Cleaning and treating an existing central
heating system – Silver Clean

Procedure
1.	 Identify and rectify mechanical faults.             11.	Repeat step 10 on all radiators.
2.	Dump system water to a foul drain and refill        12.	Use a Fernox TDS Meter to ensure that the
    with fresh plain water. Install a Fernox TF1             total dissolved solids have been satisfactorily
    Total Filter or TF1 Compact.                             removed. The system can be regarded as
3.	Add Fernox Cleaner F3 or Cleaner F5 at                   being thoroughly flushed when the system
    the recommended dose through a radiator,                 water value is within 10% of the mains water.
    the TF1 or filling loop.                                 Differences over 10% mean that significant
                                                             cleaner residues have been left in the system
4.	Turn on the boiler and circulate the Cleaner F3          and further flushing is required.
    for a minimum of one hour.
                                                        13.	Add Fernox Protector F1 500ml or Express
5.	Turn off the boiler and close the flow valve to          at the recommended dose.
    the TF1. Remove the TF1 magnet and open
    the drain valve. Drain contents into a suitable     14.	 efit the magnet assembly in the TF1 Filter.
                                                            R
    container until the water runs clearer. Close the   15.	 he retreatment sticker provided with all
                                                            T
    drain valve, open the flow valve and re-insert          Fernox Protectors should be correctly
    the TF1 magnet. Switch on the boiler.                   completed and applied to the boiler casing.
6.	Isolate all radiators by closing the wheel-head     	  Note: For continual protection Fernox
    valves or TRVs except that furthest away from           recommend Protector levels are checked
    the boiler. Circulate the cleaner through the           annually (usually during the service) or
    radiator for five minutes or until efficiency is        sooner if the system content is drained down.
    restored. Check using a ‘touch test’. If the            This should be carried out using a Fernox
    radiator remains cold at the bottom in the              Protector Test Kit.
    centre, rolling a Fernox MaxMag upwards
    from the bottom of the radiator can help to         If you are unsure of dose rates or require further
    dislodge any persistent sludge in the base.         advice, contact Fernox Technical Services on
    Close the flow to the radiator.                     +44 (0)870 870 0362 or visit www.fernox.com
7.	 Repeat step 5.
                                                        NB: Motorised valves should be manually opened
8.	Repeat steps 6 and 7 for all radiators in           during the flushing process and any anti-gravity
    the system.                                         valves should be by-passed or removed
9.	Turn off the boiler, remove the magnet from the     temporarily. If it is necessary to cap off the open
    TF1 and open all radiators. Purge the system        vent during the mains flush to prevent overflow
    water to drain whilst at the same time introduce    ensure the cap is removed prior to restarting
    fresh water via the feed and expansion cistern      the appliance.
    or via the filling loop. Flush through until the
    water runs clear.
10.	solate all radiators except that furthest away
    I
    from the boiler, and continue to purge for
    five minutes.




                                                                             www.fernox.com

Weitere ähnliche Inhalte

Andere mochten auch

Tabla evaluación de recursos web
Tabla evaluación de recursos webTabla evaluación de recursos web
Tabla evaluación de recursos webofelia19
 
Tabla de evaluacion web 2.0
Tabla de evaluacion web 2.0Tabla de evaluacion web 2.0
Tabla de evaluacion web 2.0rerolansa
 
Taller 2 tpack
Taller 2 tpackTaller 2 tpack
Taller 2 tpackvirgytita
 
employment note
employment noteemployment note
employment noteHUFLIT
 
Tehuan Map Navigation - Early mockup
Tehuan Map Navigation - Early mockup Tehuan Map Navigation - Early mockup
Tehuan Map Navigation - Early mockup Daniel Strazzulla
 
Music Video Analysis - Aphex Twin
Music Video Analysis - Aphex TwinMusic Video Analysis - Aphex Twin
Music Video Analysis - Aphex TwinCarla Appleby
 

Andere mochten auch (11)

Narrative theory
Narrative theoryNarrative theory
Narrative theory
 
Tabla evaluación de recursos web
Tabla evaluación de recursos webTabla evaluación de recursos web
Tabla evaluación de recursos web
 
training
trainingtraining
training
 
Untitled
UntitledUntitled
Untitled
 
Tabla de evaluacion web 2.0
Tabla de evaluacion web 2.0Tabla de evaluacion web 2.0
Tabla de evaluacion web 2.0
 
Maurice Dabbah :
Maurice Dabbah : Maurice Dabbah :
Maurice Dabbah :
 
Taller 2 tpack
Taller 2 tpackTaller 2 tpack
Taller 2 tpack
 
employment note
employment noteemployment note
employment note
 
Tehuan Map Navigation - Early mockup
Tehuan Map Navigation - Early mockup Tehuan Map Navigation - Early mockup
Tehuan Map Navigation - Early mockup
 
Music Video Analysis - Aphex Twin
Music Video Analysis - Aphex TwinMusic Video Analysis - Aphex Twin
Music Video Analysis - Aphex Twin
 
Undercovertemp
UndercovertempUndercovertemp
Undercovertemp
 

Ähnlich wie Method Statement - Silver Clean

Method Statement - Bronze Clean
Method Statement - Bronze CleanMethod Statement - Bronze Clean
Method Statement - Bronze CleanFernox
 
Method Statement Cleaning and Treating Existing Domestic Systems
Method Statement Cleaning and Treating Existing Domestic SystemsMethod Statement Cleaning and Treating Existing Domestic Systems
Method Statement Cleaning and Treating Existing Domestic SystemsFernox
 
Method Statement - Gold Clean
Method Statement - Gold CleanMethod Statement - Gold Clean
Method Statement - Gold CleanFernox
 
Method Statement Cleaning and Treating New Domestic Systems
Method Statement Cleaning and Treating New Domestic SystemsMethod Statement Cleaning and Treating New Domestic Systems
Method Statement Cleaning and Treating New Domestic SystemsFernox
 
Method Statement for Powerflushing Domestic Systems
Method Statement for Powerflushing Domestic SystemsMethod Statement for Powerflushing Domestic Systems
Method Statement for Powerflushing Domestic SystemsFernox
 
Method Statement Cleaning and Treating New Commercial Systems
Method Statement Cleaning and Treating New Commercial SystemsMethod Statement Cleaning and Treating New Commercial Systems
Method Statement Cleaning and Treating New Commercial SystemsFernox
 
How To Clean A Central Heating System
How To Clean A Central Heating SystemHow To Clean A Central Heating System
How To Clean A Central Heating SystemFernox
 
1 (1).pdf
1 (1).pdf1 (1).pdf
1 (1).pdfCarki1
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answersmark robertson
 
Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14
Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14
Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14Water Works
 
Tank and Filter Cleaing Procedure.pptx
Tank and Filter Cleaing Procedure.pptxTank and Filter Cleaing Procedure.pptx
Tank and Filter Cleaing Procedure.pptxmaniannan1
 
Method Statment : Cleaning and Treating Existing Commercial Systems
Method Statment : Cleaning and Treating Existing Commercial SystemsMethod Statment : Cleaning and Treating Existing Commercial Systems
Method Statment : Cleaning and Treating Existing Commercial SystemsFernox
 
Pentair #320 chlorinator manual
Pentair #320 chlorinator manualPentair #320 chlorinator manual
Pentair #320 chlorinator manualDavid Hackney
 
Archive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tagArchive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tagMuhammad Awais
 

Ähnlich wie Method Statement - Silver Clean (20)

Method Statement - Bronze Clean
Method Statement - Bronze CleanMethod Statement - Bronze Clean
Method Statement - Bronze Clean
 
Method Statement Cleaning and Treating Existing Domestic Systems
Method Statement Cleaning and Treating Existing Domestic SystemsMethod Statement Cleaning and Treating Existing Domestic Systems
Method Statement Cleaning and Treating Existing Domestic Systems
 
Method Statement - Gold Clean
Method Statement - Gold CleanMethod Statement - Gold Clean
Method Statement - Gold Clean
 
Method Statement Cleaning and Treating New Domestic Systems
Method Statement Cleaning and Treating New Domestic SystemsMethod Statement Cleaning and Treating New Domestic Systems
Method Statement Cleaning and Treating New Domestic Systems
 
Method Statement for Powerflushing Domestic Systems
Method Statement for Powerflushing Domestic SystemsMethod Statement for Powerflushing Domestic Systems
Method Statement for Powerflushing Domestic Systems
 
Method Statement Cleaning and Treating New Commercial Systems
Method Statement Cleaning and Treating New Commercial SystemsMethod Statement Cleaning and Treating New Commercial Systems
Method Statement Cleaning and Treating New Commercial Systems
 
How To Clean A Central Heating System
How To Clean A Central Heating SystemHow To Clean A Central Heating System
How To Clean A Central Heating System
 
1 (1).pdf
1 (1).pdf1 (1).pdf
1 (1).pdf
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
 
Algae Capstone S.O.P.
Algae Capstone S.O.P.Algae Capstone S.O.P.
Algae Capstone S.O.P.
 
pond filters.pdf
pond filters.pdfpond filters.pdf
pond filters.pdf
 
Assignment 1 SOP (1)
Assignment 1 SOP (1)Assignment 1 SOP (1)
Assignment 1 SOP (1)
 
pond filters
pond filterspond filters
pond filters
 
Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14
Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14
Colorado Water Purification US Water Fusion Backwashing Filter Manual 1110 8 14
 
components
componentscomponents
components
 
Rain Director Install LQ
Rain Director Install LQRain Director Install LQ
Rain Director Install LQ
 
Tank and Filter Cleaing Procedure.pptx
Tank and Filter Cleaing Procedure.pptxTank and Filter Cleaing Procedure.pptx
Tank and Filter Cleaing Procedure.pptx
 
Method Statment : Cleaning and Treating Existing Commercial Systems
Method Statment : Cleaning and Treating Existing Commercial SystemsMethod Statment : Cleaning and Treating Existing Commercial Systems
Method Statment : Cleaning and Treating Existing Commercial Systems
 
Pentair #320 chlorinator manual
Pentair #320 chlorinator manualPentair #320 chlorinator manual
Pentair #320 chlorinator manual
 
Archive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tagArchive for the ‘refrigerator commissioning’ tag
Archive for the ‘refrigerator commissioning’ tag
 

Mehr von Fernox

How To Prevent Corrosion
How To Prevent CorrosionHow To Prevent Corrosion
How To Prevent CorrosionFernox
 
How to Dose A Central Heating System with Fernox Express
How to Dose A Central Heating System with Fernox ExpressHow to Dose A Central Heating System with Fernox Express
How to Dose A Central Heating System with Fernox ExpressFernox
 
How To Reduce Boiler Noise
How To Reduce Boiler NoiseHow To Reduce Boiler Noise
How To Reduce Boiler NoiseFernox
 
How To Combat Limescale
How To Combat LimescaleHow To Combat Limescale
How To Combat LimescaleFernox
 
Fernox Infographic
Fernox InfographicFernox Infographic
Fernox InfographicFernox
 
FERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTOR
FERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTORFERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTOR
FERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTORFernox
 
£50k Anniversary Promotion
£50k Anniversary Promotion£50k Anniversary Promotion
£50k Anniversary PromotionFernox
 
FERNOX: CELEBRATING 50 YEARS OF INNOVATION
FERNOX: CELEBRATING 50 YEARS OF INNOVATION FERNOX: CELEBRATING 50 YEARS OF INNOVATION
FERNOX: CELEBRATING 50 YEARS OF INNOVATION Fernox
 
TF1 Quick Reference Installation and Cleaning Guide
TF1 Quick Reference Installation and Cleaning GuideTF1 Quick Reference Installation and Cleaning Guide
TF1 Quick Reference Installation and Cleaning GuideFernox
 
Fernox TF1 Compact Advert
Fernox TF1 Compact AdvertFernox TF1 Compact Advert
Fernox TF1 Compact AdvertFernox
 
Energy Saver F6
Energy Saver F6 Energy Saver F6
Energy Saver F6 Fernox
 
Fernox Limescale Preventer
Fernox Limescale PreventerFernox Limescale Preventer
Fernox Limescale PreventerFernox
 
Fernox Product Presentation
Fernox Product PresentationFernox Product Presentation
Fernox Product PresentationFernox
 

Mehr von Fernox (13)

How To Prevent Corrosion
How To Prevent CorrosionHow To Prevent Corrosion
How To Prevent Corrosion
 
How to Dose A Central Heating System with Fernox Express
How to Dose A Central Heating System with Fernox ExpressHow to Dose A Central Heating System with Fernox Express
How to Dose A Central Heating System with Fernox Express
 
How To Reduce Boiler Noise
How To Reduce Boiler NoiseHow To Reduce Boiler Noise
How To Reduce Boiler Noise
 
How To Combat Limescale
How To Combat LimescaleHow To Combat Limescale
How To Combat Limescale
 
Fernox Infographic
Fernox InfographicFernox Infographic
Fernox Infographic
 
FERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTOR
FERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTORFERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTOR
FERNOX APPOINTS NEW TECHNICAL & PRODUCT DIRECTOR
 
£50k Anniversary Promotion
£50k Anniversary Promotion£50k Anniversary Promotion
£50k Anniversary Promotion
 
FERNOX: CELEBRATING 50 YEARS OF INNOVATION
FERNOX: CELEBRATING 50 YEARS OF INNOVATION FERNOX: CELEBRATING 50 YEARS OF INNOVATION
FERNOX: CELEBRATING 50 YEARS OF INNOVATION
 
TF1 Quick Reference Installation and Cleaning Guide
TF1 Quick Reference Installation and Cleaning GuideTF1 Quick Reference Installation and Cleaning Guide
TF1 Quick Reference Installation and Cleaning Guide
 
Fernox TF1 Compact Advert
Fernox TF1 Compact AdvertFernox TF1 Compact Advert
Fernox TF1 Compact Advert
 
Energy Saver F6
Energy Saver F6 Energy Saver F6
Energy Saver F6
 
Fernox Limescale Preventer
Fernox Limescale PreventerFernox Limescale Preventer
Fernox Limescale Preventer
 
Fernox Product Presentation
Fernox Product PresentationFernox Product Presentation
Fernox Product Presentation
 

Method Statement - Silver Clean

  • 1. Cleaning and treating an existing central heating system – Silver Clean Procedure 1. Identify and rectify mechanical faults. 11. Repeat step 10 on all radiators. 2. Dump system water to a foul drain and refill 12. Use a Fernox TDS Meter to ensure that the with fresh plain water. Install a Fernox TF1 total dissolved solids have been satisfactorily Total Filter or TF1 Compact. removed. The system can be regarded as 3. Add Fernox Cleaner F3 or Cleaner F5 at being thoroughly flushed when the system the recommended dose through a radiator, water value is within 10% of the mains water. the TF1 or filling loop. Differences over 10% mean that significant cleaner residues have been left in the system 4. Turn on the boiler and circulate the Cleaner F3 and further flushing is required. for a minimum of one hour. 13. Add Fernox Protector F1 500ml or Express 5. Turn off the boiler and close the flow valve to at the recommended dose. the TF1. Remove the TF1 magnet and open the drain valve. Drain contents into a suitable 14. efit the magnet assembly in the TF1 Filter. R container until the water runs clearer. Close the 15. he retreatment sticker provided with all T drain valve, open the flow valve and re-insert Fernox Protectors should be correctly the TF1 magnet. Switch on the boiler. completed and applied to the boiler casing. 6. Isolate all radiators by closing the wheel-head Note: For continual protection Fernox valves or TRVs except that furthest away from recommend Protector levels are checked the boiler. Circulate the cleaner through the annually (usually during the service) or radiator for five minutes or until efficiency is sooner if the system content is drained down. restored. Check using a ‘touch test’. If the This should be carried out using a Fernox radiator remains cold at the bottom in the Protector Test Kit. centre, rolling a Fernox MaxMag upwards from the bottom of the radiator can help to If you are unsure of dose rates or require further dislodge any persistent sludge in the base. advice, contact Fernox Technical Services on Close the flow to the radiator. +44 (0)870 870 0362 or visit www.fernox.com 7. Repeat step 5. NB: Motorised valves should be manually opened 8. Repeat steps 6 and 7 for all radiators in during the flushing process and any anti-gravity the system. valves should be by-passed or removed 9. Turn off the boiler, remove the magnet from the temporarily. If it is necessary to cap off the open TF1 and open all radiators. Purge the system vent during the mains flush to prevent overflow water to drain whilst at the same time introduce ensure the cap is removed prior to restarting fresh water via the feed and expansion cistern the appliance. or via the filling loop. Flush through until the water runs clear. 10. solate all radiators except that furthest away I from the boiler, and continue to purge for five minutes. www.fernox.com