SlideShare ist ein Scribd-Unternehmen logo
1 von 21
GITEWS




   GITEWS - The German Contribution to
      the Indian Ocean Tsunami Early
             Warning System:
         experiences and lessons learned


         Alexander RUDLOFF, Jörn LAUTERJUNG,
          Harald SPAHN & GITEWS project t
          H   ld                    j t team
Timeline
GITEWS




 2004/12/26 – M9.2 Sumatra EQ and Tsunami

 2005/03/14 – Indonesian-German Joint Declaration

 2005/Summer – Installation of first instruments

 2007/09/12 – Bengkulu EQ series (M7.9, M7.7)

 2008/11/11 – St t of operation phase,
              Start f      ti    h
     Tsunami warning centre at BMKG Jakarta

 2011/03/29 – System hand-over to Indonesia
Technical Concept
                        p
GITEWS
End to end Approach
                         End-to-End pp
                        End-to-end approach
GITEWS




                   Up-Stream                                          Down-Stream




                                                     Dissem
         Sensor systems      Warning Centre
                                                                       Local Administration
         •   Seismometer     •   Processing
             GPS                 Simulation




                                                          minatio
         •                   •
         •   Tide Gauge      •   Descision-Support
             Buoy Systems
                                                                        Local Communities
         •                   •   Warning Message
         •   Others




                                                                on
                                                                     Awareness, Preparedness,
             Measurement, Analysis, Decision                                 Reaction




                                                                                              t
The Different Components
                          p
GITEWS
Sensor Stations in Indonesia
GITEWS




         X
             X
                 X
                     X X
                      X
                                          XXX
   Seismic, GPS, Tide gauge stations, and GPS buoys
EQ Monitoring Software
             Q          g
GITEWS




   fast and reliable EQ evaluation software
                      Q
   optimised for tsunamis
   world wide
   world-wide in operation
Near field simulation
GITEWS
Warning Process
               g
GITEWS
Capacity Building ( )
           p    y        g (1)
GITEWS
Capacity Building ( )
           p    y        g (2)
GITEWS
International review 2010
GITEWS




 Committee with
 members f
      b    from
 NTWC (Australia,
 India, Japan, USA,
 and IOC/IOTWS)

 „Multi-parameter
  M lti        t
 approach is highly innovative in the context of
 tsunami resarch“

 „Impressed by downstream component …“
NHESS Publication
GITEWS




  Special Issue on the
    GITEWS P j t
             Project

     2 overview articles
     22 scientific papers
                   p p

          Online and free
            available
          (google/bing for
         #GITEWS & NHESS)
Mentawai Islands site survey
                                    y
GITEWS




                        Results
                        R   lt
                         EQ felt, but not strong
                         Wave heights ~ 12 m
                         max.
                         max Inundation 450 m
                         Awareness sufficient?
Milestone #n1
GITEWS




 The system was handed over into Indonesia‘s
 responsibility b 29 M
        ibilit by    March 2011
                         h

 The project included the
 set-up of a technical
 early warning infra
                infra-
 structrure, training and
 education f
  d    ti   for scientists
                  i ti t
 and engineers and
 capacity development on
 institutional and local
 level.
Milestone #n2
GITEWS




  Indonesia
    owns one of the most advanced Tsunami
    Early W
    E l Warning systems worldwide
              i      t       ld id

    is able to publish Indonesian-wide
    warnings to the public in case of Tsunami

    fulfills the conditions to act as UNESCO’s
    „Regional T
     R i       l Tsunami Watch Provider“ for th
                         iW t hP      id “ f the
    Indian Ocean region
Project areas
                           j
GITEWS




         GITEWS Pilot Area (2006-2011)       Project Office Jakarta
         PROTECTS Project Area (2011-2013)
Trainings for
GITEWS            Tsunami Preparedness & EWS

 Individual
 I di id l                         Awareness
                                   A                          Knowledge                         Procedures
                                                          Tsunami risk, evacuation             (getting warnings &
 &                             (Tsunami hazard & risks)
                                                            plan, early warning)            guidance, evacuation, dll)
 Household
                                                                                                80 Kader (KaTsumi)
 Village                                   4                  Socialization                     4 TOF, 20 trainers
 Desa, Banjar
                                                                                                1 Module
 Institution                      Evacuation                              3                   Local Warning
 School, Hospital,
 Private Company               Plan & Procedures             45 facilitators (FaTmi)          Arrangements
                                                              3 TOT, 4 trainers, 1
 References & Services                                                   d l
                                                                     module
 at                                 Evacuation                 1                2             Local Warning
 (Sub)District                         Plan                                                      Chain
                                                              80 EP               180              24/7, SOP,
                                                                                                     / , SO ,
 Kabupaten,
 Kabupaten Kecamatan                                       facilitators       Operators
 or Kelurahan level
                                       Risk                                                      Dissemination
                                                           4 trainings        9 trainings
                                      Analysis              5 trainers        5 trainers
 3 (Bali), 3 (NTB),                                         1 module          1 module
 8 (JATIM) 5 (JABAR)
   (JATIM), (JABAR),           Hazard            Vulnerability
 4 (JATENG), 2 (DIY)         Assessment          Assessment
 Provinces
 (Bali, NTB, JATIM, JABAR,
 JATENG,
 JATENG DIY)                   Risk Assessment (Maps) - BNPB
                                Policies , Guidelines, Modules                              InaTEWS Warning
 National
                               on preparedness & EWS (BNPB)                                 Service by BMKG
Key message
             y      g
GITEWS




    Be prepared!
Recent credits and honors
GITEWS
End
GITEWS




    Thank you –
         Terima
         Te ima kasih

    Website: http://www.gitews.org
    Contact: gitews-pm@gfz-potsdam.de

    Funding by the German Federal
    Ministry for Education and Research
    (BMBF) is gratefully acknowledged

Weitere ähnliche Inhalte

Ähnlich wie GITEWS - The German Contribution to the Indonesian Ocean Tsunami Early Warning system: experiences and lessons learned

Smart cities 2012 (en)
Smart cities 2012 (en)Smart cities 2012 (en)
Smart cities 2012 (en)
Carlos Moreno
 
Disaster management and recovery in northeast japan
Disaster management and recovery in northeast japanDisaster management and recovery in northeast japan
Disaster management and recovery in northeast japan
Fatwa Ramdani
 
Ssop workshop 08 may 2013 ioc unesco
Ssop workshop 08 may 2013   ioc unescoSsop workshop 08 may 2013   ioc unesco
Ssop workshop 08 may 2013 ioc unesco
ABU_DRRGroup
 
EST: Progress Report
EST:  Progress ReportEST:  Progress Report
EST: Progress Report
CC BASE
 

Ähnlich wie GITEWS - The German Contribution to the Indonesian Ocean Tsunami Early Warning system: experiences and lessons learned (20)

Gvt 03
Gvt 03Gvt 03
Gvt 03
 
GEO activities on Disaster Risk Reduction and GEO Web Portal
GEO activities on Disaster Risk Reduction and GEO Web PortalGEO activities on Disaster Risk Reduction and GEO Web Portal
GEO activities on Disaster Risk Reduction and GEO Web Portal
 
Smart cities 2012 (en)
Smart cities 2012 (en)Smart cities 2012 (en)
Smart cities 2012 (en)
 
An effective early warning system in the rural and urban context
An effective early warning system in the rural and urban contextAn effective early warning system in the rural and urban context
An effective early warning system in the rural and urban context
 
Disaster Management: role of ICTs
Disaster Management: role of ICTsDisaster Management: role of ICTs
Disaster Management: role of ICTs
 
Day3 f siccardi
Day3 f siccardiDay3 f siccardi
Day3 f siccardi
 
Disaster management and recovery in northeast japan
Disaster management and recovery in northeast japanDisaster management and recovery in northeast japan
Disaster management and recovery in northeast japan
 
Ssop workshop 08 may 2013 ioc unesco
Ssop workshop 08 may 2013   ioc unescoSsop workshop 08 may 2013   ioc unesco
Ssop workshop 08 may 2013 ioc unesco
 
Summery of project outcome
Summery of project outcomeSummery of project outcome
Summery of project outcome
 
Country experiences in improving national forest monitoring
Country experiences in improving national forest monitoringCountry experiences in improving national forest monitoring
Country experiences in improving national forest monitoring
 
Security and safety of cross-border infrastructure
Security and safety of cross-border infrastructureSecurity and safety of cross-border infrastructure
Security and safety of cross-border infrastructure
 
Practical applications of controlled natural language with description logics...
Practical applications of controlled natural language with description logics...Practical applications of controlled natural language with description logics...
Practical applications of controlled natural language with description logics...
 
EGIforum-Amsterdam-15-Sep2010
EGIforum-Amsterdam-15-Sep2010EGIforum-Amsterdam-15-Sep2010
EGIforum-Amsterdam-15-Sep2010
 
EST: Progress Report
EST:  Progress ReportEST:  Progress Report
EST: Progress Report
 
Livestock Early Warning System: A Tool that Holds Promise for an Integrated N...
Livestock Early Warning System: A Tool that Holds Promise for an Integrated N...Livestock Early Warning System: A Tool that Holds Promise for an Integrated N...
Livestock Early Warning System: A Tool that Holds Promise for an Integrated N...
 
Tetradyn Law Enforce Introduction11nov08
Tetradyn Law Enforce Introduction11nov08Tetradyn Law Enforce Introduction11nov08
Tetradyn Law Enforce Introduction11nov08
 
AI-Based Change Detection for Disaster Identification utilizing Bi- temporal ...
AI-Based Change Detection for Disaster Identification utilizing Bi- temporal ...AI-Based Change Detection for Disaster Identification utilizing Bi- temporal ...
AI-Based Change Detection for Disaster Identification utilizing Bi- temporal ...
 
Flood risk management – creating efficiency by stakeholder involvement
Flood risk management – creating efficiency by stakeholder involvementFlood risk management – creating efficiency by stakeholder involvement
Flood risk management – creating efficiency by stakeholder involvement
 
Presentation 082311
Presentation 082311Presentation 082311
Presentation 082311
 
International workshop on semantic sensor web 2011
International workshop on semantic sensor web 2011International workshop on semantic sensor web 2011
International workshop on semantic sensor web 2011
 

Mehr von Global Risk Forum GRFDavos

Mehr von Global Risk Forum GRFDavos (20)

Disaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian DohertyDisaster Risk Management Knowledge Centre, Brian Doherty
Disaster Risk Management Knowledge Centre, Brian Doherty
 
Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...Disaster risk reduction and nursing - human science research the view of surv...
Disaster risk reduction and nursing - human science research the view of surv...
 
Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...Global alliance of disaster research institutes (GADRI) discussion session, A...
Global alliance of disaster research institutes (GADRI) discussion session, A...
 
Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...Towards a safe, secure and sustainable energy supply the role of resilience i...
Towards a safe, secure and sustainable energy supply the role of resilience i...
 
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
Making Hard Choices An Analysis of Settlement Choices and Willingness to Retu...
 
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
The Relocation Challenges in Coastal Urban Centers Options and Limitations, A...
 
C&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLAC&A Save the Children Urban DRR Project, Ray KANCHARLA
C&A Save the Children Urban DRR Project, Ray KANCHARLA
 
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
Involving the Mining Sector in Achieving Land Degradation Neutrality, Simone ...
 
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...Disaster Risk Reduction and Nursing - Human Science research the view of surv...
Disaster Risk Reduction and Nursing - Human Science research the view of surv...
 
Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...Training and awareness raising in Critical Infrastructure Protection & Resili...
Training and awareness raising in Critical Infrastructure Protection & Resili...
 
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
IDRC Davos 2016 - Workshop Awareness Raising, Education and Training - Capaci...
 
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANOGlobal Alliance of Disaster Research Institutes - Hirokazu TATANO
Global Alliance of Disaster Research Institutes - Hirokazu TATANO
 
Capacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDACapacity Development for DRR, Beatrice PROGIDA
Capacity Development for DRR, Beatrice PROGIDA
 
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...Dynamic factors influencing the post-disaster resettlement success Lessons fr...
Dynamic factors influencing the post-disaster resettlement success Lessons fr...
 
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
Consequences of the Armed Conflict as a Stressor of Climate Change in Colombi...
 
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
Disaster Risk Perception in Cameroon and its Implications for the Rehabilitat...
 
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
Systematic Knowledge Sharing of Natural Hazard Damages in Public-private Part...
 
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
Exploring the Effectiveness of Humanitarian NGO-Private Sector Collaborations...
 
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
Can UK Water Service Providers Manage Risk and Resilience as Part of a Multi-...
 
A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...A Holistic Approach Towards International Disaster Resilient Architecture by ...
A Holistic Approach Towards International Disaster Resilient Architecture by ...
 

Kürzlich hochgeladen

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 

Kürzlich hochgeladen (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 

GITEWS - The German Contribution to the Indonesian Ocean Tsunami Early Warning system: experiences and lessons learned

  • 1. GITEWS GITEWS - The German Contribution to the Indian Ocean Tsunami Early Warning System: experiences and lessons learned Alexander RUDLOFF, Jörn LAUTERJUNG, Harald SPAHN & GITEWS project t H ld j t team
  • 2. Timeline GITEWS 2004/12/26 – M9.2 Sumatra EQ and Tsunami 2005/03/14 – Indonesian-German Joint Declaration 2005/Summer – Installation of first instruments 2007/09/12 – Bengkulu EQ series (M7.9, M7.7) 2008/11/11 – St t of operation phase, Start f ti h Tsunami warning centre at BMKG Jakarta 2011/03/29 – System hand-over to Indonesia
  • 3. Technical Concept p GITEWS
  • 4. End to end Approach End-to-End pp End-to-end approach GITEWS Up-Stream Down-Stream Dissem Sensor systems Warning Centre Local Administration • Seismometer • Processing GPS Simulation minatio • • • Tide Gauge • Descision-Support Buoy Systems Local Communities • • Warning Message • Others on Awareness, Preparedness, Measurement, Analysis, Decision Reaction t
  • 6. Sensor Stations in Indonesia GITEWS X X X X X X XXX Seismic, GPS, Tide gauge stations, and GPS buoys
  • 7. EQ Monitoring Software Q g GITEWS fast and reliable EQ evaluation software Q optimised for tsunamis world wide world-wide in operation
  • 9. Warning Process g GITEWS
  • 10. Capacity Building ( ) p y g (1) GITEWS
  • 11. Capacity Building ( ) p y g (2) GITEWS
  • 12. International review 2010 GITEWS Committee with members f b from NTWC (Australia, India, Japan, USA, and IOC/IOTWS) „Multi-parameter M lti t approach is highly innovative in the context of tsunami resarch“ „Impressed by downstream component …“
  • 13. NHESS Publication GITEWS Special Issue on the GITEWS P j t Project 2 overview articles 22 scientific papers p p Online and free available (google/bing for #GITEWS & NHESS)
  • 14. Mentawai Islands site survey y GITEWS Results R lt EQ felt, but not strong Wave heights ~ 12 m max. max Inundation 450 m Awareness sufficient?
  • 15. Milestone #n1 GITEWS The system was handed over into Indonesia‘s responsibility b 29 M ibilit by March 2011 h The project included the set-up of a technical early warning infra infra- structrure, training and education f d ti for scientists i ti t and engineers and capacity development on institutional and local level.
  • 16. Milestone #n2 GITEWS Indonesia owns one of the most advanced Tsunami Early W E l Warning systems worldwide i t ld id is able to publish Indonesian-wide warnings to the public in case of Tsunami fulfills the conditions to act as UNESCO’s „Regional T R i l Tsunami Watch Provider“ for th iW t hP id “ f the Indian Ocean region
  • 17. Project areas j GITEWS GITEWS Pilot Area (2006-2011) Project Office Jakarta PROTECTS Project Area (2011-2013)
  • 18. Trainings for GITEWS Tsunami Preparedness & EWS Individual I di id l Awareness A Knowledge Procedures Tsunami risk, evacuation (getting warnings & & (Tsunami hazard & risks) plan, early warning) guidance, evacuation, dll) Household 80 Kader (KaTsumi) Village 4 Socialization 4 TOF, 20 trainers Desa, Banjar 1 Module Institution Evacuation 3 Local Warning School, Hospital, Private Company Plan & Procedures 45 facilitators (FaTmi) Arrangements 3 TOT, 4 trainers, 1 References & Services d l module at Evacuation 1 2 Local Warning (Sub)District Plan Chain 80 EP 180 24/7, SOP, / , SO , Kabupaten, Kabupaten Kecamatan facilitators Operators or Kelurahan level Risk Dissemination 4 trainings 9 trainings Analysis 5 trainers 5 trainers 3 (Bali), 3 (NTB), 1 module 1 module 8 (JATIM) 5 (JABAR) (JATIM), (JABAR), Hazard Vulnerability 4 (JATENG), 2 (DIY) Assessment Assessment Provinces (Bali, NTB, JATIM, JABAR, JATENG, JATENG DIY) Risk Assessment (Maps) - BNPB Policies , Guidelines, Modules InaTEWS Warning National on preparedness & EWS (BNPB) Service by BMKG
  • 19. Key message y g GITEWS Be prepared!
  • 20. Recent credits and honors GITEWS
  • 21. End GITEWS Thank you – Terima Te ima kasih Website: http://www.gitews.org Contact: gitews-pm@gfz-potsdam.de Funding by the German Federal Ministry for Education and Research (BMBF) is gratefully acknowledged