ANS-3.5 Overview
info@gses.com
2
ANS-3.5 Topic Overview
• Introduce ANS-3.5 Working Group
• ANS-3.5-201x Project Status
• ANS-3.5 Standards Transition Status
• Q&A with ANS-3.5 Working Group
3
ANS-3.5 Standard
Working Group Membership
Officers
• Chair - Jim Florence (Cooper)
• Vice Chair - Bob Felker (Western Services Corp.)
• Secretary - Keith Welchel (Oconee)
• Editor - Butch Colby (L3 MAPPS)
• Style Editor - SK Chang (Millstone)
• Parliamentarian - Larry Vick (NRC)
4
ANS-3.5 Standard
Working Group Membership
• Bill Fraser (Westinghouse)
• Robert Goldman (Grand Gulf)
• David Goodman (Comanche Peak)
• Jody Lawter (Summer)
• George McCullough (GSE)
• Michael Petersen (Monticello/Prairie Island)
• Pablo Rey (Tecnatom – Spain)
• James Sale (North Anna)
• Frank Tarselli (Independent)
5
ANS-3.5 Working Group
Cooper Station – Nov 2014
6
ANS-3.5-201x Scope
Approved scope:
• This standard establishes the functional requirements for
full scope nuclear power plant control room simulators that
are subject to U.S. Nuclear Regulatory Commission (NRC)
regulation for use in operator training and examination.
• The standard also establishes criteria for the scope of
simulation, performance, and functional capabilities of
nuclear power plant control room simulators.
• This standard does not establish criteria for the use of
simulators in operator training programs.
7
ANS-3.5-201x Project Status
Final effort:
• ANS-3.5-201x submitted to the American Nuclear Society on
01/16/14 to begin formal review process
• ANS Large Light Water Reactors Consensus (LLWRC) Committee
completed review on 03/16/14
• Public review period closed 09/10/14
• Working Group comment resolution (LLWRC & public) through
01/16/15 (last meeting in Frederick, MD)
• Expect to be published in 2015 (ANS-3.5-2015)
8
ANS-3.5-201x Project Status
What’s different in the 201x standard?
• Addressed comments from the 2009 standard review
effort
• Address next generation simulators
• Deleted/modified definitions; introduced “discrepancy”
in lieu of noticeable difference, deviation and
deficiency
• Deleted malfunction list in Section 3.1.4
9
ANS-3.5-201x Project Status
Moved verification/validation testing to Section 5: Configuration
Management
Moved assessment of deviations to Section 5
Changed Section 3.4/4.4 to “Performance Testing”
Defined testing periodicities
– Limits of simulation
– Steady-state & normal evolutions
– Malfunctions
– Physical fidelity & human factors
– Instructor station
– Real time & repeatability
10
ANS-3.5-201x Project Status
Defined testing configurations for various performance tests
(fully integrated vs. non-integrated)
No changes to scenario-based testing!!!
Section 5:
– Initial design vs. change control
– Performance benchmark (steady-state/transient testing)
– Noticeable differences
– Resolution of discrepancies
– Verification/validation testing
11
ANS-3.5-201x Project Status
Appendix B deleted; transient list deleted, steady-
state parameters moved to Section 4
Clarified that previously selected transients may be
used (for legacy plants)
Re-lettered Appendices C & D
Readability/clarity
12
ANS-3.5 Standards Adoption
History
A full history of full-scope nuclear power plant (NPP)
simulators as related to the ANSI/ANS-3.5 standards
Earliest NPP simulators were constructed upon specifications
only (through the '70s)
 General Electric (Dresden 2)
 Babcock and Wilcox (Rancho Seco)
 Combustion Engineering (Calvert Cliffs)
 Westinghouse (Zion)
 Indian Point 2 (Consolidated Edison of New York)
 TVA (Browns Ferry, Sequoyah, Watts Bar)
13
The age of utility-owned simulators began in the late'70s (ConEd –
Indian Point 2, TVA – Browns Ferry 2/Sequoyah/Watts Bar, VEPCO -
Surry).
The '80s was the time of a utility-owned simulator for every unique
reference unit.
Simulators for the new reactor phase are being purchased within the
nuclear steam supply system contract (all COLs applications are
referenced to ANS-3.5-1998).
Vogtle 3&4, Summer 2&3
New reactor phase of simulators are scheduled for delivery in order
that operators can be trained and licensed before criticality.
ANS-3.5 Standards Adoption
History
14
Decommissioned Simulators
Crystal River – April 2013
Kewaunee – May 2013
SONGS – July 2013
Vermont Yankee – December 2014
15
ANS-3.5 Transition Status
Simulators on 1985 standard
Simulators on 1993 standard
Simulators on 1998 standard
Simulators on 2009 standard
ANS-3.5 in 2013
16
ANS-3.5 Transition Status
Simulators on 1985 standard
Simulators on 1993 standard
Simulators on 1998 standard
Simulators on 2009 standard
ANS-3.5 in 2014
17
ANS-3.5 Commitments
(Incomplete data before 2006)
18
ANS-3.5 Web Pages
The ANS-3.5 web pages can be accessed via:
– www.ans.org
– https://www.usug.org/
Find:
– Scope statement
– Membership contact information
– Meeting locations
– Meeting minutes
– Link to ANS-3.5 clarifications
– How to submit clarification requests
For more information:
Go to: www.GSES.com
Call: +1 800.638.7912
Email: info@gses.com
Follow us on:
Twitter @GSESystems
Facebook.com/GSESystems

Weitere ähnliche Inhalte

Was ist angesagt? (10)

Supervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, SingaporeSupervision of piling works, ACES, 2011, Singapore
Supervision of piling works, ACES, 2011, Singapore
 
ICDE2008, Singapore
ICDE2008, SingaporeICDE2008, Singapore
ICDE2008, Singapore
 
2. Benoit Latapie - Foundations for infrastructure projects in MENA
2. Benoit Latapie - Foundations for infrastructure projects in MENA2. Benoit Latapie - Foundations for infrastructure projects in MENA
2. Benoit Latapie - Foundations for infrastructure projects in MENA
 
GeoSS,18SEAGS,CTS,04062013, A
GeoSS,18SEAGS,CTS,04062013, AGeoSS,18SEAGS,CTS,04062013, A
GeoSS,18SEAGS,CTS,04062013, A
 
MSc Fractured Reservoirs
MSc Fractured Reservoirs MSc Fractured Reservoirs
MSc Fractured Reservoirs
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Shear band test procedure
Shear band test procedureShear band test procedure
Shear band test procedure
 
Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015
 
ICDE2006, Singapore
ICDE2006, SingaporeICDE2006, Singapore
ICDE2006, Singapore
 
Bullock bidirectional testing
Bullock bidirectional testingBullock bidirectional testing
Bullock bidirectional testing
 

Andere mochten auch

Andere mochten auch (20)

Mochovce Unit 3 & 4 Full-Scope Simulator Project Key Points and Successes
Mochovce Unit 3 & 4 Full-Scope Simulator Project Key Points and SuccessesMochovce Unit 3 & 4 Full-Scope Simulator Project Key Points and Successes
Mochovce Unit 3 & 4 Full-Scope Simulator Project Key Points and Successes
 
Human Performance improvement for the Turkish Energy Sector
Human Performance improvement for the Turkish Energy SectorHuman Performance improvement for the Turkish Energy Sector
Human Performance improvement for the Turkish Energy Sector
 
Proposal For a Nuclear Reactor Operations Course at Purdue University
Proposal For a Nuclear Reactor Operations Course at Purdue UniversityProposal For a Nuclear Reactor Operations Course at Purdue University
Proposal For a Nuclear Reactor Operations Course at Purdue University
 
Are Your Employees Playing Games?
Are Your Employees Playing Games?Are Your Employees Playing Games?
Are Your Employees Playing Games?
 
Solving Refining & Petrochemicals Workforce Development Challenges with Perfo...
Solving Refining & Petrochemicals Workforce Development Challenges with Perfo...Solving Refining & Petrochemicals Workforce Development Challenges with Perfo...
Solving Refining & Petrochemicals Workforce Development Challenges with Perfo...
 
Virtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing PerformanceVirtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing Performance
 
Simulator Management: Ideas for Today and Tomorrow
Simulator Management: Ideas for Today and TomorrowSimulator Management: Ideas for Today and Tomorrow
Simulator Management: Ideas for Today and Tomorrow
 
VIZRAD - Evolving Simulaton in Radiation Training
VIZRAD - Evolving Simulaton in Radiation TrainingVIZRAD - Evolving Simulaton in Radiation Training
VIZRAD - Evolving Simulaton in Radiation Training
 
Simulation Training Post Fukushima
Simulation Training Post FukushimaSimulation Training Post Fukushima
Simulation Training Post Fukushima
 
Control & HMI Emulation Project
Control & HMI Emulation ProjectControl & HMI Emulation Project
Control & HMI Emulation Project
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
 
Total Training Solution - Entry2Expert
Total Training Solution - Entry2ExpertTotal Training Solution - Entry2Expert
Total Training Solution - Entry2Expert
 
How to Improve Operator Training Throughput Using Screening & Selection
How to Improve Operator Training Throughput Using Screening & SelectionHow to Improve Operator Training Throughput Using Screening & Selection
How to Improve Operator Training Throughput Using Screening & Selection
 
Improving Operational Performance With Smarter, Cost-Effective Training Programs
Improving Operational Performance With Smarter, Cost-Effective Training ProgramsImproving Operational Performance With Smarter, Cost-Effective Training Programs
Improving Operational Performance With Smarter, Cost-Effective Training Programs
 
Multi-Unit Severe Accident Simulation
Multi-Unit Severe Accident SimulationMulti-Unit Severe Accident Simulation
Multi-Unit Severe Accident Simulation
 
Applying Safety DNA Analytics to Enhance Your E2E Workforce Process
Applying Safety DNA Analytics to Enhance Your E2E Workforce ProcessApplying Safety DNA Analytics to Enhance Your E2E Workforce Process
Applying Safety DNA Analytics to Enhance Your E2E Workforce Process
 
Innovation in Nuclear Simulation
Innovation in Nuclear SimulationInnovation in Nuclear Simulation
Innovation in Nuclear Simulation
 
Process Modeling Simulation
Process Modeling SimulationProcess Modeling Simulation
Process Modeling Simulation
 
Implementation of Dynamic Simulation for Engineering and Human Factors
Implementation of Dynamic Simulation for Engineering and Human FactorsImplementation of Dynamic Simulation for Engineering and Human Factors
Implementation of Dynamic Simulation for Engineering and Human Factors
 
Real-Time Simulation for Design of New Nuclear Plants
Real-Time Simulation for Design of New Nuclear PlantsReal-Time Simulation for Design of New Nuclear Plants
Real-Time Simulation for Design of New Nuclear Plants
 

Ähnlich wie ANS-3.5 Overview

04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
AbdalmoedAlaiashy2
 
GEP presentation-rev1
GEP presentation-rev1GEP presentation-rev1
GEP presentation-rev1
Ruzainy Musa
 
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Dave Callen
 
Riannon Stenberg_Resume_May2016
Riannon Stenberg_Resume_May2016Riannon Stenberg_Resume_May2016
Riannon Stenberg_Resume_May2016
Riannon Stenberg
 
2016 Resume for Timothy Cline
2016 Resume for Timothy Cline2016 Resume for Timothy Cline
2016 Resume for Timothy Cline
Timothy Cline
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
Bert Yates
 
Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 Personal
Gary Jackson
 

Ähnlich wie ANS-3.5 Overview (20)

04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
04-Fiber-Optic-Test-Enhancement-Project-Update-Meeting-08-10-2022.pptx
 
Day-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbinesDay-to-day condition monitoring for a large fleet of wind turbines
Day-to-day condition monitoring for a large fleet of wind turbines
 
Ipea api579
Ipea api579Ipea api579
Ipea api579
 
Lessons Learned from the Licensing of Fermi 3 Nuclear Power Plant
Lessons Learned from the Licensing of Fermi 3 Nuclear Power PlantLessons Learned from the Licensing of Fermi 3 Nuclear Power Plant
Lessons Learned from the Licensing of Fermi 3 Nuclear Power Plant
 
Case Study of Phased Array UT for B31.1 Piping
Case Study of Phased Array UT for B31.1 PipingCase Study of Phased Array UT for B31.1 Piping
Case Study of Phased Array UT for B31.1 Piping
 
Integrating Laser Scan Data into FEA Model to Perform Level 3 FFS
Integrating Laser Scan Data into FEA Model to Perform Level 3 FFSIntegrating Laser Scan Data into FEA Model to Perform Level 3 FFS
Integrating Laser Scan Data into FEA Model to Perform Level 3 FFS
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
GEP presentation-rev1
GEP presentation-rev1GEP presentation-rev1
GEP presentation-rev1
 
PGRR085_RIWG_Aug24.pdf
PGRR085_RIWG_Aug24.pdfPGRR085_RIWG_Aug24.pdf
PGRR085_RIWG_Aug24.pdf
 
IFDIS PHM Conference 2016
IFDIS   PHM Conference 2016IFDIS   PHM Conference 2016
IFDIS PHM Conference 2016
 
Inspecta OTD presentation
Inspecta OTD presentation Inspecta OTD presentation
Inspecta OTD presentation
 
Multibeam Advisory Committee - 2016 UNOLS FIC Meeting
Multibeam Advisory Committee - 2016 UNOLS FIC MeetingMultibeam Advisory Committee - 2016 UNOLS FIC Meeting
Multibeam Advisory Committee - 2016 UNOLS FIC Meeting
 
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
 
Riannon Stenberg_Resume_May2016
Riannon Stenberg_Resume_May2016Riannon Stenberg_Resume_May2016
Riannon Stenberg_Resume_May2016
 
2016 Resume for Timothy Cline
2016 Resume for Timothy Cline2016 Resume for Timothy Cline
2016 Resume for Timothy Cline
 
George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16George Gilbert (Bert) Yates resume updated 5 5-16
George Gilbert (Bert) Yates resume updated 5 5-16
 
Todd S Parker
Todd S  ParkerTodd S  Parker
Todd S Parker
 
Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...
Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...
Investigation of Metal and Chemical Hydrides for Hydrogen Storage in Novel Fu...
 
Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 Personal
 
sommer resume new
sommer resume newsommer resume new
sommer resume new
 

Mehr von GSE Systems, Inc.

Mehr von GSE Systems, Inc. (13)

Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019
 
GSE Second Simulator Address Plant Training Needs CONTE 2019
GSE Second Simulator Address Plant Training Needs CONTE 2019GSE Second Simulator Address Plant Training Needs CONTE 2019
GSE Second Simulator Address Plant Training Needs CONTE 2019
 
GSE Gaining Value From Virtual Control Panels CONTE 2019
GSE Gaining Value From Virtual Control Panels CONTE 2019GSE Gaining Value From Virtual Control Panels CONTE 2019
GSE Gaining Value From Virtual Control Panels CONTE 2019
 
Onyx relap5 Presentation from SCS 2019
Onyx relap5 Presentation from SCS 2019Onyx relap5 Presentation from SCS 2019
Onyx relap5 Presentation from SCS 2019
 
Increasing ROI Through Simulation and the 'Digital Twin'
Increasing ROI Through Simulation and the 'Digital Twin'Increasing ROI Through Simulation and the 'Digital Twin'
Increasing ROI Through Simulation and the 'Digital Twin'
 
Investigating Ways to Prevent Electrical Arc Flash
Investigating Ways to Prevent Electrical Arc FlashInvestigating Ways to Prevent Electrical Arc Flash
Investigating Ways to Prevent Electrical Arc Flash
 
GSE Performance Improvement Solutions
GSE Performance Improvement SolutionsGSE Performance Improvement Solutions
GSE Performance Improvement Solutions
 
PSA-HD Simulator for Severe Accidents
PSA-HD Simulator for Severe AccidentsPSA-HD Simulator for Severe Accidents
PSA-HD Simulator for Severe Accidents
 
Potential Model Changes as a Result of Fukushima
Potential Model Changes as a Result of FukushimaPotential Model Changes as a Result of Fukushima
Potential Model Changes as a Result of Fukushima
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
 
Dynamic Simulation for HFE & Control System Design Validation
Dynamic Simulation for HFE & Control System Design ValidationDynamic Simulation for HFE & Control System Design Validation
Dynamic Simulation for HFE & Control System Design Validation
 
Fossil Power Simulator Efficiencies When Using Automated Testing
Fossil Power Simulator Efficiencies When Using Automated TestingFossil Power Simulator Efficiencies When Using Automated Testing
Fossil Power Simulator Efficiencies When Using Automated Testing
 
E-learning, 3D and Simulation for Competency Development
E-learning, 3D and Simulation for Competency DevelopmentE-learning, 3D and Simulation for Competency Development
E-learning, 3D and Simulation for Competency Development
 

Kürzlich hochgeladen

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Kürzlich hochgeladen (20)

Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 

ANS-3.5 Overview

  • 2. 2 ANS-3.5 Topic Overview • Introduce ANS-3.5 Working Group • ANS-3.5-201x Project Status • ANS-3.5 Standards Transition Status • Q&A with ANS-3.5 Working Group
  • 3. 3 ANS-3.5 Standard Working Group Membership Officers • Chair - Jim Florence (Cooper) • Vice Chair - Bob Felker (Western Services Corp.) • Secretary - Keith Welchel (Oconee) • Editor - Butch Colby (L3 MAPPS) • Style Editor - SK Chang (Millstone) • Parliamentarian - Larry Vick (NRC)
  • 4. 4 ANS-3.5 Standard Working Group Membership • Bill Fraser (Westinghouse) • Robert Goldman (Grand Gulf) • David Goodman (Comanche Peak) • Jody Lawter (Summer) • George McCullough (GSE) • Michael Petersen (Monticello/Prairie Island) • Pablo Rey (Tecnatom – Spain) • James Sale (North Anna) • Frank Tarselli (Independent)
  • 5. 5 ANS-3.5 Working Group Cooper Station – Nov 2014
  • 6. 6 ANS-3.5-201x Scope Approved scope: • This standard establishes the functional requirements for full scope nuclear power plant control room simulators that are subject to U.S. Nuclear Regulatory Commission (NRC) regulation for use in operator training and examination. • The standard also establishes criteria for the scope of simulation, performance, and functional capabilities of nuclear power plant control room simulators. • This standard does not establish criteria for the use of simulators in operator training programs.
  • 7. 7 ANS-3.5-201x Project Status Final effort: • ANS-3.5-201x submitted to the American Nuclear Society on 01/16/14 to begin formal review process • ANS Large Light Water Reactors Consensus (LLWRC) Committee completed review on 03/16/14 • Public review period closed 09/10/14 • Working Group comment resolution (LLWRC & public) through 01/16/15 (last meeting in Frederick, MD) • Expect to be published in 2015 (ANS-3.5-2015)
  • 8. 8 ANS-3.5-201x Project Status What’s different in the 201x standard? • Addressed comments from the 2009 standard review effort • Address next generation simulators • Deleted/modified definitions; introduced “discrepancy” in lieu of noticeable difference, deviation and deficiency • Deleted malfunction list in Section 3.1.4
  • 9. 9 ANS-3.5-201x Project Status Moved verification/validation testing to Section 5: Configuration Management Moved assessment of deviations to Section 5 Changed Section 3.4/4.4 to “Performance Testing” Defined testing periodicities – Limits of simulation – Steady-state & normal evolutions – Malfunctions – Physical fidelity & human factors – Instructor station – Real time & repeatability
  • 10. 10 ANS-3.5-201x Project Status Defined testing configurations for various performance tests (fully integrated vs. non-integrated) No changes to scenario-based testing!!! Section 5: – Initial design vs. change control – Performance benchmark (steady-state/transient testing) – Noticeable differences – Resolution of discrepancies – Verification/validation testing
  • 11. 11 ANS-3.5-201x Project Status Appendix B deleted; transient list deleted, steady- state parameters moved to Section 4 Clarified that previously selected transients may be used (for legacy plants) Re-lettered Appendices C & D Readability/clarity
  • 12. 12 ANS-3.5 Standards Adoption History A full history of full-scope nuclear power plant (NPP) simulators as related to the ANSI/ANS-3.5 standards Earliest NPP simulators were constructed upon specifications only (through the '70s)  General Electric (Dresden 2)  Babcock and Wilcox (Rancho Seco)  Combustion Engineering (Calvert Cliffs)  Westinghouse (Zion)  Indian Point 2 (Consolidated Edison of New York)  TVA (Browns Ferry, Sequoyah, Watts Bar)
  • 13. 13 The age of utility-owned simulators began in the late'70s (ConEd – Indian Point 2, TVA – Browns Ferry 2/Sequoyah/Watts Bar, VEPCO - Surry). The '80s was the time of a utility-owned simulator for every unique reference unit. Simulators for the new reactor phase are being purchased within the nuclear steam supply system contract (all COLs applications are referenced to ANS-3.5-1998). Vogtle 3&4, Summer 2&3 New reactor phase of simulators are scheduled for delivery in order that operators can be trained and licensed before criticality. ANS-3.5 Standards Adoption History
  • 14. 14 Decommissioned Simulators Crystal River – April 2013 Kewaunee – May 2013 SONGS – July 2013 Vermont Yankee – December 2014
  • 15. 15 ANS-3.5 Transition Status Simulators on 1985 standard Simulators on 1993 standard Simulators on 1998 standard Simulators on 2009 standard ANS-3.5 in 2013
  • 16. 16 ANS-3.5 Transition Status Simulators on 1985 standard Simulators on 1993 standard Simulators on 1998 standard Simulators on 2009 standard ANS-3.5 in 2014
  • 18. 18 ANS-3.5 Web Pages The ANS-3.5 web pages can be accessed via: – www.ans.org – https://www.usug.org/ Find: – Scope statement – Membership contact information – Meeting locations – Meeting minutes – Link to ANS-3.5 clarifications – How to submit clarification requests
  • 19. For more information: Go to: www.GSES.com Call: +1 800.638.7912 Email: info@gses.com Follow us on: Twitter @GSESystems Facebook.com/GSESystems