Welcome to Boddingtons
Manchester
Building Homes.
Developingfutures. Latimer Developments – Cocoa West, York
Drawing is artist impression, final design will be subject to change
Here, we will tell you about…
Latimer and our wider organisation
An overview of our proposal for the Boddingtons site
Our response to local housing needs in Manchester
Our plans for green spaces at our site at Boddingtons
Our approach to transport and access issues
Our programme and next steps
Our approach to working with communities
How you can tell us your opinions on our plans
We are Latimer Developments, owned by
Clarion Housing Group
Latimer is the development arm of Clarion
Housing Group, the UKs largest housing
association.
We have a charitable foundation, Clarion
Futures. And a repairs and maintenance
team, Clarion Response.
Together, our aim is to:
• Build affordable homes, helping people get on
the property ladder.
• Continually improve design, construction
and sustainability of homes.
• Support residents into work and training
through Clarion Futures.
• Invest £150 million over 10 years through
the work of Clarion Futures.
Clarion Response Clarion Housing
Association
Clarion Futures Latimer Developments
• Our site sits in an emerging
location near to Manchester city
centre.
• The site is close to the city
centre travel links, shops,
amenities cultural assets and
River Irwell.
• The site is within 5 min walk to
Victoria Train Station
• Close to Metrolink services and
650m walk to the top of
Deansgate.
Welcome to Boddingtons. We are here!
SITE
TRAIN STATION
THE
MANCHESTER
COLLEGE
RIVER
IRWELL
AO ARENA
MANCHESTER
CATHEDRAL
RIVER
IRWELL
ARNDALE/
CITY
CENTRE
PRINTWORKS
NATIONAL
FOOTBALL
MUSEUM
History of our site
180
• The site was founded as
Strangeways Brewery in 1778, primarily
serving the cotton workers of
Manchester.
• In 1853, Henry Boddington took
full ownership of the brewery,
naming it Boddingtons Brewery.
• It became the biggest brewery
in Manchester, producing 100,000
barrels of Boddingtons bitter a year.
• Production ended in 2005. It was
used temporarily as a night club,
The Warehouse Project, in 2006,
then demolished around 2007.
• The remaining iconic brick chimney
was demolished in 2010.
• Latimer purchased the site in June 2021.
What does our site look like now?
• Our Boddingtonssite is a 1.24 acre
brownfieldsite (redcircle on theimage).
• It is currentlyusedas a surfacecar park.​
• Planningpermissionhasalreadybeen
givenfora residentialscheme on thesite
nextdoor,called TheOld Brewery
Gardens(bluecircleon theimage).​
• It sits betweentheTravelodgeHotelon
theleftandThe ManchesterCollege
campus(currentlyunderconstruction)
on theright.​
• The surroundingareais dominatedby
low rise industrialsheds,which are also
subjectto redevelopmentin linewith
local planningpolicy.​
The Old Brewery Gardens site
Our Boddingtons site
Clarion’s Key Objectives for Boddingtons
Key objectives we aim to deliver throughthis project
include:
• Placemaking:creatingahighqualitylandscaped
courtyardaccessible tothepublic.​
• Theresidentswillhaveaccess tothecourtyardand
groundfloorshopsandservices.​
• Allhomeswillbeofhighqualityandcomplywiththe
Manchesterresidentialqualityguide.
• Affordablehousingwill beakeyobjectiveforthissite.​
• Aninclusiveandmixed communitywillbecreatedina
newManchesterneighbourhood.​
• Activetravelwillbepromotedandencouragetheuseof
publictransport,walkingandcycling.​
Drawing is artists impression, final design will be subject to change
Our emerging site plan for Boddingtons
Key
5
4
3
2
1 Entrances
Ground floor commercial units
Residents’ facilities
Landscaped courtyard
Green roof terrace
Electric vehicle charging points for
sustainable transport
1
5
2
3 1
2
2
4
6
6
An artist’s impression of our plans for Boddingtons
Drawing is artists impression, final design will be subject to change
High quality landscaped courtyard
An artist’s impression of our plans for Boddingtons
Drawing is artists impression, final design will be subject to change
Entrance to the courtyard from Great Ducie Street
An artist’s impression of our plans for Boddingtons
Drawing is artists impression, final design will be subject to change
View from the courtyard with the Old Brewery Gardens to the right hand side
We are responding to identified local housing needs
• In 2016, Manchester City Council endorsed the Residential Growth
Strategy alongside the Housing Affordability Policy Framework. These
documents set out the aim to increase the proportion of homes
affordable to Manchester Residents. The ambition is to deliver 6,400
homes between 2015 and 2025.
• In January 2021 Manchester City Council published an update on the
Residential Growth Strategy. This noted the waiting list had become
more serious for affordable housing during the pandemic so at this
point made a further commitment to engage with housing providers.
• In April 2021 the Greater Manchester Combined Authority identified a
significant waiting list for affordable housing in Manchester.
• The Draft Places For Everyone document sets an annual average target
of 3,533 new homes in Manchester between 2021 and 2037. In this
time the ambition is to deliver at least 50,000 affordable homes across
Greater Manchester. This will help to deliver inclusive growth and
enhance the economic productivity of Manchester.
A mix of housing types across the site
Key
1 bed
2 Beds
2 Beds
1 bed
3 Beds
2 Beds
1 bed
3 Beds
1 bedroom apartment
2 bedrooms apartment
3 bedrooms apartment
Proposed heights
Key
Height (storeys) of nearby
buildings including those
with planning approval
Height (storeys) of the
proposed building
26
11
23
15
11
26
20
17
12
11
6
X
Y
A mix of housing tenures across the site
Latimer will provide a high
number of affordable housing
on this site.
This will include:
• Social rent: Residents pay the
government prescribed rent levels.
• Shared ownership: Residents purchase
a share of the property and pay a
subsidised rent on the rest. They can
buy a larger share at a later date or sell
and move on.
The number of homes targeted for the site
is approximately 440.
Drawing is artists impression, final design will be subject to change
Making green spaces a key feature
• Green space is vitally important to
wellbeing and healthy living. The
scheme will incorporate a
landscaped courtyard accessible
to the public and a walking route
through the site.
• The green roof terrace will enhance the
local ecology and encourage biodiversity.
• It will be an attractive setting
with tree-lined pavements.
• High quality trees will be planted.
Key
Walking routes
Green space, planting
Seating and socialising
Rain garden / swale /
flood attenuation
• The site benefits from good connectivity
to public transport links and walking and
cycling routes.
• Victoria Train Station is within 5 minutes
walk, Metrolink connections are located
nearby and walkways along the River
Irwell are easily accessible.
• We will provide walking routes through
the site that will become part of the
public realm.
• The pedestrian boulevard (part of the
plans for The Old Brewery Gardens
scheme) will connect our site with
surrounding developments.
• Vehicular and pedestrian access to the
south of the site will be shared with The
Manchester College.
Travelling here and connectivity
Key
Vehicular routes
Walking routes
Pedestrian boulevard
We also encourage sustainable travel
We will promote walking and cycling:
• The residents will benefit from secure
storage for bicycles within each building.
Cycle parking will also be available for
visitors.
• We support sustainable travel and
Government’s commitment to make the
transition to electric cars by 2030.
• The development will provide parking
spaces for the disabled users, supplied
with electric vehicle charging points for
sustainable travel.
Bike stores
Disabled parking spaces
Key
Construction traffic and access to the site
• The site will be developed in one
single phase.
• The site will be constructed over
three years, we anticipate the build
will complete in summer 2025.
• Construction access will use the new
road next to The Manchester College.
Key
Vehicular routes during
the construction period
Access to the
construction site
Benefits and opportunities for local communities
• The community will be able to enjoy access to the proposed
commercial units, we anticipate these to include a café and
various shops.
• Creating inclusive spaces for the whole community:
• New public landscaped courtyard
• A new tree lined street towards The Manchester College
• Helping reduce our environmental impact:
• Net Zero carbon compatible homes, supplied with
renewable energy
• Electric charging points for cars
• Encouraging walking and cycling
• Sustainable urban drainage solutions (SUDs) to mitigate
the effects of climate change
Our approach to working with communities
For each project we actively consult, research and engage to
identify and deliver locally specific objectives covering social,
economic and environmental issues. We identify opportunities
which encourage local collaboration and a joined-up approach.
We welcome your thoughts and ideas on how we could work with
the local community in Manchester.
This could include opportunities through:
• Training and employment.
• Health and wellbeing.
• Social isolation and loneliness.
• Youth engagement and education programmes.
• Homelessness.
• Environmental enhancement.
• Business support.
• Arts spaces.
• Charity support.
Examples of community relationship building
We want to build strong community relationships and maximise benefits for local communities. Our community
collaboration is ongoing throughout development (before, during and after). Examples of our initiatives:
• Working with Clarion Futures to support people with skills and employment opportunities.
• Engaging local education institutes for work related learning activities so the development becomes a unique learning opportunity.
• Creative competitions and supporting arts and cultures.
• Community fund and sponsorship access to fund local initiatives, bringing communities and local groups to our development.
• Skilled volunteering enabling us to share our varied skills and expertise with communities including mentoring.
• Becoming trustees at educational institutes and third sector organisations which may require additional strategic support.
• Awarding tenders with local business and suppliers where feasible and possible.
• Encouraging communities to take ownership of their environment following project completion, with support in place to facilitate.
Our programme and next steps
SPRING
2021
SUMMER
2022
Public
Consultation
Consultation
Period
Application
Determined
Target
Start On Site
Planning
Submission to
Manchester City Council
SPRING
2021
SPRING
2022
EARLY
2022
SEPTEMBER
2021
Review of
Feedback Received
NOVEMBER
2021
OCTOBER
2021
We want ongoing dialogue with you…
We like to be visible and accessible, offering ongoing communication, updating you on development progress as well
as opportunities. We do this in different ways, for example:
Regular project update newsletters, with digital options posted on the project-specific website.
Regular community meetings held with the delivery team.
Noticeboards with key contact personnel details including in emergencies so you can contact us when you need to.
A dedicated community engagement officer will be on hand to help resolve concerns and find opportunities to
collaborate with the community.
Tell us what you think and ask us any questions…
Our current planning consultation is open between 6th and 19th of September 2021. We welcome your feedback, tell us
what you think in the way that suits you. You can:
Under this planning consultation, all
comments will be considered carefully as
we draw up our planning application due
in November 2021.
We want to continue a conversation with
our communities throughout our planning
and construction phases and beyond! So
please register so we can stay in touch
with you!
Register your interest in our project at www.clarionconsults.co.uk
Take our quick survey to tell us what you think
Contact us with your questions
Attend one of our webinars
Show us on a map what is important to you near our site
REGISTER
Thank you for visiting us!

Weitere ähnliche Inhalte

Was ist angesagt?

College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
Planning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPlanning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPaul Coyle
 
Gaap info
Gaap infoGaap info
Gaap infoBill Lord
 
Wesley mimico june 26, 2012 repurpose renew add
Wesley mimico june 26, 2012  repurpose renew addWesley mimico june 26, 2012  repurpose renew add
Wesley mimico june 26, 2012 repurpose renew addrwtobiassen
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]Michael Walton
 
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Fairfax County
 
Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationCity of College Station
 
Affordable Housing Development Request
Affordable Housing Development RequestAffordable Housing Development Request
Affordable Housing Development RequestCity of College Station
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_AyaAya Irin
 
University Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationUniversity Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationCity of College Station
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pmRamaChilamkurthy
 
A Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan NordA Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan NordNow Dentons
 
Tantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccTantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccMarcus Garnet
 

Was ist angesagt? (18)

College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Wellborn Zoning Districts
Wellborn Zoning DistrictsWellborn Zoning Districts
Wellborn Zoning Districts
 
Planning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPlanning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, Monaghan
 
Gaap info
Gaap infoGaap info
Gaap info
 
Wesley mimico june 26, 2012 repurpose renew add
Wesley mimico june 26, 2012  repurpose renew addWesley mimico june 26, 2012  repurpose renew add
Wesley mimico june 26, 2012 repurpose renew add
 
PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]PDR Housing estate renewal capability.FINAL[1]
PDR Housing estate renewal capability.FINAL[1]
 
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...
 
Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer Presentation
 
Affordable Housing Development Request
Affordable Housing Development RequestAffordable Housing Development Request
Affordable Housing Development Request
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya
 
University Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationUniversity Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer Presentation
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
A Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan NordA Unique Opportunity: Quebec’s Plan Nord
A Unique Opportunity: Quebec’s Plan Nord
 
Craig Kelley, Housing Development Center
Craig Kelley, Housing Development CenterCraig Kelley, Housing Development Center
Craig Kelley, Housing Development Center
 
2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Tantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccTantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwcc
 
University Town Center Rezoning
University Town Center RezoningUniversity Town Center Rezoning
University Town Center Rezoning
 

Ă„hnlich wie Public cons boddingtons v10 fc

Dorking St Ap Public Cons Stage 1 V8.pdf
Dorking St Ap Public Cons Stage 1 V8.pdfDorking St Ap Public Cons Stage 1 V8.pdf
Dorking St Ap Public Cons Stage 1 V8.pdfNiamh60
 
Dorking Station Approach Consultation Slides.pdf
Dorking Station Approach Consultation Slides.pdfDorking Station Approach Consultation Slides.pdf
Dorking Station Approach Consultation Slides.pdfkevinduxbury
 
Schools and community groups session (final)
Schools and community groups session (final)  Schools and community groups session (final)
Schools and community groups session (final) jennykur
 
Belvedere Green Links - The East London Green Grid
Belvedere Green Links - The East London Green GridBelvedere Green Links - The East London Green Grid
Belvedere Green Links - The East London Green GridDean Jones
 
Lisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 ActionsLisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 ActionsTheresa O'Donohoe
 
main power point presentation
main power point presentationmain power point presentation
main power point presentationmichael matthews
 
Louise wymandelivering quality_places
Louise wymandelivering quality_placesLouise wymandelivering quality_places
Louise wymandelivering quality_placesDesign South East
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018Crosstown TO
 
Successful Capital Pitch for $75,000
Successful Capital Pitch for $75,000Successful Capital Pitch for $75,000
Successful Capital Pitch for $75,000GR Wilson
 
Group 5 presentation finalised
Group 5 presentation finalisedGroup 5 presentation finalised
Group 5 presentation finalisedJamesECole
 
Comox Valley Community Meeting June 11, 2013
Comox Valley Community Meeting June 11, 2013Comox Valley Community Meeting June 11, 2013
Comox Valley Community Meeting June 11, 2013Island Health
 
IE International MBA Application - Presentation G
IE International MBA Application - Presentation G IE International MBA Application - Presentation G
IE International MBA Application - Presentation G George Konyashchenkov
 
Care home developments in the UK - from Castleoak
Care home developments in the UK - from CastleoakCare home developments in the UK - from Castleoak
Care home developments in the UK - from CastleoakCastleoak
 
LWB12: Peter Wanless, Big Lottery Fund
LWB12: Peter Wanless, Big Lottery FundLWB12: Peter Wanless, Big Lottery Fund
LWB12: Peter Wanless, Big Lottery FundCivic Agenda
 
Neilston Community Windfarm
Neilston Community WindfarmNeilston Community Windfarm
Neilston Community WindfarmGEAI
 
David Barrie: Project Biography 2019
David Barrie: Project Biography 2019David Barrie: Project Biography 2019
David Barrie: Project Biography 2019David Barrie
 
Place RESI 2014: Kevin McGeough, Homes & Communities Agency
Place RESI 2014: Kevin McGeough, Homes & Communities AgencyPlace RESI 2014: Kevin McGeough, Homes & Communities Agency
Place RESI 2014: Kevin McGeough, Homes & Communities AgencyPlace North West
 
Leeds City Region LIS - Draft priorities
Leeds City Region LIS - Draft prioritiesLeeds City Region LIS - Draft priorities
Leeds City Region LIS - Draft prioritiesAndrewSheenMCIPR
 
Land for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford OverviewLand for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford OverviewLWP Property Group
 

Ă„hnlich wie Public cons boddingtons v10 fc (20)

Dorking St Ap Public Cons Stage 1 V8.pdf
Dorking St Ap Public Cons Stage 1 V8.pdfDorking St Ap Public Cons Stage 1 V8.pdf
Dorking St Ap Public Cons Stage 1 V8.pdf
 
Dorking Station Approach Consultation Slides.pdf
Dorking Station Approach Consultation Slides.pdfDorking Station Approach Consultation Slides.pdf
Dorking Station Approach Consultation Slides.pdf
 
Schools and community groups session (final)
Schools and community groups session (final)  Schools and community groups session (final)
Schools and community groups session (final)
 
Belvedere Green Links - The East London Green Grid
Belvedere Green Links - The East London Green GridBelvedere Green Links - The East London Green Grid
Belvedere Green Links - The East London Green Grid
 
Lisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 ActionsLisdoonvarna Sustainable Community Plan 2017 Actions
Lisdoonvarna Sustainable Community Plan 2017 Actions
 
main power point presentation
main power point presentationmain power point presentation
main power point presentation
 
Louise wymandelivering quality_places
Louise wymandelivering quality_placesLouise wymandelivering quality_places
Louise wymandelivering quality_places
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 
Successful Capital Pitch for $75,000
Successful Capital Pitch for $75,000Successful Capital Pitch for $75,000
Successful Capital Pitch for $75,000
 
Group 5 presentation finalised
Group 5 presentation finalisedGroup 5 presentation finalised
Group 5 presentation finalised
 
Pembrokeshire Architects
Pembrokeshire ArchitectsPembrokeshire Architects
Pembrokeshire Architects
 
Comox Valley Community Meeting June 11, 2013
Comox Valley Community Meeting June 11, 2013Comox Valley Community Meeting June 11, 2013
Comox Valley Community Meeting June 11, 2013
 
IE International MBA Application - Presentation G
IE International MBA Application - Presentation G IE International MBA Application - Presentation G
IE International MBA Application - Presentation G
 
Care home developments in the UK - from Castleoak
Care home developments in the UK - from CastleoakCare home developments in the UK - from Castleoak
Care home developments in the UK - from Castleoak
 
LWB12: Peter Wanless, Big Lottery Fund
LWB12: Peter Wanless, Big Lottery FundLWB12: Peter Wanless, Big Lottery Fund
LWB12: Peter Wanless, Big Lottery Fund
 
Neilston Community Windfarm
Neilston Community WindfarmNeilston Community Windfarm
Neilston Community Windfarm
 
David Barrie: Project Biography 2019
David Barrie: Project Biography 2019David Barrie: Project Biography 2019
David Barrie: Project Biography 2019
 
Place RESI 2014: Kevin McGeough, Homes & Communities Agency
Place RESI 2014: Kevin McGeough, Homes & Communities AgencyPlace RESI 2014: Kevin McGeough, Homes & Communities Agency
Place RESI 2014: Kevin McGeough, Homes & Communities Agency
 
Leeds City Region LIS - Draft priorities
Leeds City Region LIS - Draft prioritiesLeeds City Region LIS - Draft priorities
Leeds City Region LIS - Draft priorities
 
Land for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford OverviewLand for Sale - The Glades at Byford Overview
Land for Sale - The Glades at Byford Overview
 

KĂĽrzlich hochgeladen

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 

KĂĽrzlich hochgeladen (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow đź’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 

Public cons boddingtons v10 fc

  • 1. Welcome to Boddingtons Manchester Building Homes. Developingfutures. Latimer Developments – Cocoa West, York Drawing is artist impression, final design will be subject to change
  • 2. Here, we will tell you about… Latimer and our wider organisation An overview of our proposal for the Boddingtons site Our response to local housing needs in Manchester Our plans for green spaces at our site at Boddingtons Our approach to transport and access issues Our programme and next steps Our approach to working with communities How you can tell us your opinions on our plans
  • 3. We are Latimer Developments, owned by Clarion Housing Group Latimer is the development arm of Clarion Housing Group, the UKs largest housing association. We have a charitable foundation, Clarion Futures. And a repairs and maintenance team, Clarion Response. Together, our aim is to: • Build affordable homes, helping people get on the property ladder. • Continually improve design, construction and sustainability of homes. • Support residents into work and training through Clarion Futures. • Invest ÂŁ150 million over 10 years through the work of Clarion Futures. Clarion Response Clarion Housing Association Clarion Futures Latimer Developments
  • 4. • Our site sits in an emerging location near to Manchester city centre. • The site is close to the city centre travel links, shops, amenities cultural assets and River Irwell. • The site is within 5 min walk to Victoria Train Station • Close to Metrolink services and 650m walk to the top of Deansgate. Welcome to Boddingtons. We are here! SITE TRAIN STATION THE MANCHESTER COLLEGE RIVER IRWELL AO ARENA MANCHESTER CATHEDRAL RIVER IRWELL ARNDALE/ CITY CENTRE PRINTWORKS NATIONAL FOOTBALL MUSEUM
  • 5. History of our site 180 • The site was founded as Strangeways Brewery in 1778, primarily serving the cotton workers of Manchester. • In 1853, Henry Boddington took full ownership of the brewery, naming it Boddingtons Brewery. • It became the biggest brewery in Manchester, producing 100,000 barrels of Boddingtons bitter a year. • Production ended in 2005. It was used temporarily as a night club, The Warehouse Project, in 2006, then demolished around 2007. • The remaining iconic brick chimney was demolished in 2010. • Latimer purchased the site in June 2021.
  • 6. What does our site look like now? • Our Boddingtonssite is a 1.24 acre brownfieldsite (redcircle on theimage). • It is currentlyusedas a surfacecar park.​ • Planningpermissionhasalreadybeen givenfora residentialscheme on thesite nextdoor,called TheOld Brewery Gardens(bluecircleon theimage).​ • It sits betweentheTravelodgeHotelon theleftandThe ManchesterCollege campus(currentlyunderconstruction) on theright.​ • The surroundingareais dominatedby low rise industrialsheds,which are also subjectto redevelopmentin linewith local planningpolicy.​ The Old Brewery Gardens site Our Boddingtons site
  • 7. Clarion’s Key Objectives for Boddingtons Key objectives we aim to deliver throughthis project include: • Placemaking:creatingahighqualitylandscaped courtyardaccessible tothepublic.​ • Theresidentswillhaveaccess tothecourtyardand groundfloorshopsandservices.​ • Allhomeswillbeofhighqualityandcomplywiththe Manchesterresidentialqualityguide. • Affordablehousingwill beakeyobjectiveforthissite.​ • Aninclusiveandmixed communitywillbecreatedina newManchesterneighbourhood.​ • Activetravelwillbepromotedandencouragetheuseof publictransport,walkingandcycling.​ Drawing is artists impression, final design will be subject to change
  • 8. Our emerging site plan for Boddingtons Key 5 4 3 2 1 Entrances Ground floor commercial units Residents’ facilities Landscaped courtyard Green roof terrace Electric vehicle charging points for sustainable transport 1 5 2 3 1 2 2 4 6 6
  • 9. An artist’s impression of our plans for Boddingtons Drawing is artists impression, final design will be subject to change High quality landscaped courtyard
  • 10. An artist’s impression of our plans for Boddingtons Drawing is artists impression, final design will be subject to change Entrance to the courtyard from Great Ducie Street
  • 11. An artist’s impression of our plans for Boddingtons Drawing is artists impression, final design will be subject to change View from the courtyard with the Old Brewery Gardens to the right hand side
  • 12. We are responding to identified local housing needs • In 2016, Manchester City Council endorsed the Residential Growth Strategy alongside the Housing Affordability Policy Framework. These documents set out the aim to increase the proportion of homes affordable to Manchester Residents. The ambition is to deliver 6,400 homes between 2015 and 2025. • In January 2021 Manchester City Council published an update on the Residential Growth Strategy. This noted the waiting list had become more serious for affordable housing during the pandemic so at this point made a further commitment to engage with housing providers. • In April 2021 the Greater Manchester Combined Authority identified a significant waiting list for affordable housing in Manchester. • The Draft Places For Everyone document sets an annual average target of 3,533 new homes in Manchester between 2021 and 2037. In this time the ambition is to deliver at least 50,000 affordable homes across Greater Manchester. This will help to deliver inclusive growth and enhance the economic productivity of Manchester.
  • 13. A mix of housing types across the site Key 1 bed 2 Beds 2 Beds 1 bed 3 Beds 2 Beds 1 bed 3 Beds 1 bedroom apartment 2 bedrooms apartment 3 bedrooms apartment
  • 14. Proposed heights Key Height (storeys) of nearby buildings including those with planning approval Height (storeys) of the proposed building 26 11 23 15 11 26 20 17 12 11 6 X Y
  • 15. A mix of housing tenures across the site Latimer will provide a high number of affordable housing on this site. This will include: • Social rent: Residents pay the government prescribed rent levels. • Shared ownership: Residents purchase a share of the property and pay a subsidised rent on the rest. They can buy a larger share at a later date or sell and move on. The number of homes targeted for the site is approximately 440. Drawing is artists impression, final design will be subject to change
  • 16. Making green spaces a key feature • Green space is vitally important to wellbeing and healthy living. The scheme will incorporate a landscaped courtyard accessible to the public and a walking route through the site. • The green roof terrace will enhance the local ecology and encourage biodiversity. • It will be an attractive setting with tree-lined pavements. • High quality trees will be planted. Key Walking routes Green space, planting Seating and socialising Rain garden / swale / flood attenuation
  • 17. • The site benefits from good connectivity to public transport links and walking and cycling routes. • Victoria Train Station is within 5 minutes walk, Metrolink connections are located nearby and walkways along the River Irwell are easily accessible. • We will provide walking routes through the site that will become part of the public realm. • The pedestrian boulevard (part of the plans for The Old Brewery Gardens scheme) will connect our site with surrounding developments. • Vehicular and pedestrian access to the south of the site will be shared with The Manchester College. Travelling here and connectivity Key Vehicular routes Walking routes Pedestrian boulevard
  • 18. We also encourage sustainable travel We will promote walking and cycling: • The residents will benefit from secure storage for bicycles within each building. Cycle parking will also be available for visitors. • We support sustainable travel and Government’s commitment to make the transition to electric cars by 2030. • The development will provide parking spaces for the disabled users, supplied with electric vehicle charging points for sustainable travel. Bike stores Disabled parking spaces Key
  • 19. Construction traffic and access to the site • The site will be developed in one single phase. • The site will be constructed over three years, we anticipate the build will complete in summer 2025. • Construction access will use the new road next to The Manchester College. Key Vehicular routes during the construction period Access to the construction site
  • 20. Benefits and opportunities for local communities • The community will be able to enjoy access to the proposed commercial units, we anticipate these to include a cafĂ© and various shops. • Creating inclusive spaces for the whole community: • New public landscaped courtyard • A new tree lined street towards The Manchester College • Helping reduce our environmental impact: • Net Zero carbon compatible homes, supplied with renewable energy • Electric charging points for cars • Encouraging walking and cycling • Sustainable urban drainage solutions (SUDs) to mitigate the effects of climate change
  • 21. Our approach to working with communities For each project we actively consult, research and engage to identify and deliver locally specific objectives covering social, economic and environmental issues. We identify opportunities which encourage local collaboration and a joined-up approach. We welcome your thoughts and ideas on how we could work with the local community in Manchester. This could include opportunities through: • Training and employment. • Health and wellbeing. • Social isolation and loneliness. • Youth engagement and education programmes. • Homelessness. • Environmental enhancement. • Business support. • Arts spaces. • Charity support.
  • 22. Examples of community relationship building We want to build strong community relationships and maximise benefits for local communities. Our community collaboration is ongoing throughout development (before, during and after). Examples of our initiatives: • Working with Clarion Futures to support people with skills and employment opportunities. • Engaging local education institutes for work related learning activities so the development becomes a unique learning opportunity. • Creative competitions and supporting arts and cultures. • Community fund and sponsorship access to fund local initiatives, bringing communities and local groups to our development. • Skilled volunteering enabling us to share our varied skills and expertise with communities including mentoring. • Becoming trustees at educational institutes and third sector organisations which may require additional strategic support. • Awarding tenders with local business and suppliers where feasible and possible. • Encouraging communities to take ownership of their environment following project completion, with support in place to facilitate.
  • 23. Our programme and next steps SPRING 2021 SUMMER 2022 Public Consultation Consultation Period Application Determined Target Start On Site Planning Submission to Manchester City Council SPRING 2021 SPRING 2022 EARLY 2022 SEPTEMBER 2021 Review of Feedback Received NOVEMBER 2021 OCTOBER 2021
  • 24. We want ongoing dialogue with you… We like to be visible and accessible, offering ongoing communication, updating you on development progress as well as opportunities. We do this in different ways, for example: Regular project update newsletters, with digital options posted on the project-specific website. Regular community meetings held with the delivery team. Noticeboards with key contact personnel details including in emergencies so you can contact us when you need to. A dedicated community engagement officer will be on hand to help resolve concerns and find opportunities to collaborate with the community.
  • 25. Tell us what you think and ask us any questions… Our current planning consultation is open between 6th and 19th of September 2021. We welcome your feedback, tell us what you think in the way that suits you. You can: Under this planning consultation, all comments will be considered carefully as we draw up our planning application due in November 2021. We want to continue a conversation with our communities throughout our planning and construction phases and beyond! So please register so we can stay in touch with you! Register your interest in our project at www.clarionconsults.co.uk Take our quick survey to tell us what you think Contact us with your questions Attend one of our webinars Show us on a map what is important to you near our site REGISTER
  • 26. Thank you for visiting us!