SlideShare ist ein Scribd-Unternehmen logo
1 von 12
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
© 2015 General Electric Company.
The information presented herein is intended for academic purposes, only.
Certain information has been derived from sources assumed to be reliable,
however, the said information may change without notice. GE Company
assumes no liability for use of any such information presented herein.
Reproduction without authorization is forbidden. Results may vary given
change in test environment.
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
Imagination at work.
M. Mahendhra
May, 2015
6F.01 technology overview
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
4
GE’s product portfolio
Reliable, flexible, efficient
Geared for 50Hz or 60Hz
60Hz gas turbines
50Hz gas turbines
43 MW
79 MW
90 MW
187 MW
227 MW
130 MW
265 MW
299 MW
470 MW
275 MW
397 MW
GE GT-
9HA
GE GT-9F
GE GT-9E
GE GT-
7HA
GE GT-7F
GE GT-6F
GE GT-6B
GE GT-7E
330 MW
.03
.01
.03
.03
.04
.05
.01
.02
.03
.03
.05
.01
.02
World’s
Largest
61%+ Net CC
Efficiency
51 MW
4
80 MW
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
5
• 6F.01 is the new name for the 6C
• Over 110k fired hours & 99.2% reliability
• True F-class performance & flexibility
• Modular plant for ease of installation &
maintenance
6F.01 Technology Overview…
… F-class efficiency @ 50MW block size
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
GE’s F-class turbine evolution
6F.01 … GE’s latest evolutionary F-Class product
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
7
Take away boxes should only be used for occasional emphasis.
Do not use on every slide.
GE F-class fleet serves all duty cycles
Data as of May 2014
Source: GE Reliability Engineering
Units
Operating
Hours
Total
(leader)
Starts
Total
(leader)
6F 106 5.1 M
(123,000)
59 k
(3,200)
7F 789 35.2 M
(152,000)
850 k
(4,350)
9F 272 13.3 M
(148,000)
147 k
(2,040)
All F 1,160 53.5 M
(155,000)
1.0 M
(4,350)
GE F–Class leading in units, reliability, availability … 50M+ hours
98.0%
90.6%
97.8%97.6%
90.1%
97.5%
88%
92%
96%
100%
Reliability Availability Starting
Reliability
GE F-Class Other OEM F-Class
*Source: ORAP®, All rights to Underlying Data Reserved: SPS®
Rolling 12 Month Data Oct 12 – Sep 13
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
8
Take away boxes should only be used for occasional emphasis.
Do not use on every slide.
6F.01 re-introduction
35-70 MW Gas turbine orders
Shift in technology to F-Class driven by shift to CC/CHP
Source: McCoy Power Reports
ByclassByapplication
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
9
6F.01 … enhanced value
6 DLN2.5 Can-annular
Combustors, increased Tfire
Dual fuel capability
<25ppm NOx
3 stages
Advanced and proven
HGP materials
High Tfire capability
designed in
Improved cooling/sealing
Through bolted nickel
turbine rotor
High PR capable
+2% speed increase
Axial flow exhaust
Low Mach LSB
3D aero compressor
12 stages, 3 VGV
Removable blades
High flow R1 and inlet
Cold end drive
2 bearings
Single piece
forward stub shaft
High torque capable
Reliable technology for efficient cogeneration/combined cycle
Introductory 6F.01
Enhancement to 6F.01
Pertinent experience
>100F below 9F.05 Tfire
Equivalent to 7F.05 Tfire
Same seals at 7F & HA
GEAE TBC to GEP&W TBC
6B +1.35% speed…
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
10
6F.01 modular arrangement
Generator
• Two pole
generator
• Horizontal offset
load gear
Air inlet system
• Silencer in elbow
• CFD used to obtain low pressure
drop
• Confirmed by model tests
Axial exhaust
arrangement
• Low pressure drop
• Silencer before HRSG
Acoustic
enclosure
Take away boxes should only be used for occasional emphasis.
Do not use on every slide.
Modular for quick installation and ease of maintenance
Modules not visible…
• Gas Fuel Module with
low DP valves
• Combined load gear &
lube oil module
• Static frequency converter
with black start genset
• Control module with triple
redundant Mark Vie …
factory assembled & tested
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
11
Launch site
• AKEnerji
• Kemalpasa, Turkey
• 2x1 6F.01 combined cycle
• GT shipments Dec 2003, May 2004
GT validation
• 5 months, 161 hours of testing
• 2462 TC, Press and SG sensors
• Full speed no load through full speed full load
• Aeromechanics, aerodynamics, thermal
profiles measured/confirmed
• Damping improvements made post test
Launch units
Take away boxes should only be used for occasional emphasis.
Do not use on every slide.
Reliable technology for efficient cogeneration/combined cycle
Commercial operations
• COD May 2005
• Over 110,000 operating hours
• Over 2,250 accumulated starts
• CSA coverage… CI, HGP, and MI performed
• Reliability/Availability … better than F Class industry
• AKEnerji reference letter…
• “fully satisfied with equipment and services”
• “average commercial reliability 99.2% last 4 years”
AKEnerji, Kemalpasa Turkey 6C installation Post validation inspection
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
12
6F.01 …
• Renamed to align with GE F-Class
• 50M+ hrs experience
• Best in industry reliability &
availability
• Economical heat and power
• 55+% combined cycle efficiency
• Demonstrated platform
• Comprehensive validation
• 9 years operating experience…
110k hours, 2250 starts
… the heart of a world-class 75-150 MW CC/cogen plant

Weitere ähnliche Inhalte

Was ist angesagt?

236407565 gas-turbine-notes
236407565 gas-turbine-notes236407565 gas-turbine-notes
236407565 gas-turbine-notesmanojg1990
 
GAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONGAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONUzair Ahmad
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rateManohar Tatwawadi
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)Billa ParameswaraRao
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
Dry Gas Seal Presentation
Dry Gas Seal PresentationDry Gas Seal Presentation
Dry Gas Seal PresentationIONEL DUTU
 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine EfficiencyJahanzeb Khan
 
Gas Turbine Theory - Principle of Operation and Construction
Gas Turbine Theory  - Principle of Operation and ConstructionGas Turbine Theory  - Principle of Operation and Construction
Gas Turbine Theory - Principle of Operation and ConstructionSahyog Shishodia
 
Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Hammad Akber
 
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010Shaun West
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Fired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From YokogawaFired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From YokogawaMiller Energy, Inc.
 
How Gas Turbines Work
How Gas Turbines WorkHow Gas Turbines Work
How Gas Turbines Workalidouceur
 

Was ist angesagt? (20)

236407565 gas-turbine-notes
236407565 gas-turbine-notes236407565 gas-turbine-notes
236407565 gas-turbine-notes
 
GAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTIONGAS TURBINE MAJOR INSPECTION
GAS TURBINE MAJOR INSPECTION
 
Ere ction manual bhel
Ere ction manual bhelEre ction manual bhel
Ere ction manual bhel
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
Heat 4
Heat 4Heat 4
Heat 4
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
MS 5001
MS 5001MS 5001
MS 5001
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Ci
CiCi
Ci
 
Dry Gas Seal Presentation
Dry Gas Seal PresentationDry Gas Seal Presentation
Dry Gas Seal Presentation
 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine Efficiency
 
Gas Turbine Theory - Principle of Operation and Construction
Gas Turbine Theory  - Principle of Operation and ConstructionGas Turbine Theory  - Principle of Operation and Construction
Gas Turbine Theory - Principle of Operation and Construction
 
DJA3032 CHAPTER 6
DJA3032   CHAPTER 6DJA3032   CHAPTER 6
DJA3032 CHAPTER 6
 
Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)
 
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
Maintenance of V94 series of gas turbines, Power Gen Russia, Moscow, 2010
 
Heat rate of coal fired power plant
Heat rate of coal fired power plantHeat rate of coal fired power plant
Heat rate of coal fired power plant
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Fired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From YokogawaFired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From Yokogawa
 
How Gas Turbines Work
How Gas Turbines WorkHow Gas Turbines Work
How Gas Turbines Work
 

Andere mochten auch

Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine FleetGE_India
 
Combustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactCombustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactKatherine Corcoran
 
Creating Connection
Creating ConnectionCreating Connection
Creating ConnectionPamela Day
 
Plant physiol. 2005 sep 139(1) 363 74, figures
Plant physiol. 2005 sep 139(1) 363 74, figuresPlant physiol. 2005 sep 139(1) 363 74, figures
Plant physiol. 2005 sep 139(1) 363 74, figuresTakeshi Tudio
 
Presentacion jc
Presentacion jcPresentacion jc
Presentacion jcjleime
 
Microsoft managers
Microsoft managersMicrosoft managers
Microsoft managersPrince Patni
 
Ge 2017 summer conf sponsor info
Ge 2017 summer conf sponsor infoGe 2017 summer conf sponsor info
Ge 2017 summer conf sponsor infoJim Forde
 
Ge’s two decade transformation
Ge’s two decade transformation Ge’s two decade transformation
Ge’s two decade transformation Vivek Rathod
 
Reverse Innovation
Reverse InnovationReverse Innovation
Reverse InnovationZinnov
 
Someday is Today - GE's Brand Book
Someday is Today - GE's Brand BookSomeday is Today - GE's Brand Book
Someday is Today - GE's Brand BookRich Narasaki
 
Environment Clearance Letter
Environment Clearance Letter Environment Clearance Letter
Environment Clearance Letter GE_India
 
The GE India Journey
The GE India JourneyThe GE India Journey
The GE India JourneyGE_India
 
Ge company profile
Ge company profileGe company profile
Ge company profilePrince Patni
 
GE in India
GE in IndiaGE in India
GE in IndiaGE_India
 
Gas turbine cooling system by ahmed shoshan & alaa el-adl
Gas turbine cooling system by ahmed shoshan & alaa el-adlGas turbine cooling system by ahmed shoshan & alaa el-adl
Gas turbine cooling system by ahmed shoshan & alaa el-adlAhmed Shoshan
 
Performance of gas turbine power plant
Performance of gas turbine power plantPerformance of gas turbine power plant
Performance of gas turbine power plantSai s
 
Harel Kodesh, Vice President, Predix and CTO, GE Digital
Harel Kodesh, Vice President, Predix and CTO, GE DigitalHarel Kodesh, Vice President, Predix and CTO, GE Digital
Harel Kodesh, Vice President, Predix and CTO, GE DigitalMIT Enterprise Forum Cambridge
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power PlantMd. Rimon Mia
 
Ge Presentation
Ge PresentationGe Presentation
Ge PresentationMcudworth
 
How GE Is Disrupting Itself
How GE Is Disrupting ItselfHow GE Is Disrupting Itself
How GE Is Disrupting ItselfWei Li
 

Andere mochten auch (20)

Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
 
Combustion Turbine Efficiency Impact
Combustion Turbine Efficiency ImpactCombustion Turbine Efficiency Impact
Combustion Turbine Efficiency Impact
 
Creating Connection
Creating ConnectionCreating Connection
Creating Connection
 
Plant physiol. 2005 sep 139(1) 363 74, figures
Plant physiol. 2005 sep 139(1) 363 74, figuresPlant physiol. 2005 sep 139(1) 363 74, figures
Plant physiol. 2005 sep 139(1) 363 74, figures
 
Presentacion jc
Presentacion jcPresentacion jc
Presentacion jc
 
Microsoft managers
Microsoft managersMicrosoft managers
Microsoft managers
 
Ge 2017 summer conf sponsor info
Ge 2017 summer conf sponsor infoGe 2017 summer conf sponsor info
Ge 2017 summer conf sponsor info
 
Ge’s two decade transformation
Ge’s two decade transformation Ge’s two decade transformation
Ge’s two decade transformation
 
Reverse Innovation
Reverse InnovationReverse Innovation
Reverse Innovation
 
Someday is Today - GE's Brand Book
Someday is Today - GE's Brand BookSomeday is Today - GE's Brand Book
Someday is Today - GE's Brand Book
 
Environment Clearance Letter
Environment Clearance Letter Environment Clearance Letter
Environment Clearance Letter
 
The GE India Journey
The GE India JourneyThe GE India Journey
The GE India Journey
 
Ge company profile
Ge company profileGe company profile
Ge company profile
 
GE in India
GE in IndiaGE in India
GE in India
 
Gas turbine cooling system by ahmed shoshan & alaa el-adl
Gas turbine cooling system by ahmed shoshan & alaa el-adlGas turbine cooling system by ahmed shoshan & alaa el-adl
Gas turbine cooling system by ahmed shoshan & alaa el-adl
 
Performance of gas turbine power plant
Performance of gas turbine power plantPerformance of gas turbine power plant
Performance of gas turbine power plant
 
Harel Kodesh, Vice President, Predix and CTO, GE Digital
Harel Kodesh, Vice President, Predix and CTO, GE DigitalHarel Kodesh, Vice President, Predix and CTO, GE Digital
Harel Kodesh, Vice President, Predix and CTO, GE Digital
 
Combined Cycle Power Plant
Combined Cycle Power PlantCombined Cycle Power Plant
Combined Cycle Power Plant
 
Ge Presentation
Ge PresentationGe Presentation
Ge Presentation
 
How GE Is Disrupting Itself
How GE Is Disrupting ItselfHow GE Is Disrupting Itself
How GE Is Disrupting Itself
 

Ähnlich wie 6 F.01 Technology update for customers

GE ADGT Products
GE ADGT ProductsGE ADGT Products
GE ADGT ProductsGE코리아
 
GE Additive, 21st century Paradigm Shifter - Use cases in GE
GE Additive, 21st century Paradigm Shifter - Use cases in GEGE Additive, 21st century Paradigm Shifter - Use cases in GE
GE Additive, 21st century Paradigm Shifter - Use cases in GEGE코리아
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE코리아
 
MGP720-MGP1500, THREE PHASE, 720-1650KVA
MGP720-MGP1500, THREE PHASE, 720-1650KVAMGP720-MGP1500, THREE PHASE, 720-1650KVA
MGP720-MGP1500, THREE PHASE, 720-1650KVAMY SOFTIT
 
Muhammad Ali C.v
Muhammad Ali C.vMuhammad Ali C.v
Muhammad Ali C.vAli Qureshi
 
GEA18628F Wind_1.7_Brochure_R6
GEA18628F Wind_1.7_Brochure_R6GEA18628F Wind_1.7_Brochure_R6
GEA18628F Wind_1.7_Brochure_R6Harold Schnetzka
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.splendidchuy
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016Bill Satek
 
Ve modify-compact-substation
Ve modify-compact-substationVe modify-compact-substation
Ve modify-compact-substationKamran Uddin
 
KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...
KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...
KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...Ivana Ivanovska
 

Ähnlich wie 6 F.01 Technology update for customers (20)

GE ADGT Products
GE ADGT ProductsGE ADGT Products
GE ADGT Products
 
18902 0717
18902 071718902 0717
18902 0717
 
GE Additive, 21st century Paradigm Shifter - Use cases in GE
GE Additive, 21st century Paradigm Shifter - Use cases in GEGE Additive, 21st century Paradigm Shifter - Use cases in GE
GE Additive, 21st century Paradigm Shifter - Use cases in GE
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
M.Reda CV
M.Reda CVM.Reda CV
M.Reda CV
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CC
 
PMSM.pdf
PMSM.pdfPMSM.pdf
PMSM.pdf
 
MGP720-MGP1500, THREE PHASE, 720-1650KVA
MGP720-MGP1500, THREE PHASE, 720-1650KVAMGP720-MGP1500, THREE PHASE, 720-1650KVA
MGP720-MGP1500, THREE PHASE, 720-1650KVA
 
Avanceon VFD
Avanceon VFDAvanceon VFD
Avanceon VFD
 
Muhammad Ali C.v
Muhammad Ali C.vMuhammad Ali C.v
Muhammad Ali C.v
 
GEA18628F Wind_1.7_Brochure_R6
GEA18628F Wind_1.7_Brochure_R6GEA18628F Wind_1.7_Brochure_R6
GEA18628F Wind_1.7_Brochure_R6
 
Mohmed ali haroun CV
Mohmed ali haroun  CVMohmed ali haroun  CV
Mohmed ali haroun CV
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016
 
116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt
 
Internship saad
Internship saadInternship saad
Internship saad
 
Ve modify-compact-substation
Ve modify-compact-substationVe modify-compact-substation
Ve modify-compact-substation
 
KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...
KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...
KEMET Webinar - Autonomous driving - 1st to market T598 125C with single digi...
 
EIM M2CP Electric Actuators
EIM M2CP Electric ActuatorsEIM M2CP Electric Actuators
EIM M2CP Electric Actuators
 

Mehr von GE_India

GE Wind Forecasting Solution
GE Wind Forecasting Solution GE Wind Forecasting Solution
GE Wind Forecasting Solution GE_India
 
GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'
GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'
GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'GE_India
 
The Sewage Story goes on a World Tour!
The Sewage Story goes on a World Tour!The Sewage Story goes on a World Tour!
The Sewage Story goes on a World Tour!GE_India
 
The Sewage Story goes to space!
The Sewage Story goes to space!The Sewage Story goes to space!
The Sewage Story goes to space!GE_India
 
The Sewage Story
The Sewage StoryThe Sewage Story
The Sewage StoryGE_India
 
Beyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind PowerBeyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind PowerGE_India
 
Celebrating 10 Years of Innovation in Europe
Celebrating 10 Years of Innovation in EuropeCelebrating 10 Years of Innovation in Europe
Celebrating 10 Years of Innovation in EuropeGE_India
 
Renewable Energy - Wind
Renewable Energy - WindRenewable Energy - Wind
Renewable Energy - WindGE_India
 
Data Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetData Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetGE_India
 
GE Healthcare - Lullaby Warmer
GE Healthcare - Lullaby WarmerGE Healthcare - Lullaby Warmer
GE Healthcare - Lullaby WarmerGE_India
 
GE Global Innovation Barometer 2013 – India Report
GE Global Innovation Barometer 2013 – India ReportGE Global Innovation Barometer 2013 – India Report
GE Global Innovation Barometer 2013 – India ReportGE_India
 

Mehr von GE_India (11)

GE Wind Forecasting Solution
GE Wind Forecasting Solution GE Wind Forecasting Solution
GE Wind Forecasting Solution
 
GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'
GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'
GE REITERATES ITS COMMITMENT TO 'DESIGN & MAKE IN INDIA'
 
The Sewage Story goes on a World Tour!
The Sewage Story goes on a World Tour!The Sewage Story goes on a World Tour!
The Sewage Story goes on a World Tour!
 
The Sewage Story goes to space!
The Sewage Story goes to space!The Sewage Story goes to space!
The Sewage Story goes to space!
 
The Sewage Story
The Sewage StoryThe Sewage Story
The Sewage Story
 
Beyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind PowerBeyond Big Data: Harnessing the Industrial Internet for Wind Power
Beyond Big Data: Harnessing the Industrial Internet for Wind Power
 
Celebrating 10 Years of Innovation in Europe
Celebrating 10 Years of Innovation in EuropeCelebrating 10 Years of Innovation in Europe
Celebrating 10 Years of Innovation in Europe
 
Renewable Energy - Wind
Renewable Energy - WindRenewable Energy - Wind
Renewable Energy - Wind
 
Data Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial InternetData Centers in the age of the Industrial Internet
Data Centers in the age of the Industrial Internet
 
GE Healthcare - Lullaby Warmer
GE Healthcare - Lullaby WarmerGE Healthcare - Lullaby Warmer
GE Healthcare - Lullaby Warmer
 
GE Global Innovation Barometer 2013 – India Report
GE Global Innovation Barometer 2013 – India ReportGE Global Innovation Barometer 2013 – India Report
GE Global Innovation Barometer 2013 – India Report
 

6 F.01 Technology update for customers

  • 1.
  • 2. © 2015 General Electric Company. Proprietary information. All Rights Reserved. © 2015 General Electric Company. The information presented herein is intended for academic purposes, only. Certain information has been derived from sources assumed to be reliable, however, the said information may change without notice. GE Company assumes no liability for use of any such information presented herein. Reproduction without authorization is forbidden. Results may vary given change in test environment.
  • 3. © 2015 General Electric Company. Proprietary information. All Rights Reserved. Imagination at work. M. Mahendhra May, 2015 6F.01 technology overview
  • 4. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 4 GE’s product portfolio Reliable, flexible, efficient Geared for 50Hz or 60Hz 60Hz gas turbines 50Hz gas turbines 43 MW 79 MW 90 MW 187 MW 227 MW 130 MW 265 MW 299 MW 470 MW 275 MW 397 MW GE GT- 9HA GE GT-9F GE GT-9E GE GT- 7HA GE GT-7F GE GT-6F GE GT-6B GE GT-7E 330 MW .03 .01 .03 .03 .04 .05 .01 .02 .03 .03 .05 .01 .02 World’s Largest 61%+ Net CC Efficiency 51 MW 4 80 MW
  • 5. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 5 • 6F.01 is the new name for the 6C • Over 110k fired hours & 99.2% reliability • True F-class performance & flexibility • Modular plant for ease of installation & maintenance 6F.01 Technology Overview… … F-class efficiency @ 50MW block size
  • 6. © 2015 General Electric Company. Proprietary information. All Rights Reserved. GE’s F-class turbine evolution 6F.01 … GE’s latest evolutionary F-Class product
  • 7. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 7 Take away boxes should only be used for occasional emphasis. Do not use on every slide. GE F-class fleet serves all duty cycles Data as of May 2014 Source: GE Reliability Engineering Units Operating Hours Total (leader) Starts Total (leader) 6F 106 5.1 M (123,000) 59 k (3,200) 7F 789 35.2 M (152,000) 850 k (4,350) 9F 272 13.3 M (148,000) 147 k (2,040) All F 1,160 53.5 M (155,000) 1.0 M (4,350) GE F–Class leading in units, reliability, availability … 50M+ hours 98.0% 90.6% 97.8%97.6% 90.1% 97.5% 88% 92% 96% 100% Reliability Availability Starting Reliability GE F-Class Other OEM F-Class *Source: ORAP®, All rights to Underlying Data Reserved: SPS® Rolling 12 Month Data Oct 12 – Sep 13
  • 8. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 8 Take away boxes should only be used for occasional emphasis. Do not use on every slide. 6F.01 re-introduction 35-70 MW Gas turbine orders Shift in technology to F-Class driven by shift to CC/CHP Source: McCoy Power Reports ByclassByapplication
  • 9. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 9 6F.01 … enhanced value 6 DLN2.5 Can-annular Combustors, increased Tfire Dual fuel capability <25ppm NOx 3 stages Advanced and proven HGP materials High Tfire capability designed in Improved cooling/sealing Through bolted nickel turbine rotor High PR capable +2% speed increase Axial flow exhaust Low Mach LSB 3D aero compressor 12 stages, 3 VGV Removable blades High flow R1 and inlet Cold end drive 2 bearings Single piece forward stub shaft High torque capable Reliable technology for efficient cogeneration/combined cycle Introductory 6F.01 Enhancement to 6F.01 Pertinent experience >100F below 9F.05 Tfire Equivalent to 7F.05 Tfire Same seals at 7F & HA GEAE TBC to GEP&W TBC 6B +1.35% speed…
  • 10. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 10 6F.01 modular arrangement Generator • Two pole generator • Horizontal offset load gear Air inlet system • Silencer in elbow • CFD used to obtain low pressure drop • Confirmed by model tests Axial exhaust arrangement • Low pressure drop • Silencer before HRSG Acoustic enclosure Take away boxes should only be used for occasional emphasis. Do not use on every slide. Modular for quick installation and ease of maintenance Modules not visible… • Gas Fuel Module with low DP valves • Combined load gear & lube oil module • Static frequency converter with black start genset • Control module with triple redundant Mark Vie … factory assembled & tested
  • 11. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 11 Launch site • AKEnerji • Kemalpasa, Turkey • 2x1 6F.01 combined cycle • GT shipments Dec 2003, May 2004 GT validation • 5 months, 161 hours of testing • 2462 TC, Press and SG sensors • Full speed no load through full speed full load • Aeromechanics, aerodynamics, thermal profiles measured/confirmed • Damping improvements made post test Launch units Take away boxes should only be used for occasional emphasis. Do not use on every slide. Reliable technology for efficient cogeneration/combined cycle Commercial operations • COD May 2005 • Over 110,000 operating hours • Over 2,250 accumulated starts • CSA coverage… CI, HGP, and MI performed • Reliability/Availability … better than F Class industry • AKEnerji reference letter… • “fully satisfied with equipment and services” • “average commercial reliability 99.2% last 4 years” AKEnerji, Kemalpasa Turkey 6C installation Post validation inspection
  • 12. © 2015 General Electric Company. Proprietary information. All Rights Reserved. 12 6F.01 … • Renamed to align with GE F-Class • 50M+ hrs experience • Best in industry reliability & availability • Economical heat and power • 55+% combined cycle efficiency • Demonstrated platform • Comprehensive validation • 9 years operating experience… 110k hours, 2250 starts … the heart of a world-class 75-150 MW CC/cogen plant