REPORT HYDRAULIC RAM PUMP SYSTEM
HERMINAL, BRGY. GUIMBALAON,
SILAY CITY
Background: Already in 2006 AID Foundation was requested by the community of Herminal
through the Barangay for a survey for a water system. The Barangay had heard of the possibility
of AID Foundation to pump up water to higher elevations without the use of electricity or fuel.
A survey was carried out and it was found feasible. This project was absorbed in a program with
Green Empowerment but the budget was not enough for the whole implementation. The director
of AIDFI tried to get some counterpart from the Municipality of Silay, but in one way or another
the talks between the director and the City Administration of Silay didn’t result in anything.
Other projects in the Green Empowerment program were therefore prioritized and when the
director of AIDFI went on to another organization, the negotiations were picked up again by
another staff of AIDFI.
Community: Herminal is one of the many sugarcane plantation communities. At the time of
the first survey, the place was still a plantation. In 2008 the area was placed under the land
reform program and the sugar workers were able to avail of the land. The title is still common
and needs to be subdivided. There are 78 households and one of the big problems is supply of
water. Previously before the ram pump system the people had to fetch water from an
unprotected source some 300 meters away and lower situated by 20 meters. In dry season this
source would dry up and the community members had to fetch water from a source farther away.
There consumption was limited to an average of two containers per day because of the distance.
For bathing and laundry, the households would go to the river some 1 kilometer away.
Survey: Herminal was re-surveyed on February 25, 2009 to be sure on the expected output of
the source. AIDFI has experienced many sources which diminished overtime in output. From
the survey a new design was made and the expected output (to be delivered by the ram pumps to
the community) was calculated at 16.500 liters/day.
Design: The amount reserved for Herminal from the Green Empowerment budget was not
enough but could cover the cost for the impounding, catchment, two ram pumps with drive pipe
systems, delivery line and a 10.000 liters tank and 5 tapstands. At least water could be pumped
to the reservoir, making water more easily available to the community.
Social Preparation: The organizer of AIDFI was assigned to have meetings with the
community on forming a water association, discuss counterparting and participation in terms of
labor and local technicians. The organizer spent a lot of time in trying also to deal with the
Municipality. It was suggested that AIDFI in order to avail of a financial counterpart of the
Municipality should get itself accredited by the Municipality of Silay. Normally, in other
Municipalities, this is not so hard, but in Silay they came up with all kind of additional requests
for papers. We sensed that the time for finally getting a financial contribution might take still a
long time, we decided to explain the financial limitation of AIDFI to the community and do our
part, meaning pumping up water to the reservoir. This would also give us the chance in the
meantime to work on the Municipality.
Implementation: a technical installation team of AIDFI worked for 28 days on the installation.
The hardest part to work on was the impounding since the soil structure was of limestone and
hard clay. Besides the main source, three other small sources were tapped (protected by cement
boxes and connected with HDPE pipes). As per plan the system built by AIDFI was up to the
reservoir, leaving the distribution to the tapstands to an eventual financial contribution of the
City Government. On rotation basis the people from the community helped in the construction
works. The water association arranged the schedule for this. The people were paid daily and a
small portion of the budget for the local labor went to the association’s fund. This was 20 pesos
(40 dollar cent) per day/worker. The system consists of three different springboxes, one big
impounding structure and a catchment which is directly connected to the first ram pump of 1 ½”
ram pump, followed by a second ram pump of the same size (which utilizes the waste water of
the first), delivery pipes from different sizes HDPE (each ram its own delivery pipe) leading to
the reservoir over a distance of 230 meters. Then there are five tapstands still to be connected.
Technical data: The flow of the combined sources is 105 liters/min. The first ram pump is 5.5
meters lower than the catchment and delivers around 6.6 liters/min to the 56 meters higher
elevated reservoir. The second ram pump is 6 meters lower than the first and also pumps around
6.6 liters/min over a height of 62 meters. The total output is more or less 19.000liters/day and
therefore more than expected. This provides around 240 liters/household/day. This is 200 liters
more than before.
The ram pumps have still to be fine tuned and might even deliver more water. The fine tuning
can be done when the installation has gone through the whole curing period.
Impact: Despite the long wait between first survey and the final installation, the community
members expressed their happiness about the project. Many plans were heard now the members
have more water available. From the experience of AIDFI with other communities, we can
expect healthier children with less diarrhea and skin diseases, more livestock (mostly pigs),
vegetable production and even some aqua culture. Also more time of the people, saved from
fetching water, is available for more productive activities.
Unfortunately, the camera battery died after this last picture!

Weitere ähnliche Inhalte

Mehr von Fifi62z

Poblaki Ram Pump Equipment List
Poblaki Ram Pump Equipment ListPoblaki Ram Pump Equipment List
Poblaki Ram Pump Equipment ListFifi62z
 
Poblaki Ram Pump Installation Report - Border Green Energy Team
Poblaki Ram Pump Installation Report - Border Green Energy TeamPoblaki Ram Pump Installation Report - Border Green Energy Team
Poblaki Ram Pump Installation Report - Border Green Energy TeamFifi62z
 
Ram Pump and Solar Pump Training - Border Green Energy Team
Ram Pump and Solar Pump Training - Border Green Energy TeamRam Pump and Solar Pump Training - Border Green Energy Team
Ram Pump and Solar Pump Training - Border Green Energy TeamFifi62z
 
Selecting and Installing the Hydraulic Pump
Selecting and Installing the Hydraulic PumpSelecting and Installing the Hydraulic Pump
Selecting and Installing the Hydraulic PumpFifi62z
 
The Basic’s of Hydraulic Ram Pumps - Rain Tree Foundation
The Basic’s of Hydraulic Ram Pumps - Rain Tree FoundationThe Basic’s of Hydraulic Ram Pumps - Rain Tree Foundation
The Basic’s of Hydraulic Ram Pumps - Rain Tree FoundationFifi62z
 
The Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation GuideThe Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation GuideFifi62z
 
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S HazarikaTheory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S HazarikaFifi62z
 
Tom's Hydraulic Ram Pump
Tom's Hydraulic Ram PumpTom's Hydraulic Ram Pump
Tom's Hydraulic Ram PumpFifi62z
 
Use of Hydraulic Rams in Nepal
Use of Hydraulic Rams in NepalUse of Hydraulic Rams in Nepal
Use of Hydraulic Rams in NepalFifi62z
 
Uses of Hydraulic Rams in Hill Area - Dharam Singh
Uses of Hydraulic Rams in Hill Area - Dharam SinghUses of Hydraulic Rams in Hill Area - Dharam Singh
Uses of Hydraulic Rams in Hill Area - Dharam SinghFifi62z
 
Using A Hydraulic Ram to Pump Livestock Water
Using A Hydraulic Ram to Pump Livestock WaterUsing A Hydraulic Ram to Pump Livestock Water
Using A Hydraulic Ram to Pump Livestock WaterFifi62z
 
Using A Modified Hydraulic Ram to Pump Livestock Wate
Using A Modified Hydraulic Ram to Pump Livestock WateUsing A Modified Hydraulic Ram to Pump Livestock Wate
Using A Modified Hydraulic Ram to Pump Livestock WateFifi62z
 
Water-Powered Water Pumping Systems for Livestock Watering
Water-Powered Water Pumping Systems for Livestock WateringWater-Powered Water Pumping Systems for Livestock Watering
Water-Powered Water Pumping Systems for Livestock WateringFifi62z
 
Willett Ram Pump Brochure
Willett Ram Pump BrochureWillett Ram Pump Brochure
Willett Ram Pump BrochureFifi62z
 
Hydraulic Ram Pump
Hydraulic Ram Pump Hydraulic Ram Pump
Hydraulic Ram Pump Fifi62z
 

Mehr von Fifi62z (15)

Poblaki Ram Pump Equipment List
Poblaki Ram Pump Equipment ListPoblaki Ram Pump Equipment List
Poblaki Ram Pump Equipment List
 
Poblaki Ram Pump Installation Report - Border Green Energy Team
Poblaki Ram Pump Installation Report - Border Green Energy TeamPoblaki Ram Pump Installation Report - Border Green Energy Team
Poblaki Ram Pump Installation Report - Border Green Energy Team
 
Ram Pump and Solar Pump Training - Border Green Energy Team
Ram Pump and Solar Pump Training - Border Green Energy TeamRam Pump and Solar Pump Training - Border Green Energy Team
Ram Pump and Solar Pump Training - Border Green Energy Team
 
Selecting and Installing the Hydraulic Pump
Selecting and Installing the Hydraulic PumpSelecting and Installing the Hydraulic Pump
Selecting and Installing the Hydraulic Pump
 
The Basic’s of Hydraulic Ram Pumps - Rain Tree Foundation
The Basic’s of Hydraulic Ram Pumps - Rain Tree FoundationThe Basic’s of Hydraulic Ram Pumps - Rain Tree Foundation
The Basic’s of Hydraulic Ram Pumps - Rain Tree Foundation
 
The Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation GuideThe Glockemann Ram Pump: Site and Installation Guide
The Glockemann Ram Pump: Site and Installation Guide
 
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S HazarikaTheory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
 
Tom's Hydraulic Ram Pump
Tom's Hydraulic Ram PumpTom's Hydraulic Ram Pump
Tom's Hydraulic Ram Pump
 
Use of Hydraulic Rams in Nepal
Use of Hydraulic Rams in NepalUse of Hydraulic Rams in Nepal
Use of Hydraulic Rams in Nepal
 
Uses of Hydraulic Rams in Hill Area - Dharam Singh
Uses of Hydraulic Rams in Hill Area - Dharam SinghUses of Hydraulic Rams in Hill Area - Dharam Singh
Uses of Hydraulic Rams in Hill Area - Dharam Singh
 
Using A Hydraulic Ram to Pump Livestock Water
Using A Hydraulic Ram to Pump Livestock WaterUsing A Hydraulic Ram to Pump Livestock Water
Using A Hydraulic Ram to Pump Livestock Water
 
Using A Modified Hydraulic Ram to Pump Livestock Wate
Using A Modified Hydraulic Ram to Pump Livestock WateUsing A Modified Hydraulic Ram to Pump Livestock Wate
Using A Modified Hydraulic Ram to Pump Livestock Wate
 
Water-Powered Water Pumping Systems for Livestock Watering
Water-Powered Water Pumping Systems for Livestock WateringWater-Powered Water Pumping Systems for Livestock Watering
Water-Powered Water Pumping Systems for Livestock Watering
 
Willett Ram Pump Brochure
Willett Ram Pump BrochureWillett Ram Pump Brochure
Willett Ram Pump Brochure
 
Hydraulic Ram Pump
Hydraulic Ram Pump Hydraulic Ram Pump
Hydraulic Ram Pump
 

Kürzlich hochgeladen

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 

Kürzlich hochgeladen (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 

Report Hydraulic Ram Pump System Herminal, Brgy. Guimbalaon, Silay CitY

  • 1. REPORT HYDRAULIC RAM PUMP SYSTEM HERMINAL, BRGY. GUIMBALAON, SILAY CITY Background: Already in 2006 AID Foundation was requested by the community of Herminal through the Barangay for a survey for a water system. The Barangay had heard of the possibility of AID Foundation to pump up water to higher elevations without the use of electricity or fuel. A survey was carried out and it was found feasible. This project was absorbed in a program with Green Empowerment but the budget was not enough for the whole implementation. The director of AIDFI tried to get some counterpart from the Municipality of Silay, but in one way or another the talks between the director and the City Administration of Silay didn’t result in anything. Other projects in the Green Empowerment program were therefore prioritized and when the director of AIDFI went on to another organization, the negotiations were picked up again by another staff of AIDFI. Community: Herminal is one of the many sugarcane plantation communities. At the time of the first survey, the place was still a plantation. In 2008 the area was placed under the land reform program and the sugar workers were able to avail of the land. The title is still common and needs to be subdivided. There are 78 households and one of the big problems is supply of water. Previously before the ram pump system the people had to fetch water from an unprotected source some 300 meters away and lower situated by 20 meters. In dry season this source would dry up and the community members had to fetch water from a source farther away. There consumption was limited to an average of two containers per day because of the distance. For bathing and laundry, the households would go to the river some 1 kilometer away. Survey: Herminal was re-surveyed on February 25, 2009 to be sure on the expected output of the source. AIDFI has experienced many sources which diminished overtime in output. From the survey a new design was made and the expected output (to be delivered by the ram pumps to the community) was calculated at 16.500 liters/day. Design: The amount reserved for Herminal from the Green Empowerment budget was not enough but could cover the cost for the impounding, catchment, two ram pumps with drive pipe systems, delivery line and a 10.000 liters tank and 5 tapstands. At least water could be pumped to the reservoir, making water more easily available to the community. Social Preparation: The organizer of AIDFI was assigned to have meetings with the community on forming a water association, discuss counterparting and participation in terms of labor and local technicians. The organizer spent a lot of time in trying also to deal with the Municipality. It was suggested that AIDFI in order to avail of a financial counterpart of the Municipality should get itself accredited by the Municipality of Silay. Normally, in other Municipalities, this is not so hard, but in Silay they came up with all kind of additional requests for papers. We sensed that the time for finally getting a financial contribution might take still a long time, we decided to explain the financial limitation of AIDFI to the community and do our part, meaning pumping up water to the reservoir. This would also give us the chance in the meantime to work on the Municipality.
  • 2. Implementation: a technical installation team of AIDFI worked for 28 days on the installation. The hardest part to work on was the impounding since the soil structure was of limestone and hard clay. Besides the main source, three other small sources were tapped (protected by cement boxes and connected with HDPE pipes). As per plan the system built by AIDFI was up to the reservoir, leaving the distribution to the tapstands to an eventual financial contribution of the City Government. On rotation basis the people from the community helped in the construction works. The water association arranged the schedule for this. The people were paid daily and a small portion of the budget for the local labor went to the association’s fund. This was 20 pesos (40 dollar cent) per day/worker. The system consists of three different springboxes, one big impounding structure and a catchment which is directly connected to the first ram pump of 1 ½” ram pump, followed by a second ram pump of the same size (which utilizes the waste water of the first), delivery pipes from different sizes HDPE (each ram its own delivery pipe) leading to the reservoir over a distance of 230 meters. Then there are five tapstands still to be connected. Technical data: The flow of the combined sources is 105 liters/min. The first ram pump is 5.5 meters lower than the catchment and delivers around 6.6 liters/min to the 56 meters higher elevated reservoir. The second ram pump is 6 meters lower than the first and also pumps around 6.6 liters/min over a height of 62 meters. The total output is more or less 19.000liters/day and therefore more than expected. This provides around 240 liters/household/day. This is 200 liters more than before. The ram pumps have still to be fine tuned and might even deliver more water. The fine tuning can be done when the installation has gone through the whole curing period. Impact: Despite the long wait between first survey and the final installation, the community members expressed their happiness about the project. Many plans were heard now the members have more water available. From the experience of AIDFI with other communities, we can expect healthier children with less diarrhea and skin diseases, more livestock (mostly pigs), vegetable production and even some aqua culture. Also more time of the people, saved from fetching water, is available for more productive activities.
  • 3.
  • 4.
  • 5. Unfortunately, the camera battery died after this last picture!