SlideShare ist ein Scribd-Unternehmen logo
1 von 30
Quality Systems

Investigation Technique
WHAT DOES IT ALL MEAN?
Investigation of the
         Quality System
                   Corrective &
                    Preventive
                     Actions         Production &
Design Controls
                                    Process Controls

                   Management

   Material                          Equipment &
   Controls                         Facility Controls
                     Records,
                   Documents, &
                  Change Controls
Learning Objectives

Understand the Quality Systems Investigation
Technique progresses
Understand how QSIT impacts Project
Management
Understand meeting QSIT expectations
Complete a Regulatory Training Requirement
Systems-based inspections normally
require specific coverage of the Quality
System, and at least one other system.
This may account in part for more Quality
System deficiencies cited in Warning
Letters issued after February 1, 2002
Project Management

QSIT Responsibilities
How Will Management be Inspected?

   QSIT Guide            FOOD AND DRUG
                         AD MINISTR ATIO N




      Purpose and         GUIDE TO INSPECTIONS OF
                              QUALITY SYSTEMS
       Importance
      Objectives
      Flow chart
      Narratives
                                             August 1999


   Source: www.fda.gov
QSIT Progression
1. Management Controls
2. Design Controls
3. Corrective and Preventive Actions
4. Production and Process Controls

5. Management Controls
What FDA Evaluates

  Duties

  Responsibilities

  Authorities
Procedures … FDA Looks At

  Quality Policy
  Quality Plan
  Management Review
  Quality Audit
  Quality System Procedures and
  Instructions
Assessment
“Top Down” - Defined and Documented

  1. Quality Policy
       Management Review Procedures
       Quality Audit Procedures
       Quality Plan
       QS Procedures and Instructions
Assessment
“Top Down” - Implemented

2. Quality Policy and Objectives
3. Organizational Structure
4. Management Representative
5. Management Reviews
6. Quality Audits
Assessment
“Top Down” (At Inspection Conclusion)

  7. Quality System Established and
     Maintained
Quality Policy - 820.3(u)

  The overall intentions and direction
  of an organization with respect to
  quality

  As established by management
  with executive responsibility
Quality System - 820.3(v)

  The organizational structure,
  responsibilities, procedures,
  processes, and resources for
  implementing quality management
FDA’s Authority to Hold
Management Responsible
  FD&C Act - Section 704(a)(1)
  21 CFR 820.20
  Case Law - Dotterweich & Park
  FDA will determine authority and
  responsibility to the highest level of the
  firm as well as the corporation or
  organization.
Source: www.fda.gov
Verbal Communications:
FDA “Looks At”
Management with Executive
Responsibility
    Commitment to quality
    Dialogue during daily “wrap-ups”
    Commitment to correction and
     prevention
Verbal Communications:
FDA “Looks At”
Management Representative
    Interviewed prior to review of each
     subsystem
    Provide overview of each subsystem
    Demonstrate knowledge and
     understanding of each subsystem
    Dialogue during daily “wrap-ups”
Verbal Communications:
FDA “Looks At”

 Employees
     Familiar with the Quality Policy
     Other dialogue
Written Records/ Documents
FDA Looks At

 Organizational Structure

 Appointment of Management
 Representative
Written Records/ Documents
FDA Looks At

 Documentation that audits were
 conducted as scheduled.

 Documentation that management
 reviews were conducted as
 scheduled.
FDA Access to Audit and
Management Review Reports
  FDA’s policy relative to the review of
  quality audit reports is stated in CPG
  7151.02 (CPG Manual subchapter
  130.300).
  This policy restricts FDA access to a
  firm’s audit reports.
                                    more...
FDA Access to Audit and
Management Review Reports
   Under the Quality System Regulation,
   this restriction extends to reviews of
   supplier audit reports and management
   reviews.
              more...
FDA Access to Audit and
Management Review Reports
  However, the procedures that show
  conformance with 21 CFR 820.50,
  Purchasing Controls, and 21 CFR
  820.20(3)(c), Management Reviews,
  and 21 CFR 820.22, Quality Audit, are
  subject to FDA inspection.
FDA Access to Audit and
Management Review Reports
 FDA may look at those portions of
 these audit reports and reviews
 that contain corrective and
 preventive actions if these are the
 only places these action decisions
 are documented.
At the Conclusion of the
Inspection ...

 “Evaluate whether management with
 executive responsibility ensures that
 an adequate and effective quality
 system has been established and
 maintained.”
Identifying and Assigning
 Regulatory Responsibilities

Job Title/Employee    Quality System Subpart     820 Quality System Regulation Assignment(s)


__________________ B – QS Requirements           _________________________________________________
__________________ C – Design Controls            _________________________________________________
__________________ D – Document Controls          _________________________________________________
__________________ E – Purchasing Controls       _________________________________________________
__________________ F – ID and Traceability       _________________________________________________
__________________ G – PandP Conrols             _________________________________________________
__________________ H – Acceptance Activities     _________________________________________________
__________________ I – Nonconforming Product     _________________________________________________
__________________ J – CandP Action (CAPA)      __________________________________________________
__________________ K – LandP Control            __________________________________________________
__________________ L – H,S,D&Installation       __________________________________________________
__________________ M – Records                  ___________________________________________________
__________________ N _ Servicing                ___________________________________________________
__________________ 0 _ Statistical Techniques   ___________________________________________________
Project Management
         Regulatory Responsibilities
• What are the responsibilities?
• Where are the gaps?
• What are the risks?
• What are the consequences?
• What are the potential opportunities?
• What are the rewards?
Management
                         Production &
 Design Controls
                        Process Controls

              Corrective &
               Preventive
                Actions
Material                        Equipment &
Controls                       Facility Controls
                Records,
              Documents, &
             Change Controls

              Controls
QUESTIONS

Weitere ähnliche Inhalte

Was ist angesagt?

Supplemental new drug application
Supplemental new drug applicationSupplemental new drug application
Supplemental new drug applicationgarimasaini33
 
Post Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCsPost Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCsDr. Reena Malik
 
ICH Q10 guideline.pptx
ICH Q10 guideline.pptxICH Q10 guideline.pptx
ICH Q10 guideline.pptx02AishwaryaV
 
Marketing authorization
Marketing authorizationMarketing authorization
Marketing authorizationsantoshnarla
 
FDA Warning letter
FDA Warning letterFDA Warning letter
FDA Warning letterSridhar S
 
PECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB
 
Electronic submission PPT
Electronic submission PPTElectronic submission PPT
Electronic submission PPTDoninder Hooda
 
Iso 2008 vs 2015
Iso 2008 vs 2015Iso 2008 vs 2015
Iso 2008 vs 2015Haya Haroon
 
Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485Anil Chaudhari
 
Marketing Authorization In The Eu
Marketing Authorization In The EuMarketing Authorization In The Eu
Marketing Authorization In The Euclarityeye
 
Electronic Submissions
Electronic SubmissionsElectronic Submissions
Electronic Submissionsshakulbio
 
ISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions WebinarISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions WebinarDQS Inc.
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection modelVaishali Dandge
 
CHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfCHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfDr. Dinesh Mehta
 

Was ist angesagt? (20)

ISO Standard 13485
ISO Standard 13485ISO Standard 13485
ISO Standard 13485
 
Supplemental new drug application
Supplemental new drug applicationSupplemental new drug application
Supplemental new drug application
 
Post Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCsPost Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCs
 
ICH Q10 guideline.pptx
ICH Q10 guideline.pptxICH Q10 guideline.pptx
ICH Q10 guideline.pptx
 
Marketing authorization
Marketing authorizationMarketing authorization
Marketing authorization
 
FDA Warning letter
FDA Warning letterFDA Warning letter
FDA Warning letter
 
PECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical DevicesPECB Webinar: Overview of ISO 13485 - Medical Devices
PECB Webinar: Overview of ISO 13485 - Medical Devices
 
Electronic submission PPT
Electronic submission PPTElectronic submission PPT
Electronic submission PPT
 
Iso 2008 vs 2015
Iso 2008 vs 2015Iso 2008 vs 2015
Iso 2008 vs 2015
 
Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485Difference between fda 21 cfr part 820 and ISO 13485
Difference between fda 21 cfr part 820 and ISO 13485
 
Marketing Authorization In The Eu
Marketing Authorization In The EuMarketing Authorization In The Eu
Marketing Authorization In The Eu
 
Electronic Submissions
Electronic SubmissionsElectronic Submissions
Electronic Submissions
 
ISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions WebinarISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions Webinar
 
21 cfr, parts 210 211
21 cfr, parts 210 21121 cfr, parts 210 211
21 cfr, parts 210 211
 
Ghtf study group 4
Ghtf study group 4Ghtf study group 4
Ghtf study group 4
 
Good Distribution Practices
Good Distribution PracticesGood Distribution Practices
Good Distribution Practices
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection model
 
CDER
CDERCDER
CDER
 
ISO 9001
ISO 9001ISO 9001
ISO 9001
 
CHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdfCHAPTER-1 DEFICIENCIES.pdf
CHAPTER-1 DEFICIENCIES.pdf
 

Andere mochten auch

5 investigating system requirements
5 investigating system requirements5 investigating system requirements
5 investigating system requirementsricardovigan
 
Investigation powerpoint
Investigation powerpointInvestigation powerpoint
Investigation powerpointleft4sims
 
Fundamentals of investigation
Fundamentals of investigationFundamentals of investigation
Fundamentals of investigationjaredplata
 
The Water Of Tne Morning
The Water Of Tne MorningThe Water Of Tne Morning
The Water Of Tne Morningguestfadd66
 
проект таркашевой софьи,1 «а»класс
проект таркашевой софьи,1 «а»класспроект таркашевой софьи,1 «а»класс
проект таркашевой софьи,1 «а»классОльга Климантова
 
Internet segura
Internet seguraInternet segura
Internet segurayeye2008
 
обобщение знаний об имени прилагательном
обобщение знаний об имени прилагательномобобщение знаний об имени прилагательном
обобщение знаний об имени прилагательномОльга Климантова
 
экскурсия в краеведческий музей
экскурсия в краеведческий музейэкскурсия в краеведческий музей
экскурсия в краеведческий музейОльга Климантова
 
ฐานข้อมูล DOA
ฐานข้อมูล DOAฐานข้อมูล DOA
ฐานข้อมูล DOASatapon Yosakonkun
 
Erik Johansson, The Green Man Studio on his work for Trouble Brewing
Erik Johansson, The Green Man Studio on his work for Trouble BrewingErik Johansson, The Green Man Studio on his work for Trouble Brewing
Erik Johansson, The Green Man Studio on his work for Trouble BrewingBank of Ireland
 

Andere mochten auch (20)

5 investigating system requirements
5 investigating system requirements5 investigating system requirements
5 investigating system requirements
 
Investigation powerpoint
Investigation powerpointInvestigation powerpoint
Investigation powerpoint
 
Fundamentals of investigation
Fundamentals of investigationFundamentals of investigation
Fundamentals of investigation
 
The Water Of Tne Morning
The Water Of Tne MorningThe Water Of Tne Morning
The Water Of Tne Morning
 
компьютер друг или враг
компьютер   друг или врагкомпьютер   друг или враг
компьютер друг или враг
 
проект таркашевой софьи,1 «а»класс
проект таркашевой софьи,1 «а»класспроект таркашевой софьи,1 «а»класс
проект таркашевой софьи,1 «а»класс
 
зарничка
зарничказарничка
зарничка
 
пётр 1
пётр 1пётр 1
пётр 1
 
Internet segura
Internet seguraInternet segura
Internet segura
 
Nursing Theories
Nursing TheoriesNursing Theories
Nursing Theories
 
Blogging Ideas!
Blogging Ideas!Blogging Ideas!
Blogging Ideas!
 
обобщение знаний об имени прилагательном
обобщение знаний об имени прилагательномобобщение знаний об имени прилагательном
обобщение знаний об имени прилагательном
 
экскурсия в краеведческий музей
экскурсия в краеведческий музейэкскурсия в краеведческий музей
экскурсия в краеведческий музей
 
башни кремля
башни кремлябашни кремля
башни кремля
 
спортивный праздник
спортивный праздникспортивный праздник
спортивный праздник
 
ฐานข้อมูล DOA
ฐานข้อมูล DOAฐานข้อมูล DOA
ฐานข้อมูล DOA
 
как прекрасен этот мир
как прекрасен этот миркак прекрасен этот мир
как прекрасен этот мир
 
компьютер друг или враг
компьютер   друг или врагкомпьютер   друг или враг
компьютер друг или враг
 
моя фамилия.лукашова
моя фамилия.лукашовамоя фамилия.лукашова
моя фамилия.лукашова
 
Erik Johansson, The Green Man Studio on his work for Trouble Brewing
Erik Johansson, The Green Man Studio on his work for Trouble BrewingErik Johansson, The Green Man Studio on his work for Trouble Brewing
Erik Johansson, The Green Man Studio on his work for Trouble Brewing
 

Ähnlich wie Quality Systems Investigation Technique

Implementing Automated Qms For Business Excellence
Implementing Automated Qms For Business ExcellenceImplementing Automated Qms For Business Excellence
Implementing Automated Qms For Business ExcellenceKhalizan Halid
 
Copy to crestronic 9001 2008 awareness
Copy to crestronic 9001   2008 awarenessCopy to crestronic 9001   2008 awareness
Copy to crestronic 9001 2008 awarenessMohd Ikhbar Wazir
 
Quality management system
Quality management systemQuality management system
Quality management systempareshpanshikar
 
Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsDigital-360
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanInstitute of Validation Technology
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditDinar Surtikarani
 
Basic concepts of QA and QC
Basic concepts of QA and QCBasic concepts of QA and QC
Basic concepts of QA and QCGargi Nanda
 
Effective Medical Device Validation Introduction Web 2
Effective Medical Device Validation Introduction   Web 2Effective Medical Device Validation Introduction   Web 2
Effective Medical Device Validation Introduction Web 2paulsorohan
 
ISO 13485 Noz
ISO 13485 NozISO 13485 Noz
ISO 13485 NozNissim Oz
 
Dans Resume Chrono
Dans Resume ChronoDans Resume Chrono
Dans Resume Chronodanmahaffey
 
Quality management system processes
Quality management system processesQuality management system processes
Quality management system processesselinasimpson2801
 
free training on Quality Management systems in software industry.Iso 9000,ISO...
free training on Quality Management systems in software industry.Iso 9000,ISO...free training on Quality Management systems in software industry.Iso 9000,ISO...
free training on Quality Management systems in software industry.Iso 9000,ISO...aaditya
 

Ähnlich wie Quality Systems Investigation Technique (20)

Implementing Automated Qms For Business Excellence
Implementing Automated Qms For Business ExcellenceImplementing Automated Qms For Business Excellence
Implementing Automated Qms For Business Excellence
 
Copy to crestronic 9001 2008 awareness
Copy to crestronic 9001   2008 awarenessCopy to crestronic 9001   2008 awareness
Copy to crestronic 9001 2008 awareness
 
Quality management system
Quality management systemQuality management system
Quality management system
 
Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence Solutions
 
Validation ksd
Validation ksdValidation ksd
Validation ksd
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation Plan
 
Implement Process Validation
Implement Process ValidationImplement Process Validation
Implement Process Validation
 
Documents system
Documents systemDocuments system
Documents system
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal Audit
 
Basic concepts of QA and QC
Basic concepts of QA and QCBasic concepts of QA and QC
Basic concepts of QA and QC
 
Cairo Iso 2000
Cairo Iso 2000Cairo Iso 2000
Cairo Iso 2000
 
Effective Medical Device Validation Introduction Web 2
Effective Medical Device Validation Introduction   Web 2Effective Medical Device Validation Introduction   Web 2
Effective Medical Device Validation Introduction Web 2
 
ISO 13485 Noz
ISO 13485 NozISO 13485 Noz
ISO 13485 Noz
 
Quality Audit
Quality AuditQuality Audit
Quality Audit
 
9001
90019001
9001
 
Quality process management
Quality process managementQuality process management
Quality process management
 
Dans Resume Chrono
Dans Resume ChronoDans Resume Chrono
Dans Resume Chrono
 
Quality management system processes
Quality management system processesQuality management system processes
Quality management system processes
 
free training on Quality Management systems in software industry.Iso 9000,ISO...
free training on Quality Management systems in software industry.Iso 9000,ISO...free training on Quality Management systems in software industry.Iso 9000,ISO...
free training on Quality Management systems in software industry.Iso 9000,ISO...
 
Law down1 6
Law down1 6Law down1 6
Law down1 6
 

Mehr von Mitchell Manning Sr.

Life Coaching Sessions: 2016 at first baptist church robersonville nc
Life Coaching Sessions: 2016 at first baptist church   robersonville ncLife Coaching Sessions: 2016 at first baptist church   robersonville nc
Life Coaching Sessions: 2016 at first baptist church robersonville ncMitchell Manning Sr.
 
Train the Trainer for FDA Regulated Industries
Train the Trainer for FDA Regulated IndustriesTrain the Trainer for FDA Regulated Industries
Train the Trainer for FDA Regulated IndustriesMitchell Manning Sr.
 
The projectmanagementbasicsworkbook
The projectmanagementbasicsworkbookThe projectmanagementbasicsworkbook
The projectmanagementbasicsworkbookMitchell Manning Sr.
 
The projectmanagementbasicsworkshop
The projectmanagementbasicsworkshopThe projectmanagementbasicsworkshop
The projectmanagementbasicsworkshopMitchell Manning Sr.
 
What To Say to Build Relationships
What To Say to Build RelationshipsWhat To Say to Build Relationships
What To Say to Build RelationshipsMitchell Manning Sr.
 
Training and Performance Management Guide
Training and Performance Management GuideTraining and Performance Management Guide
Training and Performance Management GuideMitchell Manning Sr.
 
Time Management: for establishing and controlling your priorities
Time Management: for establishing and controlling your prioritiesTime Management: for establishing and controlling your priorities
Time Management: for establishing and controlling your prioritiesMitchell Manning Sr.
 
Empowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balanceEmpowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balanceMitchell Manning Sr.
 
Empowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balanceEmpowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balanceMitchell Manning Sr.
 
Project Management: "made simple" using quick connects
Project Management: "made simple" using quick connectsProject Management: "made simple" using quick connects
Project Management: "made simple" using quick connectsMitchell Manning Sr.
 

Mehr von Mitchell Manning Sr. (20)

Life Coaching Sessions: 2016 at first baptist church robersonville nc
Life Coaching Sessions: 2016 at first baptist church   robersonville ncLife Coaching Sessions: 2016 at first baptist church   robersonville nc
Life Coaching Sessions: 2016 at first baptist church robersonville nc
 
2015 world leading life coaches
2015 world leading life coaches2015 world leading life coaches
2015 world leading life coaches
 
Train the Trainer for FDA Regulated Industries
Train the Trainer for FDA Regulated IndustriesTrain the Trainer for FDA Regulated Industries
Train the Trainer for FDA Regulated Industries
 
Why Leaders Fail
Why Leaders FailWhy Leaders Fail
Why Leaders Fail
 
Decision Analysis
Decision AnalysisDecision Analysis
Decision Analysis
 
Learning to Lead
Learning to LeadLearning to Lead
Learning to Lead
 
The projectmanagementbasicsworkbook
The projectmanagementbasicsworkbookThe projectmanagementbasicsworkbook
The projectmanagementbasicsworkbook
 
The projectmanagementbasicsworkshop
The projectmanagementbasicsworkshopThe projectmanagementbasicsworkshop
The projectmanagementbasicsworkshop
 
Social Media Change Agents
Social Media Change AgentsSocial Media Change Agents
Social Media Change Agents
 
Managing Regulatory Compliance
Managing Regulatory ComplianceManaging Regulatory Compliance
Managing Regulatory Compliance
 
Project Management Basics
Project Management BasicsProject Management Basics
Project Management Basics
 
John Manning 1615
John Manning 1615John Manning 1615
John Manning 1615
 
Trends in GMP Compliance: 2012
Trends in GMP Compliance: 2012Trends in GMP Compliance: 2012
Trends in GMP Compliance: 2012
 
What To Say to Build Relationships
What To Say to Build RelationshipsWhat To Say to Build Relationships
What To Say to Build Relationships
 
Quality Systems Approach Overview
Quality Systems Approach OverviewQuality Systems Approach Overview
Quality Systems Approach Overview
 
Training and Performance Management Guide
Training and Performance Management GuideTraining and Performance Management Guide
Training and Performance Management Guide
 
Time Management: for establishing and controlling your priorities
Time Management: for establishing and controlling your prioritiesTime Management: for establishing and controlling your priorities
Time Management: for establishing and controlling your priorities
 
Empowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balanceEmpowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balance
 
Empowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balanceEmpowering Mega Corp: insights into work/life balance
Empowering Mega Corp: insights into work/life balance
 
Project Management: "made simple" using quick connects
Project Management: "made simple" using quick connectsProject Management: "made simple" using quick connects
Project Management: "made simple" using quick connects
 

Kürzlich hochgeladen

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 

Kürzlich hochgeladen (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 

Quality Systems Investigation Technique

  • 2. WHAT DOES IT ALL MEAN?
  • 3. Investigation of the Quality System Corrective & Preventive Actions Production & Design Controls Process Controls Management Material Equipment & Controls Facility Controls Records, Documents, & Change Controls
  • 4. Learning Objectives Understand the Quality Systems Investigation Technique progresses Understand how QSIT impacts Project Management Understand meeting QSIT expectations Complete a Regulatory Training Requirement
  • 5. Systems-based inspections normally require specific coverage of the Quality System, and at least one other system. This may account in part for more Quality System deficiencies cited in Warning Letters issued after February 1, 2002
  • 7. How Will Management be Inspected? QSIT Guide FOOD AND DRUG AD MINISTR ATIO N  Purpose and GUIDE TO INSPECTIONS OF QUALITY SYSTEMS Importance  Objectives  Flow chart  Narratives August 1999 Source: www.fda.gov
  • 8. QSIT Progression 1. Management Controls 2. Design Controls 3. Corrective and Preventive Actions 4. Production and Process Controls 5. Management Controls
  • 9. What FDA Evaluates Duties Responsibilities Authorities
  • 10. Procedures … FDA Looks At Quality Policy Quality Plan Management Review Quality Audit Quality System Procedures and Instructions
  • 11. Assessment “Top Down” - Defined and Documented 1. Quality Policy Management Review Procedures Quality Audit Procedures Quality Plan QS Procedures and Instructions
  • 12. Assessment “Top Down” - Implemented 2. Quality Policy and Objectives 3. Organizational Structure 4. Management Representative 5. Management Reviews 6. Quality Audits
  • 13. Assessment “Top Down” (At Inspection Conclusion) 7. Quality System Established and Maintained
  • 14. Quality Policy - 820.3(u) The overall intentions and direction of an organization with respect to quality As established by management with executive responsibility
  • 15. Quality System - 820.3(v) The organizational structure, responsibilities, procedures, processes, and resources for implementing quality management
  • 16. FDA’s Authority to Hold Management Responsible FD&C Act - Section 704(a)(1) 21 CFR 820.20 Case Law - Dotterweich & Park FDA will determine authority and responsibility to the highest level of the firm as well as the corporation or organization. Source: www.fda.gov
  • 17. Verbal Communications: FDA “Looks At” Management with Executive Responsibility  Commitment to quality  Dialogue during daily “wrap-ups”  Commitment to correction and prevention
  • 18. Verbal Communications: FDA “Looks At” Management Representative  Interviewed prior to review of each subsystem  Provide overview of each subsystem  Demonstrate knowledge and understanding of each subsystem  Dialogue during daily “wrap-ups”
  • 19. Verbal Communications: FDA “Looks At” Employees  Familiar with the Quality Policy  Other dialogue
  • 20. Written Records/ Documents FDA Looks At Organizational Structure Appointment of Management Representative
  • 21. Written Records/ Documents FDA Looks At Documentation that audits were conducted as scheduled. Documentation that management reviews were conducted as scheduled.
  • 22. FDA Access to Audit and Management Review Reports FDA’s policy relative to the review of quality audit reports is stated in CPG 7151.02 (CPG Manual subchapter 130.300). This policy restricts FDA access to a firm’s audit reports. more...
  • 23. FDA Access to Audit and Management Review Reports Under the Quality System Regulation, this restriction extends to reviews of supplier audit reports and management reviews. more...
  • 24. FDA Access to Audit and Management Review Reports However, the procedures that show conformance with 21 CFR 820.50, Purchasing Controls, and 21 CFR 820.20(3)(c), Management Reviews, and 21 CFR 820.22, Quality Audit, are subject to FDA inspection.
  • 25. FDA Access to Audit and Management Review Reports FDA may look at those portions of these audit reports and reviews that contain corrective and preventive actions if these are the only places these action decisions are documented.
  • 26. At the Conclusion of the Inspection ... “Evaluate whether management with executive responsibility ensures that an adequate and effective quality system has been established and maintained.”
  • 27. Identifying and Assigning Regulatory Responsibilities Job Title/Employee Quality System Subpart 820 Quality System Regulation Assignment(s) __________________ B – QS Requirements _________________________________________________ __________________ C – Design Controls _________________________________________________ __________________ D – Document Controls _________________________________________________ __________________ E – Purchasing Controls _________________________________________________ __________________ F – ID and Traceability _________________________________________________ __________________ G – PandP Conrols _________________________________________________ __________________ H – Acceptance Activities _________________________________________________ __________________ I – Nonconforming Product _________________________________________________ __________________ J – CandP Action (CAPA) __________________________________________________ __________________ K – LandP Control __________________________________________________ __________________ L – H,S,D&Installation __________________________________________________ __________________ M – Records ___________________________________________________ __________________ N _ Servicing ___________________________________________________ __________________ 0 _ Statistical Techniques ___________________________________________________
  • 28. Project Management Regulatory Responsibilities • What are the responsibilities? • Where are the gaps? • What are the risks? • What are the consequences? • What are the potential opportunities? • What are the rewards?
  • 29. Management Production & Design Controls Process Controls Corrective & Preventive Actions Material Equipment & Controls Facility Controls Records, Documents, & Change Controls Controls