Pitfalls to Prevent and Mitigate:
Descriptions, Symptoms, Consequences, Causes,
and Recommendations
Donald G. Firesmith
Page 1 of 111
© 2013 by Carnegie Mellon University
2. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Table of Contents
1 Introduction ........................................................................................................................... 5
1.1 Usage ................................................................................................................................ 5
1.2 Problem Specifications ..................................................................................................... 6
1.3 Problem Interpretation...................................................................................................... 6
2 Testing Problems ................................................................................................................... 8
2.1 General Testing Problems ................................................................................................ 8
2.1.1 Test Planning and Scheduling Problems................................................................... 8
2.1.2 Stakeholder Involvement and Commitment Problems ........................................... 17
2.1.3 Management-related Testing Problems .................................................................. 21
2.1.4 Test Organization and Professionalism Problems .................................................. 28
2.1.5 Test Process Problems ............................................................................................ 32
2.1.6 Test Tools and Environments Problems ................................................................. 45
2.1.7 Test Communication Problems ............................................................................... 54
2.1.8 Requirements-related Testing Problems ................................................................. 60
2.2 Test Type Specific Problems.......................................................................................... 70
2.2.1 Unit Testing Problems ............................................................................................ 71
2.2.2 Integration Testing Problems .................................................................................. 72
2.2.3 Specialty Engineering Testing Problems ................................................................ 74
2.2.4 System Testing Problems ........................................................................................ 82
2.2.5 System of Systems (SoS) Testing Problems ........................................................... 84
2.2.6 Regression Testing Problems .................................................................................. 89
3 2BConclusion ....................................................................................................................... 97
3.1 Testing Problems ............................................................................................................ 97
3.2 Common Consequences ................................................................................................. 97
3.3 Common Solutions ......................................................................................................... 98
4 Potential Future Work ..................................................................................................... 100
5 Acknowledgements ........................................................................................................... 101
© 2012-2013 by Carnegie Mellon University Page 2 of 111
3. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
© 2012-2013 by Carnegie Mellon University Page 3 of 111
4. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Abstract
This special report documents the different types of problems that commonly occur when testing
software-reliant systems. These 77 problems are organized into 14 categories. Each of these
problems is given a title, description, a set of potential symptoms by which it can be recognized,
a set of potential negative consequences that can result if the problem occurs, a set of potential
causes for the problem, and recommendations for avoiding the problem or solving the should it
occur.
© 2012-2013 by Carnegie Mellon University Page 4 of 111
5. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
1 Introduction
Many testing problems can occur during the development or maintenance of software-reliant
systems and software applications. While no project is likely to be so poorly managed and
executed as to experience the majority of these problems, most projects will suffer several of
them. Similarly, while these testing problems do not guarantee failure, they definitely pose
serious risks that need to be managed.
Based on over 30 years of experience developing systems and software as well as
performingnumerous independent technical assessments, this technical report documents 77
problems that have been observed to commonly occur during testing. These problems have
beencategorized as follows:
• General Testing Problems
Test Planning and Scheduling Problems
Stakeholder Involvement and Commitment Problems
Management-related Testing Problems
Test Organization and Professionalism Problems
Test Process Problems
Test Tools and Environments Problems
Test Communication Problems
Requirements-related Testing Problems
• Testing Type Specific Problems
Unit Testing Problems
Integration Testing Problems
Specialty Engineering Testing Problems
System Testing Problems
System of Systems (SoS) Problems
Regression Testing Problems
1.1 Usage
Theinformation describing each of the commonly occurring testing problems can be used:
• To improve communication regarding commonly occurring testing problems
• As training materials for testers and the stakeholders of testing
• As checklists when:
Developing and reviewing an organizational or project testing process or strategy
Developing and reviewing test plans, the testing sections of system engineering
management plans (SEMPs), and software development plans (SDPs)
Evaluating the testing-related parts of contractor proposals
Evaluating test plans and related documentation (quality control)
© 2012-2013 by Carnegie Mellon University Page 5 of 111
6. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Evaluating the actual as-performed testing process during the oversight 1 (quality 0F
assurance)
Identifying testing risks and appropriate risk mitigation approaches
• To categorize testing problems for metrics collection, analysis, and reporting
• As an aid to identify testingareas potentially needing improvement during project post
mortems (post implementation reviews)
Although each of these testing problems has been observed on multiple projects, it is entirely
possible that you may have testing problems not addressed by this document.
1.2 Problem Specifications
The following tables document each testing problem with the following information:
• Title – a short descriptive nameof the problem
• Description – a brief definition of the problem
• Potential Symptoms (how you will know) –potential symptoms that indicate possible
existence of the problem
• Potential Consequences (why you should care) –potential negative consequences to expect
if the problem is not avoided or solved2
• Potential Causes –potential root and proximate causes of the problem3
• Recommendations (what you should do) –recommended (prepare, enable, perform, and
verify) actions to take to avoid or solve the problem4
• Related Problems – a list of links to other related testing problems
1.3 Problem Interpretation
The goal of testing is not to prove that something works, but rather to demonstrate that it does
not. 5A good tester assumes that there are always defects (an extremely safe assumption) and
2F
1
Not all testing problems have the same probability or harm severity. These problem specifications are not
intended to be used as part of a quantitative scoring scheme based on the number of problems found. Instead,
they are offered to support qualitative review and planning.
2
Note that the occurrence of a potential consequence may be a symptom by which the problem is recognized.
3
Causes are important because recommendations should be based on the causes. Also, recommendation to address
root causes may be more important than proximate causes, because recommendations addressing proximate
causes may not combat the root cause and therefore may not prevent the problem under all circumstances.
4
Some of the recommendations may no longer be practical after the problem rears its ugly head. It is usually much
easier to avoid the problem or nip it in the bud instead of fixing it when the project is well along or near
completion. For example, several possible ways exist to deal with inadequate time to complete testing including
(1) delay the test completion date and reschedule testing, (2) keep the test completion date and (a) reduce the
scope of delivered capabilities, (b) reduce the amount of testing, (c) add testers, and (d) perform more parallel
testing (e.g., different types of testing simultaneously). Selection of the appropriate recommendations to follow
therefore depends on the actual state of the project.
5
Although tests that pass are often used as evidence that the system (or subsystem) under test meets its (derived
and allocated) requirements, testing can never be exhaustive for even a simple system and therefore cannot
“prove” that all requirements are met. However, system and operational testing can provide evidence that the
system under test is “fit for purpose” and ready to be placed into operation.For example, certain types of testing
© 2012-2013 by Carnegie Mellon University Page 6 of 111
7. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
seeks to uncover them.Thus, a good test is one that causes the thing being tested to fail so that
the underlying defect(s) can be found and fixed.6
Defects are not restricted to violations of specified (or unspecified) requirements. Some of the
other important types of defects are:
• inconsistencies between the architecture, design, and implementation
• violations of coding standards
• lack of input checking (i.e., unexpected data)
• the inclusion of safety or security vulnerabilities (e.g., the use of inherently unsafe language
features or lack of verification of input data)
may provide evidence required for safety and security accreditation and certification. Nevertheless, a tester must
take a “show it fails” rather than a “show it works” mindsetto be effective.
6
Note that testing cannot identify all defects because some defects (e.g., the failure to implement missing
requirements) do not cause the system to fail in a manner detectable by testing.
© 2012-2013 by Carnegie Mellon University Page 7 of 111
8. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
2 Testing Problems
The commonly occurring testing problems documented in this section are categorized as either
general testing problems or testing type specific problems.
2.1 General Testing Problems
The following testing problems can occur regardless of the type of testing being performed:
• Test Planning and Scheduling Problems
• Stakeholder Involvement and Commitment Problems
• Management-related Testing Problems
• Test Organization and Professionalism Problems
• Test Process Problems
• Test Tools and Environments Problems
• Test Communication Problems
• Requirements-related Testing Problems
2.1.1 Test Planning and Scheduling Problems
The following testing problems are related to test planning and estimation:
• GEN-TPS-1 No Separate Test Plan
• GEN-TPS-2 Incomplete Test Planning
• GEN-TPS-3 Test Plans Ignored
• GEN-TPS-4 Test Case Documents rather than Test Plans
• GEN-TPS-5 Inadequate Test Schedule
• GEN-TPS-6 Testing is Postponed
2.1.1.1 GEN-TPS-1 No Separate Test Plan
Description: There are no separate testing-specific planning document(s).
Potential Symptoms:
• Thereisno separate Test and Evaluation Master Plan (TEMP) or System/Software Test Plan
(STP).
• Thereareonlyincomplete high-level overviews of testing in System Engineering Master Plan
(SEMP) and System/Software Development Plan (SDP).
Potential Consequences:
• The test planning parts of these other documents arenot written by testers.
• Testing is not adequately planned.
• The test plans are not adequately documented.
• It is difficult or impossible to evaluate the planned testing process.
© 2012-2013 by Carnegie Mellon University Page 8 of 111
9. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• Testing is inefficiently and ineffectively performed.
Potential Causes:
• The customer has not specified the development and delivery of a separate test plan.
• The system engineering, software engineering, or testing process has not included the
development of a separate test plan.
• There was no template for the content and format of a separate test plan.
• Management, the customer representative, or the testers did not understand the:
scope, complexity, and importance of testing
value of a separate test plan
Recommendations:
• Prepare:
Reuse or create a standard template and content/format standard for test plans.
Include one or more separateTEMPsand/or STPs as deliverable work products in the
contract.
Include the development and delivery of test planning documents in the project master
schedule (e.g., as part of major milestones).
• Enable:
Provide sufficient resources (staffing and schedule) for the development of one or more
separate test plans.
• Perform:
Develop and deliver one or more separateTEMPsand/or STPs.
• Verify:
Verify the existence and delivery of one or more separate test planning documents.
Do not accept incomplete high-level overviews of testing in the SEMP and/orSDP as the
only test planning documentation.
2.1.1.2 GEN-TPS-2 Incomplete Test Planning
Description: The test planning documents are incomplete.
Potential Symptoms:
• The test planning documents are incomplete, missing some or all7 of the:
references – listing of all relevant documents influencing testing
test goals and objectives – listing the high-level goals and subordinate objectives of the
testing program
scope of testing – listing the component(s), functionality, and/or capabilities to be
7
This does not mean that every test plan must include all of this information; test plans should include only the
information that is relevant for the current project. It is quite reasonable to reuse much/most of this information
in multiple test plans; just because it is highly reusable does not mean that it is meaningless boilerplate that can
be ignored. Test plans can be used to estimate the amount of test resources (e.g., time and tools) needed as well
as the skills/expertise that the testers need.
© 2012-2013 by Carnegie Mellon University Page 9 of 111
10. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
tested (and any that are not to be tested)
test levels – listing and describing the relevant levels of testing (e.g., unit, subsystem
integration, system integration, system, and system of systems testing)
test types – listing and describing the types of testing such as:
blackbox, graybox, and whitebox testing
developmental vs. acceptance testing
initial vs. regression testing
manual vs. automated
mode-based testing (system start-up 8, operational mode, degraded mode, training
7F
mode, and system shutdown)
normal vs. abnormal behavior (i.e., nominal vs. off-nominal, sunny day vs. rainy day
use case paths)
quality criteria based testing such as availability, capacity (e.g., load and stress
testing), interoperability, performance, reliability, robustness9, safety, security (e.g.,
penetration testing), and usability testing
static vs. dynamic testing
time- or date-based testing
testing methods and techniques – listing and describing the planned testing methods
and techniques (e.g., boundary value testing, penetration testing, fuzz testing, alpha and
beta testing) to be used including the associated:
test case selection criteria – listing and describing the criteria to be used to select
test cases (e.g., interface-based, use-case path,boundary value testing, and error
guessing)
test entrance criteria – listing the criteria that must hold before testing should
begin
test exit/completion criteria – listing the test completion criteria (e.g., based on
different levels of code coverage such as statement, branch, condition coverage)
test suspension and resumption criteria
test completeness and rigor – describing how the rigor and completeness of the testing
varies as a function of mission-, safety-, and security-criticality
resources:
staffing – listingthe different testing roles and teams, their responsibilities, their
associated qualifications (e.g., expertise, training, and experience), and their
numbers
environments – listing and description of required computers (e.g., laptops and
servers), test tools (e.g., debuggers and test management tools), test environments
(software and hardware test beds), and test facilities
testing work products – listing and describing of the testing work products to be
8
This includes combinations such as the testing of system start-up when hardware/software components fail.
9
This includes the testing of error, fault, and failure tolerance.
© 2012-2013 by Carnegie Mellon University Page 10 of 111
11. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
produced or obtained such as test documents (e.g., plans and reports), test software (e.g.,
test drivers and stubs), test data (e.g., inputs and expected outputs), test hardware, and
test environments
testing tasks – listing and describing the major testing tasks (e.g., name, objective,
preconditions, inputs, steps, postconditions, and outputs)
testing schedule – listing and describing the major testing milestones and activities in
the context of the project development cycle, schedule, and major project milestones
reviews, metrics, and status reporting – listing and describing the test-related reviews
(e.g., Test Readiness Review), test metrics (e.g., number of tests developed and run),
and status reports (e.g., content, frequency, and distribution)
dependencies of testing on other project activities – such as the need to incorporate
certain hardware and software components into test beds before testing using those
environments can begin
acronym list and glossary
Potential Consequences:
• Testers and stakeholders in testing may not understand the primary objective of testing (i.e.,
to find defects so that they can be fixed).
• Some levels and types of tests may notbe performed, allowing certain types of residual
defects to remain in the system.
• Some testing may be ad hoc and therefore inefficient and ineffectual.
• Mission-, safety-, and security-critical software may not be sufficiently tested to the
appropriate level of rigor.
• Certain types of test cases may be ignored, resulting in related residual defects in the tested
system.
• Test completion criteria may be based more on schedule deadlines than on the required
degree of freedom from defects.
• Adequate amounts of test resources (e.g., e.g., testers, test tools, environments, and test
facilities) may not be made available because they are not in the budget.
• Some testers may not have adequate expertise, experience, and skills to perform all of the
types of testing that needs to be performed.
Potential Causes:
• There were no templates or content and format standards for separate test plans.
• The associated templates or content and format standardswere incomplete.
• The test planning documents were written by people (e.g., managers or developers) who did
not understand the scope, complexity, and importance of testing.
Recommendations:
• Prepare:
Reuse or create a standard template and/or content/format standard for test plans.
• Enable:
Provide sufficient resources (staffing and schedule) to develop complete test plan(s).
• Perform:
© 2012-2013 by Carnegie Mellon University Page 11 of 111
12. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Use a proper template and/orcontent/format standard to develop the test plans (i.e., ones
that are derived from test plan standards and tailored if necessary for the specific
project).
• Verify:
Verify during inspections/reviews that all test plans are sufficiently complete
Do not accept incomplete test plans.
Related Problems:GEN-TOP-2 Unclear Testing Responsibilities, GEN-PRO-8 Inadequate
Test Evaluations, GEN-TTE-7 Tests Not Delivered, TTS-SPC-1 Inadequate Capacity
Requirements, TTS-SPC-2 Inadequate Concurrency Requirements, TTS-SPC-3 Inadequate
Performance Requirements, TTS-SPC-4 Inadequate Reliability Requirements, TTS-SPC-5
Inadequate Robustness Requirements, TTS-SPC-6 Inadequate Safety Requirements, TTS-SPC-
7 Inadequate Security Requirements, TTS-SPC-8 Inadequate Usability Requirements, TTS-
SoS-1 Inadequate SoS Planning, TTS-REG-5 Disagreement over Maintenance Test Resources
2.1.1.3 GEN-TPS-3Test Plans Ignored
Description: The test plans are ignored once developed and delivered.
Potential Symptoms:
• The way the testers perform testing is not consistent with the relevant test plan(s).
• The test plan(s) are never updated after initial delivery shortly after the start of the project.
Potential Consequences:
• Management may not have budgeted sufficient funds to the pay for the necessary test
resources e.g., testers, test tools, environments, and test facilities).
• Management may not have made adequate amounts of test resources available because they
are not in the budget.
• Testers will not have an approved document that justifies:
their request for additional needed resources when they need them
their insistence that certain types of testing is necessary and must not be dropped when
the schedule becomes tight
• Some testers may not have adequate expertise, experience, and skills to perform all of the
types of testing that needs to be performed.
• The test plan may not be maintained.
• Some levels and types of tests may not be performed so that certain types of residual defects
to remain in the system.
• Some important test cases may not be developed and executed.
• Mission-, safety-, and security-critical software may not be sufficiently tested to the
appropriate level of rigor.
• Test completion criteria may be based more on schedule deadlines than on the required
degree of freedom from defects.
Potential Causes:
© 2012-2013 by Carnegie Mellon University Page 12 of 111
13. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• The testers may have forgotten some of the test plan contents.
• The testers may have thought that the only reason a test plan was developed was because it
was a deliverable in the contract that needed to be check off.
• The test plan(s) may be so incomplete and at such a generic high level of abstraction as to
be relatively useless.
Recommendations:
• Prepare:
Have project management (both administrative and technical), testers, and quality
assurance personnel read and review the test plan.
Have management (acquisition and project) sign off on the completed test plan
document.
Use the test plan as input to the project master schedule and work breakdown schedule
(WBS).
• Enable:
Develop a short check list from the test plan(s) for use when assessing the performance
of testing.
• Perform:
Have the test manager periodically review the test work products and as-performed test
process against the test plan(s).
Have the test team update the test plan(s) as needed.
• Verify:
Have the testers present their work and status at project and test-team status meetings.
Have quality engineering periodically review the test work products (quality control)
and as performed test process (quality assurance).
Have progress, productivity, and quality test metrics collected, analyzed, and reported to
project and customer management.
Related Problems:GEN-TPS-2Incomplete Test Planning
2.1.1.4 GEN-TPS-4Test Case Documents rather than Test Plans
Description: Test case documents documenting specific test cases are labeled test plans.
Potential Symptoms:
• The “test plan(s)” contain specific test cases including inputs, test steps, expected outputs,
and sources such as specific requirements (blackbox testing) or design decisions (whitebox
testing).
• The test plans do not contain the type of general planning information listed in GEN-TPS-2
Incomplete Test Planning.
Potential Consequences:
• All of the negative consequences of GEN-TPS-2 Incomplete Test Planning may occur.
• The test case documents may not be maintained.
© 2012-2013 by Carnegie Mellon University Page 13 of 111
14. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Potential Causes:
• There may have been no template or content format for the test case documents.
• The test plan authors may not have had adequate expertise, experience, and skills to develop
test plans or know their proper content.
Recommendations:
• Prepare:
Provide the test manager and testers with at least minimal training in test planning.
• Enable:
Provide a proper test plan template.
Provide a proper content and format standard for test plans.
Add test plans and test case documents to the project technical glossary.
• Perform:
Develop the test plan in accordance with the test plan template or content and format
standard.
Develop the test case documents in accordance with the test case document template
and/or content and format standard.
Where practical, automate the test cases so that the resulting tests (extended with
comments) replace the test case documents so that the distinction is clear (i.e., the test
plan is a document meant to be read whereas the test case is meant to be executable).
• Verify:
Have the test plan(s) reviewed against the associated template or content and format
standard prior to acceptance.
Related Problems:GEN-TPS-2 Incomplete Test Planning
2.1.1.5 GEN-TPS-5 Inadequate Test Schedule
Description: The testing schedule is inadequate to permit proper testing.
Potential Symptoms:
• Testing is significantly incomplete and behind schedule.
• An insufficient time is allocated in the project master schedule to perform all:
test activities (e.g., automating testing, configuring test environments, and developing
test data, test scripts/drivers, and test stubs)
appropriate tests (e.g., abnormal behavior, quality requirements, regression testing) 10 8F
• Testers are working excessively and unsustainably long hours and days per week in an
attempt to meet schedule deadlines.
10
Note that an agile (i.e., iterative, incremental, and concurrent) development/life cycle greatly increases the
amount of regression testing needed (although this increase in testing can be largely offset by highly automating
regression tests). Although testing can never be exhaustive, more time is typically needed for adequate testing
unless testing can be made more efficient. For example, fewer defects could be produced and these defects could
be found and fixed earlier and thereby be prevented from reaching the current iteration.
© 2012-2013 by Carnegie Mellon University Page 14 of 111
15. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Potential Consequences:
• Testers are exhausted and therefore making an unacceptably large number of mistakes.
• Tester productivity (e.g., importance of defects found and number of defects found per unit
time) is decreasing.
• Customer representatives, managers, and developers have a false sense of security that the
system functions properly.
• There is a significant probability that the system or software will be delivered late with an
unacceptably large number of residual defects.
Potential Causes:
• The overall project schedule was insufficient.
• The size and complexity of the system were underestimated.
• The project master plan was written by people (e.g., managers, chief engineers, or technical
leads) who do not understand the scope, complexity, and importance of testing.
• The project master plan was developed without input from the test team(s).
Recommendations:
• Prepare:
Provide evidence-based estimates of the amount of testing and associated test effort that
will be needed.
Ensure that adequate time for testing is included in the program master schedule and test
team schedules including the testing of abnormal behavior and the specialty engineering
testing of quality requirements (e.g., load testing for capacity requirements and
penetration testing for security requirements). 11 9F
Provide adequate time for testing in change request estimates.
• Enable:
Deliver inputs to the testing process (e.g., requirements, architecture, design, and
implementation) earlier and more often (e.g., as part of an incremental, iterative, parallel
– agile – development cycle).
Provide sufficient test resources (e.g., number of testers, test environments, and test
tools).
If at all possible, do not reduce the testing effort in order to meet a delivery deadline.
• Perform:
Automate as much of the regression testing as is practical, and allocate sufficient
resources to maintain the automated tests. 12 10F
• Verify:
Verify that amount of time scheduled for testing is consistent with the evidence-based
11
Also integrate the testing process into the software development process.
12
When there is insufficient time to perform manual testing, it may be difficult to justify the automation of these
tests. However, automating regression testing is not just a maintenance issue. Even during initial development,
there should typically be a large amount of regression testing, especially if an iterative and incremental
development cycle is used. Thus, ignoring the automation of regression testing is often a case of being penny
wise and pound foolish.
© 2012-2013 by Carnegie Mellon University Page 15 of 111
16. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
estimates of need time.
Related Problems:TTS-SoS-5 SoS Testing Not Properly Scheduled
2.1.1.6 GEN-TPS-6 Testing is Postponed
Description: Testing is postponed until late in the development schedule.
Potential Symptoms:
• Testing is scheduled to be performed late in the development cycle on the project master
schedule.
• Little or no unit or integration testing:
is planned
is being performed during the early and middle stages of the development cycle
Potential Consequences:
• There is insufficient time left in the schedule to correct any major defects found. 13 11F
• It is difficult to show the required degree of test coverage.
• Because so much of the system has been integrated before the beginning of testing, it is
very difficult to find and localize defects that remain hidden within the internals of the
system.
Potential Causes:
• The project is using a strictly-interpreted traditional sequential Waterfall development
cycle.
• Management was not able to staff the testing team early during the development cycle.
• Management was primarily interested in system testing and did not recognize the need for
lower-level (e.g., unit and integration) testing.
Recommendations:
• Prepare:
Plan and schedule testing to be performed iteratively, incrementally, and in a parallel
manner (i.e., agile) starting early during development.
Provide training in incremental iterative testing.
Incorporate iterative and incremental testing into the project’s system/software
engineering process.
• Enable:
Provide adequate testing resources (staffing, tools, budget, and schedule) early during
development.
• Perform:
Perform testing in an iterative, incremental, and parallel manner starting early during the
development cycle.
13
An interesting example of this is the Hubble telescope. Testing of the mirror’s focusing was postponed until after
launch, resulting in an incredibly expensive repair mission.
© 2012-2013 by Carnegie Mellon University Page 16 of 111
17. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• Verify:
Verify in an ongoing manner (or at the very least during major project milestones) that
testing is being performed iteratively, incrementally, and in parallel with design,
implementation, and integration.
Use testing metrics to verify status and ongoing progress.
Related Problems:GEN-PRO-1 Testing and Engineering Process not Integrated
2.1.2 Stakeholder Involvement and Commitment Problems
The following testing problems are related to stakeholder involvement in and commitment to the
testing effort:
• GEN-SIC-1 Wrong Testing Mindset
• GEN-SIC-2 Unrealistic Testing Expectations / False Sense of Security
• GEN-SIC-3 Lack of Stakeholder Commitment
2.1.2.1 GEN-SIC-1 Wrong Testing Mindset
Description: Some of the testers and other testing stakeholders have the wrong testing mindset.
Potential Symptoms:
• Some testers and other testing stakeholdersbegin testing assumingthat the system/software
works.
• Testers believe that their job is to verify or “prove” that the system/software works. 14 12 F
• Testing is used to demonstrate that the system/software works properly rather than to
determinewhere and how it fails.
• Only normal (“sunny day”, “happy path”, or “golden path”) behavior is being tested.
• There is little or no testing of:
exceptional or fault/failure tolerant(“rainy day”) behavior
input data (e.g., range testing to identify incorrect handling of invalid input values)
• Test inputsonly include middle of the road values rather than boundary values and corner
cases.
Potential Consequences:
• There is a high probability that:
the delivered system or software will contain a significant number of residual defects,
especially related to abnormal behavior (e.g., exceptional use case paths)
these defects will unacceptably reduce its reliability and robustness (e.g., error, fault,
and failure tolerance)
• Customer representatives, managers, and developers have a false sense of security that the
system functions properly.
14
Using testing to “prove” that their software works is most likely to become a problem when developers test their
own software (e.g., with unit testing and with small cross-functional or agile teams).
© 2012-2013 by Carnegie Mellon University Page 17 of 111
18. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Potential Causes:
• Testers were taught or explicitly told that their job is to verify or “prove” that the
system/software works.
• Developers are testing their own software15 so that there is a “conflict of interest” (i.e., build
software that works and show that their software does not work). This is especially a
problem with small, cross-functional development organizations/teams that “cannot afford”
to have separate testers (i.e., professional testers who specialize in testing).
• There was insufficient schedule allocated for testing so that there is only sufficient time to
test the normal behavior (e.g., use case paths).
• The organizational culture is very success oriented so that looking “too hard” for problems
is (implicitly) discouraged.
• Management gave the testers the strong impression that they do not want to hear any “bad”
news (i.e., that there are any significant defects being found in the system).
Recommendations:
• Prepare:
Explicitly state in the project test plan that the primary goal of testing is to:
find defects by causing system faults and failuresrather than to demonstrate that
there are no defects
break the system rather than toprove that it works
• Enable:
Provide test training that emphasizes uncovering defects by causing faults or failures.
Provide sufficient time in the schedule for testing beyond the basic success paths.
Hire new testers who exhibit a strong “destructive” mindset to testing.
• Perform:
In addition to test cases that verify all normal behavior, emphasize looking for defects
where they are most likely to hide (e.g., boundary values, corner cases, and input
type/range verification). 16 1 3F
Incentivize testers based more on the number of significant defects they uncoverthan
merely on the number requirements “verified” or test cases ran.17
Foster a healthy competition between developers (who seek to avoid inserting defects)
and testers (who seek to find those defects).
• Verify:
Verify that the testers exhibit a testing mindset.
15
Developers typically do their own unit level (i.e., lowest level) testing. With small, cross functional (e.g., agile)
teams, it is becoming more common for developers to also do integration and subsystem testing.
16
Whereas tests that verify nominal behavior are essential, testers must keep in mind that there are typically many
more ways for the system/software under test to fail than to work properly. Also, nominal tests must remain part
of the regression test suite even after all known defects are fixed because changes could introduce new defects
that cause nominal behavior to fail.
17
Take care to avoid incentivizing developers to insert defects into their own software so that they can then find
them during testing.
© 2012-2013 by Carnegie Mellon University Page 18 of 111
19. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Related Problems:GEN-MGMT-2 Inappropriate External Pressures, GEN-COM-4Inadequate
Communication Concerning Testing, TTS-UNT-3 Unit Testing Considered Unimportant
2.1.2.2 GEN-SIC-2 Unrealistic Testing Expectations / False Sense of
Security
Description: Testers and other testing stakeholders have unrealistic testing expectations that
generate a false sense of security.
Potential Symptoms:
• Testing stakeholders (e.g., managers and customer representatives) and some testers falsely
believe that:
Testing detects all (or even the majority of) defects. 18 14F
Testing proves that there are no remaining defects and that the system therefore works
as intended.
Testing can be, for all practical purposes, exhaustive.
Testing can be relied on for all verification. (Note that some requirements are better
verified via analysis, demonstration, certification, and inspection.)
Testing (if it is automated) will guarantee the quality of the tests and reduce the testing
effort 19 15 F
• Managers and other testing stakeholders may not understand that:
Test automation requires specialized expertise and needs to be budgeted for the effort
required to develop, verify, and maintain the automated tests.
A passed test could result from a weak/incorrect test rather than a lack of defects.
A truly successful/useful test is one that finds one or more defects, whereas a passed test
only shows that the system worked in that single specific instance.
Potential Consequences:
• Testers and other testing stakeholders have a false sense of security that the system or
software will work properly on delivery and deployment.
• Non-testing forms of verification (e.g., analysis, demonstration, inspection, and simulation)
are not given adequate emphasis.
Potential Causes:
• Testing stakeholders and testers were not exposed to research results that document the
relatively large percentage of residual defects that typically remain after testing.
• Testers and testing stakeholders have not been trained in verification approaches (e.g.,
analysis, demonstration, inspection) other than testing and their relative pros and cons.
• Project testing metrics do not include estimates of residual defects.
18
Testing typically finds less than half of all latent defects and is not the most efficient way of detecting many
defects.
19
This depends on the development cycle and the volatility of the system’s requirements, architecture, design, and
implementation.
© 2012-2013 by Carnegie Mellon University Page 19 of 111
20. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Recommendations:
• Prepare:
Collect information on the limitations of testing.
Collect information on when and how to augment testing with other types of
verification.
• Enable:
Provide basic training in verification methods including their associated strengths and
limitations.
• Perform:
Train and mentor managers, customer representatives, testers, and other test
stakeholders concerning the limits of testing:
Testing will not detect all (or even a majority of) defects.
No testing is truly exhaustive.
Testing cannot prove (or demonstrate) that the system works under all combinations
of preconditions and trigger events.
A passed test could result from a weak test rather than a lack of defects.
A truly successful test is one that finds one or more defects.
Do not rely on testing for the verification of all requirements, especially architecturally-
significant quality requirements.
Collect, analyze, and report testing metrics that estimate the number of defectsremaining
after testing.
• Verify:
Verify that testing stakeholders understand the limitations of testing.
Verify that testing is not the only type of verification being used.
Verify that the number of defects remaining is estimated and reported.
Related Problems:GEN-MGMT-2 Inappropriate External Pressures, GEN-COM-4Inadequate
Communication Concerning Testing, TTS-REG-2 Regression Testing not Performed
2.1.2.3 GEN-SIC-3 Lack of Stakeholder Commitment
Description: There is a lack of adequate stakeholder commitment to the testing effort.
Potential Symptoms:
• Stakeholders (especially customers and management) are not providing sufficient resources
(e.g., people, schedule, tools, funding) for the testing effort.
• Stakeholders are unavailable for the review of test assets such as test plans and important
test cases.
• Stakeholders (e.g., customer representatives) point out defects in test assets after they have
been reviewed.
• Stakeholders do not support testing when resources must be cut (e.g., due to schedule
slippages and budget overruns).
© 2012-2013 by Carnegie Mellon University Page 20 of 111
21. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Potential Consequences:
• Testing is less effective due to inadequate resources.
• Stakeholders (e.g., customer representatives) reject reviewed test assets.
• The testing effort losesneeded resources when the schedule slips or the budget overruns.
Potential Causes:
• Stakeholders did not understand the scope, complexity, and importance of testing.
• Stakeholders were not provided adequate estimates of the resources needed to properly
perform testing.
• Stakeholders wereextremely busy with other duties.
• The overall project schedule and budget estimates were inadequate, thereby forcing cuts in
testing.
Recommendations:
• Prepare:
Convey the scope, complexity, and importance of testing to the testing stakeholders.
• Enable:
Provide stakeholders with adequate estimates of the resources needed to properly
perform testing.
• Perform:
Officially request sufficient testing resources from the testing stakeholders.
Obtain commitments of support for authoritative stakeholders at the beginning of the
project.
• Verify:
Verify that the testing stakeholders are providing sufficient resources (e.g., people,
schedule, tools, funding) for the testing effort.
Related Problems:GEN-MGMT-1 Inadequate Test Resources, GEN-MGMT-5 Test Lessons
Learned Ignored,GEN-MGMT-2 Inappropriate External Pressures, GEN-COM-4Inadequate
Communication Concerning Testing, TTS-SoS-4 Inadequate Funding for SoS Testing, TTS-
SoS-6 Inadequate Test Support from Individual Systems
2.1.3 Management-related Testing Problems
The following testing problems are related to stakeholder involvement in and commitment to the
testing effort:
• GEN-MGMT-1 Inadequate Test Resources
• GEN-MGMT-2 Inappropriate External Pressures
• GEN-MGMT-3 Inadequate Test-related Risk Management
• GEN-MGMT-4 Inadequate Test Metrics
• GEN-MGMT-5 Test Lessons Learned Ignored
© 2012-2013 by Carnegie Mellon University Page 21 of 111
22. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
2.1.3.1 GEN-MGMT-1 Inadequate Test Resources
Description: Management allocates an inadequate amount of resources to testing.
Potential Symptoms:
• The test planning documents and schedulesfail to provide for adequate test resources such
as:
test time in schedule with inadequate schedule reserves
trained and experienced testers and reviewers
funding
test tools and environments (e.g., integration test beds and repositories of test data)
Potential Consequences:
• Adequate test resources will likely not be provided to perform sufficient testing within
schedule and budget limitations.
• An unnecessary number of defects may make it through testing and into the deployed
system.
Potential Causes:
• Testing stakeholders may not understand the scope, complexity, and importance of testing,
and therefore its impact on the resources needed to properly perform testing.
• Estimates of needed testing resources may not be based on any evidenced-based cost/effort
models.
• Resource estimates may be informally made by management without input from the testing
organization, especially those testers who will be actually performing the testing tasks.
• Resource estimates may be based on available resources rather than resource needs.
• Management may believe that the testers have padded their estimates and therefore cut the
tester’s estimates.
• Testers and testing stakeholders may be being overly optimistic so that their informal
estimates of needed resources are based on best case scenarios rather than most likely or
worst case scenarios.
Recommendations:
• Prepare:
Ensure that testing stakeholders understand the scope, complexity, and importance of
testing, and therefore its impact on the resources needed to properly perform testing.
• Enable:
Begin test planning at project inception (e.g., at contract award or during proposal
development).
Train testers in the use of evidence-based cost/effort models to estimate the amount of
testing resources needed.
• Perform:
Use evidenced-based cost/effort models to estimate the needed testing resources.
Officially request sufficient testing resources from the testing stakeholders.
© 2012-2013 by Carnegie Mellon University Page 22 of 111
23. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Ensure that the test planning documents, schedules, and project work breakdown
structure (WBS) provide for adequate levels of these test resources.
Obtain commitments of support for authoritative stakeholders at the beginning of the
project.
• Verify:
Verify that the testing stakeholders are providing sufficient resources (e.g., people,
schedule, tools, funding) for the testing effort.
Related Problems:GEN-SIC-3 Lack of Stakeholder Commitment, GEN-TOP-3 Inadequate
Testing Expertise
2.1.3.2 GEN-MGMT-2 Inappropriate External Pressures
Description: Testers are subject to inappropriate external pressures, primarily from managers.
Potential Symptoms:
• Managers (or possibly customers or developers) are dictating to the testers what constitutes
a bug or a defect worth reporting.
• Managerial pressure exists to:
inappropriately cut corners (e.g., only perform “sunny day” testing in order to meet
schedule deadlines
inappropriately lower the severity and priority of reported defects
not find defects (e.g., until after delivery because the project is so far behind schedule
that there is no time to fix any defects found)
Potential Consequences:
• If the testers yield to this pressure, then the test metrics do not accurately reflect either the
true state of the system / software or the status of the testing process.
• The delivered system or software contains an unacceptably large number of residual
defects.
Potential Causes:
• The project is significantly behind schedule and/or over budget.
• There is insufficient time until the delivery/release date to fix a significant number of
defects that were found via testing.
• The project is in danger of being cancelled due to lack of performance.
• Management is highly risk adverse and thereforedid not want to officially label any testing
risk as a risk.
Recommendations:
• Prepare:
Establish criteria for determining the priority and severity of reported defects.
• Enable:
Ensure that trained testers determine what constitutes a bug or a defect worth reporting.
Place the manager of the testing organization at the same or higher level as the project
© 2012-2013 by Carnegie Mellon University Page 23 of 111
24. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
manager in the organizational hierarchy (i.e., have the test manager report
independently of the project manager).20
• Perform:
Support testers when they oppose any inappropriate managerial pressure that would
have them violate their professional ethics.
Customer representatives must insist on proper testing.
• Verify:
Verify that the testers are the ones who decide what constitutes a reportable defect.
Verify that the testing manager reports independently of the project manager.
Related Problems:GEN-SIC-1 Wrong Testing Mindset, GEN-TOP-1 Lack of Independence
2.1.3.3 GEN-MGMT-3 Inadequate Test-related Risk Management
Description: There are too few test-related risks identified in the project’s official risk
repository. 21F
Potential Symptoms:
• Managers are highly risk adverse, treating risk as if it were a “four letter word”. 17 F
• Because adding risks to the risk repository is looked on as a symptom of management
failure, risks (including testing risks) are mislabeled as issues or concerns so that they need
not be reported as an official risk.
• There arefew if anytest-related risks identified in the project’s official risk repository.
• The number of test-related risks is unrealistically low.
• The identified test-related risks have inappropriately low probabilities, low harm severities,
and low priorities.
• The identified test risks have no:
associated risk mitigation approaches
one assigned as being responsible for the risk
• The test risks are never updated (e.g., additions or modification) over the course of the
project.
• Testing risks are not addressed in either the test plan(s) or the risk management plan.
Potential Consequences:
• Testing risks are not reported.
• Management and acquirer representatives are unaware of their existence.
• Testing risks are not being managed.
• The management of testing risks is not given sufficiently high priority.
Potential Causes:
• Management ishighly risk adverse.
20
Note that this will only help if the test manager is not below the manager applying improper pressure.
21
These potential testing problems can be viewed as generic testing risks.
© 2012-2013 by Carnegie Mellon University Page 24 of 111
25. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• Managers strongly communicate their preference that only a small number of the most
critical risks be entered into the project risk repository.
• The people responsible for risk management and managing the risk repository have never
been trained or exposed to the many potential test-related risks (e.g., those associated with
the commonly occurring testing problems addressed in this document).
• The risk management process strongly emphasizes system-specific or system-level (as
opposed to software-level) risks and tends to not address any development activity risks
(such as those associated with testing).
• It is early in the development cycle before sufficient testing has begun.
• There have been few if any evaluations of the testing process.
• There has been little if any oversight of the testing process.
Recommendations:
• Prepare:
Determine management’s degree of risk aversion and attitude regarding inclusion of
risks in the project risk repository.
• Enable:
Ensure that the people responsible for risk management and managing the risk
repository are aware of the many potential test-related risks.
• Perform:
Identify test-related risks and incorporate them into the official project risk repository.
Provide test-related risks with realistic probabilities, harm severities, and priorities.
• Verify:
Verify that the risk repository contains an appropriate number of testing risks.
Verify that there is sufficient management and quality assurance oversight and
evaluation of the testing process.
Related Problems: GEN-SIC-2 Unrealistic Testing Expectations / False Sense of Security
2.1.3.4 GEN-MGMT-4 Inadequate Test Metrics
Description: Insufficient test metrics are being produced, analyzed, and reported.
Potential Symptoms:
• Insufficient or no test metrics are being produced, analyzed, and reported.
• The primary test metrics (e.g., number of tests 22, number of tests needed to meet adequate
18F
or required test coverage levels, number of tests passed/failed, number of defects found)
show neither the productivity of the testers nor their effectiveness at finding defects (e.g.,
22
Note that the number of tests metric does not indicate the effort or complexity of identifying, analyzing, and
fixing defects.
© 2012-2013 by Carnegie Mellon University Page 25 of 111
26. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
defects found per test or per day).
• The number of latent undiscovered defects remaining is not being estimated (e.g., using
COQUALMO 23). 19 F
• Management measures tester productivity strictly in terms of defects found per unit time,
ignoring the importance or severity of the defects found.
Potential Consequences:
• Managers, testers, and other stakeholders in testing do not accurately know the quality of
testing, the importance of the defects being found, or the number of residual defects in the
delivered system or software.
• Managers do not know the productivity of the testers and their effectiveness at finding of
important defects, thereby making it difficult to improve the testing process.
• Testers concentrate on finding lots of (unimportant) defects rather than finding critical
defects (e.g., those with mission-critical, safety-critical, or security-critical ramifications).
• Customer representatives, managers, and developers have a false sense of security that the
system functions properly.
Potential Causes:
• Project management (including the managers/leaders of test organizations/teams) are not
familiar with the different types of testing metrics (e.g., quality, status, and productivity)
that could be useful.
• Metrics collection, analysis, and reporting is at such a high level that individual disciplines
(such as testing) are rarely assigned more than one or two highly-generic metrics (e.g.,
“Inadequate testing is a risk”).
• Project management (and testers) are only aware of backward looking metrics (e.g., defects
found and fixed) as opposed to forward looking metrics (e.g., residual defects remaining to
be found).
Recommendations:
• Prepare:
Provide testers and testing stakeholders with basic training in metrics with an emphasis
on test metrics.
• Enable:
Incorporate a robust metrics program in the test plan that covers leading indicators.
Emphasize the finding of important defects.
• Perform:
Consider using some of the following representative examples of useful testing metrics:
number of defects found per test (test effectiveness metric)
number of defects found per tester day (tester productivity metric)
number of defects that slip through each verification milestone / inch pebble (e.g.,
23
COQUALMO (COnstructiveQUALity Model is an estimation model that can be used for predicting the number
of residual defects/KSLOC (thousands of source lines of code) or defects/FP (Function Point) in a software
product.
© 2012-2013 by Carnegie Mellon University Page 26 of 111
27. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
reviews, inspections, tests) 24 20F
estimated number of latent undiscovered defects remaining in the delivered system
(e.g., estimated using COQUALMO)
Regularly collect, analyze, and report an appropriate set of testing metrics.
• Verify:
Important: Evaluate and maintain visibility into the as-performed testing process to
ensure that it does not become metrics-driven.
Watch out for signs that testers worry more about looking good (e.g., by concentrating
on only the defects that are easy to find) than on finding the most important defects.
Verify that sufficient testing metrics are collected, analyzed, and reported.
Related Problems: None
2.1.3.5 GEN-MGMT-5 Test Lessons Learned Ignored
Description: Lessons that are learned regarding testing are not placed into practice.
Potential Symptoms:
• Management, the test teams, or customer representatives ignore lessons learned during
previous projects or during the testing of previous increments of the system under test.
Potential Consequences:
• The test processes is not being continually improved.
• The same problems continue to occur.
• Customer representatives, managers, and developers have a false sense of security that the
system functions properly.
Potential Causes:
• Lessons learned were not documented.
• The capturing of lessons learned was being postponed until after the project was over when
the people who have learned the lessons were no longer available, having scattered to new
projects.
• The only usage of lessons learned is informal and solely based on the experience that the
individual developers and testers bring to new projects.
• Lessons learned from previous projects are not reviewed before starting new projects.
Recommendations:
• Prepare:
Make the documentation of lessons learned an explicit part of the testing process.
Review previous lessons learned as an initial step in determining the testing process.
• Enable:
Capture (and implement) lessons learned as they are learned.
24
For example, what are the percentages of defects that manage to slip by architecture reviews, design reviews,
implementation inspections, unit testing, integration testing, and system testingwithout being detected?
© 2012-2013 by Carnegie Mellon University Page 27 of 111
28. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Do not wait until a project postmortem when project staff member’s memories are
fading and they are moving (have moved) on to their next project.
• Perform:
Incorporate previously learned testing lessons learned into the current testing process
and test plans.
• Verify:
Verify that previously learned testing lessons learned have been incorporated into the
current testing process and test plans.
Verify that testing lessons learned are capture (and implemented) as they are learned.
Related Problems:GEN-SIC-3 Lack of Stakeholder Commitment
2.1.4 Test Organization and Professionalism Problems
The following testing problems are related to the test organization and the professionalism of the
testers:
• GEN-TOP-1 Lack of Independence
• GEN-TOP-2 Unclear Testing Responsibilities
• GEN-TOP-3 Inadequate Testing Expertise
2.1.4.1 GEN-TOP-1 Lack of Independence
Description: The test organization or team lacks adequate independence to enable them to
properly perform their testing tasks.
Potential Symptoms:
• The manager of the test organization reports to the development manager.
• The lead of the project test team reports to the project manager.
• The test organization manager or test team leader does not have sufficient authority to raise
and manage testing-related risks.
Potential Consequences:
• A lack of sufficient independence forces the test organization or team to select an
inappropriate test process or tool.
• Members of the test organization or teamare intimidated into withholding objective and
timely information from the testing stakeholders.
• The test organization or team has insufficient budget and schedule to be effective.
• The project manager inappropriately overrules or pressures the testers to violate their
principles.
Potential Causes:
• Management does not see the value or need for independent reporting.
• Management does not see the similarity between quality assurance and testing with regard
to independence.
© 2012-2013 by Carnegie Mellon University Page 28 of 111
29. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Recommendations:
• Prepare:
Determine reporting structures
Identify potential independence problems
• Enable:
Clarify to testing stakeholders (especially project management) the value of independent
reporting for the test organization manager and project test team leader.
• Perform:
Ensure that the test organization or team has:
Technical independence so that they can select the most appropriate test process and
tools for the job
Managerial independence so that they can provide objective and timely information
about the test program and results without fear of intimidation due to business
considerations or project-internal politics
Financial independence so that their budget (and schedule) is sufficient to enable
them to be effective and efficient
Have the test organization manager report at the same or higher level as the
development organization manager.
Have the project test team leader report independently of the project manager to the test
organization manager or equivalent (e.g., quality assurance manager).
• Verify:
Verify that the test organization manager reports at the same or higher level as the
development organization manager.
Verify that project test team leader report independently of the project manager to the
test organization manager or equivalent (e.g., quality assurance manager).
Related Problems:GEN-MGMT-2 Inappropriate External Pressures
2.1.4.2 GEN-TOP-2 Unclear Testing Responsibilities
Description: The testing responsibilities are unclear.
Potential Symptoms:
• The test planning documents does not adequately address testing responsibilities in terms of
which organizations, teams, and people:
will perform which types of testing on what [types of] components
are responsible for procuring, building, configuring, and maintaining the test
environments
are the ultimate decision makers regarding testing risks, test completion criteria, test
completion, and the status/priority of defects
Potential Consequences:
• Certain tests are not performed, while other tests are performed redundantly by multiple
organizations or people.
© 2012-2013 by Carnegie Mellon University Page 29 of 111
30. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• Incomplete testing enables some defects to make it through testing and into the deployed
system.
• Redundant testing wastes test resources and cause testing deadlines to slip.
Potential Causes:
• The test plan template did not clearly address responsibilities.
• The project team is very small with everyone wearing multiple hats and therefore
performing testing on an as available / as needed basis.
Recommendations:
• Prepare:
Obtain documents describing current testing responsibilities
Identify potential testing responsibility problems (e.g., missing, vague responsibilities)
• Enable:
Obtain organizational agreement as to the testing responsibilities.
• Perform:
Clearly and completely document the responsibilities for testing in the test plans as well
as the charters of the teams who will be performing the tests.
Managers should clearly communicate these responsibilities to the relevant
organizations and people.
• Verify:
Verify that testing responsibilities are clearly and completely documented in the test
plans as well as the charters of the teams who will be performing the tests.
Related Problems:GEN-TPS-2 Incomplete Test Planning, GEN-PRO-7 Too Immature for
Testing, GEN-COM-2 Inadequate Test Documentation, TTS-SoS-3 Unclear SoS Testing
Responsibilities
2.1.4.3 GEN-TOP-3 Inadequate Testing Expertise
Description: Too many people have inadequate testing expertise, experience, and training.
Potential Symptoms:
• Testers and/or those who oversee them (e.g., managers and customer representatives) have
inadequate testing expertise, experience, or training.
• Developers who are not professional testers have been tasked to perform testing.
• Little or no classroom or on-the-job training in testing has taken place.
• Testing is ad hoc without any proper process.
• Industry best practices are not followed.
Potential Consequences:
• Testing is not effective in detecting defects, especially the less obvious ones.
• There areunusually large numbers of false positive and false negative test results.
• The productivity of the testers is needlessly low.
© 2012-2013 by Carnegie Mellon University Page 30 of 111
31. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• There is a high probability that the system or software will be delivered late with an
unacceptably large number of residual defects.
• During development, managers, developers, and customer representatives have a false sense
of security that the system functions properly. 25 21 F
Potential Causes:
• Management did not understand the scope and complexity of testing.
• Management did not understand the required qualifications of a professional tester.
• There was insufficient funding to hire fully qualified professional testers.
• The project team is very small with everyone wearing multiple hats and therefore
performing testing on an as available / as needed basis.
• An agile development method is being followed that emphasizes cross functional
development teams.
Recommendations:
• Prepare:
Provide proper test processes including procedures, standards, guidelines, and templates
for On-The-Job training.
Ensure that the required qualifications of a professional tester are documented in the
tester job description.
• Enable:
Convey the required qualifications of the different types of testers to those technically
evaluating prospective testers.
Provide appropriate amounts of test training (both classroom and on-the-job) for both
testers and those overseeing testing.
Ensure that the testers who will be automating testing have the necessary specialized
expertise and training. 26 22F
Obtain independent support for those overseeing testing.
• Perform:
Hire full time (i.e., professional) testers who have sufficient expertise and experience in
testing.
Use an independent test organization staffed with experienced trained testers for
system/acceptance testing, whereby the head of this organization is at the same (or
higher) level as the project manager.
• Verify:
Verify that those technically evaluating prospective testers understand the required
qualifications of the different types of testers.
Verify that the testers have adequate testing expertise, experience, and training.
25
This false sense of security is likely to be replaced by a sense of panic when the system begins to frequently fail
operational testing or real-world usage after deployment.
26
Note that these recommendations apply, regardless of whether the project uses separate testing teams or cross
functional teams including testers.
© 2012-2013 by Carnegie Mellon University Page 31 of 111
32. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Related Problems:GEN-MGMT-1 Inadequate Test Resources
2.1.5 Test ProcessProblems
The following testing problems are related to the processes and techniques being used to perform
testing:
• GEN-PRO-1 Testing and Engineering Process not Integrated
• GEN-PRO-2 One-Size-Fits-All Testing
• GEN-PRO-3 Inadequate Test Prioritization
• GEN-PRO-4 Functionality Testing Overemphasized
• GEN-PRO-5 Black-boxSystem Testing Overemphasized
• GEN-PRO-6 White-boxUnit and Integration Testing Overemphasized
• GEN-PRO-7 Too Immature for Testing
• GEN-PRO-8 Inadequate Test Evaluations
• GEN-PRO-9 Inadequate Test Maintenance
2.1.5.1 GEN-PRO-1 Testing and Engineering Process Not Integrated
Description: The testing process is not adequately integrated into the overall system/software
engineering process.
Potential Symptoms:
• There is little or no discussion of testing in the system/software engineering documentation:
System Engineering Master Plan (SEMP), Software Development Plan (SDP), Work
Breakdown Structure (WBS), Project Master Schedule (PMS), and system/software
development cycle (SDC).
• All or most of the testing is being done as a completely independent activity performed by
staff members who are not part of the project engineering team.
• Testing istreated as a separate specialty-engineering activity with only limited interfaces
with the primary engineering activities.
• Testers are not included in the requirements teams, architecture teams, and any cross
functional engineering teams.
Potential Consequences:
• There is inadequate communication between testers and other system/software engineers
(e.g., requirements engineers, architects, designers, and implementers).
• Few testing outsiders understand the scope, complexity, and importance of testing.
• Testers do not understand the work being performed by other engineers.
• There are incompatibilities between outputs and associated inputs at the interfaces between
testers and other engineers.
• Testing is less effective and takes longer than necessary.
Potential Causes:
• Testers are not involved in the determination and documentation of the overall engineering
© 2012-2013 by Carnegie Mellon University Page 32 of 111
33. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
process.
• The people determining and documenting the overall engineering process do not have
significant testing expertise, training, or experience.
Recommendations:
• Prepare:
ObtainSEMP, SDP, WBS, and project master schedule
• Enable:
Provide a top-level briefing/training in testing to the chief system engineer, system
architect, system/software process engineer.
• Perform:
Have test subject matter experts and project testers collaborate closely with the project
chief engineer / technical lead and process engineer when they develop the engineering
process descriptions and associated process documents.
In addition to being in test plans such as the Test and Evaluation Master Plan (TEMP)
or Software Test Plan (STP) as well as in other process documents, provide high-level
overviews of testing in the SEMP(s) and SDP(s).
Document how testing is integrated into the system/software development/life cycle,
regardless of whether it is traditional waterfall, agile (iterative, incremental, and
parallel), or anything in between.
For example, document handover points in the development cycle when testing
input and output work products are delivered from one project organization or group
to another.
Incorporate testing into the Project Master Schedule.
Incorporate testing into the project’s work breakdown structure (WBS).
• Verify:
Verify that testing is incorporated into the project’s:
system/software engineering process
SEMP and SDP
WBS
PMS
SDC
Related Problems:GEN-COM-4 Inadequate Communication Concerning Testing
2.1.5.2 GEN-PRO-2 One-Size-Fits-All Testing
Description: All testing is to be performed to the same level of rigor, regardless of its
criticality.
Potential Symptoms:
• The test planning documents may contain only generic boilerplate rather than appropriate
system-specific information.
© 2012-2013 by Carnegie Mellon University Page 33 of 111
34. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• Mission-, safety-, and security-critical software may not be required to be tested more
completely and rigorously than other less-critical software.
• Only general techniques suitable for testing functional requirements/behavior may be
documented; for example, there is no description of the special types of testing needed for
quality requirements (e.g., availability, capacity, performance, reliability, robustness, safety,
security, and usability requirements).
Potential Consequences:
• Mission-, safety-, and security-critical software may not be adequately tested.
• When there are insufficient resources to adequately test all of the software, some of these
limited resources may be misapplied to lower-priority software instead of being
concentrated on the testing of more critical capabilities.
• Some defects may not be found, and an unnecessary number of these defects may make it
through testing and into the deployed system.
• The system may not be sufficiently safe or secure.
Potential Causes:
• Test plan templates and content/format standards may be incomplete and may not address
the impact of mission/safety/security criticality on testing.
• Test engineers may not be familiar with the impact of safety and security on testing (e.g.,
the higher level of testing rigor required to achieve accreditation and certification.
• Safety and security engineers may not have input into the test planning process.
Recommendations:
• Prepare:
Provide training to those writing system/software development plans and
system/software test plans concerning the need to include project-specific testing
information including potential content
Tailor the templates for test plans and development methods to address the need for
project/system-specific information.
• Enable:
Update (if needed) the templates for test plans and development methods to address the
type, completeness, and rigor
• Perform:
Address in the system/software test plans and system/software development plans:
Difference in testing types/degrees of completeness and rigor, etc. as a function of
mission/safety/security criticality.
Specialty engineering testing methods and techniques for testing the quality
requirements (e.g., penetration testing for security requirements).
Test mission-, safety-, and security-critical software more completely and rigorously
than other less-critical software.
• Verify:
Verify that the completeness, type, and rigor of testing:
is addressed in the system/software development plans and system/software test
© 2012-2013 by Carnegie Mellon University Page 34 of 111
35. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
plans
are a function of the criticality of the system/subsystem/software being tested
are sufficient based on the degree of criticality of the system/subsystem/software
being tested
Related Problems:GEN-PRO-3 Inadequate Test Prioritization
2.1.5.3 GEN-PRO-3 Inadequate Test Prioritization
Description: Testing is not being adequately prioritized.
Potential Symptoms:
• All types of testing may have the same priority.
• All test cases for the system or one of its subsystems mayhave the same priority.
• The most important tests of a given type may not be being performed first.
• Testing may begin with the easy testing of “low-hanging fruit”.
• Difficult testing or the testing of high risk functionality/components may be being
postponed until late in the schedule.
• Testing ignores the order of integration and delivery; for example, unit testing before
integration before system testing and the testing of the functionality of current the current
increment before the testing of future increments. 27 23 F
Potential Consequences:
• Limited testing resources may be wasted or ineffectively used.
• Some of the most critical defects (in terms of failure consequences) may not be discovered
until after the system/software is delivered and placed into operation.
• Specifically, defects with mission, safety, and security ramifications may not be found.
Potential Causes:
• The system/software test plans and testing parts of the system/software development plans
do not address the prioritization of the testing.
• Any prioritization of testing is not used to schedule testing.
• Evaluations of the individual testers and test teams:
are based [totally] on number of tests performed per unit time
ignore the importance of capabilities, subsystems, or defects found
Recommendations:
• Prepare:
Update the following documents to address the prioritization of testing:
system/software test plans
testing parts of the system/software development plans
27
While the actual testing of future capabilities must wait until those capabilities are delivered to the testers, one
can begin to develop black-box test cases based on requirements allocated to future builds (i.e., tests that are
currently not needed and may never be needed if the associated requirements change or are deleted).
© 2012-2013 by Carnegie Mellon University Page 35 of 111
36. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
Define the different types and levels/categories of criticality
• Enable:
Perform a mission analysis to determine the mission-criticality of the different
capabilities and subsystems
Perform a safety (hazard) analysis to determine the safety-criticality of the different
capabilities and subsystems
Perform a security (threat) analysis to determine the safety-criticality of the different
capabilities and subsystems
• Perform:
Work with the developers, management, and stakeholders to prioritize testing according
to the:
criticality (e.g., mission, safety, and security) of the system/subsystem/software
being tested
potential importance of the potential defects identified via test failure
probability that the test is likely to elicit important failures
potential level of risk incurred if the defects are not identified via test failure
delivery schedules
integration/dependency order
Use prioritization of testing to schedule testing so that thehighest priority tests are tested
first.
Collect test metrics based on the number and importance of the defects found
Base the performance evaluations of the individual testers and test teams on the test
effectiveness (e.g., the number and importance of defects found) rather than merely on
the number of tests written and performed.
• Verify:
Evaluate the system/software test plans and the testing parts of the system/software
development plans to verify that they properly address test prioritization.
Verify that mission, safety, and security analysis have been performed and the results
are used to prioritize testing.
Verify that testing is properly prioritized.
Verify that testing is in fact being performed in accordance with the prioritization.
Verify that testing metrics address test prioritization.
Verify that performance evaluations are based on
Related Problems:GEN-PRO-2 One-Size-Fits-All Testing
2.1.5.4 GEN-PRO-4 Functionality Testing Overemphasized
Description: There is an over emphasis on testing functionality as opposed to quality
characteristics, data, and interfaces.
Potential Symptoms:
© 2012-2013 by Carnegie Mellon University Page 36 of 111
37. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• The vast majority of testing may be concerned with verifying functional behavior.
• Little unit or testing may be being performed to verify adequate levels of the quality
characteristics (e.g., availability, reliability, robustness, safety, security, and usability).
• Inadequate levels of various quality characteristics and their attributes are onlybeing
recognized after the system has been delivered and placed into operation.
Potential Consequences:
• The system may not have adequate levels of important quality characteristics and thereby
fail to meet all of its quality requirements.
• Failures to meet data and interface requirements (e.g., due to a lack of verification of input
data and message contents) may not be recognized until late during integration or after
delivery.
• Testers and developers may have a harder time localizing the defects that the system tests
reveal.
• The system or software may be delivered late and fail to meet an unacceptably large number
of non-functional requirements.
Potential Causes:
• The test plans and process documents do not adequately address the testing of non-
functional requirements.
• There are no process requirements (e.g., in the development contract) mandating the
specialized testing of non-functional requirements.
• Managers, developers, and or testers believe:
Testing other types of requirements (i.e., data, interface, quality, and
architecture/design/implementation/configuration constraints) is too hard.
Testing the non-functional requirements will take too long.28
The non-functional requirements are not as important as the functional requirements.
Testing the non-functional testing will naturally occur as a byproduct of the testing of
the functional requirements.29
• The other types of requirements (especially quality requirements) are:
poorly specified (e.g., “The system shall be secure.” or “The system shall be easy to
use.”)
not specified
therefore not testable
• Functional testing may be the only testing that is mandated by the development contract and
therefore the testing of the non-functional requirements is out of scope or unimportant to the
acquisition organization.
Recommendations:
28
Note that adequately testing quality requirements requires significantly more time to prepare for and perform that
typical functional requirements.
29
Note that this can be largely true for some of the non-functional requirements (e.g., interface requirements and
performance requirements).
© 2012-2013 by Carnegie Mellon University Page 37 of 111
38. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
• Prepare:
Adequately address the testing of non-functional requirements in the test plans and
process documents.
Include process requirements mandating the specialized testing of non-functional
requirements in the contract.
• Enable:
Ensure that managers, developers, and or testers understand the importance of testing
non-functional requirements as well as conformance to the architecture and design (e.g.,
via whitebox testing).
• Perform:
Adequately perform the other types of testing.
• Verify:
Verify that the managers, developers, and or testers understand the importance of testing
non-functional requirements and conformance to the architecture and design.
Have quality engineers verify that the testers are testing the quality, data, and interface
requirements as well as the architecture/design/implementation/configuration
constraints.
Review the test plans and process documents to ensure that they adequately address the
testing of non-functional behavior.
Measure, analyze, and report the types of non-functional defects and when they are
being detected.
Related Problems: None
2.1.5.5 GEN-PRO-5Black-boxSystem Testing Overemphasized
Description: There is an over emphasis on black-box system testing for requirements
conformance.
Potential Symptoms:
• The vast majority of testing isoccurring at the system level for purposes of verifying
conformance to requirements.
• There is very little white-box unit and integration testing.
• System testing is detecting many defects that could have been more easily identified during
unit or integration testing.
• Similar residual defects may also be causing faults and failures after the system has been
delivered and placed into operation.
Potential Consequences:
• Defects that could have been found during unit or integration testing are harder to detect,
localize, analyze, and fix.
• System testing is unlikely to be completed on schedule.
• It is harder to develop sufficient system-level tests to meet code coverage criteria.
• The system or software may be delivered late with an unacceptably large number of
© 2012-2013 by Carnegie Mellon University Page 38 of 111
39. Common Testing Problems: Pitfalls to Prevent and Mitigate 25 January 2013
Descriptions, Symptoms, Consequences, Causes, and Recommendations
residual defects that will only rarely be executed and thereby cause faults or failures.
Potential Causes:
• The test plans and process documents do not adequately address unit and integration testing.
• There are no process requirements (e.g., in the development contract) mandating unit and
integration testing.
• The developers believe that blackbox system test is all that is necessary to detect the
defects.
• Developers believe that testing is totally the responsibility of the independent test team,
which is only planning on performing system-level testing.
• The schedule does not contain adequate time for unit and integration testing. Note that this
may really be an under emphasis of unit and integration testing rather than an overemphasis
on system testing.
• Independent testers rather than developers are performing the testing.
Recommendations:
• Prepare:
Adequately address in the test plans, test process documents, and contract:
whitebox and graybox testing
unit and integration testing
• Enable:
Ensure that managers, developers, and or testers understand the importance these lower-
level types of testing.
Use a test plan template or content and format standard that addresses these lower-level
types of testing.
• Perform:
Increase the amount and effectiveness of these lower-level types of testing.
• Verify:
Review the test plans and process documents to ensure that they adequately address
these lower-level types of tests.
Verify that the managers, developers, and or testers understand the importance of these
lower-level types of testing.
Have quality engineers verify that the testers are actually performing these lower-level
types of testing and at an appropriate percentage of total tests.
Review the test plans and process documents to ensure that they adequately address
lower-level testing.
Measure the number of defects slipping past unit and integration testing.
Related Problems:GEN-PRO-6White-box Unit and Integration Testing Overemphasized
© 2012-2013 by Carnegie Mellon University Page 39 of 111