SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Mobile: 0408 580 852
Email: Geoff.chandler01@gmail.com
Address: 65 Inshore Drive, Torquay
Victoria 3228
GEOFF CHANDLER
Contract Supervisor/Pipeline Inspector
I am a highly motivated and energetic professional with 30years’ experience in the civil
construction industry working on multidisciplinary projects. Some of my key areas of works
include transmission oil and gas, major pipeline construction, structures, sewer and water
infrastructure.
As a Superintendent I have been directly responsible for undertaking all aspects of
construction, including managing subcontractors, project management, SQE and risk
compliance to achieve project requirements.
I have built strong relationships and effectively managed client expectations, driven
efficiencies within a team and achieved project deliverables set during all phases of
construction and this is reflected in the high standards achieved on projects. I have
successfully influenced outcomes by using my construction expertise to drive cost
effective solutions during project development and delivery phases.
Adopting a “no harm” vision through all aspects of the project was imperative to the success
of projects and to drive best practice in the construction industry.
Asset Integrity Contract/Contractor Supervision, Pipeline
Inspection / Supervision
2014 - Current
John
Holland
2009-2014
Third Party management of Shell Australia Assets (High pressure
pipelines). Third Party supervision of contractors works within asset
easement to manage compliance against Shell permit requirements (AS
2885.1).
Key Responsibilities include:
• Supervision
• Develop key relationships with subcontractors and Shell
management to streamline communications and project outcomes.
• Issue Permit to work.
• Manage contractor compliance against permit requirements.
• Auditing
• Understand and apply OH&S regulatory guidelines and Acts
• Review drawings and specifications and ensure works are
performed within the set requirements.
Construction Officer - Barwon Water Alliance
Key responsibilities include:
• Support and drive team to achieve project deliverables (OH&S,
budget and timelines).
PAGE 1 OF 5
Expertise
• Contractor & Consultant
Management
• Client management
• Risk Assessment
• SQE management
• Stakeholder Management
• Project management
• Team Leadership
• Project budgeting
• Scheduling and resourcing for
construction
• Auditing
Training
• CCF accredited plant operator
license
• Spotters Ticket
• Confined Space Accredited
• Dogmans Ticket
• First Aid Level 2
• Certificate IV in Safety Leadership
OHS Construction (module
completion stage)
• Drug and Alcohol Monitoring &
Testing
• Working at Heights
• Trenching & Shoring
• Mine Managers Permit
• Rail Track Safety
• Red Card
• Shell Permit Training
geoff chandler
2008 – 2009
2006-2008
• Mentoring of staff within the Construction Team.
• Delivering toolbox sessions.
• Support continuous improvement of construction techniques.
• Develop key relationships with subcontractors and external
stakeholders within the region to streamline communications
achieving efficient outcomes.
• Development, implementation and communication of construction
systems and procedures.
• Participate and undertake audits and monitoring results for
compliance across Alliance projects.
• Understand and apply OH&S regulatory guidelines and Acts.
• Involvement in pre tender TOC and Design finalisation.
• Manage contractor adherence to project Safety requirements
• Review drawings and specifications and ensure works are
performed within the set requirements.
• Support Site Supervisors in managing contractor adherence to
project requirements.
• Provide constructability advice throughout project lifecycle
Valves & Fittings Superintendent
Sugarloaf Pipeline Alliance - John Holland Southern Region
Key responsibilities included:
• Monitor Staff KPI”s and training requirements
• Supervision of team in the delivery of valve and fittings construction
• Manage resourcing and budget requirements to achieve project
deadline and program.
• Installation of scour valves, 225mm air valves and scour off takes
on 1700/1400mm Pipeline
• Installation of scour dewatering pits and shafts;
• Pipeline coating and wrapping;
• Country Fire Authority off-take installations;
• Testing and Commissioning;
• Supervision of pipe deliveries/stringing and storage;
• Pipeline tie in works;
• Earthworks;
• OH&S management for work crew;
• Implement and maintain quality control on works & environmental
controls;
• Plant and labour costing;
Supervisor, relieving Superintendent
Melbourne Water Projects
Key responsibilities included:
• Supervise and plan daily construction activities;
• Directly manage subcontractors onsite to achieve project
deliverables.
• Undertake Toolbox sessions, Prestarts, Site Inductions and
Maintain site diary.
• Responsible for ensuring all OH&S requirements were implemented
and followed by all workers onsite.
• Track and report ongoing costs to undertake specific tasks.
• Monitor budget for construction activities.
PAGE 2 OF 5
geoff chandler
Melbourne Water - Eastern Treatment Plant (Aeration Upgrade).
Project involved the refurbishment of the existing 6 aeration tanks and
the associated infrastructure
Construction activities included:
• Demolition of all existing services, aeration headers and equipment.
• Installation of new aeration pipework and supply pipes, sludge line
and foam harvester.
• Installation of mechanical and electrical systems.
• Installation of additional baffle walls, mixers supports, mixers and
new diffuser system.
• Commissioning of all electrical systems to support the aeration
upgrade.
• Isolation of existing treatment plant assets interfacing with the
Aeration upgrade.
Melbourne Water - Bridges Construction.
Project involved construction of 16 precast concrete bridges within
remote areas of Melbourne Water catchments.
Construction activities included:
• Earthworks and road construction,
• Clear & Grade activities to provide construction access (ie cranes)
through the catchment to deliver the precast 12-16m long bridge
beams directly to the site.
• Construction of bridge footings, placement of abutments, beams,
pre tension of beams, and installation of hand rails.
Melbourne Water – Relining Water Supply Aqueduct & Installation
of Gratings.
Project involved relining of approx 5km of the existing Maroondah
Aqueduct and installation of grating structures.
Construction activities included:
• Removal of old liner, clean and repair existing channel.
• Installation of neoprene liner (welding and strapping).
• Installation of galvanized grating structures and platforms over
aqueduct.
Melbourne Water – Sorrento Pump station, Rising Main and
Drainage outfall works.
Construction activities included:
• Construction of wet well and inlet pipeline.
• Construction of valve pit.
• Construction of rising main and drainage outfall structure.
• Installation of pumps and electrical switchboard.
Previous Experience
Supervisor
Tenix Alliance – Melbourne Water Civil Contract
• Staff supervision – 3 locations;
• Develop works schedules;
• Contractor and OH& S management;
• Training/safety management;
• Plant management;
• Auditing;
PAGE 3 OF 5
geoff chandler
City West Water Contracts
• Emergency repairs on CWW assets.
• Minor construction works.
Shepparton H.R.A.L Treatment Plant
• Site foreman overseeing major works.
• Bulk earthworks.
• Water main construction.
• Overseeing electrical and mechanical works.
• Civil works
Yarra Valley Water Sewer Rehab
• Site foreman in charge of laying 225-300mm sewer mains.
• Construction of precast manholes.
• Rectifying existing pipeline assets.
• Excavation of shafts up to 4m.
Power Station works – Dalyrimple S.A
• Construction of power station.
• Concrete/civil works.
• Management of contractors.
• Site audits and JSA/risk management;
• Costing and budgeting.
• Remote site utilisation
Power Station works – Dromana Alinta project
• Civil works – concreting/formwork.
• Drainage, sewer and road works construction.
• Staff Supervision.
• Management of budget and timelines to achieve project outcomes.
• Procurement of all materials, labour and equipment hire on the
project.
• OH&S management, contractor management and auditing;
Serco
• Works crew Supervisor in charge of sewer and water construction
projects.
• Water and sewer main rectifications 100-600mm;
• Minor civil construction works.
Transfield
• Supervisor overseeing water main construction crew in the removal
of AC and CI water mains.
• Air scouring,flushing and water quality testing program.
• Large sewer connections.
Yarra Valley Water
• Supervisor in charge of water emergency after hours works which
included repairs to both sewer and water mains.
• Minor capitol works program for relaying water mains.
• In charge of water quality and air scouring.
Melbourne Water
• In charge of maintenance and construction on water and sewer
pipeline – assets from 100-600mm.
PAGE 4 OF 5
geoff chandler
• Routine maintenance of Water Catchment and Water Supply
facilities.
• Construction and maintenance of pipeline – assets from 600mm –
1450mm
PAGE 5 OF 5
geoff chandler
• Routine maintenance of Water Catchment and Water Supply
facilities.
• Construction and maintenance of pipeline – assets from 600mm –
1450mm
PAGE 5 OF 5

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

wsa
wsawsa
wsa
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 May
 
wsa
wsawsa
wsa
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
BABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTILBABU--KUNIYAMKOTTIL
BABU--KUNIYAMKOTTIL
 
JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)JOEY_STEPHENSON_(R1136)
JOEY_STEPHENSON_(R1136)
 
Project Experience
Project ExperienceProject Experience
Project Experience
 
Resume 1
Resume 1 Resume 1
Resume 1
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
Stephen Cordova Final CV
Stephen Cordova Final CVStephen Cordova Final CV
Stephen Cordova Final CV
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Topside
TopsideTopside
Topside
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
 
CV 3
CV 3CV 3
CV 3
 

Ähnlich wie Chandler Geoff 2016 cv

Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen Music
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensedkevin quigley
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1andrew wellbelove
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon CapabilityDamien Allen
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 

Ähnlich wie Chandler Geoff 2016 cv (20)

Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
Naim CV
Naim CVNaim CV
Naim CV
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensed
 
CV -mosleh
CV -moslehCV -mosleh
CV -mosleh
 
CV
CVCV
CV
 
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
 
AllenCon Capability
AllenCon CapabilityAllenCon Capability
AllenCon Capability
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Amir QC
Amir QCAmir QC
Amir QC
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
Salman Resume 2016
Salman Resume  2016Salman Resume  2016
Salman Resume 2016
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 

Chandler Geoff 2016 cv

  • 1. Mobile: 0408 580 852 Email: Geoff.chandler01@gmail.com Address: 65 Inshore Drive, Torquay Victoria 3228 GEOFF CHANDLER Contract Supervisor/Pipeline Inspector I am a highly motivated and energetic professional with 30years’ experience in the civil construction industry working on multidisciplinary projects. Some of my key areas of works include transmission oil and gas, major pipeline construction, structures, sewer and water infrastructure. As a Superintendent I have been directly responsible for undertaking all aspects of construction, including managing subcontractors, project management, SQE and risk compliance to achieve project requirements. I have built strong relationships and effectively managed client expectations, driven efficiencies within a team and achieved project deliverables set during all phases of construction and this is reflected in the high standards achieved on projects. I have successfully influenced outcomes by using my construction expertise to drive cost effective solutions during project development and delivery phases. Adopting a “no harm” vision through all aspects of the project was imperative to the success of projects and to drive best practice in the construction industry. Asset Integrity Contract/Contractor Supervision, Pipeline Inspection / Supervision 2014 - Current John Holland 2009-2014 Third Party management of Shell Australia Assets (High pressure pipelines). Third Party supervision of contractors works within asset easement to manage compliance against Shell permit requirements (AS 2885.1). Key Responsibilities include: • Supervision • Develop key relationships with subcontractors and Shell management to streamline communications and project outcomes. • Issue Permit to work. • Manage contractor compliance against permit requirements. • Auditing • Understand and apply OH&S regulatory guidelines and Acts • Review drawings and specifications and ensure works are performed within the set requirements. Construction Officer - Barwon Water Alliance Key responsibilities include: • Support and drive team to achieve project deliverables (OH&S, budget and timelines). PAGE 1 OF 5 Expertise • Contractor & Consultant Management • Client management • Risk Assessment • SQE management • Stakeholder Management • Project management • Team Leadership • Project budgeting • Scheduling and resourcing for construction • Auditing Training • CCF accredited plant operator license • Spotters Ticket • Confined Space Accredited • Dogmans Ticket • First Aid Level 2 • Certificate IV in Safety Leadership OHS Construction (module completion stage) • Drug and Alcohol Monitoring & Testing • Working at Heights • Trenching & Shoring • Mine Managers Permit • Rail Track Safety • Red Card • Shell Permit Training
  • 2. geoff chandler 2008 – 2009 2006-2008 • Mentoring of staff within the Construction Team. • Delivering toolbox sessions. • Support continuous improvement of construction techniques. • Develop key relationships with subcontractors and external stakeholders within the region to streamline communications achieving efficient outcomes. • Development, implementation and communication of construction systems and procedures. • Participate and undertake audits and monitoring results for compliance across Alliance projects. • Understand and apply OH&S regulatory guidelines and Acts. • Involvement in pre tender TOC and Design finalisation. • Manage contractor adherence to project Safety requirements • Review drawings and specifications and ensure works are performed within the set requirements. • Support Site Supervisors in managing contractor adherence to project requirements. • Provide constructability advice throughout project lifecycle Valves & Fittings Superintendent Sugarloaf Pipeline Alliance - John Holland Southern Region Key responsibilities included: • Monitor Staff KPI”s and training requirements • Supervision of team in the delivery of valve and fittings construction • Manage resourcing and budget requirements to achieve project deadline and program. • Installation of scour valves, 225mm air valves and scour off takes on 1700/1400mm Pipeline • Installation of scour dewatering pits and shafts; • Pipeline coating and wrapping; • Country Fire Authority off-take installations; • Testing and Commissioning; • Supervision of pipe deliveries/stringing and storage; • Pipeline tie in works; • Earthworks; • OH&S management for work crew; • Implement and maintain quality control on works & environmental controls; • Plant and labour costing; Supervisor, relieving Superintendent Melbourne Water Projects Key responsibilities included: • Supervise and plan daily construction activities; • Directly manage subcontractors onsite to achieve project deliverables. • Undertake Toolbox sessions, Prestarts, Site Inductions and Maintain site diary. • Responsible for ensuring all OH&S requirements were implemented and followed by all workers onsite. • Track and report ongoing costs to undertake specific tasks. • Monitor budget for construction activities. PAGE 2 OF 5
  • 3. geoff chandler Melbourne Water - Eastern Treatment Plant (Aeration Upgrade). Project involved the refurbishment of the existing 6 aeration tanks and the associated infrastructure Construction activities included: • Demolition of all existing services, aeration headers and equipment. • Installation of new aeration pipework and supply pipes, sludge line and foam harvester. • Installation of mechanical and electrical systems. • Installation of additional baffle walls, mixers supports, mixers and new diffuser system. • Commissioning of all electrical systems to support the aeration upgrade. • Isolation of existing treatment plant assets interfacing with the Aeration upgrade. Melbourne Water - Bridges Construction. Project involved construction of 16 precast concrete bridges within remote areas of Melbourne Water catchments. Construction activities included: • Earthworks and road construction, • Clear & Grade activities to provide construction access (ie cranes) through the catchment to deliver the precast 12-16m long bridge beams directly to the site. • Construction of bridge footings, placement of abutments, beams, pre tension of beams, and installation of hand rails. Melbourne Water – Relining Water Supply Aqueduct & Installation of Gratings. Project involved relining of approx 5km of the existing Maroondah Aqueduct and installation of grating structures. Construction activities included: • Removal of old liner, clean and repair existing channel. • Installation of neoprene liner (welding and strapping). • Installation of galvanized grating structures and platforms over aqueduct. Melbourne Water – Sorrento Pump station, Rising Main and Drainage outfall works. Construction activities included: • Construction of wet well and inlet pipeline. • Construction of valve pit. • Construction of rising main and drainage outfall structure. • Installation of pumps and electrical switchboard. Previous Experience Supervisor Tenix Alliance – Melbourne Water Civil Contract • Staff supervision – 3 locations; • Develop works schedules; • Contractor and OH& S management; • Training/safety management; • Plant management; • Auditing; PAGE 3 OF 5
  • 4. geoff chandler City West Water Contracts • Emergency repairs on CWW assets. • Minor construction works. Shepparton H.R.A.L Treatment Plant • Site foreman overseeing major works. • Bulk earthworks. • Water main construction. • Overseeing electrical and mechanical works. • Civil works Yarra Valley Water Sewer Rehab • Site foreman in charge of laying 225-300mm sewer mains. • Construction of precast manholes. • Rectifying existing pipeline assets. • Excavation of shafts up to 4m. Power Station works – Dalyrimple S.A • Construction of power station. • Concrete/civil works. • Management of contractors. • Site audits and JSA/risk management; • Costing and budgeting. • Remote site utilisation Power Station works – Dromana Alinta project • Civil works – concreting/formwork. • Drainage, sewer and road works construction. • Staff Supervision. • Management of budget and timelines to achieve project outcomes. • Procurement of all materials, labour and equipment hire on the project. • OH&S management, contractor management and auditing; Serco • Works crew Supervisor in charge of sewer and water construction projects. • Water and sewer main rectifications 100-600mm; • Minor civil construction works. Transfield • Supervisor overseeing water main construction crew in the removal of AC and CI water mains. • Air scouring,flushing and water quality testing program. • Large sewer connections. Yarra Valley Water • Supervisor in charge of water emergency after hours works which included repairs to both sewer and water mains. • Minor capitol works program for relaying water mains. • In charge of water quality and air scouring. Melbourne Water • In charge of maintenance and construction on water and sewer pipeline – assets from 100-600mm. PAGE 4 OF 5
  • 5. geoff chandler • Routine maintenance of Water Catchment and Water Supply facilities. • Construction and maintenance of pipeline – assets from 600mm – 1450mm PAGE 5 OF 5
  • 6. geoff chandler • Routine maintenance of Water Catchment and Water Supply facilities. • Construction and maintenance of pipeline – assets from 600mm – 1450mm PAGE 5 OF 5