This document provides a 7-step procedure for cleaning and treating new commercial HVAC systems using Fernox HVAC F3 and Fernox HVAC F1 chemicals. The steps include identifying mechanical faults, dosing the system with HVAC F3, circulating it for an hour, draining and flushing the system to remove HVAC F3, dosing with HVAC F1, taking a sample for analysis, and forwarding the report.