Overview Project
New two post open rack will be installed to house Telco equipment (such as router/switch/firewall/WAAS/patch panel), Old 4 Post 38U
rack will be empty out then retired. Old full size 46U rack (which was housing IBM servers)will be re-used to house windows servers.
New Rack & cable management bracket will be installed after business hour once IBM Vendor (Vicom) has completed their migration
process. Vicom will take the responsibility of patching cables Between New IBM server RACK and Network Switch.
The project can take up to maximum of 5 days.
Scope of Work
 Exemption and analyze/visual inspect current rack population
 Design & build new rack population layout
 Relocate & re-seat equipment's to new Two 2 Post open rack
 Empty out old 36U rack and relocate all the devices to new 2 Post open rack & old IBM serverack
 Mark & Label patch cable(such as router, firewall, servers), install cable management bracket , Re-connect all the patch cable back to
appropriate devices
1
Before & After Server Room Layout
BEFORE AFTER
2 Post Open Rack Over Head Cable Raceway KVM over IP
Picture
Installed Equipment List
3
Before Server Room Layout
4
After Server Room Layout
Rack Rack
Entrance Door
2 post open rack
w/cable mgmt bracket
Cable mgmt ladder
CCTV,
출입통제
Aircon
Patch Cable Path
1 Cable from IBM servers
1
2
2 Cable from DELL/SAN servers
Cable Clamp
Back of RACK
01
05
10
15
20
25
30
35
40
02
03
04
06
07
08
09
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
01
05
10
15
20
25
30
35
40
02
03
04
06
07
08
09
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
DSK-594-500GB
72KSATA
500GB
CONSOLE A GE 0/0 S A GE 0/1 S
!
Wide Area Virtualization Engine 594
AUTO
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
1
5
10
15
20
25
30
35
40
45
2
3
4
6
7
8
9
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
43
44
1
5
10
15
20
25
30
35
40
45
2
3
4
6
7
8
9
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
43
44
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
Smart-UPS
2 2 0 0
Test
I
O
www.apcc.com
Catalyst 2950 SERIES
SYST
MODE
SPEED
DUPLX
UTIL
STAT
RPS
1X
18X
17X
16X2X
15X 31X
32X 34X
33X 47X
48X
1000 Base-SX
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10
1 2
CABLE MANAGEMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Catalyst 2950 SERIES
SYST
MODE
SPEED
DUPLX
UTIL
STAT
RPS
1X
18X
17X
16X2X
15X 31X
32X 34X
33X 47X
48X
1000 Base-SX
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10
1 2
Overhead cable management bracket
01
05
10
15
20
25
30
35
40
02
03
04
06
07
08
09
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
01
05
10
15
20
25
30
35
40
02
03
04
06
07
08
09
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
IBM
Server & UPS
2 Post Open Rack Old IBM Rack New IBM Rack
1
5
10
15
20
25
30
35
40
45
2
3
4
6
7
8
9
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
43
44
1
5
10
15
20
25
30
35
40
45
2
3
4
6
7
8
9
11
12
13
14
16
17
18
19
21
22
23
24
26
27
28
29
31
32
33
34
36
37
38
39
41
42
43
44
2 Post Open Rack
Catalyst 2950 SERIES
SYST
MODE
SPEED
DUPLX
UTIL
STAT
RPS
1X
18X
17X
16X2X
15X 31X
32X 34X
33X 47X
48X
1000 Base-SX
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10
1 2
Catalyst 2950 SERIES
SYST
MODE
SPEED
DUPLX
UTIL
STAT
RPS
1X
18X
17X
16X2X
15X 31X
32X 34X
33X 47X
48X
1000 Base-SX
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10
1 2
POWER STATUS ACTIVE VPN FLASH
CISCO ASA 5510 series
Adaptive Security Appliance
POWER STATUS ACTIVE VPN FLASH
CISCO ASA 5510 series
Adaptive Security Appliance
DO NOT REMOVE DURING NETWORK OPERATION
Cisco 2800 Series
PWR
SYS
PWR AIM0 CF COMPACT FLASH
AUX/
CONSOLE
AUX
SYS 1
0
100-240V ~ 3A
50/60Hz
OPTIONAL RPS INPUT
12V - - -
___
18A
DO NOT REMOVE DURING NETWORK OPERATION
Cisco 2800 Series
PWR
SYS
PWR AIM0 CF COMPACT FLASH
AUX/
CONSOLE
AUX
SYS 1
0
100-240V ~ 3A
50/60Hz
OPTIONAL RPS INPUT
12V - - -
___
18A
DO NOT REMOVE DURING NETWORK OPERATION
Cisco 2800 Series
PWR
SYS
PWR AIM0 CF COMPACT FLASH
AUX/
CONSOLE
AUX
SYS 1
0
100-240V ~ 3A
50/60Hz
OPTIONAL RPS INPUT
12V - - -
___
18A
Catalyst 2950 SERIES
SYST
MODE
SPEED
DUPLX
UTIL
STAT
RPS
1X
18X
17X
16X2X
15X 31X
32X 34X
33X 47X
48X
1000 Base-SX
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10
1 2
Cisco 1800 Series
SYS
PWR
SYS
OK
ESX1 (vSPHERE 4)
ESX2 (vSPHERE 4)
vCenter
DELL PowerVault
MD3200i SAN storage
CABLE MANAGEMENT
PowerConnect SAN SW
Old PDU
CABLE MANAGEMENT
5
After Server Room
Page 6
Project Schedule

Weitere ähnliche Inhalte

Was ist angesagt?

SQL Analytics Powering Telemetry Analysis at Comcast
SQL Analytics Powering Telemetry Analysis at ComcastSQL Analytics Powering Telemetry Analysis at Comcast
SQL Analytics Powering Telemetry Analysis at Comcast
Databricks
 
Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...
Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...
Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...
Jorge Orchilles
 

Was ist angesagt? (20)

Top 10 Data Center Success Criteria
Top 10 Data Center Success CriteriaTop 10 Data Center Success Criteria
Top 10 Data Center Success Criteria
 
SQL Analytics Powering Telemetry Analysis at Comcast
SQL Analytics Powering Telemetry Analysis at ComcastSQL Analytics Powering Telemetry Analysis at Comcast
SQL Analytics Powering Telemetry Analysis at Comcast
 
NTXISSACSC4 - Layered Security / Defense in Depth
NTXISSACSC4 - Layered Security / Defense in DepthNTXISSACSC4 - Layered Security / Defense in Depth
NTXISSACSC4 - Layered Security / Defense in Depth
 
Jys casting for metso hp200 cone crusher parts
Jys casting for metso hp200 cone crusher partsJys casting for metso hp200 cone crusher parts
Jys casting for metso hp200 cone crusher parts
 
初めて解析したマルウェアはMIPSアーキテクチャ
初めて解析したマルウェアはMIPSアーキテクチャ初めて解析したマルウェアはMIPSアーキテクチャ
初めて解析したマルウェアはMIPSアーキテクチャ
 
SANS Digital Forensics and Incident Response Poster 2012
SANS Digital Forensics and Incident Response Poster 2012SANS Digital Forensics and Incident Response Poster 2012
SANS Digital Forensics and Incident Response Poster 2012
 
Industrial IoT summit_andresg_guilarte Siemens
Industrial IoT summit_andresg_guilarte Siemens Industrial IoT summit_andresg_guilarte Siemens
Industrial IoT summit_andresg_guilarte Siemens
 
Catálogo de peças smb múltipla (português)
Catálogo de peças smb múltipla (português)Catálogo de peças smb múltipla (português)
Catálogo de peças smb múltipla (português)
 
Massey Ferguson MF 9240 parts catalog
Massey Ferguson MF 9240 parts catalog Massey Ferguson MF 9240 parts catalog
Massey Ferguson MF 9240 parts catalog
 
SIVACON S4 Presentation - R.A. Engineering partnered with Siemens
SIVACON S4 Presentation - R.A. Engineering partnered with SiemensSIVACON S4 Presentation - R.A. Engineering partnered with Siemens
SIVACON S4 Presentation - R.A. Engineering partnered with Siemens
 
Apache Ranger Hive Metastore Security
Apache Ranger Hive Metastore Security Apache Ranger Hive Metastore Security
Apache Ranger Hive Metastore Security
 
Management Zabbix with Terraform
Management Zabbix with TerraformManagement Zabbix with Terraform
Management Zabbix with Terraform
 
Cyber Security and Cloud Computing
Cyber Security and Cloud ComputingCyber Security and Cloud Computing
Cyber Security and Cloud Computing
 
Lemken solitair 9/400 parts catalog
Lemken solitair 9/400 parts catalog Lemken solitair 9/400 parts catalog
Lemken solitair 9/400 parts catalog
 
Cyber Situational Awareness: TechNet Augusta 2015
Cyber Situational Awareness: TechNet Augusta 2015Cyber Situational Awareness: TechNet Augusta 2015
Cyber Situational Awareness: TechNet Augusta 2015
 
Jys casting for metso hp100 cone crusher parts
Jys casting for metso hp100 cone crusher partsJys casting for metso hp100 cone crusher parts
Jys casting for metso hp100 cone crusher parts
 
Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...
Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...
Managing & Showing Value during Red Team Engagements & Purple Team Exercises ...
 
Lemken EurOpal 7 parts catalog
Lemken EurOpal 7 parts catalogLemken EurOpal 7 parts catalog
Lemken EurOpal 7 parts catalog
 
EDR vs SIEM - The fight is on
EDR vs SIEM - The fight is onEDR vs SIEM - The fight is on
EDR vs SIEM - The fight is on
 
catalogo pecas perkins 4236.pdf
catalogo pecas perkins 4236.pdfcatalogo pecas perkins 4236.pdf
catalogo pecas perkins 4236.pdf
 

Andere mochten auch

KASPERSKY SECURITY CENTER IMPLEMENTATION
KASPERSKY SECURITY CENTER IMPLEMENTATIONKASPERSKY SECURITY CENTER IMPLEMENTATION
KASPERSKY SECURITY CENTER IMPLEMENTATION
GS CHO
 
Data Center Network Trends - Lin Nease
Data Center Network Trends - Lin NeaseData Center Network Trends - Lin Nease
Data Center Network Trends - Lin Nease
HPDutchWorld
 
Cisco VMDC Cloud Security 1.0 Design Guide
Cisco VMDC Cloud Security 1.0 Design GuideCisco VMDC Cloud Security 1.0 Design Guide
Cisco VMDC Cloud Security 1.0 Design Guide
Cisco Service Provider
 

Andere mochten auch (20)

KASPERSKY SECURITY CENTER IMPLEMENTATION
KASPERSKY SECURITY CENTER IMPLEMENTATIONKASPERSKY SECURITY CENTER IMPLEMENTATION
KASPERSKY SECURITY CENTER IMPLEMENTATION
 
Juniper Networks: Q Fabric Architecture
Juniper Networks: Q Fabric ArchitectureJuniper Networks: Q Fabric Architecture
Juniper Networks: Q Fabric Architecture
 
Data center network
Data center networkData center network
Data center network
 
Data Center Migration and Network Bandwidth Assessments with Cisco MATE Desig...
Data Center Migration and Network Bandwidth Assessments with Cisco MATE Desig...Data Center Migration and Network Bandwidth Assessments with Cisco MATE Desig...
Data Center Migration and Network Bandwidth Assessments with Cisco MATE Desig...
 
diagram
diagramdiagram
diagram
 
OpenFlow Data Center - A case Study by Pica8
OpenFlow Data Center - A case Study by Pica8OpenFlow Data Center - A case Study by Pica8
OpenFlow Data Center - A case Study by Pica8
 
Kernel Recipes 2013 - Virtual Network over TRILL (VNT) : Design, implementati...
Kernel Recipes 2013 - Virtual Network over TRILL (VNT) : Design, implementati...Kernel Recipes 2013 - Virtual Network over TRILL (VNT) : Design, implementati...
Kernel Recipes 2013 - Virtual Network over TRILL (VNT) : Design, implementati...
 
Virtualization in 4-4 1-4 Data Center Network.
Virtualization in 4-4 1-4 Data Center Network.Virtualization in 4-4 1-4 Data Center Network.
Virtualization in 4-4 1-4 Data Center Network.
 
Data Center Network Trends - Lin Nease
Data Center Network Trends - Lin NeaseData Center Network Trends - Lin Nease
Data Center Network Trends - Lin Nease
 
The Evolving Data Center Network: Open and Software-Defined
The Evolving Data Center Network: Open and Software-DefinedThe Evolving Data Center Network: Open and Software-Defined
The Evolving Data Center Network: Open and Software-Defined
 
Cisco VMDC Cloud Security 1.0 Design Guide
Cisco VMDC Cloud Security 1.0 Design GuideCisco VMDC Cloud Security 1.0 Design Guide
Cisco VMDC Cloud Security 1.0 Design Guide
 
Morphology of Modern Data Center Networks - YaC 2013
Morphology of Modern Data Center Networks - YaC 2013Morphology of Modern Data Center Networks - YaC 2013
Morphology of Modern Data Center Networks - YaC 2013
 
Ecet375 1 a - basic networking concepts
Ecet375   1 a - basic networking conceptsEcet375   1 a - basic networking concepts
Ecet375 1 a - basic networking concepts
 
Firewall, Router and Switch Configuration Review
Firewall, Router and Switch Configuration ReviewFirewall, Router and Switch Configuration Review
Firewall, Router and Switch Configuration Review
 
MetaFabric™ Architecture Virtualized Data Center: Design and Implementation G...
MetaFabric™ Architecture Virtualized Data Center: Design and Implementation G...MetaFabric™ Architecture Virtualized Data Center: Design and Implementation G...
MetaFabric™ Architecture Virtualized Data Center: Design and Implementation G...
 
QFabric: Reinventing the Data Center Network
QFabric: Reinventing the Data Center NetworkQFabric: Reinventing the Data Center Network
QFabric: Reinventing the Data Center Network
 
diagrama 2
diagrama 2diagrama 2
diagrama 2
 
diagrama5
diagrama5diagrama5
diagrama5
 
diagrama 6
diagrama 6diagrama 6
diagrama 6
 
Presentation data center design overview
Presentation   data center design overviewPresentation   data center design overview
Presentation data center design overview
 

Ähnlich wie Server room cable clean up Project

Visio -poland-gorzow++em0734+lan+diagram+v3
Visio -poland-gorzow++em0734+lan+diagram+v3Visio -poland-gorzow++em0734+lan+diagram+v3
Visio -poland-gorzow++em0734+lan+diagram+v3
Able George
 
Data Center Security Case-Study
Data Center Security Case-StudyData Center Security Case-Study
Data Center Security Case-Study
R. James Brownlow
 
Arauco ServoSistemas Presentation
Arauco ServoSistemas PresentationArauco ServoSistemas Presentation
Arauco ServoSistemas Presentation
Eduardo Condemarin
 
Summit x770 product overview
Summit x770 product overviewSummit x770 product overview
Summit x770 product overview
MUK
 

Ähnlich wie Server room cable clean up Project (20)

How to view a project, as a junior engineer - Networkshop44
How to view a project, as a junior engineer - Networkshop44How to view a project, as a junior engineer - Networkshop44
How to view a project, as a junior engineer - Networkshop44
 
DrupalCamp Colorado 2014 Building A Scalable Private VMware Based Drupal Cloud
DrupalCamp Colorado 2014 Building A Scalable Private VMware Based Drupal CloudDrupalCamp Colorado 2014 Building A Scalable Private VMware Based Drupal Cloud
DrupalCamp Colorado 2014 Building A Scalable Private VMware Based Drupal Cloud
 
Visio -poland-gorzow++em0734+lan+diagram+v3
Visio -poland-gorzow++em0734+lan+diagram+v3Visio -poland-gorzow++em0734+lan+diagram+v3
Visio -poland-gorzow++em0734+lan+diagram+v3
 
Cisco catalyst 2960 plus series switch datasheet
Cisco catalyst 2960 plus  series switch datasheetCisco catalyst 2960 plus  series switch datasheet
Cisco catalyst 2960 plus series switch datasheet
 
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
MX – универсальная сервисная платформа. Вчера, сегодня, завтра.
 
Cisco switch catalyst 2960 x datasheet
Cisco switch catalyst 2960 x datasheetCisco switch catalyst 2960 x datasheet
Cisco switch catalyst 2960 x datasheet
 
Cisco catalyst 2960 xr series switches datasheet
Cisco catalyst 2960 xr series switches datasheetCisco catalyst 2960 xr series switches datasheet
Cisco catalyst 2960 xr series switches datasheet
 
BMS_Siemen_solution_for_the_building.pdf
BMS_Siemen_solution_for_the_building.pdfBMS_Siemen_solution_for_the_building.pdf
BMS_Siemen_solution_for_the_building.pdf
 
JCM STOCK LIST 2016
JCM STOCK LIST 2016JCM STOCK LIST 2016
JCM STOCK LIST 2016
 
Cisco catalyst 3650-24ps-s datasheet
Cisco catalyst 3650-24ps-s datasheetCisco catalyst 3650-24ps-s datasheet
Cisco catalyst 3650-24ps-s datasheet
 
Switches - Catalyst 2960_Art.ppt
Switches - Catalyst 2960_Art.pptSwitches - Catalyst 2960_Art.ppt
Switches - Catalyst 2960_Art.ppt
 
Data Center Security Case-Study
Data Center Security Case-StudyData Center Security Case-Study
Data Center Security Case-Study
 
Arauco ServoSistemas Presentation
Arauco ServoSistemas PresentationArauco ServoSistemas Presentation
Arauco ServoSistemas Presentation
 
Cisco Catalyst 2960-X Series Switching Architecture
Cisco Catalyst 2960-X Series Switching ArchitectureCisco Catalyst 2960-X Series Switching Architecture
Cisco Catalyst 2960-X Series Switching Architecture
 
The time lines of the various Madge Networks Products
The time lines of the various Madge Networks ProductsThe time lines of the various Madge Networks Products
The time lines of the various Madge Networks Products
 
Semiconductor equipment tool may 18th 2020
Semiconductor equipment tool may 18th 2020Semiconductor equipment tool may 18th 2020
Semiconductor equipment tool may 18th 2020
 
cisco-n9k-c93180yc-ex-datasheet.pdf
cisco-n9k-c93180yc-ex-datasheet.pdfcisco-n9k-c93180yc-ex-datasheet.pdf
cisco-n9k-c93180yc-ex-datasheet.pdf
 
Technical Overview of Cisco Catalyst 9200 Series Switches
Technical Overview of Cisco Catalyst 9200 Series SwitchesTechnical Overview of Cisco Catalyst 9200 Series Switches
Technical Overview of Cisco Catalyst 9200 Series Switches
 
Cisco catalyst 3850-48t-s datasheet
Cisco catalyst 3850-48t-s datasheetCisco catalyst 3850-48t-s datasheet
Cisco catalyst 3850-48t-s datasheet
 
Summit x770 product overview
Summit x770 product overviewSummit x770 product overview
Summit x770 product overview
 

Server room cable clean up Project

  • 1. Overview Project New two post open rack will be installed to house Telco equipment (such as router/switch/firewall/WAAS/patch panel), Old 4 Post 38U rack will be empty out then retired. Old full size 46U rack (which was housing IBM servers)will be re-used to house windows servers. New Rack & cable management bracket will be installed after business hour once IBM Vendor (Vicom) has completed their migration process. Vicom will take the responsibility of patching cables Between New IBM server RACK and Network Switch. The project can take up to maximum of 5 days. Scope of Work  Exemption and analyze/visual inspect current rack population  Design & build new rack population layout  Relocate & re-seat equipment's to new Two 2 Post open rack  Empty out old 36U rack and relocate all the devices to new 2 Post open rack & old IBM serverack  Mark & Label patch cable(such as router, firewall, servers), install cable management bracket , Re-connect all the patch cable back to appropriate devices
  • 2. 1 Before & After Server Room Layout BEFORE AFTER
  • 3. 2 Post Open Rack Over Head Cable Raceway KVM over IP Picture Installed Equipment List
  • 5. 4 After Server Room Layout Rack Rack Entrance Door 2 post open rack w/cable mgmt bracket Cable mgmt ladder CCTV, 출입통제 Aircon Patch Cable Path 1 Cable from IBM servers 1 2 2 Cable from DELL/SAN servers Cable Clamp
  • 6. Back of RACK 01 05 10 15 20 25 30 35 40 02 03 04 06 07 08 09 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 01 05 10 15 20 25 30 35 40 02 03 04 06 07 08 09 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 DSK-594-500GB 72KSATA 500GB CONSOLE A GE 0/0 S A GE 0/1 S ! Wide Area Virtualization Engine 594 AUTO Smart-UPS 2 2 0 0 Test I O www.apcc.com Smart-UPS 2 2 0 0 Test I O www.apcc.com Smart-UPS 2 2 0 0 Test I O www.apcc.com 1 5 10 15 20 25 30 35 40 45 2 3 4 6 7 8 9 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 43 44 1 5 10 15 20 25 30 35 40 45 2 3 4 6 7 8 9 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 43 44 Smart-UPS 2 2 0 0 Test I O www.apcc.com Smart-UPS 2 2 0 0 Test I O www.apcc.com Smart-UPS 2 2 0 0 Test I O www.apcc.com Smart-UPS 2 2 0 0 Test I O www.apcc.com Catalyst 2950 SERIES SYST MODE SPEED DUPLX UTIL STAT RPS 1X 18X 17X 16X2X 15X 31X 32X 34X 33X 47X 48X 1000 Base-SX 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10 1 2 CABLE MANAGEMENT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Catalyst 2950 SERIES SYST MODE SPEED DUPLX UTIL STAT RPS 1X 18X 17X 16X2X 15X 31X 32X 34X 33X 47X 48X 1000 Base-SX 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10 1 2 Overhead cable management bracket 01 05 10 15 20 25 30 35 40 02 03 04 06 07 08 09 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 01 05 10 15 20 25 30 35 40 02 03 04 06 07 08 09 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 IBM Server & UPS 2 Post Open Rack Old IBM Rack New IBM Rack 1 5 10 15 20 25 30 35 40 45 2 3 4 6 7 8 9 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 43 44 1 5 10 15 20 25 30 35 40 45 2 3 4 6 7 8 9 11 12 13 14 16 17 18 19 21 22 23 24 26 27 28 29 31 32 33 34 36 37 38 39 41 42 43 44 2 Post Open Rack Catalyst 2950 SERIES SYST MODE SPEED DUPLX UTIL STAT RPS 1X 18X 17X 16X2X 15X 31X 32X 34X 33X 47X 48X 1000 Base-SX 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10 1 2 Catalyst 2950 SERIES SYST MODE SPEED DUPLX UTIL STAT RPS 1X 18X 17X 16X2X 15X 31X 32X 34X 33X 47X 48X 1000 Base-SX 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10 1 2 POWER STATUS ACTIVE VPN FLASH CISCO ASA 5510 series Adaptive Security Appliance POWER STATUS ACTIVE VPN FLASH CISCO ASA 5510 series Adaptive Security Appliance DO NOT REMOVE DURING NETWORK OPERATION Cisco 2800 Series PWR SYS PWR AIM0 CF COMPACT FLASH AUX/ CONSOLE AUX SYS 1 0 100-240V ~ 3A 50/60Hz OPTIONAL RPS INPUT 12V - - - ___ 18A DO NOT REMOVE DURING NETWORK OPERATION Cisco 2800 Series PWR SYS PWR AIM0 CF COMPACT FLASH AUX/ CONSOLE AUX SYS 1 0 100-240V ~ 3A 50/60Hz OPTIONAL RPS INPUT 12V - - - ___ 18A DO NOT REMOVE DURING NETWORK OPERATION Cisco 2800 Series PWR SYS PWR AIM0 CF COMPACT FLASH AUX/ CONSOLE AUX SYS 1 0 100-240V ~ 3A 50/60Hz OPTIONAL RPS INPUT 12V - - - ___ 18A Catalyst 2950 SERIES SYST MODE SPEED DUPLX UTIL STAT RPS 1X 18X 17X 16X2X 15X 31X 32X 34X 33X 47X 48X 1000 Base-SX 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 2 3 4 5 6 7 8 9 10 1 2 Cisco 1800 Series SYS PWR SYS OK ESX1 (vSPHERE 4) ESX2 (vSPHERE 4) vCenter DELL PowerVault MD3200i SAN storage CABLE MANAGEMENT PowerConnect SAN SW Old PDU CABLE MANAGEMENT 5 After Server Room