R iskope International SA                   www.ris kope.com

                 Cas e postale No 28                         +39-347-7007’420
                 1055 Froide ville, Suis s e                 +41-79-621’8795




How to get the most out of (Vegetable) Waste Oil for your Small
or Medium Business: CDA-ESM can help you to select the best
option

By C. Oboni and F. Oboni, Oboni Riskope Associates Inc.
www.riskope.com


INTRODUCTION

Reportedly, some fast food chains started (2007) to use their vegetable waste
cooking oil (VWO) to make biodiesel. In one example with 1200 restaurants, the
entire corporate delivery fleet of 155 vehicles was converted to biodiesel. Other
sources reveal that fast food companies fleets have been using biodiesel "for a
few years" in some European countries.

In this paper an ”average sized” fast food restaurant or any equivalent VWO
producing Medium Sized Business (MSB) will be used to build a case study.

The MSB's Management wants to find a better way to deal with their VWO, but
also wants to avoid the implementation of the filtering station necessary for
automotive uses. The MSB does not have enough vehicles to make the fleet
conversion economically feasible/reasonable. Management is also fully aware
that, reportedly, some large chains would like to use VWO to heat water, but are
aware of space limitations for a redundant system and their personnel lacks time
and ability to operate a more complex burner system. However, Management
has recently learned that there are off-the-shelf solution with burners capable of
burning VWO that are simple to use, can accommodate various fuels, and, with
some restrictions, can be inserted in existing furnaces, thus avoiding expensive
replacements.

Management has therefore to decide whether they want to maintain the status
quo, i.e. the presently active VWO management/disposal or to switch to a new
solution including a burner capable of using VWO to generate useful heat. The
new equipment should not be redundant (no need for extra room) with the
present one, and should either use the existing furnace with a new burner, or
replace the old system with a brand new one.
This paper shows how to set up the data necessary for rational decision making
using an innovative alternative evaluation methodology called CDA/ESM
(Comparative Decision Analysis/Economic Safety Margin) (C.+F. Oboni, 2009).
CDA/ESM brings to MSBs the opportunity to apply Risk Based Decision Making
to the alternative selection process and to explore how two code compliant and
perfectly legitimate alternatives may differ on the long run, not only in their
implementation and running costs, but also in their risk profile (upside and
downside risks, i.e. opportunities and failures).

CDA/ESM has been used at preliminary design level (Oboni and Oboni 2007,
2008; Oboni 1999-2000, 2005) to support decisions in many industries/situations
by comparing alternatives in financial terms, including:

a) life’s cycle economic balance encompassing internal and external risks and
b) project implementation and demobilization costs and risks.

CDA/ESM has been successfully applied to date to industrial alternatives such
as: rope v.s. road transportation, surface v.s. underground solutions, environ-
mental rehabilitation projects, water treatments alternatives, transportation
networks and go/no-go decisions.

CDA/ESM is particularly useful when comparing long term projects, as its “risks
included” cumulative cost evaluation eliminates the “zeroing effect” and the “rosy
scenario syndrome” linked to Net Present Value (NPV). It has already been
shown in many instances that attempts to tweak the NPV to include risks are
generally misleading (C.+F. Oboni, 2009).

Description of the Case Study

The considered Medium Sized Business (MSB) has to dispose of appx. 5,000
liters of VWO per year. The MSB is an ”average sized” fast food restaurant, of
roughly 150m2, or less than 500m3 construction volume. The MSB's Management
is examining various alternatives to its VWO management, such as:

1) Maintaining the status quo (disposal and using mineral oils/gas to provide heat
and hot water).
2) Replacing the furnace/boiler with a new model allowing to burn the vegetal
waste oil.
3) Replacing only the burner with a new one capable of burning vegetal oils.

Of course in case of the last two alternatives' selection the new burner will have
to be compliant with environmental protection regulations, using VWO.
Alternatives 2,3 would allow the MSB to stop the long term contract with a VWO
disposal company and reduce/eliminate their use of mineral oil/gas.
The selected time horizon for the analysis is twenty years.
The Status Quo alternative (1) encompasses a contractual arrangement with a
company that picks up and legally disposes the waste for the MSB for a given
lump sum annual fee. The contract foresees penalties if the volume is larger/
smaller than ±5% than the contractual value. There is also an exit fee if the
contract is stopped by the MSB before its term. The MSB uses roughly 4,000lt/yr
mineral fuel for heating and sanitary water.

Burning waste oil on site (2,3) will generate heat that can be used for sanitary/
process water and heat. In this case MSB will have to pay the early stop penalty.
Roughly 1,000lt/yr of excess VWO will be stored to constitute a buffer.

Of course, each one of the paths, including Status Quo, has its own risks that
should be considered in the decision making process/ alternatives' evaluation.

Classic decision making

In a case like the one under consideration, the MSB's Management would likely
make the decision based on “guts feelings”, or, at best, use the Net Present
Value (NPV) to compare alternatives.

NPV is a very widely used evaluation technique which uses a number of
assumptions, including the financial discount rate, to define a number, the NPV,
which represents the amount of money one would have to invest today to obtain
the same final result (gain or loss) than the evaluated alternative, at the end of its
life. NPV, by its own nature, underestimates anything that happens far away in
the future. To cover a large expense twenty years from now, one could invest a
small amount and let it grow, so the NPV of that future expense is minuscule
compared to expenses that will happen at the beginning of the project's life
(Answers      Corporation.     2009.     http://www.answers.com/topic/net-present-
value#Common_pitfalls) .

There is one additional major problem with NPV: in its classic implementation
people input yearly expenses, yearly income, and NO risks! Thus the alternative
displaying the best NPV may turn out to be a ruinous one on real life!
For the three alternatives under consideration the results of the classic NPV are
as follows (all results are expenses, so the best value is the smallest):

   •   Status Quo: 1'282E,
   •   Burner replacement:3'185E,
   •   Full replacement (burner and furnace) 23'985E.

These results would lead to keeping the present solution, with a significant
margin. We will see later that this selection is by far not the best possible one.
Risk Based Decision Making: preparing the data for CDA/ESM

Before being able to evaluate alternatives with CDA/ESM, thus avoiding the NPV
pitfalls (see above), we need to perform a hazard identification on the three
alternatives, and evaluate the probability (likelihood) of occurrence of each
hazard, together with the cost of consequence of an occurrence of that hazard,
thus leading to a summarized risk evaluation.

The table below summarize these concepts for each alternative, but because of
space limitation we have not diplayed the actual values of probabilities and costs
for each hazard/risk scenario.


      Element/Hazard         1 Status     2 Furnace and          3 Burner
                               Quo           Burner         Replacement in old
                                          Replacement            furnace
         Burner to
    maintain/replace with      Highest
    standard one if need                  Lowest relative        Low relative
                               relative
             be                             likelihood            likelihood
                             likelihood
    Furnace replacement
    Fuel costs variations      Direct
                                                       No impact
                              impact
    Penalties if variations Based on
                                                Contract breach penalty
    of volume to dispose contract
    Escalation of price to
                              Likely       No impact as VWO is burned onsite
          dispose
    Over-costs in case
    future laws prohibit
                                N/A       Various scenarios should be examined
    waste oil burning as
         foreseen
.

All the costs are defined with minimum, maximum, average and standard
deviation estimates. Likelihoods are defined quantitatively using for example the
technique described in http://foboni.wordpress.com/2009/11/04/easy-way-to-
defining-probability-of-a-fire-in-a-residential-area-of-vancouver/

In the prior paper with same title, the risk scenarios had been defined per each
Alternative, so we are not going to repeat those tables.

Furthermore, to limit the length of this paper, the numeric data related to each
cost and likelihood have been omitted.
CDA/ESM Analysis

Once all the data for the three alternatives are ready, the CDA-ESM application
can be launched. The result is a detailed year by year evaluation of the
performances of each alternative, including their specific risks, leading to a
sensible comparison thus enabling a rational and a sustainable Risk Based
Decision Making over the 20 years life cycle analysis.

Again, to limit the size of this paper, we have decided to only deliver the end
cumulative costs of each alternative.

Alternative                      Average Investment Life time cost
Status Quo                       0                        265'262E
Replacing burner in old furnace 5'600                     196'340E
Replacing burner and furnace     26'400                   112'740E


                                                                            0.6
                                          Status Quo
                                          New burner in                     0.5
                                          old furnace
                                          Furnace and
                                          Burner Im-                        0.4
                                          plementation
                                                                            0.3

                                                                            0.2

                                                                            0.1

                                                                            0
     -300         -250          -200          -150           -100        -50


The best return on investment is delivered by just replacing the burner in the old
furnace, this solution being also the replacement one that requires the smaller
investment. However, the second best solution would, on the long run deliver
appx. 84'000E of additional economies.

As already discussed, a classic NPV comparison would lead to select the Status
Quo (as all numbers are expenses, it's the smallest value that represents the
best alternative). Clearly the classic NPV that ignores risks such as fuel
increases cannot be right. CDA/ESM shows instead that in the case under
consideration, the best ROI is given by burner replacement only, this solution
being also the replacement one that requires the smaller investment.

If the differential implementation cost was invested (assumed at 8% return,
twenty years), then the following figure displays the variation of the results.

                                                                            0.6
                                                           Status Quo
                                                           New burner in    0.5
                                                           old furnace
                                                           Furnace and
                                                                            0.4
                                                           Burner Im-
                                                           plementation
                                                                            0.3

                                                                            0.2

                                                                            0.1

                                                                             0
     -180       -160       -140       -120        -100       -80          -60


This only reconfirms that the best choice is replacing the burner only.

Conclusions

The aim of this paper is to show how innovative evaluations techniques can be
used by small and medium sized business to select among alternatives.
Thanks to CDA-ESM the power of Risk Based Decision Making is now available
to small and medium sized businesses.

References

F. Oboni. 1999-2000. Risk/Crisis Management Systems Design, University of
British Columbia
F. Oboni. 2005. Do Risk Assessments Really Add Value To Projects?. CIM,
Ottawa
F. Oboni and C. Oboni. 2007. “Improving Sustainability through Reasonable Risk
and Crisis Management”. ISBN 978-0-9784462-0-8
F. Oboni and C. Oboni. 2008. Oboni, Risk and Decision Making.
www.edumine.com
C. Oboni, F. Oboni, 2009, Stop Procrastinating! NPV is Dead: Use Risk as a Key
Decision Parameter, CLRA Meeting, Quebec City.
APPENDIX
This Appendix is based on recent research from one of the leading technical
universities of Italy (Zecchinato, L., Utilizzo di olii vegetali a scopo energetico,
Politecnico di Torino, Facoltà di Ingegneria Chimica, 3-2008).
The research report states that “for the tests we have used a burner AR-CO BR5,
a low pressure burner built to burn Naphta, Fuel, Vegetal Oils, or Wasted Oils
(mineral or vegetal), pure or in mixes, as needed (www.arcobruciatori.it ). The
burner works under the principle of low pressure and emulsifying, i.e. by
mixing a part of the primary combustion air with the fuel. Thanks to this principle,
with a good air-fuel mixing already in the compressor and with the spraying
through a specially made nozzle, the burner produces very low emissions with
any of the tested fuels, in compliance with the Italian and most emission codes.”
The figure below summarizes the research results for combustion tests of
Refined -R- or Unrefined Canola oil in a AR-CO BR5 burner, with various levels
of pre-heating (55 0C, or 90 0C). In addition, the same plot depicts the results
of tests performed on a modified AR-CO BR5, to cope with counter-
pressures ranging from 0mb to 3.35mb, burning waste frying oil -F-.
It can be seen from the plots (CO, NOx expressed in ppm as a function of the
excess air applied to each text) that the burner is perfectly capable of burning
waste frying oils, with low emissions even with fairly high counter pressures
common to modern furnaces.


                            Canola OIl Combustion Tests (R=refined, F=Fried), AR-CO Burner BR5
                            For F tes ts , burner is modified to be used with counterpress ures at m arked values
                                                     2117

                                                        1000       966
                                                           810
                                                            793
                                                             781       1158                   CO55

                                                               492861912                      CO90
                                                       678 658713                             CO90R
                                                          391
                                                        600                                   F CO counterpressure=0
                                                      332
   PPM (CO, NOx)




                                                                                              F CO counterpressure=0.85-1.3
                                                          420                                 F CO counterpressure=2.5-3.35
                                                     302 286                                  NO x 55
                                                                                              NO x 90
                                                                                              NO x 90R
                                                                                              NO x counterpressure=0
                                                                                              NO x counterpressure=0.85-1.3
                                                     646559
                                                        62
                                                     53 53 5652                               NO x counterpressure=2.5-3.35


                                                                        36 33
                                                       42 40                    28
                                                            35 36
                                                             34
                                                                        29
                   20
                        0         0.5            1              1.5             2       2.5

                                                     Excess Air Index

Weitere ähnliche Inhalte

Andere mochten auch

Nastas Lecture Graduate School of Business Michgan State University
Nastas Lecture Graduate School of Business Michgan State UniversityNastas Lecture Graduate School of Business Michgan State University
Nastas Lecture Graduate School of Business Michgan State UniversityThomas Nastas
 
How to write tech posts & talks
How to write tech posts & talksHow to write tech posts & talks
How to write tech posts & talksRyan Chartrand
 
How to grow a business
How to grow a businessHow to grow a business
How to grow a businessJason Dunstone
 
Positive Thinking
Positive ThinkingPositive Thinking
Positive ThinkingAnne Egros
 
Tests & trials in the baha'i faith
Tests & trials in the baha'i faithTests & trials in the baha'i faith
Tests & trials in the baha'i faithBijan masumian
 
My learningessentails
My learningessentailsMy learningessentails
My learningessentailsSharon Amer
 
#IgNiteTH Keynote by iannnnn
#IgNiteTH Keynote by iannnnn#IgNiteTH Keynote by iannnnn
#IgNiteTH Keynote by iannnnniannnnn
 
Herzel.the way to_ziyon (nx_power_lite)
Herzel.the way to_ziyon (nx_power_lite)Herzel.the way to_ziyon (nx_power_lite)
Herzel.the way to_ziyon (nx_power_lite)silvia shapiro
 
20100812 Comfi Web Presentation
20100812 Comfi Web Presentation20100812 Comfi Web Presentation
20100812 Comfi Web PresentationGunther De Backer
 
Russian & English: Nastas Ltrs of Confirmation-Contributions
Russian & English: Nastas Ltrs of Confirmation-ContributionsRussian & English: Nastas Ltrs of Confirmation-Contributions
Russian & English: Nastas Ltrs of Confirmation-ContributionsThomas Nastas
 
User Zoom Webinar Monster Aug09 Vf
User Zoom Webinar Monster Aug09 VfUser Zoom Webinar Monster Aug09 Vf
User Zoom Webinar Monster Aug09 VfUserZoom
 
"mettiamoci sempre dove si prende"
"mettiamoci sempre dove si prende""mettiamoci sempre dove si prende"
"mettiamoci sempre dove si prende"Denis Ferraretti
 
Real World Applications of OWL
Real World Applications of OWLReal World Applications of OWL
Real World Applications of OWLMichel Dumontier
 
Designing a Customer Feedback Program to Measure and Improve User Satisfaction
Designing a Customer Feedback Program to Measure and Improve User SatisfactionDesigning a Customer Feedback Program to Measure and Improve User Satisfaction
Designing a Customer Feedback Program to Measure and Improve User SatisfactionUserZoom
 
The Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationThe Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationIain Sanders
 

Andere mochten auch (19)

Nastas Lecture Graduate School of Business Michgan State University
Nastas Lecture Graduate School of Business Michgan State UniversityNastas Lecture Graduate School of Business Michgan State University
Nastas Lecture Graduate School of Business Michgan State University
 
How to write tech posts & talks
How to write tech posts & talksHow to write tech posts & talks
How to write tech posts & talks
 
How to grow a business
How to grow a businessHow to grow a business
How to grow a business
 
Positive Thinking
Positive ThinkingPositive Thinking
Positive Thinking
 
Tests & trials in the baha'i faith
Tests & trials in the baha'i faithTests & trials in the baha'i faith
Tests & trials in the baha'i faith
 
Generation Myth
Generation MythGeneration Myth
Generation Myth
 
My learningessentails
My learningessentailsMy learningessentails
My learningessentails
 
#IgNiteTH Keynote by iannnnn
#IgNiteTH Keynote by iannnnn#IgNiteTH Keynote by iannnnn
#IgNiteTH Keynote by iannnnn
 
Herzel.the way to_ziyon (nx_power_lite)
Herzel.the way to_ziyon (nx_power_lite)Herzel.the way to_ziyon (nx_power_lite)
Herzel.the way to_ziyon (nx_power_lite)
 
20100812 Comfi Web Presentation
20100812 Comfi Web Presentation20100812 Comfi Web Presentation
20100812 Comfi Web Presentation
 
Russian & English: Nastas Ltrs of Confirmation-Contributions
Russian & English: Nastas Ltrs of Confirmation-ContributionsRussian & English: Nastas Ltrs of Confirmation-Contributions
Russian & English: Nastas Ltrs of Confirmation-Contributions
 
User Zoom Webinar Monster Aug09 Vf
User Zoom Webinar Monster Aug09 VfUser Zoom Webinar Monster Aug09 Vf
User Zoom Webinar Monster Aug09 Vf
 
"mettiamoci sempre dove si prende"
"mettiamoci sempre dove si prende""mettiamoci sempre dove si prende"
"mettiamoci sempre dove si prende"
 
Real World Applications of OWL
Real World Applications of OWLReal World Applications of OWL
Real World Applications of OWL
 
Health-e-cITi NJ
Health-e-cITi NJHealth-e-cITi NJ
Health-e-cITi NJ
 
Dfi Portfolio
Dfi PortfolioDfi Portfolio
Dfi Portfolio
 
Designing a Customer Feedback Program to Measure and Improve User Satisfaction
Designing a Customer Feedback Program to Measure and Improve User SatisfactionDesigning a Customer Feedback Program to Measure and Improve User Satisfaction
Designing a Customer Feedback Program to Measure and Improve User Satisfaction
 
Walt Disney Quotes
Walt Disney QuotesWalt Disney Quotes
Walt Disney Quotes
 
The Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationThe Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed Generation
 

Ähnlich wie Cda esm waste oil disposal application part 2

Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenanceSTACY DAVIS
 
Task Force Pace Phone Confer Q&A 7 29 09
Task Force Pace Phone Confer Q&A 7 29 09Task Force Pace Phone Confer Q&A 7 29 09
Task Force Pace Phone Confer Q&A 7 29 09Chris Smith
 
Dual fuels technology ppt presentation truck operators
Dual fuels technology ppt presentation   truck operatorsDual fuels technology ppt presentation   truck operators
Dual fuels technology ppt presentation truck operatorsSpectracom
 
Do My Economics Homework
Do My Economics HomeworkDo My Economics Homework
Do My Economics HomeworkHarry Morris
 
US Petrochemical Industry Future - Integrating Design Operation and Maintenance
US Petrochemical Industry Future -  Integrating Design Operation and MaintenanceUS Petrochemical Industry Future -  Integrating Design Operation and Maintenance
US Petrochemical Industry Future - Integrating Design Operation and MaintenanceBruce LaCour
 
Supply Chain Management - Master Carbon Management
Supply Chain Management - Master Carbon ManagementSupply Chain Management - Master Carbon Management
Supply Chain Management - Master Carbon ManagementIBMElectronics
 
Tri fuel v4
Tri fuel v4Tri fuel v4
Tri fuel v4Erplane
 
6.benchmarking of
6.benchmarking of6.benchmarking of
6.benchmarking oflibfsb
 
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)Brian James
 
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINALSA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINALBrian James
 
Calculating cost savings
Calculating cost savingsCalculating cost savings
Calculating cost savingsa1-cbiss
 
Energy management for Belgian Businesses
Energy management for Belgian BusinessesEnergy management for Belgian Businesses
Energy management for Belgian BusinessesFilip Modderie
 
Cda Esm Comparative Decision Analysis Economic Safety Margin
Cda Esm Comparative Decision Analysis   Economic Safety MarginCda Esm Comparative Decision Analysis   Economic Safety Margin
Cda Esm Comparative Decision Analysis Economic Safety Margincoboni
 
A compressed air & gas institute Question & Answer session
A compressed air & gas institute Question & Answer sessionA compressed air & gas institute Question & Answer session
A compressed air & gas institute Question & Answer sessionSingh Ashwani
 
Step by Step CHP: the Pitfalls to Avoid Between Planning and Design
Step by Step CHP: the Pitfalls to Avoid Between Planning and DesignStep by Step CHP: the Pitfalls to Avoid Between Planning and Design
Step by Step CHP: the Pitfalls to Avoid Between Planning and DesignENERGplc
 
The Contracting Conundrum (Apr 2009)
The Contracting Conundrum (Apr 2009)The Contracting Conundrum (Apr 2009)
The Contracting Conundrum (Apr 2009)David Noort
 

Ähnlich wie Cda esm waste oil disposal application part 2 (20)

Life cycle costing
Life cycle costingLife cycle costing
Life cycle costing
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Task Force Pace Phone Confer Q&A 7 29 09
Task Force Pace Phone Confer Q&A 7 29 09Task Force Pace Phone Confer Q&A 7 29 09
Task Force Pace Phone Confer Q&A 7 29 09
 
Dual fuels technology ppt presentation truck operators
Dual fuels technology ppt presentation   truck operatorsDual fuels technology ppt presentation   truck operators
Dual fuels technology ppt presentation truck operators
 
Combined Cycles
Combined CyclesCombined Cycles
Combined Cycles
 
Do My Economics Homework.pptx
Do My Economics Homework.pptxDo My Economics Homework.pptx
Do My Economics Homework.pptx
 
Do My Economics Homework
Do My Economics HomeworkDo My Economics Homework
Do My Economics Homework
 
US Petrochemical Industry Future - Integrating Design Operation and Maintenance
US Petrochemical Industry Future -  Integrating Design Operation and MaintenanceUS Petrochemical Industry Future -  Integrating Design Operation and Maintenance
US Petrochemical Industry Future - Integrating Design Operation and Maintenance
 
Supply Chain Management - Master Carbon Management
Supply Chain Management - Master Carbon ManagementSupply Chain Management - Master Carbon Management
Supply Chain Management - Master Carbon Management
 
Tri fuel v4
Tri fuel v4Tri fuel v4
Tri fuel v4
 
Chapter 22 the costs of production
Chapter 22 the costs of productionChapter 22 the costs of production
Chapter 22 the costs of production
 
6.benchmarking of
6.benchmarking of6.benchmarking of
6.benchmarking of
 
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
SA 2015 Transportation Fuel Cell Cost Analysis (Auto and Bus)
 
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINALSA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
SA 2014 Transportation Cost Analysis Final Report Revision 1- FINAL
 
Calculating cost savings
Calculating cost savingsCalculating cost savings
Calculating cost savings
 
Energy management for Belgian Businesses
Energy management for Belgian BusinessesEnergy management for Belgian Businesses
Energy management for Belgian Businesses
 
Cda Esm Comparative Decision Analysis Economic Safety Margin
Cda Esm Comparative Decision Analysis   Economic Safety MarginCda Esm Comparative Decision Analysis   Economic Safety Margin
Cda Esm Comparative Decision Analysis Economic Safety Margin
 
A compressed air & gas institute Question & Answer session
A compressed air & gas institute Question & Answer sessionA compressed air & gas institute Question & Answer session
A compressed air & gas institute Question & Answer session
 
Step by Step CHP: the Pitfalls to Avoid Between Planning and Design
Step by Step CHP: the Pitfalls to Avoid Between Planning and DesignStep by Step CHP: the Pitfalls to Avoid Between Planning and Design
Step by Step CHP: the Pitfalls to Avoid Between Planning and Design
 
The Contracting Conundrum (Apr 2009)
The Contracting Conundrum (Apr 2009)The Contracting Conundrum (Apr 2009)
The Contracting Conundrum (Apr 2009)
 

Mehr von Oboni Riskope Associates Inc.

Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Oboni Riskope Associates Inc.
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Oboni Riskope Associates Inc.
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Associates Inc.
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeOboni Riskope Associates Inc.
 

Mehr von Oboni Riskope Associates Inc. (20)

Riskope new web site announcement
Riskope new web site announcementRiskope new web site announcement
Riskope new web site announcement
 
Rational Risk and Crisis Management Course
Rational Risk and Crisis Management CourseRational Risk and Crisis Management Course
Rational Risk and Crisis Management Course
 
Cim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniukCim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniuk
 
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
 
Riskope for christmas 2012
Riskope for christmas 2012Riskope for christmas 2012
Riskope for christmas 2012
 
Ore cockpit castellano
Ore cockpit castellanoOre cockpit castellano
Ore cockpit castellano
 
Mining 012 riskope is it true that pi_gs
Mining 012 riskope  is it true that pi_gsMining 012 riskope  is it true that pi_gs
Mining 012 riskope is it true that pi_gs
 
Bogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining SummitBogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining Summit
 
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...Balangero asbestos mine dumps restoration a few years after, in the aftermath...
Balangero asbestos mine dumps restoration a few years after, in the aftermath...
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
 
Review ICS Guidelines
Review ICS GuidelinesReview ICS Guidelines
Review ICS Guidelines
 
Cassass presentation WLF2 Rome
Cassass presentation WLF2 RomeCassass presentation WLF2 Rome
Cassass presentation WLF2 Rome
 
Road Safety- Sicurezza Stradale
Road Safety- Sicurezza StradaleRoad Safety- Sicurezza Stradale
Road Safety- Sicurezza Stradale
 
Tolerability and Decision Making Discussion
Tolerability and Decision Making DiscussionTolerability and Decision Making Discussion
Tolerability and Decision Making Discussion
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, Riskope
 
Rims Metals and Mining Session
Rims Metals and Mining Session Rims Metals and Mining Session
Rims Metals and Mining Session
 
Force Majeure: a Time Bomb
Force Majeure: a Time BombForce Majeure: a Time Bomb
Force Majeure: a Time Bomb
 
Oboni02 castellano
Oboni02 castellanoOboni02 castellano
Oboni02 castellano
 
Oboni01 castellano
Oboni01 castellanoOboni01 castellano
Oboni01 castellano
 
Force Majeure Clause in Contracts
Force Majeure Clause in ContractsForce Majeure Clause in Contracts
Force Majeure Clause in Contracts
 

Cda esm waste oil disposal application part 2

  • 1. R iskope International SA www.ris kope.com Cas e postale No 28 +39-347-7007’420 1055 Froide ville, Suis s e +41-79-621’8795 How to get the most out of (Vegetable) Waste Oil for your Small or Medium Business: CDA-ESM can help you to select the best option By C. Oboni and F. Oboni, Oboni Riskope Associates Inc. www.riskope.com INTRODUCTION Reportedly, some fast food chains started (2007) to use their vegetable waste cooking oil (VWO) to make biodiesel. In one example with 1200 restaurants, the entire corporate delivery fleet of 155 vehicles was converted to biodiesel. Other sources reveal that fast food companies fleets have been using biodiesel "for a few years" in some European countries. In this paper an ”average sized” fast food restaurant or any equivalent VWO producing Medium Sized Business (MSB) will be used to build a case study. The MSB's Management wants to find a better way to deal with their VWO, but also wants to avoid the implementation of the filtering station necessary for automotive uses. The MSB does not have enough vehicles to make the fleet conversion economically feasible/reasonable. Management is also fully aware that, reportedly, some large chains would like to use VWO to heat water, but are aware of space limitations for a redundant system and their personnel lacks time and ability to operate a more complex burner system. However, Management has recently learned that there are off-the-shelf solution with burners capable of burning VWO that are simple to use, can accommodate various fuels, and, with some restrictions, can be inserted in existing furnaces, thus avoiding expensive replacements. Management has therefore to decide whether they want to maintain the status quo, i.e. the presently active VWO management/disposal or to switch to a new solution including a burner capable of using VWO to generate useful heat. The new equipment should not be redundant (no need for extra room) with the present one, and should either use the existing furnace with a new burner, or replace the old system with a brand new one.
  • 2. This paper shows how to set up the data necessary for rational decision making using an innovative alternative evaluation methodology called CDA/ESM (Comparative Decision Analysis/Economic Safety Margin) (C.+F. Oboni, 2009). CDA/ESM brings to MSBs the opportunity to apply Risk Based Decision Making to the alternative selection process and to explore how two code compliant and perfectly legitimate alternatives may differ on the long run, not only in their implementation and running costs, but also in their risk profile (upside and downside risks, i.e. opportunities and failures). CDA/ESM has been used at preliminary design level (Oboni and Oboni 2007, 2008; Oboni 1999-2000, 2005) to support decisions in many industries/situations by comparing alternatives in financial terms, including: a) life’s cycle economic balance encompassing internal and external risks and b) project implementation and demobilization costs and risks. CDA/ESM has been successfully applied to date to industrial alternatives such as: rope v.s. road transportation, surface v.s. underground solutions, environ- mental rehabilitation projects, water treatments alternatives, transportation networks and go/no-go decisions. CDA/ESM is particularly useful when comparing long term projects, as its “risks included” cumulative cost evaluation eliminates the “zeroing effect” and the “rosy scenario syndrome” linked to Net Present Value (NPV). It has already been shown in many instances that attempts to tweak the NPV to include risks are generally misleading (C.+F. Oboni, 2009). Description of the Case Study The considered Medium Sized Business (MSB) has to dispose of appx. 5,000 liters of VWO per year. The MSB is an ”average sized” fast food restaurant, of roughly 150m2, or less than 500m3 construction volume. The MSB's Management is examining various alternatives to its VWO management, such as: 1) Maintaining the status quo (disposal and using mineral oils/gas to provide heat and hot water). 2) Replacing the furnace/boiler with a new model allowing to burn the vegetal waste oil. 3) Replacing only the burner with a new one capable of burning vegetal oils. Of course in case of the last two alternatives' selection the new burner will have to be compliant with environmental protection regulations, using VWO. Alternatives 2,3 would allow the MSB to stop the long term contract with a VWO disposal company and reduce/eliminate their use of mineral oil/gas. The selected time horizon for the analysis is twenty years.
  • 3. The Status Quo alternative (1) encompasses a contractual arrangement with a company that picks up and legally disposes the waste for the MSB for a given lump sum annual fee. The contract foresees penalties if the volume is larger/ smaller than ±5% than the contractual value. There is also an exit fee if the contract is stopped by the MSB before its term. The MSB uses roughly 4,000lt/yr mineral fuel for heating and sanitary water. Burning waste oil on site (2,3) will generate heat that can be used for sanitary/ process water and heat. In this case MSB will have to pay the early stop penalty. Roughly 1,000lt/yr of excess VWO will be stored to constitute a buffer. Of course, each one of the paths, including Status Quo, has its own risks that should be considered in the decision making process/ alternatives' evaluation. Classic decision making In a case like the one under consideration, the MSB's Management would likely make the decision based on “guts feelings”, or, at best, use the Net Present Value (NPV) to compare alternatives. NPV is a very widely used evaluation technique which uses a number of assumptions, including the financial discount rate, to define a number, the NPV, which represents the amount of money one would have to invest today to obtain the same final result (gain or loss) than the evaluated alternative, at the end of its life. NPV, by its own nature, underestimates anything that happens far away in the future. To cover a large expense twenty years from now, one could invest a small amount and let it grow, so the NPV of that future expense is minuscule compared to expenses that will happen at the beginning of the project's life (Answers Corporation. 2009. http://www.answers.com/topic/net-present- value#Common_pitfalls) . There is one additional major problem with NPV: in its classic implementation people input yearly expenses, yearly income, and NO risks! Thus the alternative displaying the best NPV may turn out to be a ruinous one on real life! For the three alternatives under consideration the results of the classic NPV are as follows (all results are expenses, so the best value is the smallest): • Status Quo: 1'282E, • Burner replacement:3'185E, • Full replacement (burner and furnace) 23'985E. These results would lead to keeping the present solution, with a significant margin. We will see later that this selection is by far not the best possible one.
  • 4. Risk Based Decision Making: preparing the data for CDA/ESM Before being able to evaluate alternatives with CDA/ESM, thus avoiding the NPV pitfalls (see above), we need to perform a hazard identification on the three alternatives, and evaluate the probability (likelihood) of occurrence of each hazard, together with the cost of consequence of an occurrence of that hazard, thus leading to a summarized risk evaluation. The table below summarize these concepts for each alternative, but because of space limitation we have not diplayed the actual values of probabilities and costs for each hazard/risk scenario. Element/Hazard 1 Status 2 Furnace and 3 Burner Quo Burner Replacement in old Replacement furnace Burner to maintain/replace with Highest standard one if need Lowest relative Low relative relative be likelihood likelihood likelihood Furnace replacement Fuel costs variations Direct No impact impact Penalties if variations Based on Contract breach penalty of volume to dispose contract Escalation of price to Likely No impact as VWO is burned onsite dispose Over-costs in case future laws prohibit N/A Various scenarios should be examined waste oil burning as foreseen . All the costs are defined with minimum, maximum, average and standard deviation estimates. Likelihoods are defined quantitatively using for example the technique described in http://foboni.wordpress.com/2009/11/04/easy-way-to- defining-probability-of-a-fire-in-a-residential-area-of-vancouver/ In the prior paper with same title, the risk scenarios had been defined per each Alternative, so we are not going to repeat those tables. Furthermore, to limit the length of this paper, the numeric data related to each cost and likelihood have been omitted.
  • 5. CDA/ESM Analysis Once all the data for the three alternatives are ready, the CDA-ESM application can be launched. The result is a detailed year by year evaluation of the performances of each alternative, including their specific risks, leading to a sensible comparison thus enabling a rational and a sustainable Risk Based Decision Making over the 20 years life cycle analysis. Again, to limit the size of this paper, we have decided to only deliver the end cumulative costs of each alternative. Alternative Average Investment Life time cost Status Quo 0 265'262E Replacing burner in old furnace 5'600 196'340E Replacing burner and furnace 26'400 112'740E 0.6 Status Quo New burner in 0.5 old furnace Furnace and Burner Im- 0.4 plementation 0.3 0.2 0.1 0 -300 -250 -200 -150 -100 -50 The best return on investment is delivered by just replacing the burner in the old furnace, this solution being also the replacement one that requires the smaller investment. However, the second best solution would, on the long run deliver appx. 84'000E of additional economies. As already discussed, a classic NPV comparison would lead to select the Status Quo (as all numbers are expenses, it's the smallest value that represents the best alternative). Clearly the classic NPV that ignores risks such as fuel increases cannot be right. CDA/ESM shows instead that in the case under
  • 6. consideration, the best ROI is given by burner replacement only, this solution being also the replacement one that requires the smaller investment. If the differential implementation cost was invested (assumed at 8% return, twenty years), then the following figure displays the variation of the results. 0.6 Status Quo New burner in 0.5 old furnace Furnace and 0.4 Burner Im- plementation 0.3 0.2 0.1 0 -180 -160 -140 -120 -100 -80 -60 This only reconfirms that the best choice is replacing the burner only. Conclusions The aim of this paper is to show how innovative evaluations techniques can be used by small and medium sized business to select among alternatives. Thanks to CDA-ESM the power of Risk Based Decision Making is now available to small and medium sized businesses. References F. Oboni. 1999-2000. Risk/Crisis Management Systems Design, University of British Columbia F. Oboni. 2005. Do Risk Assessments Really Add Value To Projects?. CIM, Ottawa F. Oboni and C. Oboni. 2007. “Improving Sustainability through Reasonable Risk and Crisis Management”. ISBN 978-0-9784462-0-8 F. Oboni and C. Oboni. 2008. Oboni, Risk and Decision Making. www.edumine.com C. Oboni, F. Oboni, 2009, Stop Procrastinating! NPV is Dead: Use Risk as a Key Decision Parameter, CLRA Meeting, Quebec City.
  • 7. APPENDIX This Appendix is based on recent research from one of the leading technical universities of Italy (Zecchinato, L., Utilizzo di olii vegetali a scopo energetico, Politecnico di Torino, Facoltà di Ingegneria Chimica, 3-2008). The research report states that “for the tests we have used a burner AR-CO BR5, a low pressure burner built to burn Naphta, Fuel, Vegetal Oils, or Wasted Oils (mineral or vegetal), pure or in mixes, as needed (www.arcobruciatori.it ). The burner works under the principle of low pressure and emulsifying, i.e. by mixing a part of the primary combustion air with the fuel. Thanks to this principle, with a good air-fuel mixing already in the compressor and with the spraying through a specially made nozzle, the burner produces very low emissions with any of the tested fuels, in compliance with the Italian and most emission codes.” The figure below summarizes the research results for combustion tests of Refined -R- or Unrefined Canola oil in a AR-CO BR5 burner, with various levels of pre-heating (55 0C, or 90 0C). In addition, the same plot depicts the results of tests performed on a modified AR-CO BR5, to cope with counter- pressures ranging from 0mb to 3.35mb, burning waste frying oil -F-. It can be seen from the plots (CO, NOx expressed in ppm as a function of the excess air applied to each text) that the burner is perfectly capable of burning waste frying oils, with low emissions even with fairly high counter pressures common to modern furnaces. Canola OIl Combustion Tests (R=refined, F=Fried), AR-CO Burner BR5 For F tes ts , burner is modified to be used with counterpress ures at m arked values 2117 1000 966 810 793 781 1158 CO55 492861912 CO90 678 658713 CO90R 391 600 F CO counterpressure=0 332 PPM (CO, NOx) F CO counterpressure=0.85-1.3 420 F CO counterpressure=2.5-3.35 302 286 NO x 55 NO x 90 NO x 90R NO x counterpressure=0 NO x counterpressure=0.85-1.3 646559 62 53 53 5652 NO x counterpressure=2.5-3.35 36 33 42 40 28 35 36 34 29 20 0 0.5 1 1.5 2 2.5 Excess Air Index