Project on clean street
In
Zone-one, Addis ababa
Prepared By:
Fikru Tessema
(Project Coordinator)
OCTOBER 1999
HEALTH BUREAU
ADDIS ABABA
TABLE OF CONTENT
Contents Page
INTRODUCTION................................................. 1
PROBLEM STATEMENT.................................... 1
GOAL AND OBJECTIVES.................................. 2
IMPLEMENTATION STRATEGY...................... 3
IMPLEMENTATION SCHEDULE...................... 4
MONITORING & EVALUATION...................... 4
PROJECT BUDGET............................................. 5
REFERENCE........................................................ 7
i
EXECUTIVE SUMMARY
PROJECT ON CLEAN STREET IN ZONE -- 1, ADDIS ABABA
(Fikru Tessema and Demissie W/Giorgis)
Clean street is essential if cities are to be environmentally attractive. Waste
management is one of the most requirement and important service to make the urban
centers clean places, which will help to promote the health of the population to
enhance its creative and productive capacities.
Addis Ababa is one of the major urban centers of Ethiopia and the capital city of the
country. Its population is 2.5 million and divided into 6 zones, 28 woredas and 303
kebeles.
Zone-1 is one of the six zones in the city and located at the middle of the city. It is also
the business center for both the city and the country. Due to this position, the waste
generation is not only from the residences of the zone. The highest portion of waste
generation is from market places and institutions.
According to the 1994 population and housing census, the total population of zone-1
is about 314 565 and the total housing units are 53 341. Out of these housing units,
43 674 have some type of sanitary facilities.
Of the total solid waste collected in the city, 25% is from this zone. The resources
daily allocated to give solid waste collection services are 6 garbage container lifter
and 4 side loader trucks, 99 and 200 communal containers of size 8 cu. m and 1.1 cu.
M respectively and 78 street cleaners. There are also 22 public toilets, which serve
about 5 290 people per toilet per day.
In general, the zone lacks proper waste management, which requires proper resource
allocation, management and integrated approach. Most drainage lines are open
ditches, which are often used for receiving any type of refuses, storm and waste water.
Most drainage appurtenances are not functional and need maintenance. These
conditions contributed to the pronounced odor and unsighty condition and deposit of
waste on the side and pavement of the street. As a result, it affects human health and
comfort and aggravates pollution of the environment in general and street in
particular.
The goal of the project is to decrease communicable diseases and avoid unsighty
condition by improving poor environmental condition and poor street cleanliness of
the zone through integrating different sectors and participating the community to
create conducive and attractive environment to the residents and visitors.
The strategies for the implementation of the project are empowering and participating
the community and integrating stakeholders. This is intended to be done by
formulating the coordinating committee of the zone. The committee is supposed to
invite governmental and non-governmental organizations, businessmen and any
ii
interested individuals or groups to participate in keeping their environment clean in
general and street in particular.
This project has two phases. The project components for the first phase are awareness
creation, street cleaning and guarding the polluters; and for the second phase
construction and maintenance of open ditches, roads and sewerage lines.
The outputs of the project are reduction of communicable diseases, creation and
sharing of responsibility, sighty and attractive environment in general and clean
street in particular.
The project will be implemented by the Zonal & Woreda Administration. Zonal Health
Department is the coordinator of the project. It is intended to be implemented in the
coming 5 years starting from the end of 1999 through 2004. Activities of the first
phase of the project will be implemented in the first 2 years and the second phase in
the last 3 years.
The project will be monitored and evaluated by the experts of Health Bureau and
Zonal Health Department jointly. The reports will be submitted to the project
coordinating committee and Health Bureau to finalize the evaluation.
All the resources of the project are expected from governmental, non-governmental
organizations, interested individuals, groups or donors. The total cost of the project
for the first phase is Birr 1 987 172 for a year and Birr 3 974 344 for two years; and
for the second phase it will be given in its project document.
1
Project on Street Cleaning in Zone - 1, Addis Ababa
1. Introduction
Clean street is essential if cities are to be environmentally attractive. Waste
management is one of the most requirement and important service to make the urban
centers clean places, which will help to promote the health of the population to
enhance its creative and productive capacities.
An effective and efficient waste management requires sufficient resource
allocation and management. Waste management is complex and expensive. To sustain
the operation, it demands few skilled and a lot of unskilled staffs, population
cooperation and integration of different stakeholders.
Street cleaning is one of the major activities of solid waste management. Due
to poor roads' condition, drainage system and lack of parking areas and awareness,
keeping streets clean is very difficult in the city in general. It, therefore, needs an
integrated action to keep all streets clean. Since applying this program to the whole
city is not easy, it is designed to be conducted as a pilot project in one part of the city.
2. Problem Statement:
Addis Ababa is the capital city of the country with a population of 2.5 million.
The majority of the population live in unplanned, poor housing condition and mixed
commercial and residential areas. It is divided into 6 zones, 28 woerdas and 303.
Zone-1 is one of the six zones in the city with 314 565 population, 53 341
housing units of 53 341 and 43 674 housing units with some type of sanitary facilities
(1994 P.H.C) and it is located at the middle of the city. It is also the business center
for both the city and the country. Due to this position, the waste generation is not only
from the residents of the zone, but also from the visitors. The highest portion of waste
generation is from market places and institutions.
The Solid Waste Management Team with its 8 garbage lifter and 4 side loader
trucks, 99 & 200 communal containers of 8 cu. M and 1.1 cu. M size respectively and
78 street cleaners are collecting solid waste, which are 25% of the total solid waste
collected from the city per day. Out of the total solid waste collected, 8% is from
street cleaning.
The zone lacks clean environment in general and street in particular. Due to its
position of being the largest open market of the country, its solid waste generation per
day is very high. Since the solid waste collection service coverage is also low, large
portion of solid waste is disposed of on streets, in drainage lines and rivers, which
enhances communicable diseases' transmission and creates odor and unsighty
environment to its residents and visitors.
2
There are about 120 km long roads in the Zone, which need routine cleaning.
The Solid Waste Management Team is cleaning about 40% of roads and the rest 60%
need cleaning that requires additional inputs.
3. Goal and Objectives
Goal:
The overall goal of this project is to decrease communicable diseases and
avoid unsighty condition by improving poor environmental condition and poor street
cleanliness of the zone.
Objectives:
๏‚ท Clean the street to create conducive and attractive environment to the residents and
visitors.
๏‚ท Enhance the job opportunities for unemployed residents of the zone.
๏‚ท Keep the environment clean through raising the awareness of the community and
guarding the polluters.
๏‚ท Expand the program to the other areas of the city.
4. Beneficiaries
The residents of the zone are potential beneficiaries. The benefits obtained
from the implementation of the project include the improved health and sanitation,
protection from pollution and deterioration of the environment and employment
opportunity.
The benefits, therefore, have environmental, economical and health
implication in the broader sense.
5. Implementation Strategy
Strategies are options of different courses of action that will help to meet and
achieve the goal and objectives of the program and sustain the program in the project
area.
The project area is Zone - 1. This project has two phases to implement the
program. Different course of action will also be employed for each phase.
The expected outputs of the project are reduction of communicable diseases,
creation and sharing of responsibilities, sighty environment, clean street and job
opportunities.
3
The implementation strategies for the first phase of the program:
Strategies Activities Responsible Institution Area of Responsibility Role of Health Bureau
Empowering and
participating the
community
๏‚ท Formulate Zonal Project
Coordinating Committee
๏‚ท Health Bureau and Zonal
Health Department
๏‚ท Coordinate community
leaders & different
stakeholders to formulate the
committee
๏‚ท Coordinate the activities
Intersectoral
collaboration
๏‚ท Participate different
stakeholder
๏‚ท Coordinating committee
๏‚ท Zonal Health Department
๏‚ท Invite stakeholders to
participate in the program
๏‚ท Coordinate NGOs & GOs
Enforcement ๏‚ท Teach and enforce the
community to exercise rules
and regulations
๏‚ท Kebele Administration ๏‚ท Penalize polluters ๏‚ท Prepare forum for discussion
and information sharing and
advocacy
Awareness creation ๏‚ท Promote hygiene and
environmental education
๏‚ท Zonal Coordinating
Committee and Kebele
Administration
๏‚ท Control and evaluate
community educators
๏‚ท Give training for hygiene
educators and technical
assistance
Street cleaning ๏‚ท Sweep streets, market places,
etc
๏‚ท Zonal Coordinating
committee
๏‚ท Kebele Administration
๏‚ท Hire street cleaners
๏‚ท Control and evaluate cleaners
๏‚ท Give technical assistance
Guarding polluters ๏‚ท Guard roads, schools, market
places, churches, mosques, etc
๏‚ท Zonal coordinating
committee
๏‚ท Kebele Administration
๏‚ท Hire sanitary guards
๏‚ท Control and evaluate guards
๏‚ท Give training for sanitary
guards and technical
assistance
4
Implementation Schedule:
The time frame for the implementation of the project:
Se.
No.
Activities Duration 1999/ 00 - 2003/04
1999/00 2000/01 2001/02 2002/03 2003/04
1 Phase - 1:
๏‚ท Formulate Zonal project
coordinating committee
X
๏‚ท Participate different
stakeholders
X X X X X
๏‚ท Enforce the community to
exercise rules & regulations
X X X X X
๏‚ท Promote hygiene and
environmental education
X X
๏‚ท Sweep streets, market
places, etc.
X X X X X
๏‚ท Guard roads, schools,
market places, churches,
mosques, etc.
X X X X X
2 Phase - 2:
๏‚ท Construction &
maintenance of open
ditches
X X X
๏‚ท Construction &
maintenance of roads
X X X
๏‚ท Construction of sewerage
lines X X X
6. Monitoring and evaluation
6.1. Monitoring:
The project will be monitored by Zonal Environmental Health Service
Coordinating Team. It will be done by field visits, group discussion and
weekly report.
5
6.2. Evaluation:
The project will be evaluated quarterly by the Environmental Health Experts of
the Health Bureau. The out comes of the evaluation will be submitted to the
coordinating committee and Health Bureau.
7. Project Budget:
The budget for the first phase is given below and for the second phase, it will
be given in its project document.
7.1. Cost of materials:
Se.
No.
Item Unit Qty. Unit
cost
(Birr)
Total
cost
(Birr)
Source
Comm NGOs
1 Wheel Barrow No 88 250 22 000
2 Shovel โ€œ 88 60 5280
3 Fork โ€œ 88 50 4400
4 Broom โ€œ 11 800 5 59 000
5 Total 86 280
6 10% contingency 8 628
7 G. Total for a year 94 908
8 G. Total for 2 years 189 816
7.2. Cost of working clothes and wages for street cleaners
Se.
No.
Item Unit Qty. Unit cost
(Birr per
month)
Total cost
(Birr per
year)
Source
Comm. NGOs
1 Wage of street
cleaners No. 240 250 720 000
2 Wage of foreman โ€œ 20 350 84 000
3 Hardship allowance โ€œ
260 60 187 200
4 Working cloth per
year
โ€œ 520 350 182 000
5 Total 1 173 200
6 10% contingency 117 320
7 G. Total for a year 1 290 520
8 G. Total for 2 years. 2 581 040
6
7.3. Cost for wages and uniform of sanitary guards
Se.
No.
Item Unit Qty. Unit cost
(Birr per
month)
Total cost
(Birr per
year)
Source
Comm. NGOs
1 Wage of sanitary
guards No. 104 230 287 040
2 Uniform per year โ€œ 208 350 72 800
3 Total 359 840
4 10% for contingency 35 984
5 Grand total for a year 395 824
6 Grand total for 2 years 791 648
7.4. Cost for incentives of hygiene educators:
Se.
No.
Item Unit Qty. Unit cost
(Birr per
month)
Total cost
(Birr per
year)
Source
Comm. NGOs
1 Hygiene and
environmental
educators
No. 104 150 187 200
2 10% contingency 18 720
3 Total for a year 205 920
4 Total for 2 years 411 840
7.5. Cost summary:
Se.
No.
Type of cost Budget of
a year
Budget of
2 years
Source
Comm. NGOs
1 For material for street
cleaning 94 908 189 816
2 For wage & working
cloth of street cleaners 1 290 520 2 581 040
3 For wage & uniform for
sanitary guards 395 824 791 648
4 For incentives of
7
educators for awareness
creation 205 920 411 840
5 Total cost 1 987 172 3 974 344
8. References:
1. Addis Ababa Health Bureau activities reports.
2. Kumie A. An overview of Addis Ababa solid waste management.
3. Nor consult, Addis Ababa solid waste management study 1982.
4. Luisberger consult, Addis Ababa solid waste management study
1994 & 1995.
5. UNDP-World Bank water and Sanitation Program flied note on
Addis Ababa-1996.

Weitere รคhnliche Inhalte

Was ist angesagt?

EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project Saurabh Gupta
ย 
Hazardous and Toxic Waste
Hazardous and Toxic WasteHazardous and Toxic Waste
Hazardous and Toxic WasteJester Paquera
ย 
Integrated swm training guide
Integrated swm training guideIntegrated swm training guide
Integrated swm training guideNidz Bancud
ย 
Environmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementEnvironmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementJoy Bhattacharjee
ย 
Drainage System in Manila
Drainage System in ManilaDrainage System in Manila
Drainage System in Manilaharoldtaylor1113
ย 
Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)GAURAV. H .TANDON
ย 
Rejuvenation of lakes
Rejuvenation of lakesRejuvenation of lakes
Rejuvenation of lakesKrishanPal21
ย 
Solid Waste and its Management ppt
Solid Waste and its Management pptSolid Waste and its Management ppt
Solid Waste and its Management pptFaisal Hayat
ย 
CONSTRUCTED WETLAND PPT
CONSTRUCTED WETLAND PPTCONSTRUCTED WETLAND PPT
CONSTRUCTED WETLAND PPTNischay N Gowda
ย 
A Sample Of Project Proposal By A Community Based Organisation
A Sample Of Project Proposal By A Community Based OrganisationA Sample Of Project Proposal By A Community Based Organisation
A Sample Of Project Proposal By A Community Based OrganisationKarin Faust
ย 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
ย 
Project Proposal_Farm-Market-Road Development_Mabini, Bohol
Project Proposal_Farm-Market-Road Development_Mabini, BoholProject Proposal_Farm-Market-Road Development_Mabini, Bohol
Project Proposal_Farm-Market-Road Development_Mabini, BoholRandy Jubac Fostanes, CE
ย 
Stages of EIA
Stages of EIAStages of EIA
Stages of EIAKinza Irshad
ย 
Sequential batch reactor (SBR)
Sequential batch reactor (SBR)Sequential batch reactor (SBR)
Sequential batch reactor (SBR)PRASHANT SRIVASTAVA
ย 
Strategic Local Economic Development: A Guide for Local Governments
Strategic Local Economic Development: A Guide for Local GovernmentsStrategic Local Economic Development: A Guide for Local Governments
Strategic Local Economic Development: A Guide for Local Governmentsled4lgus
ย 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processesAshish Agarwal
ย 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIASakthivel R
ย 
Ce 105 81 solid waste management - vcs
Ce 105 81 solid waste management - vcsCe 105 81 solid waste management - vcs
Ce 105 81 solid waste management - vcsGaurav Pahuja
ย 

Was ist angesagt? (20)

EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project  EIA REPORT :Renuka dam project
EIA REPORT :Renuka dam project
ย 
Hazardous and Toxic Waste
Hazardous and Toxic WasteHazardous and Toxic Waste
Hazardous and Toxic Waste
ย 
Integrated swm training guide
Integrated swm training guideIntegrated swm training guide
Integrated swm training guide
ย 
Environmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementEnvironmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project Management
ย 
Drainage System in Manila
Drainage System in ManilaDrainage System in Manila
Drainage System in Manila
ย 
Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)
ย 
Rejuvenation of lakes
Rejuvenation of lakesRejuvenation of lakes
Rejuvenation of lakes
ย 
Solid Waste and its Management ppt
Solid Waste and its Management pptSolid Waste and its Management ppt
Solid Waste and its Management ppt
ย 
CONSTRUCTED WETLAND PPT
CONSTRUCTED WETLAND PPTCONSTRUCTED WETLAND PPT
CONSTRUCTED WETLAND PPT
ย 
A Sample Of Project Proposal By A Community Based Organisation
A Sample Of Project Proposal By A Community Based OrganisationA Sample Of Project Proposal By A Community Based Organisation
A Sample Of Project Proposal By A Community Based Organisation
ย 
Street Sweeping
Street SweepingStreet Sweeping
Street Sweeping
ย 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
ย 
Project Proposal_Farm-Market-Road Development_Mabini, Bohol
Project Proposal_Farm-Market-Road Development_Mabini, BoholProject Proposal_Farm-Market-Road Development_Mabini, Bohol
Project Proposal_Farm-Market-Road Development_Mabini, Bohol
ย 
Stages of EIA
Stages of EIAStages of EIA
Stages of EIA
ย 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
ย 
Sequential batch reactor (SBR)
Sequential batch reactor (SBR)Sequential batch reactor (SBR)
Sequential batch reactor (SBR)
ย 
Strategic Local Economic Development: A Guide for Local Governments
Strategic Local Economic Development: A Guide for Local GovernmentsStrategic Local Economic Development: A Guide for Local Governments
Strategic Local Economic Development: A Guide for Local Governments
ย 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
ย 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ย 
Ce 105 81 solid waste management - vcs
Ce 105 81 solid waste management - vcsCe 105 81 solid waste management - vcs
Ce 105 81 solid waste management - vcs
ย 

Andere mochten auch

Street cleaning
Street cleaningStreet cleaning
Street cleaningluciadevega98
ย 
Complete Cleaning Equipments
Complete Cleaning EquipmentsComplete Cleaning Equipments
Complete Cleaning EquipmentsMultiCleanSolutions
ย 
Self Regulating Streets
Self Regulating StreetsSelf Regulating Streets
Self Regulating StreetsJason Taylor
ย 
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...MultiCleanSolutions
ย 
Session 33 Kaarle Kupiainen
Session 33 Kaarle KupiainenSession 33 Kaarle Kupiainen
Session 33 Kaarle KupiainenTransportforum (VTI)
ย 
30_8.14_Street Cleaning_1800
30_8.14_Street Cleaning_180030_8.14_Street Cleaning_1800
30_8.14_Street Cleaning_1800Kerry Porter
ย 
solid waste management
solid waste managementsolid waste management
solid waste managementAmit Nakli
ย 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management pptPallabi Priyadarsini
ย 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare pptMandy Suzanne
ย 

Andere mochten auch (9)

Street cleaning
Street cleaningStreet cleaning
Street cleaning
ย 
Complete Cleaning Equipments
Complete Cleaning EquipmentsComplete Cleaning Equipments
Complete Cleaning Equipments
ย 
Self Regulating Streets
Self Regulating StreetsSelf Regulating Streets
Self Regulating Streets
ย 
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
Complete hotel, hospital, institutions, automobile showrooms cleaning equipme...
ย 
Session 33 Kaarle Kupiainen
Session 33 Kaarle KupiainenSession 33 Kaarle Kupiainen
Session 33 Kaarle Kupiainen
ย 
30_8.14_Street Cleaning_1800
30_8.14_Street Cleaning_180030_8.14_Street Cleaning_1800
30_8.14_Street Cleaning_1800
ย 
solid waste management
solid waste managementsolid waste management
solid waste management
ย 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
ย 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
ย 

ร„hnlich wie Clean street project

Project ghg
Project ghgProject ghg
Project ghgFikru Tessema
ย 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Palash Mehar
ย 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design aberanegash
ย 
Edited solid waste managment
Edited solid waste managmentEdited solid waste managment
Edited solid waste managmenteyasu1
ย 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21Julia ariffin
ย 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditKANTHARAJAN GANESAN
ย 
impact assesment .pptx
impact assesment .pptximpact assesment .pptx
impact assesment .pptxSaikumar281375
ย 
Department of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshDepartment of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshTokiTahmidPrangon
ย 
PPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxPPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxyonas513377
ย 
Interior services unit 4
Interior services unit 4Interior services unit 4
Interior services unit 4ctlachu
ย 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eiaJoseph Asem
ย 
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...IRJET Journal
ย 
Concept note: Pan-African landscape restoration program
Concept note: Pan-African landscape restoration programConcept note: Pan-African landscape restoration program
Concept note: Pan-African landscape restoration programNAP Events
ย 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...sbgjbritishcouncil
ย 
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...Mohammad Aslam Shaiekh
ย 
Hazardous waste in Bangladesh
Hazardous waste in BangladeshHazardous waste in Bangladesh
Hazardous waste in BangladeshAktaruzzamanHasan
ย 
Bangkok Green Zone(1)
Bangkok Green Zone(1)Bangkok Green Zone(1)
Bangkok Green Zone(1)pratchaya
ย 

ร„hnlich wie Clean street project (20)

Project ghg
Project ghgProject ghg
Project ghg
ย 
Tor for assessing impact of radio programmes
Tor for assessing impact of radio programmesTor for assessing impact of radio programmes
Tor for assessing impact of radio programmes
ย 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
ย 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design
ย 
Edited solid waste managment
Edited solid waste managmentEdited solid waste managment
Edited solid waste managment
ย 
Local agenda 21
Local agenda 21Local agenda 21
Local agenda 21
ย 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
ย 
impact assesment .pptx
impact assesment .pptximpact assesment .pptx
impact assesment .pptx
ย 
Department of environment(DOE),Bangladesh
Department of environment(DOE),BangladeshDepartment of environment(DOE),Bangladesh
Department of environment(DOE),Bangladesh
ย 
PPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptxPPT presentation ESIAF1.pptx
PPT presentation ESIAF1.pptx
ย 
Interior services unit 4
Interior services unit 4Interior services unit 4
Interior services unit 4
ย 
Public participation in eia
Public participation in eiaPublic participation in eia
Public participation in eia
ย 
Eco2 Cities
Eco2 CitiesEco2 Cities
Eco2 Cities
ย 
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
Environmental Adaption and Mitigation Strategies for Upgrading Industrial slu...
ย 
Urbanization
UrbanizationUrbanization
Urbanization
ย 
Concept note: Pan-African landscape restoration program
Concept note: Pan-African landscape restoration programConcept note: Pan-African landscape restoration program
Concept note: Pan-African landscape restoration program
ย 
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
Understanding Environmental Degradation under ISA by the students of SBGJ, Gu...
ย 
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
A PROPOSAL ON WORKPLACE HEALTH PROMOTION, EDUCATION AND COMMUNICATION PROGRAM...
ย 
Hazardous waste in Bangladesh
Hazardous waste in BangladeshHazardous waste in Bangladesh
Hazardous waste in Bangladesh
ย 
Bangkok Green Zone(1)
Bangkok Green Zone(1)Bangkok Green Zone(1)
Bangkok Green Zone(1)
ย 

Mehr von Fikru Tessema

Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeFikru Tessema
ย 
Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeFikru Tessema
ย 
Network full-engllish
Network full-engllishNetwork full-engllish
Network full-engllishFikru Tessema
ย 
Health system reform overall
Health system reform overallHealth system reform overall
Health system reform overallFikru Tessema
ย 
Eeo health and environment-final
Eeo health and environment-finalEeo health and environment-final
Eeo health and environment-finalFikru Tessema
ย 
National wm strategy and poa sa
National wm strategy and poa saNational wm strategy and poa sa
National wm strategy and poa saFikru Tessema
ย 
Swm ethiopia
Swm ethiopiaSwm ethiopia
Swm ethiopiaFikru Tessema
ย 
Water supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-finalWater supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-finalFikru Tessema
ย 
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measuresEthiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measuresFikru Tessema
ย 
Emission ch4 solid waste
Emission ch4 solid wasteEmission ch4 solid waste
Emission ch4 solid wasteFikru Tessema
ย 
Aa swm-overviw
Aa swm-overviwAa swm-overviw
Aa swm-overviwFikru Tessema
ย 
Hcwm guidelines ethiopia final
Hcwm guidelines ethiopia finalHcwm guidelines ethiopia final
Hcwm guidelines ethiopia finalFikru Tessema
ย 
Fikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitmentFikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitmentFikru Tessema
ย 
Wb swm psp- main report final
Wb swm  psp- main report finalWb swm  psp- main report final
Wb swm psp- main report finalFikru Tessema
ย 
School based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassaSchool based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassaFikru Tessema
ย 
Ethiopia households water supply survey report
Ethiopia households water supply survey reportEthiopia households water supply survey report
Ethiopia households water supply survey reportFikru Tessema
ย 
Employee retention initiatives_study_report-rev
Employee retention initiatives_study_report-revEmployee retention initiatives_study_report-rev
Employee retention initiatives_study_report-revFikru Tessema
ย 
Ethiopia baseline review for water mdg
Ethiopia baseline review for water mdgEthiopia baseline review for water mdg
Ethiopia baseline review for water mdgFikru Tessema
ย 
Fikru presentation m&e
Fikru presentation m&eFikru presentation m&e
Fikru presentation m&eFikru Tessema
ย 

Mehr von Fikru Tessema (20)

Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptake
ย 
Effect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptakeEffect of blue star healthcare network on family planning service uptake
Effect of blue star healthcare network on family planning service uptake
ย 
M&e system
M&e systemM&e system
M&e system
ย 
Network full-engllish
Network full-engllishNetwork full-engllish
Network full-engllish
ย 
Health system reform overall
Health system reform overallHealth system reform overall
Health system reform overall
ย 
Eeo health and environment-final
Eeo health and environment-finalEeo health and environment-final
Eeo health and environment-final
ย 
National wm strategy and poa sa
National wm strategy and poa saNational wm strategy and poa sa
National wm strategy and poa sa
ย 
Swm ethiopia
Swm ethiopiaSwm ethiopia
Swm ethiopia
ย 
Water supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-finalWater supply md gs-ethiopia country case study-final
Water supply md gs-ethiopia country case study-final
ย 
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measuresEthiopian urban setting ch4 emiission from solid waste mitigation measures
Ethiopian urban setting ch4 emiission from solid waste mitigation measures
ย 
Emission ch4 solid waste
Emission ch4 solid wasteEmission ch4 solid waste
Emission ch4 solid waste
ย 
Aa swm-overviw
Aa swm-overviwAa swm-overviw
Aa swm-overviw
ย 
Hcwm guidelines ethiopia final
Hcwm guidelines ethiopia finalHcwm guidelines ethiopia final
Hcwm guidelines ethiopia final
ย 
Fikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitmentFikru jsi r&t ltr of commitment
Fikru jsi r&t ltr of commitment
ย 
Wb swm psp- main report final
Wb swm  psp- main report finalWb swm  psp- main report final
Wb swm psp- main report final
ย 
School based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassaSchool based rh program evaluation report the case of hawassa
School based rh program evaluation report the case of hawassa
ย 
Ethiopia households water supply survey report
Ethiopia households water supply survey reportEthiopia households water supply survey report
Ethiopia households water supply survey report
ย 
Employee retention initiatives_study_report-rev
Employee retention initiatives_study_report-revEmployee retention initiatives_study_report-rev
Employee retention initiatives_study_report-rev
ย 
Ethiopia baseline review for water mdg
Ethiopia baseline review for water mdgEthiopia baseline review for water mdg
Ethiopia baseline review for water mdg
ย 
Fikru presentation m&e
Fikru presentation m&eFikru presentation m&e
Fikru presentation m&e
ย 

Kรผrzlich hochgeladen

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Anamikakaur10
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...tanu pandey
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹nirzagarg
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
ย 

Kรผrzlich hochgeladen (20)

VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
Water Pollution
Water Pollution Water Pollution
Water Pollution
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
๐Ÿ’š๐Ÿ˜‹ Mathura Escort Service Call Girls, 9352852248 โ‚น5000 To 25K With AC๐Ÿ’š๐Ÿ˜‹
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Attur Layout Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
ย 

Clean street project

  • 1. Project on clean street In Zone-one, Addis ababa Prepared By: Fikru Tessema (Project Coordinator) OCTOBER 1999 HEALTH BUREAU ADDIS ABABA
  • 2. TABLE OF CONTENT Contents Page INTRODUCTION................................................. 1 PROBLEM STATEMENT.................................... 1 GOAL AND OBJECTIVES.................................. 2 IMPLEMENTATION STRATEGY...................... 3 IMPLEMENTATION SCHEDULE...................... 4 MONITORING & EVALUATION...................... 4 PROJECT BUDGET............................................. 5 REFERENCE........................................................ 7
  • 3. i EXECUTIVE SUMMARY PROJECT ON CLEAN STREET IN ZONE -- 1, ADDIS ABABA (Fikru Tessema and Demissie W/Giorgis) Clean street is essential if cities are to be environmentally attractive. Waste management is one of the most requirement and important service to make the urban centers clean places, which will help to promote the health of the population to enhance its creative and productive capacities. Addis Ababa is one of the major urban centers of Ethiopia and the capital city of the country. Its population is 2.5 million and divided into 6 zones, 28 woredas and 303 kebeles. Zone-1 is one of the six zones in the city and located at the middle of the city. It is also the business center for both the city and the country. Due to this position, the waste generation is not only from the residences of the zone. The highest portion of waste generation is from market places and institutions. According to the 1994 population and housing census, the total population of zone-1 is about 314 565 and the total housing units are 53 341. Out of these housing units, 43 674 have some type of sanitary facilities. Of the total solid waste collected in the city, 25% is from this zone. The resources daily allocated to give solid waste collection services are 6 garbage container lifter and 4 side loader trucks, 99 and 200 communal containers of size 8 cu. m and 1.1 cu. M respectively and 78 street cleaners. There are also 22 public toilets, which serve about 5 290 people per toilet per day. In general, the zone lacks proper waste management, which requires proper resource allocation, management and integrated approach. Most drainage lines are open ditches, which are often used for receiving any type of refuses, storm and waste water. Most drainage appurtenances are not functional and need maintenance. These conditions contributed to the pronounced odor and unsighty condition and deposit of waste on the side and pavement of the street. As a result, it affects human health and comfort and aggravates pollution of the environment in general and street in particular. The goal of the project is to decrease communicable diseases and avoid unsighty condition by improving poor environmental condition and poor street cleanliness of the zone through integrating different sectors and participating the community to create conducive and attractive environment to the residents and visitors. The strategies for the implementation of the project are empowering and participating the community and integrating stakeholders. This is intended to be done by formulating the coordinating committee of the zone. The committee is supposed to invite governmental and non-governmental organizations, businessmen and any
  • 4. ii interested individuals or groups to participate in keeping their environment clean in general and street in particular. This project has two phases. The project components for the first phase are awareness creation, street cleaning and guarding the polluters; and for the second phase construction and maintenance of open ditches, roads and sewerage lines. The outputs of the project are reduction of communicable diseases, creation and sharing of responsibility, sighty and attractive environment in general and clean street in particular. The project will be implemented by the Zonal & Woreda Administration. Zonal Health Department is the coordinator of the project. It is intended to be implemented in the coming 5 years starting from the end of 1999 through 2004. Activities of the first phase of the project will be implemented in the first 2 years and the second phase in the last 3 years. The project will be monitored and evaluated by the experts of Health Bureau and Zonal Health Department jointly. The reports will be submitted to the project coordinating committee and Health Bureau to finalize the evaluation. All the resources of the project are expected from governmental, non-governmental organizations, interested individuals, groups or donors. The total cost of the project for the first phase is Birr 1 987 172 for a year and Birr 3 974 344 for two years; and for the second phase it will be given in its project document.
  • 5. 1 Project on Street Cleaning in Zone - 1, Addis Ababa 1. Introduction Clean street is essential if cities are to be environmentally attractive. Waste management is one of the most requirement and important service to make the urban centers clean places, which will help to promote the health of the population to enhance its creative and productive capacities. An effective and efficient waste management requires sufficient resource allocation and management. Waste management is complex and expensive. To sustain the operation, it demands few skilled and a lot of unskilled staffs, population cooperation and integration of different stakeholders. Street cleaning is one of the major activities of solid waste management. Due to poor roads' condition, drainage system and lack of parking areas and awareness, keeping streets clean is very difficult in the city in general. It, therefore, needs an integrated action to keep all streets clean. Since applying this program to the whole city is not easy, it is designed to be conducted as a pilot project in one part of the city. 2. Problem Statement: Addis Ababa is the capital city of the country with a population of 2.5 million. The majority of the population live in unplanned, poor housing condition and mixed commercial and residential areas. It is divided into 6 zones, 28 woerdas and 303. Zone-1 is one of the six zones in the city with 314 565 population, 53 341 housing units of 53 341 and 43 674 housing units with some type of sanitary facilities (1994 P.H.C) and it is located at the middle of the city. It is also the business center for both the city and the country. Due to this position, the waste generation is not only from the residents of the zone, but also from the visitors. The highest portion of waste generation is from market places and institutions. The Solid Waste Management Team with its 8 garbage lifter and 4 side loader trucks, 99 & 200 communal containers of 8 cu. M and 1.1 cu. M size respectively and 78 street cleaners are collecting solid waste, which are 25% of the total solid waste collected from the city per day. Out of the total solid waste collected, 8% is from street cleaning. The zone lacks clean environment in general and street in particular. Due to its position of being the largest open market of the country, its solid waste generation per day is very high. Since the solid waste collection service coverage is also low, large portion of solid waste is disposed of on streets, in drainage lines and rivers, which enhances communicable diseases' transmission and creates odor and unsighty environment to its residents and visitors.
  • 6. 2 There are about 120 km long roads in the Zone, which need routine cleaning. The Solid Waste Management Team is cleaning about 40% of roads and the rest 60% need cleaning that requires additional inputs. 3. Goal and Objectives Goal: The overall goal of this project is to decrease communicable diseases and avoid unsighty condition by improving poor environmental condition and poor street cleanliness of the zone. Objectives: ๏‚ท Clean the street to create conducive and attractive environment to the residents and visitors. ๏‚ท Enhance the job opportunities for unemployed residents of the zone. ๏‚ท Keep the environment clean through raising the awareness of the community and guarding the polluters. ๏‚ท Expand the program to the other areas of the city. 4. Beneficiaries The residents of the zone are potential beneficiaries. The benefits obtained from the implementation of the project include the improved health and sanitation, protection from pollution and deterioration of the environment and employment opportunity. The benefits, therefore, have environmental, economical and health implication in the broader sense. 5. Implementation Strategy Strategies are options of different courses of action that will help to meet and achieve the goal and objectives of the program and sustain the program in the project area. The project area is Zone - 1. This project has two phases to implement the program. Different course of action will also be employed for each phase. The expected outputs of the project are reduction of communicable diseases, creation and sharing of responsibilities, sighty environment, clean street and job opportunities.
  • 7. 3 The implementation strategies for the first phase of the program: Strategies Activities Responsible Institution Area of Responsibility Role of Health Bureau Empowering and participating the community ๏‚ท Formulate Zonal Project Coordinating Committee ๏‚ท Health Bureau and Zonal Health Department ๏‚ท Coordinate community leaders & different stakeholders to formulate the committee ๏‚ท Coordinate the activities Intersectoral collaboration ๏‚ท Participate different stakeholder ๏‚ท Coordinating committee ๏‚ท Zonal Health Department ๏‚ท Invite stakeholders to participate in the program ๏‚ท Coordinate NGOs & GOs Enforcement ๏‚ท Teach and enforce the community to exercise rules and regulations ๏‚ท Kebele Administration ๏‚ท Penalize polluters ๏‚ท Prepare forum for discussion and information sharing and advocacy Awareness creation ๏‚ท Promote hygiene and environmental education ๏‚ท Zonal Coordinating Committee and Kebele Administration ๏‚ท Control and evaluate community educators ๏‚ท Give training for hygiene educators and technical assistance Street cleaning ๏‚ท Sweep streets, market places, etc ๏‚ท Zonal Coordinating committee ๏‚ท Kebele Administration ๏‚ท Hire street cleaners ๏‚ท Control and evaluate cleaners ๏‚ท Give technical assistance Guarding polluters ๏‚ท Guard roads, schools, market places, churches, mosques, etc ๏‚ท Zonal coordinating committee ๏‚ท Kebele Administration ๏‚ท Hire sanitary guards ๏‚ท Control and evaluate guards ๏‚ท Give training for sanitary guards and technical assistance
  • 8. 4 Implementation Schedule: The time frame for the implementation of the project: Se. No. Activities Duration 1999/ 00 - 2003/04 1999/00 2000/01 2001/02 2002/03 2003/04 1 Phase - 1: ๏‚ท Formulate Zonal project coordinating committee X ๏‚ท Participate different stakeholders X X X X X ๏‚ท Enforce the community to exercise rules & regulations X X X X X ๏‚ท Promote hygiene and environmental education X X ๏‚ท Sweep streets, market places, etc. X X X X X ๏‚ท Guard roads, schools, market places, churches, mosques, etc. X X X X X 2 Phase - 2: ๏‚ท Construction & maintenance of open ditches X X X ๏‚ท Construction & maintenance of roads X X X ๏‚ท Construction of sewerage lines X X X 6. Monitoring and evaluation 6.1. Monitoring: The project will be monitored by Zonal Environmental Health Service Coordinating Team. It will be done by field visits, group discussion and weekly report.
  • 9. 5 6.2. Evaluation: The project will be evaluated quarterly by the Environmental Health Experts of the Health Bureau. The out comes of the evaluation will be submitted to the coordinating committee and Health Bureau. 7. Project Budget: The budget for the first phase is given below and for the second phase, it will be given in its project document. 7.1. Cost of materials: Se. No. Item Unit Qty. Unit cost (Birr) Total cost (Birr) Source Comm NGOs 1 Wheel Barrow No 88 250 22 000 2 Shovel โ€œ 88 60 5280 3 Fork โ€œ 88 50 4400 4 Broom โ€œ 11 800 5 59 000 5 Total 86 280 6 10% contingency 8 628 7 G. Total for a year 94 908 8 G. Total for 2 years 189 816 7.2. Cost of working clothes and wages for street cleaners Se. No. Item Unit Qty. Unit cost (Birr per month) Total cost (Birr per year) Source Comm. NGOs 1 Wage of street cleaners No. 240 250 720 000 2 Wage of foreman โ€œ 20 350 84 000 3 Hardship allowance โ€œ 260 60 187 200 4 Working cloth per year โ€œ 520 350 182 000 5 Total 1 173 200 6 10% contingency 117 320 7 G. Total for a year 1 290 520 8 G. Total for 2 years. 2 581 040
  • 10. 6 7.3. Cost for wages and uniform of sanitary guards Se. No. Item Unit Qty. Unit cost (Birr per month) Total cost (Birr per year) Source Comm. NGOs 1 Wage of sanitary guards No. 104 230 287 040 2 Uniform per year โ€œ 208 350 72 800 3 Total 359 840 4 10% for contingency 35 984 5 Grand total for a year 395 824 6 Grand total for 2 years 791 648 7.4. Cost for incentives of hygiene educators: Se. No. Item Unit Qty. Unit cost (Birr per month) Total cost (Birr per year) Source Comm. NGOs 1 Hygiene and environmental educators No. 104 150 187 200 2 10% contingency 18 720 3 Total for a year 205 920 4 Total for 2 years 411 840 7.5. Cost summary: Se. No. Type of cost Budget of a year Budget of 2 years Source Comm. NGOs 1 For material for street cleaning 94 908 189 816 2 For wage & working cloth of street cleaners 1 290 520 2 581 040 3 For wage & uniform for sanitary guards 395 824 791 648 4 For incentives of
  • 11. 7 educators for awareness creation 205 920 411 840 5 Total cost 1 987 172 3 974 344 8. References: 1. Addis Ababa Health Bureau activities reports. 2. Kumie A. An overview of Addis Ababa solid waste management. 3. Nor consult, Addis Ababa solid waste management study 1982. 4. Luisberger consult, Addis Ababa solid waste management study 1994 & 1995. 5. UNDP-World Bank water and Sanitation Program flied note on Addis Ababa-1996.