River training works
The river flowing in alluvial plains meander in wide widths. River
discharges also vary widely. In certain years, the flood season
discharges may be as high as 500 times the discharge of low flow
season. Therefore, rivers carry different sediment loads at different
times of the year according to variation in discharge . Due to non
uniform variation in discharge and sediment load , the rivers enlarge
and contract their channel width and gradually change their courses
from time to time.
When a barrage is constructed across a river , the river is made to
forced or guided to flow through it. More ever , fluming of water ways
barrages results in afflux, which may some times be several feet. The
effect of afflux is felt up to several miles up stream of the barrage . A
high afflux may submerged large tracts of costly land and properties
along the river, if these are not protected.
Therefore to insure that the river flows through the barrage and protect
the submerging of large tracts of costly land and property upstream ,
certain works upstream of barrage are constructed. These works are
called river training works.
River training works
1. Guide banks
2. Marginal banks
3. Spurs
4. Pitched island
(1)Guide banks
• The works required in the river to guide the passage of river
water through weir or barrages are called guide banks.
• The guide banks consist of two heavily built set of
embankments with heavily protected curved ends in the
shape of bell mouth. The width of water way is kept equal to
the width of the structure from abutments. The river side
slops of guide banks are pitched with stones.
(2)The marginal banks
• With the construction of weir or barrage, the level of water in the
river upstream is raised by a few feet in all season. This is called
afflux. The rise of water level is felt up to several miles upstream. If
this rise is felt unattended, it will part from threatening the safety of
structure , will submerge large areas upstream.
• Therefore to protect properties from submergence and destruction,
a set of embankments are constructed both sides of the river
upstream of the barrage. These embankments are called marginal
banks. Since the marginal banks are permanent structures these are
aligned in such a way that they do not interfere with the river
meander. They are tied or joined to the high ground upstream so
that the river flows with in the two marginal banks and is not
allowed to out flank the barrage and also not submerged areas up
stream.
• Marginal banks are usually provided with a top width of 6m with
river side slope 3:1 to 5:1 and land side slope of 4:1 to 6:1. the river
side slope is protected with stone pitching and flexible stone apron.
(3)Spurs
• Spurs are heavily fortified embankments constructed in the
river bed transverse to the river banks. Their main function is
to control the river channel so that it may run along a
specified course and protect the river banks from scouring by
keeping the river course away from it.
• Spurs may be aligned in such a way that they may hold, repel
or attract a river course.
Types of spurs according to
functions
• Holding spurs: spurs are constructed to the river current. They should
be short in length and should be constructed perpendicular to the bank.
Such spurs are utilized to hold the channel in position and protect the
banks.
• Attracting spurs: spurs should be constructed pointing towards
upstream of the flow to attract the river current towards the bank. The
angle of inclination may vary from 60 degree to 80 degree. This attract
river flow towards the banks from which the spurs are very strong in
construction as they have to bear the full frontal attack of the river flow.
• Repelling spurs: spurs constructed to repel the river current should be
aligned pointing towards downstream. The angle of inclination with
normal to bank varies from 40 to 60 degrees. The head of the spur
should be heavily protected to resist swirling action of the current. The
distance between the two spurs is kept 1 to 2 times the length of the
spurs. On bends the distance between the spurs is kept more in case of
convex banks and small for concave banks.
The classes of the spurs
• Impermeable spurs
• permeable spurs
Impermeable spurs
• Impermeable spurs as name implies are those spurs which do
not allow water to seep through them.
Types:
• Bar spurs
• Hockey spurs
• Inverted hockey spur
• T- head spur
• Sloping spur
Permeable spurs
• A permeable spurs allows water to seep through it. However,
as the silt laden water passes through the voids in the material
of such spurs, its velocity is reduced considerably, which
allows water to drop its entire silt load in the pores of spurs
gradually making it full impermeable.
Types :
• Tree spur
• Wire crated stone spur
(4)The pitched island
• A pitched island is an artificially created island in the river. It is made
of earth with pitched side slopes and stone apron. Sometimes an
existing natural island in the river is reshaped and pitched and
provided with aprons.
• Pitched island cause redistribution of tractive force, velocity and
sediment charge of river flow. The tractive force near a pitched
island begins to increase rapidly after construction of island which
creates a deep scour around the island thus drawing the river
channel near it and holding it there permanently. Therefore pitched
island are used to correct the river approach conditions by attracting
the river course above the weir and holding it there. It decreases the
intensity of flow along a marginal banks and guide banks and protect
them from damage. It also deepens the river channel, which helps
the silt distribution before the head regulator of off-taking channels
and navigation purposes. Pitched island are particularly suitable in
deep channels. In shallow channel with flash floods, they are not
suitable.

Weitere ähnliche Inhalte

Was ist angesagt?

Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
saibabu48
 

Was ist angesagt? (20)

Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
River engineering
River engineeringRiver engineering
River engineering
 
Canal lining
Canal liningCanal lining
Canal lining
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Silt excluders
Silt excludersSilt excluders
Silt excluders
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
River and it's training work
River and it's training workRiver and it's training work
River and it's training work
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Design of gravity dams
Design of gravity damsDesign of gravity dams
Design of gravity dams
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity dam
 
DIVERSION HEAD WORK
DIVERSION HEAD WORKDIVERSION HEAD WORK
DIVERSION HEAD WORK
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Dams 1
Dams 1Dams 1
Dams 1
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 

Ähnlich wie River training works lecture

Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636
saibabu48
 
Channels and characteristics AQA
Channels and characteristics AQAChannels and characteristics AQA
Channels and characteristics AQA
anicholls1234
 
Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02
saibabu48
 

Ähnlich wie River training works lecture (20)

Unit 12 River training work.pdf
Unit 12 River training work.pdfUnit 12 River training work.pdf
Unit 12 River training work.pdf
 
Mohit mayoor kashyap
Mohit mayoor kashyapMohit mayoor kashyap
Mohit mayoor kashyap
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
 
Types of Rivers
Types of RiversTypes of Rivers
Types of Rivers
 
Channels and characteristics AQA
Channels and characteristics AQAChannels and characteristics AQA
Channels and characteristics AQA
 
Rivers, floods and management
Rivers, floods and management Rivers, floods and management
Rivers, floods and management
 
Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02
 
CH-1 Introduction to River Hydraulics.pdf
CH-1 Introduction to River Hydraulics.pdfCH-1 Introduction to River Hydraulics.pdf
CH-1 Introduction to River Hydraulics.pdf
 
Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptx
 
River erosion
River erosionRiver erosion
River erosion
 
River Erosion and its Associated fetures
River Erosion and its Associated feturesRiver Erosion and its Associated fetures
River Erosion and its Associated fetures
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
River erosion
River erosionRiver erosion
River erosion
 
SDME revision pack 2016
SDME revision pack 2016SDME revision pack 2016
SDME revision pack 2016
 
introduction.ppt
introduction.pptintroduction.ppt
introduction.ppt
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8th
 

Kürzlich hochgeladen

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 

River training works lecture

  • 1. River training works The river flowing in alluvial plains meander in wide widths. River discharges also vary widely. In certain years, the flood season discharges may be as high as 500 times the discharge of low flow season. Therefore, rivers carry different sediment loads at different times of the year according to variation in discharge . Due to non uniform variation in discharge and sediment load , the rivers enlarge and contract their channel width and gradually change their courses from time to time. When a barrage is constructed across a river , the river is made to forced or guided to flow through it. More ever , fluming of water ways barrages results in afflux, which may some times be several feet. The effect of afflux is felt up to several miles up stream of the barrage . A high afflux may submerged large tracts of costly land and properties along the river, if these are not protected. Therefore to insure that the river flows through the barrage and protect the submerging of large tracts of costly land and property upstream , certain works upstream of barrage are constructed. These works are called river training works.
  • 2. River training works 1. Guide banks 2. Marginal banks 3. Spurs 4. Pitched island
  • 3. (1)Guide banks • The works required in the river to guide the passage of river water through weir or barrages are called guide banks. • The guide banks consist of two heavily built set of embankments with heavily protected curved ends in the shape of bell mouth. The width of water way is kept equal to the width of the structure from abutments. The river side slops of guide banks are pitched with stones.
  • 4. (2)The marginal banks • With the construction of weir or barrage, the level of water in the river upstream is raised by a few feet in all season. This is called afflux. The rise of water level is felt up to several miles upstream. If this rise is felt unattended, it will part from threatening the safety of structure , will submerge large areas upstream. • Therefore to protect properties from submergence and destruction, a set of embankments are constructed both sides of the river upstream of the barrage. These embankments are called marginal banks. Since the marginal banks are permanent structures these are aligned in such a way that they do not interfere with the river meander. They are tied or joined to the high ground upstream so that the river flows with in the two marginal banks and is not allowed to out flank the barrage and also not submerged areas up stream. • Marginal banks are usually provided with a top width of 6m with river side slope 3:1 to 5:1 and land side slope of 4:1 to 6:1. the river side slope is protected with stone pitching and flexible stone apron.
  • 5. (3)Spurs • Spurs are heavily fortified embankments constructed in the river bed transverse to the river banks. Their main function is to control the river channel so that it may run along a specified course and protect the river banks from scouring by keeping the river course away from it. • Spurs may be aligned in such a way that they may hold, repel or attract a river course.
  • 6. Types of spurs according to functions • Holding spurs: spurs are constructed to the river current. They should be short in length and should be constructed perpendicular to the bank. Such spurs are utilized to hold the channel in position and protect the banks. • Attracting spurs: spurs should be constructed pointing towards upstream of the flow to attract the river current towards the bank. The angle of inclination may vary from 60 degree to 80 degree. This attract river flow towards the banks from which the spurs are very strong in construction as they have to bear the full frontal attack of the river flow. • Repelling spurs: spurs constructed to repel the river current should be aligned pointing towards downstream. The angle of inclination with normal to bank varies from 40 to 60 degrees. The head of the spur should be heavily protected to resist swirling action of the current. The distance between the two spurs is kept 1 to 2 times the length of the spurs. On bends the distance between the spurs is kept more in case of convex banks and small for concave banks.
  • 7. The classes of the spurs • Impermeable spurs • permeable spurs
  • 8. Impermeable spurs • Impermeable spurs as name implies are those spurs which do not allow water to seep through them. Types: • Bar spurs • Hockey spurs • Inverted hockey spur • T- head spur • Sloping spur
  • 9. Permeable spurs • A permeable spurs allows water to seep through it. However, as the silt laden water passes through the voids in the material of such spurs, its velocity is reduced considerably, which allows water to drop its entire silt load in the pores of spurs gradually making it full impermeable. Types : • Tree spur • Wire crated stone spur
  • 10. (4)The pitched island • A pitched island is an artificially created island in the river. It is made of earth with pitched side slopes and stone apron. Sometimes an existing natural island in the river is reshaped and pitched and provided with aprons. • Pitched island cause redistribution of tractive force, velocity and sediment charge of river flow. The tractive force near a pitched island begins to increase rapidly after construction of island which creates a deep scour around the island thus drawing the river channel near it and holding it there permanently. Therefore pitched island are used to correct the river approach conditions by attracting the river course above the weir and holding it there. It decreases the intensity of flow along a marginal banks and guide banks and protect them from damage. It also deepens the river channel, which helps the silt distribution before the head regulator of off-taking channels and navigation purposes. Pitched island are particularly suitable in deep channels. In shallow channel with flash floods, they are not suitable.

Hinweis der Redaktion

  1. By Engr. Hayat hussain