. Jay Ar Bote Mangulabnan
Design Engineer (HLBM) HONG LEONG BUILDING MATERIALS
Singapore
+6594230956
Engr. Jeffrey Castro Mercado
Quality Control Engineer (Contech Precast Pte. Ltd)
Singapore
+6586084219