1.0 INTRODUCTION
• Stormwater drainage is the science of draining
that part of rainfall which appears on the
surface. With increasing urbanization it
becomes increasingly important but is far too
often neglected or relegated to an afterthought
in the development of urban infrastructure.
This science is important because unattended
high flood levels can cause property damage,
loss of life and other
1/24/2018
Cont.…………..
• contaminating the ground with sewage from
flooded septic tanks and pit latrines. In the
past, attention to this problem has been
severely limited, especially in Masumbwe
ward areas. with the consequence that in the
rainy seasons, poorer residents having access
to it, use pounded, polluted surface water even
when potable water is available at kiosks and
the overflow from pit latrines in particular and
cause of disease outbreaks such as cholera.
1/24/2018
1.1 BACKGROUND
Drainage is the term used to describe natural or
artificial removal of surface and subsurface
water from the area. The significance of
drainage is to maintain cleanness of an area
against odor, flies and epidemic disease.
Stormwater is water that originates during
precipitation events. It may also be used to
apply to water that originates with snowmelt
that enters the storm water system.
1/24/2018
Cont.……..
Stormwater that does not soak into the ground
becomes surface runoff, Storm water is of concern
for two main issues: one related to the volume and
timing of runoff water (flood control and water
supplies). The traditional approach to handle
stormwater from Mbogwe still used traditional
canal as drainage. That resulted by infrastructures
that hander infiltration and concentration
stormwater flow, this approach has several impact
to environmental that’s heavy metal, organic
material and oil in stormwater.
1/24/2018
1.2 PROBLEM STATEMENT
Mbogwe District is one of the
five districts of Geita Region of Tanzania. Due to
geographical of the area the stormwater from the
catchment area is accumulated at a lower land.
Most stormwater originated due to rainfall water
that accumulates to one point resulted from roof
or catchment. If the situation remains unsolved it
will risk health of the people in the area through
epidemic diseases such as cholera(occurred
1999&2012), dysentery and destruction of
infrastructure.
1/24/2018
Cont.………….
On the other hand houses are inhabitable and
playgrounds are not functioned during the
rainy season.
1/24/2018
1.3 OBJECTIVE OF THE STUDY
 General object
The objective of this study is investigating,
planning and design of stormwater drainage
system at Mbogwe, Geita from point to the
discharge as method of removing accumulated
water point.
1/24/2018
Cont.……
 specific objective
Determination of peak discharge
Performing of leveling point to discharge
Designing of open channel for stormwater
drainage system
Assess of quality and quantity of drainage
system of stormwater for rice cultivation.
1/24/2018
1.4 Project area
• Mbogwe District is one of the five districts
of Geita Region of Tanzania. It is bordered to
the north by Chato District and Geita District,
to the east by Kahama District and Kahama
Urban
• This place is situated at geographical co-
ordinate 3°22°0’’ south and 32°16°00’’East, its
climatic information varies as 31/24℃ and its
wind direction is 30km/hr.
1/24/2018
1.5 SCOPE OF THE STUDY
The scope of this study to design of open
channel as drainage system from point to direct it
to the discharge approximate of more than
1.2km.
1/24/2018
1.7 SIGNIFICANT OF THE STUDY
• The study will give to the suggestion of user’s
at the end of project to undertake care of
stormwater and use of open channel designed
either for rice cultivation or directing to dam
for dry season use. Also will help to access the
main sources of accumulated stormwater at the
point.
1/24/2018
2.0 LITERATURE REVIEW
 This will help to enable general information
about these topics
Cause of stormwater
Effect resulted from stormwater
Designing criteria of open channel hydraulics
Procedure in determination of quantity and
quality of stormwater
1/24/2018
3.0 METHODOLOGY
Determination of peak discharge
• determination rainfall intensity
• Rational method
• Regression data and statistics analysis
method
1/24/2018
Cont.………
 Topographical survey
• Reconnaissance
• Fieldworks(visiting site)
• Office work in compelling data into excel
• Plotting of profile, contour and cross section
using software AutoCAD 2017&2017 3D
1/24/2018
Cont.………
Designing of open channel(drainage) for
stormwater drainage system
• Collecting of hydrological and metrological
data from Mbogwe council/TMA
• Determination of discharge by manning
coefficient method
• Determination of total drainage area
(Catchment area) ‘A’ by AutoCAD 2017 3D
software and GIS after collecting co ordinate
points.
1/24/2018
Cont.……
Assess of quality and quantity of drainage
system of stormwater for rice cultivation
• Laboratory determination of NO2
-
• Laboratory determination of pH( acidity &
basicity) of stormwater by pH meter.
1/24/2018
Appropriate formula to be used
•
•
Determination of quantity Discharge (Q)
Using rational formula
Q =CIA
Where;
Q = Flood peak of Catchment (m3/sec )
C = Rational runoff Coefficient
I = Average rainfall Intensity over the
whole Catchment
A=catchment area
1/24/2018
Cont.………
• Velocity of flow can be determined by
Manning’s formula
𝑉 = 1/𝑛 ∗ 𝑅2/3 𝑆½
Where: V= Allowable flow velocity
n = Manning’s roughness coefficient.
R = Hydraulic radius (m)
S = Bed slope of the channel taken as ground
slope
1/24/2018
3.1 Data collection
This referred as process of gathering
information and measuring information on target
variable, this project data collection method used
was
 field work,
 reconnaissance of data,
 Collecting of hydrological and metrological
data from Mbogwe council,
 collection of rainfall data intensity from TMA
1/24/2018
3.2 Data analysis
Data resulted to inspecting, cleansing,
transforming and modeling of data. This data
will be analysis in
• Table form,
• graph method,
• histogram,
• bar chart,
• profile and contour.
1/24/2018
4.0 working plan(schedule)
2017 2018(Duration in months)
Activities NOV DEC JAN FEB MARC APRIL MAY
Writing project proposal
Presentation of project
proposal
Literature review
Data collection at mbogwe
district
Data sampling at WI
laboratory
Data analysis and compiling
Design of open channel
Presentation of project report
Submission the project report
1/24/2018
5.0 BUDGET
S/
N
Activities amount Sources
of
income
1 Travelling to Mbogwe 100,000 Sponsor
2 Hiring and purchase of
equipment’s
50,000 Sponsor
3 Laboratory work at WI 50,000 HESLB
4 Surveying works, meal and
accommodation
300,000 HESLB
5 Unskilled labor 100,000 PARENTS
6 Stationary works 50,000 HESLB
TOTAL 650,000
1/24/2018
6.0 REFERENCE
• R.Chudley (1995), Building construction hand
book, 2nd Edition, St Edmund press.
• Duggal K.N (2002), Elements of Environmental
Engineering, Chand and Co. Ltd.
• S. N. Ghoshi (1986), Flood Control and
Drainage Engineering, 2nd Edition
• A. Kamal (1989), Water supply, Sanitary
Engineering and Pollution, Environment
Engineering, 1st Editi
1/24/2018

Weitere ähnliche Inhalte

Was ist angesagt?

Academia session: John Chilton, International Association of Hydrogeologists,...
Academia session: John Chilton, International Association of Hydrogeologists,...Academia session: John Chilton, International Association of Hydrogeologists,...
Academia session: John Chilton, International Association of Hydrogeologists,...
water-decade
 
Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...
Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...
Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...
AI Publications
 
Vestraten central asia unescoundpgef water meeting 022014
Vestraten central asia unescoundpgef water meeting 022014Vestraten central asia unescoundpgef water meeting 022014
Vestraten central asia unescoundpgef water meeting 022014
groundwatercop
 
Presentation on expertise services
Presentation on expertise servicesPresentation on expertise services
Presentation on expertise services
WATER HARVESTERS
 
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISIONAPPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
Marwan Haddad
 

Was ist angesagt? (20)

Drinking Water Systems management perceptions, priorities, and expectations: ...
Drinking Water Systems management perceptions, priorities, and expectations: ...Drinking Water Systems management perceptions, priorities, and expectations: ...
Drinking Water Systems management perceptions, priorities, and expectations: ...
 
Academia session: John Chilton, International Association of Hydrogeologists,...
Academia session: John Chilton, International Association of Hydrogeologists,...Academia session: John Chilton, International Association of Hydrogeologists,...
Academia session: John Chilton, International Association of Hydrogeologists,...
 
Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...
Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...
Assessment of the Upstream Water Quality of a Narrow River using Numerical Mo...
 
Es31954961
Es31954961Es31954961
Es31954961
 
Vestraten central asia unescoundpgef water meeting 022014
Vestraten central asia unescoundpgef water meeting 022014Vestraten central asia unescoundpgef water meeting 022014
Vestraten central asia unescoundpgef water meeting 022014
 
Mihai Grozavescu Aquatim - Timisoara demo case
Mihai Grozavescu Aquatim - Timisoara demo caseMihai Grozavescu Aquatim - Timisoara demo case
Mihai Grozavescu Aquatim - Timisoara demo case
 
Rethinking water storage for agricultural adaptation to climate change in sub...
Rethinking water storage for agricultural adaptation to climate change in sub...Rethinking water storage for agricultural adaptation to climate change in sub...
Rethinking water storage for agricultural adaptation to climate change in sub...
 
Hydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing ClimateHydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing Climate
 
Presentation on expertise services
Presentation on expertise servicesPresentation on expertise services
Presentation on expertise services
 
Minnesota Watershed Nitrogen Reduction Planning Tool
Minnesota Watershed Nitrogen Reduction Planning ToolMinnesota Watershed Nitrogen Reduction Planning Tool
Minnesota Watershed Nitrogen Reduction Planning Tool
 
Benter, Water Rates
Benter, Water RatesBenter, Water Rates
Benter, Water Rates
 
Drought monitoring, Precipitation statistics, and water balance with freely a...
Drought monitoring, Precipitation statistics, and water balance with freely a...Drought monitoring, Precipitation statistics, and water balance with freely a...
Drought monitoring, Precipitation statistics, and water balance with freely a...
 
Solar Irrigation and Groundwater Management
Solar Irrigation and Groundwater ManagementSolar Irrigation and Groundwater Management
Solar Irrigation and Groundwater Management
 
Economic instruments in water resources management in Armenia
Economic instruments in water resources management in ArmeniaEconomic instruments in water resources management in Armenia
Economic instruments in water resources management in Armenia
 
Community Based Ground Water Management
Community Based Ground Water ManagementCommunity Based Ground Water Management
Community Based Ground Water Management
 
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISIONAPPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
 
A Holistic Approach for Determining the Characteristic Flow on Kangsabati Cat...
A Holistic Approach for Determining the Characteristic Flow on Kangsabati Cat...A Holistic Approach for Determining the Characteristic Flow on Kangsabati Cat...
A Holistic Approach for Determining the Characteristic Flow on Kangsabati Cat...
 
DSD-INT 2017 - Delft3D - Water Quality and Ecological Modeling Symposium - Fr...
DSD-INT 2017 - Delft3D - Water Quality and Ecological Modeling Symposium - Fr...DSD-INT 2017 - Delft3D - Water Quality and Ecological Modeling Symposium - Fr...
DSD-INT 2017 - Delft3D - Water Quality and Ecological Modeling Symposium - Fr...
 
Middlesex County Office of Planning Internship Abstract
Middlesex County Office of Planning Internship AbstractMiddlesex County Office of Planning Internship Abstract
Middlesex County Office of Planning Internship Abstract
 
Anneli Ylimartimo
Anneli YlimartimoAnneli Ylimartimo
Anneli Ylimartimo
 

Ähnlich wie Gadama pw

Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
RSIS International
 
2014 Master Project 701-242
2014 Master Project 701-2422014 Master Project 701-242
2014 Master Project 701-242
pojing liu
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdata
hydrologyproject0
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdata
hydrologyproject0
 
5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf
5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf
5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf
AbdusalamIdiris
 

Ähnlich wie Gadama pw (20)

Tools and Technologies for Water Resources Planning and Climate Change Adapta...
Tools and Technologies for Water Resources Planning and Climate Change Adapta...Tools and Technologies for Water Resources Planning and Climate Change Adapta...
Tools and Technologies for Water Resources Planning and Climate Change Adapta...
 
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
 
Study of parameters requiried for quanitification of
Study of parameters requiried for quanitification ofStudy of parameters requiried for quanitification of
Study of parameters requiried for quanitification of
 
D43011925
D43011925D43011925
D43011925
 
2014 Master Project 701-242
2014 Master Project 701-2422014 Master Project 701-242
2014 Master Project 701-242
 
DSD-SEA 2019 Application of Mathematical Modelling Tools in Water Resource M...
DSD-SEA 2019 Application of  Mathematical Modelling Tools in Water Resource M...DSD-SEA 2019 Application of  Mathematical Modelling Tools in Water Resource M...
DSD-SEA 2019 Application of Mathematical Modelling Tools in Water Resource M...
 
Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models Coupling of Surface water and Groundwater Models
Coupling of Surface water and Groundwater Models
 
DAM Site Selection Using GIS Techniques and remote sensing to Minimize Flash ...
DAM Site Selection Using GIS Techniques and remote sensing to Minimize Flash ...DAM Site Selection Using GIS Techniques and remote sensing to Minimize Flash ...
DAM Site Selection Using GIS Techniques and remote sensing to Minimize Flash ...
 
IRJET - To Study the Hurdles in Designing a Water Supply System for a City
IRJET - To Study the Hurdles in Designing a Water Supply System for a CityIRJET - To Study the Hurdles in Designing a Water Supply System for a City
IRJET - To Study the Hurdles in Designing a Water Supply System for a City
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdata
 
Download-manuals-surface water-software-processingofstreamflowdata
 Download-manuals-surface water-software-processingofstreamflowdata Download-manuals-surface water-software-processingofstreamflowdata
Download-manuals-surface water-software-processingofstreamflowdata
 
DSD-SEA 2019 Use of Earth Observation Data to Enhance Water Resource Manageme...
DSD-SEA 2019 Use of Earth Observation Data to Enhance Water Resource Manageme...DSD-SEA 2019 Use of Earth Observation Data to Enhance Water Resource Manageme...
DSD-SEA 2019 Use of Earth Observation Data to Enhance Water Resource Manageme...
 
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
 
measures to counteract urban floods
measures to counteract urban floodsmeasures to counteract urban floods
measures to counteract urban floods
 
DSD-SEA 2019 Plastic modelling in Indonesia-Wardani
DSD-SEA 2019 Plastic modelling in Indonesia-WardaniDSD-SEA 2019 Plastic modelling in Indonesia-Wardani
DSD-SEA 2019 Plastic modelling in Indonesia-Wardani
 
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAWATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
 
A Model of (P-GIS) for Hydraulic Protection Dams in Northern Morocco
A Model of (P-GIS) for Hydraulic Protection Dams in Northern MoroccoA Model of (P-GIS) for Hydraulic Protection Dams in Northern Morocco
A Model of (P-GIS) for Hydraulic Protection Dams in Northern Morocco
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf
5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf
5. PREDICTING SOIL EROSION RISK BY SWAT IN A-searchable.pdf
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

Gadama pw

  • 1. WATER INSTITUTE DEPARTMENT: WATER RESOURCES AND IRRIGATION ENGINEERING PROGRAM: Bachelor degree in water resources and irrigation engineering 1/24/2018
  • 2. PROJECT TITLE: PLANNING AND DESIGN OF STORMWATER DRAINAGE SYSTEM AT MBOGWE,GEITA. STUDENT NAME:GADAMA KULWA REG NO: BD/2014/WRIE/37 SUB:18 DECEMBER,2018 1/24/2018
  • 3. 1.0 INTRODUCTION • Stormwater drainage is the science of draining that part of rainfall which appears on the surface. With increasing urbanization it becomes increasingly important but is far too often neglected or relegated to an afterthought in the development of urban infrastructure. This science is important because unattended high flood levels can cause property damage, loss of life and other 1/24/2018
  • 4. Cont.………….. • contaminating the ground with sewage from flooded septic tanks and pit latrines. In the past, attention to this problem has been severely limited, especially in Masumbwe ward areas. with the consequence that in the rainy seasons, poorer residents having access to it, use pounded, polluted surface water even when potable water is available at kiosks and the overflow from pit latrines in particular and cause of disease outbreaks such as cholera. 1/24/2018
  • 5. 1.1 BACKGROUND Drainage is the term used to describe natural or artificial removal of surface and subsurface water from the area. The significance of drainage is to maintain cleanness of an area against odor, flies and epidemic disease. Stormwater is water that originates during precipitation events. It may also be used to apply to water that originates with snowmelt that enters the storm water system. 1/24/2018
  • 6. Cont.…….. Stormwater that does not soak into the ground becomes surface runoff, Storm water is of concern for two main issues: one related to the volume and timing of runoff water (flood control and water supplies). The traditional approach to handle stormwater from Mbogwe still used traditional canal as drainage. That resulted by infrastructures that hander infiltration and concentration stormwater flow, this approach has several impact to environmental that’s heavy metal, organic material and oil in stormwater. 1/24/2018
  • 7. 1.2 PROBLEM STATEMENT Mbogwe District is one of the five districts of Geita Region of Tanzania. Due to geographical of the area the stormwater from the catchment area is accumulated at a lower land. Most stormwater originated due to rainfall water that accumulates to one point resulted from roof or catchment. If the situation remains unsolved it will risk health of the people in the area through epidemic diseases such as cholera(occurred 1999&2012), dysentery and destruction of infrastructure. 1/24/2018
  • 8. Cont.…………. On the other hand houses are inhabitable and playgrounds are not functioned during the rainy season. 1/24/2018
  • 9. 1.3 OBJECTIVE OF THE STUDY  General object The objective of this study is investigating, planning and design of stormwater drainage system at Mbogwe, Geita from point to the discharge as method of removing accumulated water point. 1/24/2018
  • 10. Cont.……  specific objective Determination of peak discharge Performing of leveling point to discharge Designing of open channel for stormwater drainage system Assess of quality and quantity of drainage system of stormwater for rice cultivation. 1/24/2018
  • 11. 1.4 Project area • Mbogwe District is one of the five districts of Geita Region of Tanzania. It is bordered to the north by Chato District and Geita District, to the east by Kahama District and Kahama Urban • This place is situated at geographical co- ordinate 3°22°0’’ south and 32°16°00’’East, its climatic information varies as 31/24℃ and its wind direction is 30km/hr. 1/24/2018
  • 12. 1.5 SCOPE OF THE STUDY The scope of this study to design of open channel as drainage system from point to direct it to the discharge approximate of more than 1.2km. 1/24/2018
  • 13. 1.7 SIGNIFICANT OF THE STUDY • The study will give to the suggestion of user’s at the end of project to undertake care of stormwater and use of open channel designed either for rice cultivation or directing to dam for dry season use. Also will help to access the main sources of accumulated stormwater at the point. 1/24/2018
  • 14. 2.0 LITERATURE REVIEW  This will help to enable general information about these topics Cause of stormwater Effect resulted from stormwater Designing criteria of open channel hydraulics Procedure in determination of quantity and quality of stormwater 1/24/2018
  • 15. 3.0 METHODOLOGY Determination of peak discharge • determination rainfall intensity • Rational method • Regression data and statistics analysis method 1/24/2018
  • 16. Cont.………  Topographical survey • Reconnaissance • Fieldworks(visiting site) • Office work in compelling data into excel • Plotting of profile, contour and cross section using software AutoCAD 2017&2017 3D 1/24/2018
  • 17. Cont.……… Designing of open channel(drainage) for stormwater drainage system • Collecting of hydrological and metrological data from Mbogwe council/TMA • Determination of discharge by manning coefficient method • Determination of total drainage area (Catchment area) ‘A’ by AutoCAD 2017 3D software and GIS after collecting co ordinate points. 1/24/2018
  • 18. Cont.…… Assess of quality and quantity of drainage system of stormwater for rice cultivation • Laboratory determination of NO2 - • Laboratory determination of pH( acidity & basicity) of stormwater by pH meter. 1/24/2018
  • 19. Appropriate formula to be used • • Determination of quantity Discharge (Q) Using rational formula Q =CIA Where; Q = Flood peak of Catchment (m3/sec ) C = Rational runoff Coefficient I = Average rainfall Intensity over the whole Catchment A=catchment area 1/24/2018
  • 20. Cont.……… • Velocity of flow can be determined by Manning’s formula 𝑉 = 1/𝑛 ∗ 𝑅2/3 𝑆½ Where: V= Allowable flow velocity n = Manning’s roughness coefficient. R = Hydraulic radius (m) S = Bed slope of the channel taken as ground slope 1/24/2018
  • 21. 3.1 Data collection This referred as process of gathering information and measuring information on target variable, this project data collection method used was  field work,  reconnaissance of data,  Collecting of hydrological and metrological data from Mbogwe council,  collection of rainfall data intensity from TMA 1/24/2018
  • 22. 3.2 Data analysis Data resulted to inspecting, cleansing, transforming and modeling of data. This data will be analysis in • Table form, • graph method, • histogram, • bar chart, • profile and contour. 1/24/2018
  • 23. 4.0 working plan(schedule) 2017 2018(Duration in months) Activities NOV DEC JAN FEB MARC APRIL MAY Writing project proposal Presentation of project proposal Literature review Data collection at mbogwe district Data sampling at WI laboratory Data analysis and compiling Design of open channel Presentation of project report Submission the project report 1/24/2018
  • 24. 5.0 BUDGET S/ N Activities amount Sources of income 1 Travelling to Mbogwe 100,000 Sponsor 2 Hiring and purchase of equipment’s 50,000 Sponsor 3 Laboratory work at WI 50,000 HESLB 4 Surveying works, meal and accommodation 300,000 HESLB 5 Unskilled labor 100,000 PARENTS 6 Stationary works 50,000 HESLB TOTAL 650,000 1/24/2018
  • 25. 6.0 REFERENCE • R.Chudley (1995), Building construction hand book, 2nd Edition, St Edmund press. • Duggal K.N (2002), Elements of Environmental Engineering, Chand and Co. Ltd. • S. N. Ghoshi (1986), Flood Control and Drainage Engineering, 2nd Edition • A. Kamal (1989), Water supply, Sanitary Engineering and Pollution, Environment Engineering, 1st Editi 1/24/2018