    1926.250 General requirements for storage
1926.250(a) General. (1) “All materials stored in tiers
shall be stacked, racked, blocked, interlocked, or
otherwise secured to prevent sliding, falling or
collapse.”

1926.250(a)(2) “Maximum safe load limits of floors
within buildings and structures, in pounds per square
foot, shall be conspicuously posted in all storage areas,
except for floor or slab on grade. Maximum safe loads
shall not be exceeded.”
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
    1926.250 General requirements for storage
1926.250(b)(6) “Brick stacks shall not be more than 7
feet in height. When a loose brick stack reaches a
height of 4 feet, it shall be tapered back 2 inches in
every foot of height above the 4-foot level.”

1926.250(b)(7) “When masonry blocks are stacked
higher than 6 feet, the stack shall be tapered back one-
half block per tier above the 6-foot level.”

                                                         3
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
    1926.250 General requirements for storage
1926.250(b)(8) “Lumber;”
1926.250(b)(8)(i) “Used lumber shall have all nails
withdrawn before stacking.”
1926.250(b)(8)(ii) “Lumber shall be stacked on level
and solidly supported sills.”
1926.250(b)(8)(iii) “Lumber shall be so stacked as to be
stable and self supporting.”
1926.250(b)(8)(iv) “Lumber piles shall not exceed 20
feet in height provided that lumber to be handled
manually shall not be stacked more than 16 feet high.”
OCCUPATIONAL SAFETY AND HEALTH
      OSHA                ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
   1926.250 General requirements for storage
1926.250(c) Housekeeping. “Storage areas shall be
kept free from accumulation of materials that
constitute hazards from tripping, fire, explosion, or
pest harborage. Vegetation control will be exercised
when necessary.”




                                                        5
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(a) General. (1) “Rigging equipment for
material handling shall be inspected prior to use on
each shift and as necessary during its use to ensure
that it is safe. Defective equipment shall be removed
from service.”




                                                        6
7
OCCUPATIONAL SAFETY AND HEALTH
       OSHA                ADMINISTRATION

 Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(a)(6) Inspections. “Each day before being
used, the sling and all fastenings and attachments shall
be inspected for damage or defects by a competent
person designated by the employer. Additional
inspections shall be performed during sling use, where
service conditions warrant. Damaged or defective slings
shall be immediately removed from service.”


                                                        8
OSHA     OCCUPATIONAL SAFETY AND HEALTH
                         ADMINISTRATION



                     1926.251
          Rigging equipment for material
                     handling




Synthetic Fiber    Metal Mesh    Alloy Steel   Wire Rope
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(b) Alloy steel chains. (1) “Welded alloy steel
chain slings shall have permanently affixed
identification stating size, grade, rated capacity, and
sling manufacturer.”

1926.251(b)(3) “Job or shop hooks and links, or
makeshift fasteners, formed from bolts, rods, etc. or
other such attachments, shall not be used.”

                                                          10
11
It must be marked with grade or manufacturer's mark
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(b)(6) Inspections. (i) “In addition to the
inspection required by other paragraphs of this
section, a thorough periodic inspection of alloy steel
chain slings in use shall be made on a regular basis, to
be determined on the basis of (A) frequency of sling
use; (B) severity of service conditions; (C) nature of
lifts being made; and (D) experience gained on the
service life of slings used in similar circumstances.
Such inspections shall in no event be at intervals
greater than once every 12 months.”
14
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(b)(6)(ii) “The employer shall make and
maintain a record of the most recent month in which
each alloy steel chain sling was thoroughly inspected,
and shall make such record available for examination.”




                                                       15
OCCUPATIONAL SAFETY AND HEALTH
      OSHA                ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
 1926.251(c) Wire rope. (1) …………the safe working
 loads recommended by the manufacturer for specific,
 identifiable products shall be followed, provided that a
 safety factor of not less than 5 is maintained.

 1926.251(c)(2) “Protruding ends of strands in splices
 on slings and bridles shall be covered or blunted.”


                                                       16
Wire

    Core
                   Center




            Strand




Wire rope
Left Regular Lay


     Right Regular Lay


     Left Lang Lay


     Right Lang Lay
18
One Wire Rope Lay




One strand makes a 360 degree turn
                                 19
Dead End




       20
6 x 25 Wire Rope
Each strand
contains 25
   wires
                                 6 Strands
22
23
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(c)(4)(i) “An eye splice made in any wire rope
shall have not less than three full tucks. However, this
requirement shall not operate to preclude the use of
another form of splice or connection which can be
shown to be as efficient and which is not otherwise
prohibited.”



                                                       24
25
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(c)(5)((i) “When used for eye splices, the U-
bolt shall be applied so that the “U” section is in
contact with the dead end of the rope.”




                                                        26
Dead End




           27
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(c)(6) “Slings shall not be shortened with
knots or bolts or other makeshift devices.”

1926.251(c)(7) “Slings legs shall not be kinked.”

1926.251(c)(8) “Slings used in a basket hitch shall have
the loads balanced to prevent slippage.”

1926.251(c)(9) “Slings shall be padded or protected
from the sharp edges of their loads.”
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
1926.251 Rigging equipment for material handling
1926.251(c)(10) “Hands or fingers shall not be placed
between the sling and its load while the sling is being
tightened around the load.”

1926.251(c)(11) “Shock loading is prohibited.”

1926.251(c)(12) “A sling shall not be pulled from under
a load when the load is resting on the sling.”

                                                          29
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
          1926.251 Synthetic webbing
      (nylon, polyester, and polypropylene)
1926.251(e)(1) “The employer shall have each synthetic
web sling marked or coded to show:”
1926.251(e)(1)(i) “Name or trademark of
manufacturer.”
1926.251(e)(1)(ii) “Rated capacities for the type of
hitch.”
1926.251(e)(1)(iii) “ Type of material.”
                                                       30
31
32
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
           1926.251 Synthetic webbing
       (nylon, polyester, and polypropylene)
1926.251(e)(4) Fittings. “Fittings shall be:”
1926.251(e)(4)(i) “Of a minimum breaking strength
equal to that of the sling; and”
1926.251(e)(4)(ii) “Free of all sharp edges that could in
any way damage the webbing.”



                                                        33
34
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
           1926.251 Synthetic webbing
       (nylon, polyester, and polypropylene)
1926.251(e)(8) Removal from service. “Synthetic web
slings shall be immediately removed from service if any
of the following conditions are present:”
1926.251(e)(8)(i) “Acid or caustic burns;”
1926.251(e)(8)(ii) “Melting or charring of any part of
the sling surface;”
1926.251(e)(8)(iii) “Snags, punctures, tears or cuts;”
1926.251(e)(8)(iv) “Broken or worn stitches; or”
1926.251(e)(8)(v) “Distortion of fittings.”
36
37
OCCUPATIONAL SAFETY AND HEALTH
       OSHA               ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
        1926.252 Disposal of waste material
1926.252(a) “Whenever materials are dropped more
than 20 feet to any point lying outside the exterior
walls of the building, an enclosed chute of wood, or
equivalent material, shall be used. For the purpose of
this paragraph, an enclosed chute is a slide, closed in
on all sides, through which material is moved from a
high place to a lower one.”


                                                          38
39
OCCUPATIONAL SAFETY AND HEALTH
      OSHA                ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
        1926.252 Disposal of waste material
1926.252(b) “When debris is dropped through holes
in the floor without the use of chutes, the area onto
which the material is dropped shall be completely
enclosed with barricades not less than 42 inches high
and not less than 6 feet back from the projected edge
of the opening above. Signs warning of the hazard of
falling materials shall be posted at each level.
Removal shall not be permitted in this lower area
until debris handling ceases above.”
                                                        40
OCCUPATIONAL SAFETY AND HEALTH
      OSHA                ADMINISTRATION

Subpart H – Materials Handling, Storage, Use, and Disposal
        1926.252 Disposal of waste material
1926.252(b) “Disposal of waste material or debris by
burning shall comply with local fire regulations.”

1926.252(e) “All solvent waste, oily rags, and
flammable liquids shall be kept in fire resistant
covered containers until removed from worksite.”



                                                       41
OCCUPATIONAL SAFETY AND HEALTH
    OSHA               ADMINISTRATION


     1926.850 Prepatory operations
1926.850(h) “When debris is dropped through holes
in the floor without the use of chutes, the area onto
which the material is dropped shall be completely
enclosed with barricades not less than 42 inches high
and not less than 6 feet back from the projected edge
of the opening above. Signs, warning of the hazard of
falling materials, shall be posted at each level.
Removal shall not be permitted in this lower area
until debris handling ceases above.”
                                                  42

Weitere ähnliche Inhalte

Was ist angesagt?

IT substituição l7 por weg (2).pdf
IT substituição l7 por weg (2).pdfIT substituição l7 por weg (2).pdf
IT substituição l7 por weg (2).pdfJosAlbertoTavaresdos
 
HV Transmission line specifications
HV Transmission line specificationsHV Transmission line specifications
HV Transmission line specificationsHilal Bhat
 
Ts 1148-007-treinamento para operadores de retro escavadeira
Ts 1148-007-treinamento para operadores de retro escavadeiraTs 1148-007-treinamento para operadores de retro escavadeira
Ts 1148-007-treinamento para operadores de retro escavadeiraBiela_123456
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chartvishalgohel12195
 
Ficha inspeção lingas de corrente aricabos
Ficha inspeção lingas de corrente aricabosFicha inspeção lingas de corrente aricabos
Ficha inspeção lingas de corrente aricabosGustavo Cassiolato
 
NGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptxNGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptxMUHAMMAD TAHIR
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Hazem El-Henawy
 
Manual de Operação de manutenção Linha AGI AGI e AGE.pdf
Manual de Operação de manutenção Linha AGI AGI e AGE.pdfManual de Operação de manutenção Linha AGI AGI e AGE.pdf
Manual de Operação de manutenção Linha AGI AGI e AGE.pdfNilton F. Rosa
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
Seguranca na operacao de pontes rolantes
Seguranca na operacao de pontes rolantesSeguranca na operacao de pontes rolantes
Seguranca na operacao de pontes rolantesEliane Damião Alves
 
MOD 9 segurança e sinalização.pdf
MOD 9 segurança e sinalização.pdfMOD 9 segurança e sinalização.pdf
MOD 9 segurança e sinalização.pdfSérgio Alves
 
ELECTRICAL SAFETY AWARENES.pdf
ELECTRICAL SAFETY AWARENES.pdfELECTRICAL SAFETY AWARENES.pdf
ELECTRICAL SAFETY AWARENES.pdfJansenSunga
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging SafetyNickHawkins19
 
EQUIPOS DE IZAJE EXPO.pptx
EQUIPOS DE IZAJE EXPO.pptxEQUIPOS DE IZAJE EXPO.pptx
EQUIPOS DE IZAJE EXPO.pptxAlex537556
 

Was ist angesagt? (20)

IT substituição l7 por weg (2).pdf
IT substituição l7 por weg (2).pdfIT substituição l7 por weg (2).pdf
IT substituição l7 por weg (2).pdf
 
HV Transmission line specifications
HV Transmission line specificationsHV Transmission line specifications
HV Transmission line specifications
 
Içamento
IçamentoIçamento
Içamento
 
Ts 1148-007-treinamento para operadores de retro escavadeira
Ts 1148-007-treinamento para operadores de retro escavadeiraTs 1148-007-treinamento para operadores de retro escavadeira
Ts 1148-007-treinamento para operadores de retro escavadeira
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chart
 
Ficha inspeção lingas de corrente aricabos
Ficha inspeção lingas de corrente aricabosFicha inspeção lingas de corrente aricabos
Ficha inspeção lingas de corrente aricabos
 
NGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptxNGR & Zig-Zag Transformer.pptx
NGR & Zig-Zag Transformer.pptx
 
Mobile crane inspection guidelines
Mobile crane inspection guidelinesMobile crane inspection guidelines
Mobile crane inspection guidelines
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
 
Manual de Operação de manutenção Linha AGI AGI e AGE.pdf
Manual de Operação de manutenção Linha AGI AGI e AGE.pdfManual de Operação de manutenção Linha AGI AGI e AGE.pdf
Manual de Operação de manutenção Linha AGI AGI e AGE.pdf
 
Check list andaime
Check list   andaimeCheck list   andaime
Check list andaime
 
2016 CRW - An inside look at Kiewit's Crane & Rigging Management System
2016 CRW - An inside look at Kiewit's Crane & Rigging Management System2016 CRW - An inside look at Kiewit's Crane & Rigging Management System
2016 CRW - An inside look at Kiewit's Crane & Rigging Management System
 
O que é Munck?
O que é Munck?O que é Munck?
O que é Munck?
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Seguranca na operacao de pontes rolantes
Seguranca na operacao de pontes rolantesSeguranca na operacao de pontes rolantes
Seguranca na operacao de pontes rolantes
 
MOD 9 segurança e sinalização.pdf
MOD 9 segurança e sinalização.pdfMOD 9 segurança e sinalização.pdf
MOD 9 segurança e sinalização.pdf
 
ELECTRICAL SAFETY AWARENES.pdf
ELECTRICAL SAFETY AWARENES.pdfELECTRICAL SAFETY AWARENES.pdf
ELECTRICAL SAFETY AWARENES.pdf
 
Faults in Power System.pptx
Faults in Power System.pptxFaults in Power System.pptx
Faults in Power System.pptx
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
EQUIPOS DE IZAJE EXPO.pptx
EQUIPOS DE IZAJE EXPO.pptxEQUIPOS DE IZAJE EXPO.pptx
EQUIPOS DE IZAJE EXPO.pptx
 

Andere mochten auch

Subpart L - Scaffolding
Subpart L - ScaffoldingSubpart L - Scaffolding
Subpart L - ScaffoldingFFSafety
 
OSHA Eye and Face Protection
OSHA Eye and Face ProtectionOSHA Eye and Face Protection
OSHA Eye and Face ProtectionJo Woolery
 
Subpart K - Electrical
Subpart K - ElectricalSubpart K - Electrical
Subpart K - ElectricalFFSafety
 
Subpart N - Cranes
Subpart N - CranesSubpart N - Cranes
Subpart N - CranesFFSafety
 
Subpart G - Signs and Signals
Subpart G - Signs and SignalsSubpart G - Signs and Signals
Subpart G - Signs and SignalsFFSafety
 
S A F E T Y P H O T O S P R E S E N T A T I O N
S A F E T Y  P H O T O S  P R E S E N T A T I O NS A F E T Y  P H O T O S  P R E S E N T A T I O N
S A F E T Y P H O T O S P R E S E N T A T I O NFFSafety
 
Subpart O - Motor Vehicles
Subpart O - Motor VehiclesSubpart O - Motor Vehicles
Subpart O - Motor VehiclesFFSafety
 
Subpart F - Fire Protection
Subpart F -  Fire ProtectionSubpart F -  Fire Protection
Subpart F - Fire ProtectionFFSafety
 
Subpart P - Excavations
Subpart P - ExcavationsSubpart P - Excavations
Subpart P - ExcavationsFFSafety
 
Subpart T - Demolition
Subpart T -  DemolitionSubpart T -  Demolition
Subpart T - DemolitionFFSafety
 
Subpart J - Welding
Subpart J  - WeldingSubpart J  - Welding
Subpart J - WeldingFFSafety
 
Subpart R - Steel Erection
Subpart R -  Steel ErectionSubpart R -  Steel Erection
Subpart R - Steel ErectionFFSafety
 
Subpart E - PPE
Subpart E  - PPESubpart E  - PPE
Subpart E - PPEFFSafety
 
Subpart I - Tools
Subpart I - ToolsSubpart I - Tools
Subpart I - ToolsFFSafety
 
OSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State UniversityOSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State UniversityAtlantic Training, LLC.
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncAtlantic Training, LLC.
 

Andere mochten auch (19)

Subpart L - Scaffolding
Subpart L - ScaffoldingSubpart L - Scaffolding
Subpart L - Scaffolding
 
OSHA Eye and Face Protection
OSHA Eye and Face ProtectionOSHA Eye and Face Protection
OSHA Eye and Face Protection
 
Subpart K - Electrical
Subpart K - ElectricalSubpart K - Electrical
Subpart K - Electrical
 
Subpart N - Cranes
Subpart N - CranesSubpart N - Cranes
Subpart N - Cranes
 
Occupational Noise Exposure and Hearing Conservation
Occupational Noise Exposure and Hearing ConservationOccupational Noise Exposure and Hearing Conservation
Occupational Noise Exposure and Hearing Conservation
 
Subpart G - Signs and Signals
Subpart G - Signs and SignalsSubpart G - Signs and Signals
Subpart G - Signs and Signals
 
S A F E T Y P H O T O S P R E S E N T A T I O N
S A F E T Y  P H O T O S  P R E S E N T A T I O NS A F E T Y  P H O T O S  P R E S E N T A T I O N
S A F E T Y P H O T O S P R E S E N T A T I O N
 
Subpart O - Motor Vehicles
Subpart O - Motor VehiclesSubpart O - Motor Vehicles
Subpart O - Motor Vehicles
 
Subpart F - Fire Protection
Subpart F -  Fire ProtectionSubpart F -  Fire Protection
Subpart F - Fire Protection
 
Subpart P - Excavations
Subpart P - ExcavationsSubpart P - Excavations
Subpart P - Excavations
 
Subpart T - Demolition
Subpart T -  DemolitionSubpart T -  Demolition
Subpart T - Demolition
 
Subpart J - Welding
Subpart J  - WeldingSubpart J  - Welding
Subpart J - Welding
 
Subpart R - Steel Erection
Subpart R -  Steel ErectionSubpart R -  Steel Erection
Subpart R - Steel Erection
 
Subpart E - PPE
Subpart E  - PPESubpart E  - PPE
Subpart E - PPE
 
Eye and Face Protection
Eye and Face ProtectionEye and Face Protection
Eye and Face Protection
 
Subpart I - Tools
Subpart I - ToolsSubpart I - Tools
Subpart I - Tools
 
OSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State UniversityOSHA Occupational Noise Training by San Diego State University
OSHA Occupational Noise Training by San Diego State University
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, Inc
 
Blasting
BlastingBlasting
Blasting
 

Ähnlich wie Subpart H - Material Handling

Materials Handling, Storage, Use and Disposal by NMED
Materials Handling, Storage, Use and Disposal by NMEDMaterials Handling, Storage, Use and Disposal by NMED
Materials Handling, Storage, Use and Disposal by NMEDAtlantic Training, LLC.
 
Subpart Q Concrete Written
Subpart Q   Concrete   WrittenSubpart Q   Concrete   Written
Subpart Q Concrete WrittenFFSafety
 
Subpart C Safety And Health
Subpart C   Safety And HealthSubpart C   Safety And Health
Subpart C Safety And HealthFFSafety
 
510 material handling rigging 2015
510 material handling rigging 2015510 material handling rigging 2015
510 material handling rigging 2015John Newquist
 
fall protection 2015
 fall protection 2015 fall protection 2015
fall protection 2015John Newquist
 
Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - LaddersFFSafety
 
Ppe report
Ppe reportPpe report
Ppe reportmadz_mj
 
Personal Protective Equipment in the Construction Industry Training by NMENV
Personal Protective Equipment in the Construction Industry Training by NMENVPersonal Protective Equipment in the Construction Industry Training by NMENV
Personal Protective Equipment in the Construction Industry Training by NMENVAtlantic Training, LLC.
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.pptssuser523d4d
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.pptssuser523d4d
 

Ähnlich wie Subpart H - Material Handling (14)

Materials Handling, Storage, Use and Disposal by NMED
Materials Handling, Storage, Use and Disposal by NMEDMaterials Handling, Storage, Use and Disposal by NMED
Materials Handling, Storage, Use and Disposal by NMED
 
Rigging Presentation by Pipeweldrig
Rigging Presentation by PipeweldrigRigging Presentation by Pipeweldrig
Rigging Presentation by Pipeweldrig
 
Subpart Q Concrete Written
Subpart Q   Concrete   WrittenSubpart Q   Concrete   Written
Subpart Q Concrete Written
 
Subpart C Safety And Health
Subpart C   Safety And HealthSubpart C   Safety And Health
Subpart C Safety And Health
 
510 material handling rigging 2015
510 material handling rigging 2015510 material handling rigging 2015
510 material handling rigging 2015
 
510 trenching 2018
510 trenching 2018510 trenching 2018
510 trenching 2018
 
510 trenching 2015
510 trenching 2015510 trenching 2015
510 trenching 2015
 
fall protection 2015
 fall protection 2015 fall protection 2015
fall protection 2015
 
Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - Ladders
 
Ppe report
Ppe reportPpe report
Ppe report
 
Personal Protective Equipment in the Construction Industry Training by NMENV
Personal Protective Equipment in the Construction Industry Training by NMENVPersonal Protective Equipment in the Construction Industry Training by NMENV
Personal Protective Equipment in the Construction Industry Training by NMENV
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
Ppe construction
Ppe constructionPpe construction
Ppe construction
 

Mehr von FFSafety

Fall Protection, Gtech
Fall Protection, GtechFall Protection, Gtech
Fall Protection, GtechFFSafety
 
Site Photos, 0608
Site Photos, 0608Site Photos, 0608
Site Photos, 0608FFSafety
 
00999 Focus Four 131
00999 Focus Four 13100999 Focus Four 131
00999 Focus Four 131FFSafety
 
Recordkeeping 00150 22
Recordkeeping 00150 22Recordkeeping 00150 22
Recordkeeping 00150 22FFSafety
 
Subpart H - Material Handling
Subpart H -  Material HandlingSubpart H -  Material Handling
Subpart H - Material HandlingFFSafety
 
Subpart D - Health & Environment
Subpart D - Health & EnvironmentSubpart D - Health & Environment
Subpart D - Health & EnvironmentFFSafety
 
Focus Four Ppp
Focus Four PppFocus Four Ppp
Focus Four PppFFSafety
 
Scaffolding
ScaffoldingScaffolding
ScaffoldingFFSafety
 
Scaffolds C
Scaffolds CScaffolds C
Scaffolds CFFSafety
 
Safetyorient
SafetyorientSafetyorient
SafetyorientFFSafety
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5FFSafety
 

Mehr von FFSafety (13)

Fall Protection, Gtech
Fall Protection, GtechFall Protection, Gtech
Fall Protection, Gtech
 
Site Photos, 0608
Site Photos, 0608Site Photos, 0608
Site Photos, 0608
 
00999 Focus Four 131
00999 Focus Four 13100999 Focus Four 131
00999 Focus Four 131
 
Recordkeeping 00150 22
Recordkeeping 00150 22Recordkeeping 00150 22
Recordkeeping 00150 22
 
Subpart H - Material Handling
Subpart H -  Material HandlingSubpart H -  Material Handling
Subpart H - Material Handling
 
Subpart D - Health & Environment
Subpart D - Health & EnvironmentSubpart D - Health & Environment
Subpart D - Health & Environment
 
Article
ArticleArticle
Article
 
Focus Four Ppp
Focus Four PppFocus Four Ppp
Focus Four Ppp
 
Ppe C
Ppe CPpe C
Ppe C
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Scaffolds C
Scaffolds CScaffolds C
Scaffolds C
 
Safetyorient
SafetyorientSafetyorient
Safetyorient
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5
 

Kürzlich hochgeladen

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 

Kürzlich hochgeladen (20)

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 

Subpart H - Material Handling

  • 1.
  • 2. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.250 General requirements for storage 1926.250(a) General. (1) “All materials stored in tiers shall be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse.” 1926.250(a)(2) “Maximum safe load limits of floors within buildings and structures, in pounds per square foot, shall be conspicuously posted in all storage areas, except for floor or slab on grade. Maximum safe loads shall not be exceeded.”
  • 3. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.250 General requirements for storage 1926.250(b)(6) “Brick stacks shall not be more than 7 feet in height. When a loose brick stack reaches a height of 4 feet, it shall be tapered back 2 inches in every foot of height above the 4-foot level.” 1926.250(b)(7) “When masonry blocks are stacked higher than 6 feet, the stack shall be tapered back one- half block per tier above the 6-foot level.” 3
  • 4. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.250 General requirements for storage 1926.250(b)(8) “Lumber;” 1926.250(b)(8)(i) “Used lumber shall have all nails withdrawn before stacking.” 1926.250(b)(8)(ii) “Lumber shall be stacked on level and solidly supported sills.” 1926.250(b)(8)(iii) “Lumber shall be so stacked as to be stable and self supporting.” 1926.250(b)(8)(iv) “Lumber piles shall not exceed 20 feet in height provided that lumber to be handled manually shall not be stacked more than 16 feet high.”
  • 5. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.250 General requirements for storage 1926.250(c) Housekeeping. “Storage areas shall be kept free from accumulation of materials that constitute hazards from tripping, fire, explosion, or pest harborage. Vegetation control will be exercised when necessary.” 5
  • 6. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(a) General. (1) “Rigging equipment for material handling shall be inspected prior to use on each shift and as necessary during its use to ensure that it is safe. Defective equipment shall be removed from service.” 6
  • 7. 7
  • 8. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(a)(6) Inspections. “Each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a competent person designated by the employer. Additional inspections shall be performed during sling use, where service conditions warrant. Damaged or defective slings shall be immediately removed from service.” 8
  • 9. OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION 1926.251 Rigging equipment for material handling Synthetic Fiber Metal Mesh Alloy Steel Wire Rope
  • 10. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(b) Alloy steel chains. (1) “Welded alloy steel chain slings shall have permanently affixed identification stating size, grade, rated capacity, and sling manufacturer.” 1926.251(b)(3) “Job or shop hooks and links, or makeshift fasteners, formed from bolts, rods, etc. or other such attachments, shall not be used.” 10
  • 11. 11
  • 12. It must be marked with grade or manufacturer's mark
  • 13. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(b)(6) Inspections. (i) “In addition to the inspection required by other paragraphs of this section, a thorough periodic inspection of alloy steel chain slings in use shall be made on a regular basis, to be determined on the basis of (A) frequency of sling use; (B) severity of service conditions; (C) nature of lifts being made; and (D) experience gained on the service life of slings used in similar circumstances. Such inspections shall in no event be at intervals greater than once every 12 months.”
  • 14. 14
  • 15. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(b)(6)(ii) “The employer shall make and maintain a record of the most recent month in which each alloy steel chain sling was thoroughly inspected, and shall make such record available for examination.” 15
  • 16. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(c) Wire rope. (1) …………the safe working loads recommended by the manufacturer for specific, identifiable products shall be followed, provided that a safety factor of not less than 5 is maintained. 1926.251(c)(2) “Protruding ends of strands in splices on slings and bridles shall be covered or blunted.” 16
  • 17. Wire Core Center Strand Wire rope
  • 18. Left Regular Lay Right Regular Lay Left Lang Lay Right Lang Lay 18
  • 19. One Wire Rope Lay One strand makes a 360 degree turn 19
  • 20. Dead End 20
  • 21. 6 x 25 Wire Rope Each strand contains 25 wires 6 Strands
  • 22. 22
  • 23. 23
  • 24. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(c)(4)(i) “An eye splice made in any wire rope shall have not less than three full tucks. However, this requirement shall not operate to preclude the use of another form of splice or connection which can be shown to be as efficient and which is not otherwise prohibited.” 24
  • 25. 25
  • 26. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(c)(5)((i) “When used for eye splices, the U- bolt shall be applied so that the “U” section is in contact with the dead end of the rope.” 26
  • 27. Dead End 27
  • 28. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(c)(6) “Slings shall not be shortened with knots or bolts or other makeshift devices.” 1926.251(c)(7) “Slings legs shall not be kinked.” 1926.251(c)(8) “Slings used in a basket hitch shall have the loads balanced to prevent slippage.” 1926.251(c)(9) “Slings shall be padded or protected from the sharp edges of their loads.”
  • 29. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Rigging equipment for material handling 1926.251(c)(10) “Hands or fingers shall not be placed between the sling and its load while the sling is being tightened around the load.” 1926.251(c)(11) “Shock loading is prohibited.” 1926.251(c)(12) “A sling shall not be pulled from under a load when the load is resting on the sling.” 29
  • 30. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Synthetic webbing (nylon, polyester, and polypropylene) 1926.251(e)(1) “The employer shall have each synthetic web sling marked or coded to show:” 1926.251(e)(1)(i) “Name or trademark of manufacturer.” 1926.251(e)(1)(ii) “Rated capacities for the type of hitch.” 1926.251(e)(1)(iii) “ Type of material.” 30
  • 31. 31
  • 32. 32
  • 33. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Synthetic webbing (nylon, polyester, and polypropylene) 1926.251(e)(4) Fittings. “Fittings shall be:” 1926.251(e)(4)(i) “Of a minimum breaking strength equal to that of the sling; and” 1926.251(e)(4)(ii) “Free of all sharp edges that could in any way damage the webbing.” 33
  • 34. 34
  • 35. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.251 Synthetic webbing (nylon, polyester, and polypropylene) 1926.251(e)(8) Removal from service. “Synthetic web slings shall be immediately removed from service if any of the following conditions are present:” 1926.251(e)(8)(i) “Acid or caustic burns;” 1926.251(e)(8)(ii) “Melting or charring of any part of the sling surface;” 1926.251(e)(8)(iii) “Snags, punctures, tears or cuts;” 1926.251(e)(8)(iv) “Broken or worn stitches; or” 1926.251(e)(8)(v) “Distortion of fittings.”
  • 36. 36
  • 37. 37
  • 38. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.252 Disposal of waste material 1926.252(a) “Whenever materials are dropped more than 20 feet to any point lying outside the exterior walls of the building, an enclosed chute of wood, or equivalent material, shall be used. For the purpose of this paragraph, an enclosed chute is a slide, closed in on all sides, through which material is moved from a high place to a lower one.” 38
  • 39. 39
  • 40. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.252 Disposal of waste material 1926.252(b) “When debris is dropped through holes in the floor without the use of chutes, the area onto which the material is dropped shall be completely enclosed with barricades not less than 42 inches high and not less than 6 feet back from the projected edge of the opening above. Signs warning of the hazard of falling materials shall be posted at each level. Removal shall not be permitted in this lower area until debris handling ceases above.” 40
  • 41. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION Subpart H – Materials Handling, Storage, Use, and Disposal 1926.252 Disposal of waste material 1926.252(b) “Disposal of waste material or debris by burning shall comply with local fire regulations.” 1926.252(e) “All solvent waste, oily rags, and flammable liquids shall be kept in fire resistant covered containers until removed from worksite.” 41
  • 42. OCCUPATIONAL SAFETY AND HEALTH OSHA ADMINISTRATION 1926.850 Prepatory operations 1926.850(h) “When debris is dropped through holes in the floor without the use of chutes, the area onto which the material is dropped shall be completely enclosed with barricades not less than 42 inches high and not less than 6 feet back from the projected edge of the opening above. Signs, warning of the hazard of falling materials, shall be posted at each level. Removal shall not be permitted in this lower area until debris handling ceases above.” 42