SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
FIRST QUANTUM MINERALS
TSX: FM February 2017
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT
Some of the statements contained in the following material are
forward-looking statements and not statement of facts. Such
statements are based on the current beliefs of management, as well
as assumptions based on management information currently
available.
Forward-looking statements are subject to various risks,
uncertainties and other factors that could cause actual results to
differ materially from expected results.
Readers must rely on their own evaluation of these uncertainties.
Note: all dollar amounts in US dollars unless otherwise indicated
2
3
A LEADING COPPER PRODUCER
UNRIVALLED GROWTH IN COPPER PRODUCTION
 Sentinel mine began commercial
production in November 2016
 Cobre Panama project on track for
phased commissioning in 2018
1 First Quantum excludes the sold Kevitsa mine
2020F assumes flat year-over-year production plus
300K tonnes of production from Cobre Panama
4
2019E Copper Production1
(million tonnes)1.61
1.42
1.35
1.24
0.98
0.91
0.59 0.57 0.52
0.44 0.42 0.38
0.30 0.26
0.61
0.54
0.31
Coldeco
Freeport-McMoRan
Glencore
BHPBilliton
SouthernCopper
FirstQuantum2020F
(includingCobrePanama)
RioTinto
KGHM
Antofagasta
Vale
AngloAmerican
Norilsk
KAZMinerals
TeckResources
FirstQuantum2019F
(2019Guidance)
FirstQuantum2016A
FirstQuantum2012A
2016 – A STRONG YEAR FOR FIRST QUANTUM
DELIVERED ON OUR OBJECTIVES
 Sold the non-core Kevitsa mine for a
total of $732M in cash
 Ramped up & started commercial
production at Sentinel
 Achieved record copper production &
sales
 Lowered unit production cost
 Strengthened our financial position
 Protected cash flows in a weak copper
price market
5
2016 – A STRONG YEAR FOR FIRST QUANTUM
STARTED COMMERCIAL PRODUCTION
AT SENTINEL
 Operations stabilized with improved
crusher and conveyor availability
 Power supply progressively increased
after 2nd power line energized
 Unit production cost for two months of
commercial production: C1 = $1.47/lb;
AISC = $2.13/lb; C3 = $2.16/lb
 Transitioning to terrace mining for
increased mining efficiencies and
improved water management capabilities
6
2016 – A STRONG YEAR FOR FIRST QUANTUM
RECORD COPPER PRODUCTION & SALES1
 Good results across the operations:
Ramped up & began commercial operations
at the Sentinel mine
Higher production at the Kansanshi mine
Record output from the Las Cruces mine
1st full year in commercial operation for the
Kansanshi smelter
 Generated $964M comparative EBITDA;
$0.24 EPS
2015 2016
Other Operations Sentinel
540
411
7
2015 2016
Other Operations Sentinel
SALES
000’s tonnes
PRODUCTION
000’s tonnes
392
536
1 Excludes the sold Kevitsa mine
2016 – A STRONG YEAR FOR FIRST QUANTUM
LOWERED COPPER UNIT PRODUCTION COST
 2nd consecutive year of cost reduction:
Benefits of operating the Kansanshi smelter
Delivery on cost savings programs
8
UNIT PRODUCTION COST*
$/lb
$1.41
$1.21
$1.03
$2.02
$1.85
$1.41
2014 2015 2016
C1
AISC
38
17
3 3
AISC COST REDUCTIONS
2016 vs 2014
cents/lb
C1
Capital
expenditures
G&A costs
Royalties
* Excludes Sentinel
2016 – A STRONG YEAR FOR FIRST QUANTUM
STRENGTHENED OUR FINANCIAL POSITION
 Completed a refinancing in May 2016
 Year-end 2016:
 $713 million of committed undrawn facilities
 $565 million in net unrestricted cash
 $964 million of working capital
 In full compliance with all debt covenants
9
LONG-TERM DEBT PROFILE
$ millions
2016 – A STRONG YEAR FOR FIRST QUANTUM
PROTECTED CASH FLOWS IN A
WEAK COPPER PRICE MARKET
 Initiated a sales hedge program to
ensure stability of cash flows in the
current higher capital expenditure
phase of the development of the
Cobre Panama project
 Added $60M to revenues for the year
2016
10
• Mining concession extended for a
second 20-year term to February 2037
• Port & power station at peak construction
• Mine site & process plant areas moving
towards construction peak in 2H 2017
• Priority given to the power station and
associated infrastructure
• Expect first commercial power in Q4
2017 from the first 150MW unit
• 2nd 150MW unit expected to follow into
operation in the 1H 2018
COBRE PANAMA DEVELOPMENT ON TRACK
11
• All 7 mills and their drives should be fully
installed by the middle 2017
• Commissioning of entire operation
planned to begin in 2018
• Target to achieve an equivalent 60 million
tonne-per-annum throughput rate in
December 2018, and continue towards
steady state operation and further ramp
up in 2019
COBRE PANAMA DEVELOPMENT ON TRACK
12
COBRE PANAMA DEVELOPMENT ON TRACK
 Capital unchanged at $5.48B
$ billions Total First Quantum 3rd Party
Spent to Dec 2015 2.72 1.86 0.86
Spent to Dec 2016 0.76 0.46 0.30
Estimated 2017 spend 1.06 0.64 0.42
Estimated spend 2018 to completion 0.94 0.41 0.53
Total Cobre Panama 5.48 3.37 2.11
13
Good progress made on Project Financing
COBRE PANAMA – PROJECT FINANCING UPDATE
 Project financing for Cobre Panama was
launched to ECA’s in December 2016
 Discussions with a number of ECA’s across
Asia, Europe and North America going well
 Expected long term debt of up to $2.5 billion
 Site visit and term sheet discussions will be
held in March with follow up discussions in
Q2 2017
 Targeted completion of the second half of
2017
14
COBRE PANAMA PROGRESS – PORT & POWER STATION OVERVIEW
15
COBRE PANAMA PROGRESS – POWER STATION OVERVIEW
16
COBRE PANAMA PROGRESS – POWER STATION
17
COBRE PANAMA PROGRESS – OVERALL PROCESS PLANT &
MINE VIEW
18
COBRE PANAMA PROGRESS – PROCESS AREA OVERVIEW
19
COBRE PANAMA PROGRESS – TAILINGS MANAGEMENT FACILITY
DECANT TUNNEL – INLET
20
POSITIVE DEVELOPMENTS IN ZAMBIA
• Improved power situation:
 301MW currently being provided to Kansanshi complex and Sentinel – sufficient for
current operations
 Itezhi-Tehzi hydro added ~120MW into the system
 Maamba Collieries introduced the 2nd 150MW (300MW total) mid-November 2016
• Changes to Zambian mining tax regime enacted June 1 2016:
 Variable profits tax repealed
 20% royalty lowered to between 4-6% depending on the monthly average LME
copper trading price (currently 5%)
• VAT accrued to December 31, 2016 = $275 million:
 Refunds of $77M received for claims subsequent to February 2015
 Discussions with relevant authorities continue
21
3-YEAR MARKET GUIDANCE
000’s 2017 2018 2019
Copper – tonnes 570 600 605
Nickel – contained tonnes 25 25 25
Gold – ounces 200 200 200
Zinc – tonnes 20 20 15
PRODUCTION GUIDANCE1
22
C1 Cash Cost2 - $ per pound 2017 2018 2019
Copper 1.20 – 1.40 1.20 – 1.40 1.20 – 1.40
Nickel 4.60 – 4.80 4.60 – 4.80 4.60 – 4.80
All-in sustaining cost3 – $ per pound
Copper 1.65 – 1.80 1.65 – 1.80 1.65 – 1.80
Nickel 5.10 – 5.40 5.10 – 5.40 5.10 – 5.40
C1 CASH COST AND ALL-IN SUSTAINING COST GUIDANCE1
1 Copper guidance provided
includes estimates for Sentinel but
not for Cobre Panama
2 C1 cash cost includes all mining
and processing costs less any
profits from by-products such as
gold, cobalt or zinc. TC/RC and
freight deductions on metal sales,
which are typically recognized as a
component of sales revenues, are
added to C1 cash cost to arrive at
an approximate cost of finished
metal.
3 All-in sustaining cost is defined as
C1 cash cost plus general and
administrative expenses,
sustaining capital expenditure,
deferred stripping and royalties
3-YEAR MARKET GUIDANCE
$ millions 2017 2018 2019
Total Cobre Panama 1,060 830 110
Third-party contribution (420) (330) (200)
First Quantum’s share of Cobre Panama 640 500 (90)
Capitalized stripping 200 200 200
Sustaining capital and other non-major projects 230 150 150
Total net capital expenditure 1,070 850 260
CAPITAL EXPENDITURE GUIDANCE4
23
4 Excludes capitalization of any net pre-commercial production costs and capitalized interest
FIRST QUANTUM MINERALS
TSX: FM February 2017

Weitere ähnliche Inhalte

Was ist angesagt?

First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014
FirstQuantum
 
First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014
FirstQuantum
 

Was ist angesagt? (19)

First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014First Quantum Minerals Corporate Presentation - June 2014
First Quantum Minerals Corporate Presentation - June 2014
 
Rice Energy's 1Q16 PowerPoint Presentation for Investors
Rice Energy's 1Q16 PowerPoint Presentation for InvestorsRice Energy's 1Q16 PowerPoint Presentation for Investors
Rice Energy's 1Q16 PowerPoint Presentation for Investors
 
Premier Oil Investor Presentation 2017-February
Premier Oil Investor Presentation 2017-FebruaryPremier Oil Investor Presentation 2017-February
Premier Oil Investor Presentation 2017-February
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Nal energy corporate presentation - january 2012
Nal energy   corporate presentation - january 2012Nal energy   corporate presentation - january 2012
Nal energy corporate presentation - january 2012
 
First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 
Premier oil
Premier oilPremier oil
Premier oil
 
Premier oil q3_14_presentation
Premier oil q3_14_presentationPremier oil q3_14_presentation
Premier oil q3_14_presentation
 
Premier oil13a pres
Premier oil13a presPremier oil13a pres
Premier oil13a pres
 
Auriga Gold Corp. (AIA.V) - Maverick Gold Project Presentation May 2014.
Auriga Gold Corp. (AIA.V) - Maverick Gold Project Presentation May 2014. Auriga Gold Corp. (AIA.V) - Maverick Gold Project Presentation May 2014.
Auriga Gold Corp. (AIA.V) - Maverick Gold Project Presentation May 2014.
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015
 
Barclays select screen march 2015
Barclays select screen   march 2015Barclays select screen   march 2015
Barclays select screen march 2015
 
2017 07-13 great-panther_silver_limited_corporate_presentation
2017 07-13 great-panther_silver_limited_corporate_presentation2017 07-13 great-panther_silver_limited_corporate_presentation
2017 07-13 great-panther_silver_limited_corporate_presentation
 
Dej april2015
Dej april2015Dej april2015
Dej april2015
 
Premier oil inv_pres_nov_2015
Premier oil inv_pres_nov_2015Premier oil inv_pres_nov_2015
Premier oil inv_pres_nov_2015
 
Enerplus overview
Enerplus overviewEnerplus overview
Enerplus overview
 
2017 10-30 great-panther_silver_limited_corporate_presentation
2017 10-30 great-panther_silver_limited_corporate_presentation2017 10-30 great-panther_silver_limited_corporate_presentation
2017 10-30 great-panther_silver_limited_corporate_presentation
 
2017 10-12 great-panther_silver_limited_corporate_presentation (1)
2017 10-12 great-panther_silver_limited_corporate_presentation (1)2017 10-12 great-panther_silver_limited_corporate_presentation (1)
2017 10-12 great-panther_silver_limited_corporate_presentation (1)
 

Andere mochten auch

Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16
Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16
Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16
valeritasir
 
Annual Shareholders Meeting Presentation
Annual Shareholders Meeting PresentationAnnual Shareholders Meeting Presentation
Annual Shareholders Meeting Presentation
richmontminesinc2016
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
richmontminesinc2016
 
Island Gold Mine Site Visit Presentation
Island Gold Mine Site Visit PresentationIsland Gold Mine Site Visit Presentation
Island Gold Mine Site Visit Presentation
richmontminesinc2016
 

Andere mochten auch (20)

BMO 26th Global Metals & Mining Conference
BMO 26th Global Metals & Mining ConferenceBMO 26th Global Metals & Mining Conference
BMO 26th Global Metals & Mining Conference
 
022617 bmo conference
022617 bmo conference022617 bmo conference
022617 bmo conference
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Alamos corp presentation March 2017
Alamos corp presentation March 2017Alamos corp presentation March 2017
Alamos corp presentation March 2017
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_final
 
Discover 4Q16 Earnings
Discover 4Q16 EarningsDiscover 4Q16 Earnings
Discover 4Q16 Earnings
 
Itg investor presentation_03feb17
Itg investor presentation_03feb17Itg investor presentation_03feb17
Itg investor presentation_03feb17
 
Egd
EgdEgd
Egd
 
Calibre Mining Corporate Presentation March 2017
Calibre Mining Corporate Presentation March 2017Calibre Mining Corporate Presentation March 2017
Calibre Mining Corporate Presentation March 2017
 
2017 PDAC Convention
2017 PDAC Convention 2017 PDAC Convention
2017 PDAC Convention
 
Connecticut Water Service, Inc. 2016 Annual Investor-Analyst Call
Connecticut Water Service, Inc. 2016 Annual Investor-Analyst CallConnecticut Water Service, Inc. 2016 Annual Investor-Analyst Call
Connecticut Water Service, Inc. 2016 Annual Investor-Analyst Call
 
Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16
Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16
Art 923 rev-c-updating investor presentation on valeritas website_final_12.05.16
 
Celp investor presentation march 2017 final
Celp investor presentation march 2017 finalCelp investor presentation march 2017 final
Celp investor presentation march 2017 final
 
Cdm ir (1 q16) 160726 v1
Cdm ir (1 q16) 160726 v1Cdm ir (1 q16) 160726 v1
Cdm ir (1 q16) 160726 v1
 
June 2015 Presentation
June 2015 PresentationJune 2015 Presentation
June 2015 Presentation
 
Denver Gold Presentation 2013
Denver Gold Presentation 2013Denver Gold Presentation 2013
Denver Gold Presentation 2013
 
Annual Shareholders Meeting Presentation
Annual Shareholders Meeting PresentationAnnual Shareholders Meeting Presentation
Annual Shareholders Meeting Presentation
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
Island Gold Mine Site Visit Presentation
Island Gold Mine Site Visit PresentationIsland Gold Mine Site Visit Presentation
Island Gold Mine Site Visit Presentation
 
Island Gold Site Visit
Island Gold Site VisitIsland Gold Site Visit
Island Gold Site Visit
 

Ähnlich wie February 2017 Corporate Presentation

Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
FirstQuantum
 
Thompson creek-q4-and-fy-2015-cc-presentation-final-0
Thompson creek-q4-and-fy-2015-cc-presentation-final-0Thompson creek-q4-and-fy-2015-cc-presentation-final-0
Thompson creek-q4-and-fy-2015-cc-presentation-final-0
Adnet Communications
 
08 08-16 q2 webcast presentation (sm)
08 08-16 q2 webcast presentation (sm)08 08-16 q2 webcast presentation (sm)
08 08-16 q2 webcast presentation (sm)
RichmontIR
 

Ähnlich wie February 2017 Corporate Presentation (20)

Presentation november final
Presentation   november finalPresentation   november final
Presentation november final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3
 
Sqm corp pres baml
Sqm corp pres bamlSqm corp pres baml
Sqm corp pres baml
 
Sqm corp pres baml
Sqm corp pres bamlSqm corp pres baml
Sqm corp pres baml
 
Sqm corp pres 2q17_new version
Sqm corp pres 2q17_new versionSqm corp pres 2q17_new version
Sqm corp pres 2q17_new version
 
2016 q1results.21apr2016
2016 q1results.21apr20162016 q1results.21apr2016
2016 q1results.21apr2016
 
Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 final
 
Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016Q3 Earnings Results Presentation 2016
Q3 Earnings Results Presentation 2016
 
Thompson creek-q4-and-fy-2015-cc-presentation-final-0
Thompson creek-q4-and-fy-2015-cc-presentation-final-0Thompson creek-q4-and-fy-2015-cc-presentation-final-0
Thompson creek-q4-and-fy-2015-cc-presentation-final-0
 
SQM - Fourth Quarter 2016 Earnings
SQM - Fourth Quarter 2016 EarningsSQM - Fourth Quarter 2016 Earnings
SQM - Fourth Quarter 2016 Earnings
 
Sqm corp pres 2q17 results
Sqm corp pres 2q17 resultsSqm corp pres 2q17 results
Sqm corp pres 2q17 results
 
Sqm corp pres apr_btg final
Sqm corp pres apr_btg finalSqm corp pres apr_btg final
Sqm corp pres apr_btg final
 
Sqm corp pres 1q16_final
Sqm corp pres 1q16_finalSqm corp pres 1q16_final
Sqm corp pres 1q16_final
 
HMBNP Remarks
HMBNP RemarksHMBNP Remarks
HMBNP Remarks
 
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
 
08 08-16 q2 webcast presentation (sm)
08 08-16 q2 webcast presentation (sm)08 08-16 q2 webcast presentation (sm)
08 08-16 q2 webcast presentation (sm)
 

Mehr von FirstQuantum (11)

Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - final
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - final
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - final
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor Presentation
 
Corporate Presentation - February 2014
Corporate Presentation - February 2014Corporate Presentation - February 2014
Corporate Presentation - February 2014
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013
 
Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013
 

Kürzlich hochgeladen

VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Sheetaleventcompany
 
Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...
Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...
Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 

Kürzlich hochgeladen (20)

Pakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girlsPakistani Call girls in Ajman +971563133746 Ajman Call girls
Pakistani Call girls in Ajman +971563133746 Ajman Call girls
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls South Ex ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Hauz Khas ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Hauz Khas ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Q3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call PresentationQ3 FY24 Earnings Conference Call Presentation
Q3 FY24 Earnings Conference Call Presentation
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...
Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...
Sensual Moments: +91 9999965857 Independent Call Girls Aerocity Delhi {{ Moni...
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
Indapur - Virgin Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service...
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 

February 2017 Corporate Presentation

  • 1. FIRST QUANTUM MINERALS TSX: FM February 2017
  • 2. CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT Some of the statements contained in the following material are forward-looking statements and not statement of facts. Such statements are based on the current beliefs of management, as well as assumptions based on management information currently available. Forward-looking statements are subject to various risks, uncertainties and other factors that could cause actual results to differ materially from expected results. Readers must rely on their own evaluation of these uncertainties. Note: all dollar amounts in US dollars unless otherwise indicated 2
  • 4. UNRIVALLED GROWTH IN COPPER PRODUCTION  Sentinel mine began commercial production in November 2016  Cobre Panama project on track for phased commissioning in 2018 1 First Quantum excludes the sold Kevitsa mine 2020F assumes flat year-over-year production plus 300K tonnes of production from Cobre Panama 4 2019E Copper Production1 (million tonnes)1.61 1.42 1.35 1.24 0.98 0.91 0.59 0.57 0.52 0.44 0.42 0.38 0.30 0.26 0.61 0.54 0.31 Coldeco Freeport-McMoRan Glencore BHPBilliton SouthernCopper FirstQuantum2020F (includingCobrePanama) RioTinto KGHM Antofagasta Vale AngloAmerican Norilsk KAZMinerals TeckResources FirstQuantum2019F (2019Guidance) FirstQuantum2016A FirstQuantum2012A
  • 5. 2016 – A STRONG YEAR FOR FIRST QUANTUM DELIVERED ON OUR OBJECTIVES  Sold the non-core Kevitsa mine for a total of $732M in cash  Ramped up & started commercial production at Sentinel  Achieved record copper production & sales  Lowered unit production cost  Strengthened our financial position  Protected cash flows in a weak copper price market 5
  • 6. 2016 – A STRONG YEAR FOR FIRST QUANTUM STARTED COMMERCIAL PRODUCTION AT SENTINEL  Operations stabilized with improved crusher and conveyor availability  Power supply progressively increased after 2nd power line energized  Unit production cost for two months of commercial production: C1 = $1.47/lb; AISC = $2.13/lb; C3 = $2.16/lb  Transitioning to terrace mining for increased mining efficiencies and improved water management capabilities 6
  • 7. 2016 – A STRONG YEAR FOR FIRST QUANTUM RECORD COPPER PRODUCTION & SALES1  Good results across the operations: Ramped up & began commercial operations at the Sentinel mine Higher production at the Kansanshi mine Record output from the Las Cruces mine 1st full year in commercial operation for the Kansanshi smelter  Generated $964M comparative EBITDA; $0.24 EPS 2015 2016 Other Operations Sentinel 540 411 7 2015 2016 Other Operations Sentinel SALES 000’s tonnes PRODUCTION 000’s tonnes 392 536 1 Excludes the sold Kevitsa mine
  • 8. 2016 – A STRONG YEAR FOR FIRST QUANTUM LOWERED COPPER UNIT PRODUCTION COST  2nd consecutive year of cost reduction: Benefits of operating the Kansanshi smelter Delivery on cost savings programs 8 UNIT PRODUCTION COST* $/lb $1.41 $1.21 $1.03 $2.02 $1.85 $1.41 2014 2015 2016 C1 AISC 38 17 3 3 AISC COST REDUCTIONS 2016 vs 2014 cents/lb C1 Capital expenditures G&A costs Royalties * Excludes Sentinel
  • 9. 2016 – A STRONG YEAR FOR FIRST QUANTUM STRENGTHENED OUR FINANCIAL POSITION  Completed a refinancing in May 2016  Year-end 2016:  $713 million of committed undrawn facilities  $565 million in net unrestricted cash  $964 million of working capital  In full compliance with all debt covenants 9 LONG-TERM DEBT PROFILE $ millions
  • 10. 2016 – A STRONG YEAR FOR FIRST QUANTUM PROTECTED CASH FLOWS IN A WEAK COPPER PRICE MARKET  Initiated a sales hedge program to ensure stability of cash flows in the current higher capital expenditure phase of the development of the Cobre Panama project  Added $60M to revenues for the year 2016 10
  • 11. • Mining concession extended for a second 20-year term to February 2037 • Port & power station at peak construction • Mine site & process plant areas moving towards construction peak in 2H 2017 • Priority given to the power station and associated infrastructure • Expect first commercial power in Q4 2017 from the first 150MW unit • 2nd 150MW unit expected to follow into operation in the 1H 2018 COBRE PANAMA DEVELOPMENT ON TRACK 11
  • 12. • All 7 mills and their drives should be fully installed by the middle 2017 • Commissioning of entire operation planned to begin in 2018 • Target to achieve an equivalent 60 million tonne-per-annum throughput rate in December 2018, and continue towards steady state operation and further ramp up in 2019 COBRE PANAMA DEVELOPMENT ON TRACK 12
  • 13. COBRE PANAMA DEVELOPMENT ON TRACK  Capital unchanged at $5.48B $ billions Total First Quantum 3rd Party Spent to Dec 2015 2.72 1.86 0.86 Spent to Dec 2016 0.76 0.46 0.30 Estimated 2017 spend 1.06 0.64 0.42 Estimated spend 2018 to completion 0.94 0.41 0.53 Total Cobre Panama 5.48 3.37 2.11 13
  • 14. Good progress made on Project Financing COBRE PANAMA – PROJECT FINANCING UPDATE  Project financing for Cobre Panama was launched to ECA’s in December 2016  Discussions with a number of ECA’s across Asia, Europe and North America going well  Expected long term debt of up to $2.5 billion  Site visit and term sheet discussions will be held in March with follow up discussions in Q2 2017  Targeted completion of the second half of 2017 14
  • 15. COBRE PANAMA PROGRESS – PORT & POWER STATION OVERVIEW 15
  • 16. COBRE PANAMA PROGRESS – POWER STATION OVERVIEW 16
  • 17. COBRE PANAMA PROGRESS – POWER STATION 17
  • 18. COBRE PANAMA PROGRESS – OVERALL PROCESS PLANT & MINE VIEW 18
  • 19. COBRE PANAMA PROGRESS – PROCESS AREA OVERVIEW 19
  • 20. COBRE PANAMA PROGRESS – TAILINGS MANAGEMENT FACILITY DECANT TUNNEL – INLET 20
  • 21. POSITIVE DEVELOPMENTS IN ZAMBIA • Improved power situation:  301MW currently being provided to Kansanshi complex and Sentinel – sufficient for current operations  Itezhi-Tehzi hydro added ~120MW into the system  Maamba Collieries introduced the 2nd 150MW (300MW total) mid-November 2016 • Changes to Zambian mining tax regime enacted June 1 2016:  Variable profits tax repealed  20% royalty lowered to between 4-6% depending on the monthly average LME copper trading price (currently 5%) • VAT accrued to December 31, 2016 = $275 million:  Refunds of $77M received for claims subsequent to February 2015  Discussions with relevant authorities continue 21
  • 22. 3-YEAR MARKET GUIDANCE 000’s 2017 2018 2019 Copper – tonnes 570 600 605 Nickel – contained tonnes 25 25 25 Gold – ounces 200 200 200 Zinc – tonnes 20 20 15 PRODUCTION GUIDANCE1 22 C1 Cash Cost2 - $ per pound 2017 2018 2019 Copper 1.20 – 1.40 1.20 – 1.40 1.20 – 1.40 Nickel 4.60 – 4.80 4.60 – 4.80 4.60 – 4.80 All-in sustaining cost3 – $ per pound Copper 1.65 – 1.80 1.65 – 1.80 1.65 – 1.80 Nickel 5.10 – 5.40 5.10 – 5.40 5.10 – 5.40 C1 CASH COST AND ALL-IN SUSTAINING COST GUIDANCE1 1 Copper guidance provided includes estimates for Sentinel but not for Cobre Panama 2 C1 cash cost includes all mining and processing costs less any profits from by-products such as gold, cobalt or zinc. TC/RC and freight deductions on metal sales, which are typically recognized as a component of sales revenues, are added to C1 cash cost to arrive at an approximate cost of finished metal. 3 All-in sustaining cost is defined as C1 cash cost plus general and administrative expenses, sustaining capital expenditure, deferred stripping and royalties
  • 23. 3-YEAR MARKET GUIDANCE $ millions 2017 2018 2019 Total Cobre Panama 1,060 830 110 Third-party contribution (420) (330) (200) First Quantum’s share of Cobre Panama 640 500 (90) Capitalized stripping 200 200 200 Sustaining capital and other non-major projects 230 150 150 Total net capital expenditure 1,070 850 260 CAPITAL EXPENDITURE GUIDANCE4 23 4 Excludes capitalization of any net pre-commercial production costs and capitalized interest
  • 24. FIRST QUANTUM MINERALS TSX: FM February 2017