1.Training Course:
Standalone Solar PV System
Design, Installation for engineers
BY
Eng.Eyad Adnan
https://www.linkedin.com/groups/12107513
• Goals of Course
• Project Profile
• PV sample Projects
• Site Surveying
- GPS coordination
- Metro Geographical Data and analysis
• Shading
- Consideration
- effects and treatments
• PV system Field surveying
• To be familiar with Designing standalone PV grid
• To prepare PV bidding, specification and BOQ
• To get knowledge with off-grid solar power
system
• To specify the best brands for off grid solar
components
• To recognize the AUS/NZS and IEC standards
• To simulate PV Grid by Pvsys software
• Profile Project or Size Project
• client details:
• Address project
• Project Name
• Contract, consulting and Owner companies
• TOTAL POWER CAPACITY AND AREA
• DATA COLLECTION:
1. Solar Irradiation :
to specify the total required PV to macth demand customer power
2. Location GPS : to orient PV panels and elevation angle for
shading concern
3. PV panels mounting type
4.Any obstacles to avoid shading problems
4.Amobient condition for the sit location to check power grid
losses /degrading temperature factor
5. Searching place and room for DC batteries , inverters and other
equipment
6. Total available area and free spaces “m^2”
 What is Solar irradiation
 On-site Visit
 Roof types and site evaluation
 Site Assessment
• 1. Go to:https://www.gps-coordinates.net/
2. Go to :
https://eosweb.larc.nasa.gov/cgi-
bin/sse/grid.cgi?email=luke.s@wildmail.com
Daily, Monthly, annual averaged insolation incident on
horizontal surface in kWh/m2/day
Multi-year average of the temperature of the Earth's
surface
Average Air Temperature at Ten Meters Above the Surface
of the Earth.
Maximum Air Temperature at Ten Meters Above the
Surface of the Earth.
Minimum Air Temperature at Ten Meters Above the
Surface of the Earth.
Meteorological Data Assessment
Meteorological Data Assessment
Meteorological Data Assessment
Meteorological Data Assessment
Site & Meteo Details
Location coordinates 31.527N, 34.3E
Avg. Ambient Temperature (0C) Max Average Min
33.4 25.1 14.3
Relative humidity 76.1%
Avg. Daily Solar irradiation-
Horizontal
5.25 Kw-hrs/m2/day
Atmospheric Pressure 98.2 kPA
Wind Speed 2.2 m/s
Avg. Earth temperature
(0C)
Max Average Min
36.8 26.1 14.1
Height from sea level 21m
Project Details
Type of installation Ground-mounted
Estimated array peak power 850kWp
Shading consideration Shade-free
LT voltage 415-480V AC
Phase connection 3-phase
Grid frequency 50Hz
Required area 5600 sqm
Expected Project Cost
Meteorological Data Assessment
1. Average, Max, Min Air Temperature
Meteorological Data Analysis
1. Average Insolation Incident Kwh/m2/day
Meteorological Data Analysis
1. Why shading is problem ??
Overheating
Low performance solar collector
2. Shade-free-No Risk Shading
Open area :inter-row shading by designing -
raw space between PV rows
3. Uniform shading
4. Un-uniform shading IS VERY IMPORTANT
• Hnaweh HSL72S
1. the way in which the inverter performs
the maximum power point tracking
(MPPT), mean that modular
configurations are not always the least
susceptible to shade effects.
2. central-, string- and module-inverter
configurations,```
3.3 Inverter MPP track
3. Shading Treatment
1. Elevation or Latitude Angle for preventive
shading:/
• An important parameter in the design of
photovoltaic systems is the maximum elevation
angle, that is, the maximum height of the sun in
the sky at a particular time of year.
• This maximum elevation angle occurs at solar
noon and depends on the latitude and
declination angle as shown in the figure below
See my article:
https://www.linkedin.com/pulse/cost-optimize-azimuth-angle-tilt-over-
photovoltaic-solar-eyad-adnan/
 No cost optimizing can be achieved at hemisphere area by setting the azimuth angle
to 180 "PV oriented to south orientation" and the hemisphere south the azimuth
angle is 0.
• How much area we need to our project ??
-The required area for all PV nodules = total KWp/160 W
I.e. each 160 wattage = 1 m2 @nominal cond
- The required area for shading phenomena = 70 % of
total area
- The free area and equipment area = 30 %
- Safety factor upon your economic issue
𝑇𝑜𝑡𝑎𝑙 𝑎𝑟𝑒𝑎 =
𝑡𝑜𝑡𝑎𝑙𝑘𝑤𝑝
160
∗ 1.7 ∗ 1.3
-if the project is only one raw such as building roofs
The shading and free area factors will be small
• Site Surveying is the first step for designing and installing
PV grid
• Average solar radiation, site latitude, sun elevation angle
and shading effects should be investigated during site visit
and assessment
• Shading can be eliminated by free space between PV rows,
PV bypass panels , tilt angle and MPP track in string
inverters
• Tilt angle of PV panel can determine by site latitude angle
• Azimuth angle or PV orientation to south sun at northern
hemisphere
• Shading can be either uniform or non uniform shading
• No cost optimizing can be achieved at
hemisphere area by setting the azimuth angle
to 180 "PV oriented to south orientation" and
the hemisphere south the azimuth angle is 0.
• Tilt angle is fixed to your latitude building +15
in winter and -15 in summer;
• the fixed tilt angle over year is the average
angle between tilt angle in summer and
winter
• AS/NZS 4509.2
• AS/NZS 5033:2014
• PVTRIN Handbook

Weitere ähnliche Inhalte

Was ist angesagt?

Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of buildingniraj2510
 
SOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technologySOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technologyPraveen Kumar
 
Basic Difference Between Wires and Cables
Basic Difference Between Wires and CablesBasic Difference Between Wires and Cables
Basic Difference Between Wires and CablesDr.Raja R
 
Surveying with gps
Surveying with gpsSurveying with gps
Surveying with gpsengr jafar
 
Module 4 Introduction to Surveying and Levelling.pptx
Module 4 Introduction to Surveying and Levelling.pptxModule 4 Introduction to Surveying and Levelling.pptx
Module 4 Introduction to Surveying and Levelling.pptxSilasChaudhari
 
Home electrical installations
Home electrical installationsHome electrical installations
Home electrical installationstecnoloxias2
 
Solar Radiation Geometry
Solar Radiation GeometrySolar Radiation Geometry
Solar Radiation GeometryVanita Thakkar
 
WIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptxWIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptxRIDDHESH VARIK
 
Photovoltaic Power Conversion systems
Photovoltaic Power Conversion systems	Photovoltaic Power Conversion systems
Photovoltaic Power Conversion systems Niraj Solanki
 
5.10 Fiber optics
5.10 Fiber optics5.10 Fiber optics
5.10 Fiber opticslpapadop
 
Presentation solar panels martin
Presentation solar panels  martinPresentation solar panels  martin
Presentation solar panels martinCKMCforstudents
 

Was ist angesagt? (20)

Design methodology for pv
Design methodology for pvDesign methodology for pv
Design methodology for pv
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of building
 
Solar street light
Solar street lightSolar street light
Solar street light
 
9 system-sizing
9 system-sizing9 system-sizing
9 system-sizing
 
Types of lamps
Types of lampsTypes of lamps
Types of lamps
 
SOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technologySOLAR POWER generation using solar PV and Concentrated solar power technology
SOLAR POWER generation using solar PV and Concentrated solar power technology
 
Basic Difference Between Wires and Cables
Basic Difference Between Wires and CablesBasic Difference Between Wires and Cables
Basic Difference Between Wires and Cables
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Surveying with gps
Surveying with gpsSurveying with gps
Surveying with gps
 
Surveying introduction
Surveying introductionSurveying introduction
Surveying introduction
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
 
Module 4 Introduction to Surveying and Levelling.pptx
Module 4 Introduction to Surveying and Levelling.pptxModule 4 Introduction to Surveying and Levelling.pptx
Module 4 Introduction to Surveying and Levelling.pptx
 
Home electrical installations
Home electrical installationsHome electrical installations
Home electrical installations
 
Solar Radiation Geometry
Solar Radiation GeometrySolar Radiation Geometry
Solar Radiation Geometry
 
WIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptxWIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptx
 
Photovoltaic Power Conversion systems
Photovoltaic Power Conversion systems	Photovoltaic Power Conversion systems
Photovoltaic Power Conversion systems
 
KVAh TARIFF( ppt)
KVAh TARIFF( ppt)KVAh TARIFF( ppt)
KVAh TARIFF( ppt)
 
5.10 Fiber optics
5.10 Fiber optics5.10 Fiber optics
5.10 Fiber optics
 
Solar_Power_System
Solar_Power_SystemSolar_Power_System
Solar_Power_System
 
Presentation solar panels martin
Presentation solar panels  martinPresentation solar panels  martin
Presentation solar panels martin
 

Ähnlich wie Conducting a Site Assessment and PV System Field Survey

Photovoltaic Training Course - Module 1.3 - PV facility calculations
Photovoltaic Training Course - Module 1.3 -  PV facility calculationsPhotovoltaic Training Course - Module 1.3 -  PV facility calculations
Photovoltaic Training Course - Module 1.3 - PV facility calculationsLeonardo ENERGY
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model Vijay Kannan
 
Opimal orientation1.pptx
Opimal orientation1.pptxOpimal orientation1.pptx
Opimal orientation1.pptxthirasaku1
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planningChirag Jain
 
04-DESIGN AND LAYOUT OF WIND FARM.pdf
04-DESIGN AND LAYOUT OF WIND FARM.pdf04-DESIGN AND LAYOUT OF WIND FARM.pdf
04-DESIGN AND LAYOUT OF WIND FARM.pdfPrakashBadal9
 
T4.5 - Solar energy potential assessment
T4.5 - Solar energy potential assessmentT4.5 - Solar energy potential assessment
T4.5 - Solar energy potential assessmenti-SCOPE Project
 
Meteorological measurements for solar energy
Meteorological measurements for solar energyMeteorological measurements for solar energy
Meteorological measurements for solar energyPeter Kalverla
 
Predicting the Wind: Wind farm prospecting using GIS
Predicting the Wind: Wind farm prospecting using GISPredicting the Wind: Wind farm prospecting using GIS
Predicting the Wind: Wind farm prospecting using GISKenex Ltd
 
Predicting the Wind - wind farm prospecting with GIS
Predicting the Wind - wind farm prospecting with GISPredicting the Wind - wind farm prospecting with GIS
Predicting the Wind - wind farm prospecting with GISKenex Ltd
 
Small Scale Photovoltaic Installations - Use of RETScreen Software
Small Scale Photovoltaic Installations - Use of RETScreen SoftwareSmall Scale Photovoltaic Installations - Use of RETScreen Software
Small Scale Photovoltaic Installations - Use of RETScreen Softwarefernando nuño
 
Photovoltaic Project Analysis Using RETScreen software
Photovoltaic Project Analysis Using RETScreen softwarePhotovoltaic Project Analysis Using RETScreen software
Photovoltaic Project Analysis Using RETScreen softwareLeonardo ENERGY
 
Offshore wind resource assessment
Offshore wind resource assessmentOffshore wind resource assessment
Offshore wind resource assessmentDileep V Raj
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales solpowerpeople
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.Saurabh Biswas
 
DG SYSTEM SELECTION IN URBAN AREA
DG SYSTEM SELECTION IN URBAN AREADG SYSTEM SELECTION IN URBAN AREA
DG SYSTEM SELECTION IN URBAN AREAHaryo Agung Wibowo
 
Mrs. Wilma EERENSTEIN - Desert Proof Modules
Mrs. Wilma EERENSTEIN - Desert Proof ModulesMrs. Wilma EERENSTEIN - Desert Proof Modules
Mrs. Wilma EERENSTEIN - Desert Proof ModulesMouhcine Benmeziane
 
Remote Sensing Application in Wind Energy
Remote Sensing Application in Wind EnergyRemote Sensing Application in Wind Energy
Remote Sensing Application in Wind EnergySiraj Ahmed
 
Presentation Final Research Project
Presentation Final Research ProjectPresentation Final Research Project
Presentation Final Research ProjectMaxime Thomas
 
Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)slmnsvn
 

Ähnlich wie Conducting a Site Assessment and PV System Field Survey (20)

Photovoltaic Training Course - Module 1.3 - PV facility calculations
Photovoltaic Training Course - Module 1.3 -  PV facility calculationsPhotovoltaic Training Course - Module 1.3 -  PV facility calculations
Photovoltaic Training Course - Module 1.3 - PV facility calculations
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
 
Opimal orientation1.pptx
Opimal orientation1.pptxOpimal orientation1.pptx
Opimal orientation1.pptx
 
Session 07 site assessment & planning
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planning
 
04-DESIGN AND LAYOUT OF WIND FARM.pdf
04-DESIGN AND LAYOUT OF WIND FARM.pdf04-DESIGN AND LAYOUT OF WIND FARM.pdf
04-DESIGN AND LAYOUT OF WIND FARM.pdf
 
T4.5 - Solar energy potential assessment
T4.5 - Solar energy potential assessmentT4.5 - Solar energy potential assessment
T4.5 - Solar energy potential assessment
 
MY ME PROJECT 2013-2015
MY ME PROJECT 2013-2015MY ME PROJECT 2013-2015
MY ME PROJECT 2013-2015
 
Meteorological measurements for solar energy
Meteorological measurements for solar energyMeteorological measurements for solar energy
Meteorological measurements for solar energy
 
Predicting the Wind: Wind farm prospecting using GIS
Predicting the Wind: Wind farm prospecting using GISPredicting the Wind: Wind farm prospecting using GIS
Predicting the Wind: Wind farm prospecting using GIS
 
Predicting the Wind - wind farm prospecting with GIS
Predicting the Wind - wind farm prospecting with GISPredicting the Wind - wind farm prospecting with GIS
Predicting the Wind - wind farm prospecting with GIS
 
Small Scale Photovoltaic Installations - Use of RETScreen Software
Small Scale Photovoltaic Installations - Use of RETScreen SoftwareSmall Scale Photovoltaic Installations - Use of RETScreen Software
Small Scale Photovoltaic Installations - Use of RETScreen Software
 
Photovoltaic Project Analysis Using RETScreen software
Photovoltaic Project Analysis Using RETScreen softwarePhotovoltaic Project Analysis Using RETScreen software
Photovoltaic Project Analysis Using RETScreen software
 
Offshore wind resource assessment
Offshore wind resource assessmentOffshore wind resource assessment
Offshore wind resource assessment
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
 
DG SYSTEM SELECTION IN URBAN AREA
DG SYSTEM SELECTION IN URBAN AREADG SYSTEM SELECTION IN URBAN AREA
DG SYSTEM SELECTION IN URBAN AREA
 
Mrs. Wilma EERENSTEIN - Desert Proof Modules
Mrs. Wilma EERENSTEIN - Desert Proof ModulesMrs. Wilma EERENSTEIN - Desert Proof Modules
Mrs. Wilma EERENSTEIN - Desert Proof Modules
 
Remote Sensing Application in Wind Energy
Remote Sensing Application in Wind EnergyRemote Sensing Application in Wind Energy
Remote Sensing Application in Wind Energy
 
Presentation Final Research Project
Presentation Final Research ProjectPresentation Final Research Project
Presentation Final Research Project
 
Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)Automatic dual axis solar tracking system(eee499.blogspot.com)
Automatic dual axis solar tracking system(eee499.blogspot.com)
 

Kürzlich hochgeladen

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 

Kürzlich hochgeladen (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Conducting a Site Assessment and PV System Field Survey

  • 1. 1.Training Course: Standalone Solar PV System Design, Installation for engineers BY Eng.Eyad Adnan https://www.linkedin.com/groups/12107513
  • 2.
  • 3.
  • 4.
  • 5. • Goals of Course • Project Profile • PV sample Projects • Site Surveying - GPS coordination - Metro Geographical Data and analysis • Shading - Consideration - effects and treatments • PV system Field surveying
  • 6. • To be familiar with Designing standalone PV grid • To prepare PV bidding, specification and BOQ • To get knowledge with off-grid solar power system • To specify the best brands for off grid solar components • To recognize the AUS/NZS and IEC standards • To simulate PV Grid by Pvsys software
  • 7. • Profile Project or Size Project • client details: • Address project • Project Name • Contract, consulting and Owner companies • TOTAL POWER CAPACITY AND AREA
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. • DATA COLLECTION: 1. Solar Irradiation : to specify the total required PV to macth demand customer power 2. Location GPS : to orient PV panels and elevation angle for shading concern 3. PV panels mounting type 4.Any obstacles to avoid shading problems 4.Amobient condition for the sit location to check power grid losses /degrading temperature factor 5. Searching place and room for DC batteries , inverters and other equipment 6. Total available area and free spaces “m^2”
  • 14.  What is Solar irradiation
  • 16.  Roof types and site evaluation
  • 18. • 1. Go to:https://www.gps-coordinates.net/
  • 19.
  • 20. 2. Go to : https://eosweb.larc.nasa.gov/cgi- bin/sse/grid.cgi?email=luke.s@wildmail.com Daily, Monthly, annual averaged insolation incident on horizontal surface in kWh/m2/day Multi-year average of the temperature of the Earth's surface Average Air Temperature at Ten Meters Above the Surface of the Earth. Maximum Air Temperature at Ten Meters Above the Surface of the Earth. Minimum Air Temperature at Ten Meters Above the Surface of the Earth. Meteorological Data Assessment
  • 24. Site & Meteo Details Location coordinates 31.527N, 34.3E Avg. Ambient Temperature (0C) Max Average Min 33.4 25.1 14.3 Relative humidity 76.1% Avg. Daily Solar irradiation- Horizontal 5.25 Kw-hrs/m2/day Atmospheric Pressure 98.2 kPA Wind Speed 2.2 m/s Avg. Earth temperature (0C) Max Average Min 36.8 26.1 14.1 Height from sea level 21m Project Details Type of installation Ground-mounted Estimated array peak power 850kWp Shading consideration Shade-free LT voltage 415-480V AC Phase connection 3-phase Grid frequency 50Hz Required area 5600 sqm Expected Project Cost Meteorological Data Assessment
  • 25. 1. Average, Max, Min Air Temperature Meteorological Data Analysis
  • 26. 1. Average Insolation Incident Kwh/m2/day Meteorological Data Analysis
  • 27. 1. Why shading is problem ?? Overheating Low performance solar collector 2. Shade-free-No Risk Shading Open area :inter-row shading by designing - raw space between PV rows 3. Uniform shading 4. Un-uniform shading IS VERY IMPORTANT
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 40. 1. the way in which the inverter performs the maximum power point tracking (MPPT), mean that modular configurations are not always the least susceptible to shade effects. 2. central-, string- and module-inverter configurations,``` 3.3 Inverter MPP track 3. Shading Treatment
  • 41.
  • 42. 1. Elevation or Latitude Angle for preventive shading:/ • An important parameter in the design of photovoltaic systems is the maximum elevation angle, that is, the maximum height of the sun in the sky at a particular time of year. • This maximum elevation angle occurs at solar noon and depends on the latitude and declination angle as shown in the figure below
  • 43.
  • 45.  No cost optimizing can be achieved at hemisphere area by setting the azimuth angle to 180 "PV oriented to south orientation" and the hemisphere south the azimuth angle is 0.
  • 46.
  • 47.
  • 48.
  • 49. • How much area we need to our project ?? -The required area for all PV nodules = total KWp/160 W I.e. each 160 wattage = 1 m2 @nominal cond - The required area for shading phenomena = 70 % of total area - The free area and equipment area = 30 % - Safety factor upon your economic issue 𝑇𝑜𝑡𝑎𝑙 𝑎𝑟𝑒𝑎 = 𝑡𝑜𝑡𝑎𝑙𝑘𝑤𝑝 160 ∗ 1.7 ∗ 1.3 -if the project is only one raw such as building roofs The shading and free area factors will be small
  • 50. • Site Surveying is the first step for designing and installing PV grid • Average solar radiation, site latitude, sun elevation angle and shading effects should be investigated during site visit and assessment • Shading can be eliminated by free space between PV rows, PV bypass panels , tilt angle and MPP track in string inverters • Tilt angle of PV panel can determine by site latitude angle • Azimuth angle or PV orientation to south sun at northern hemisphere • Shading can be either uniform or non uniform shading
  • 51. • No cost optimizing can be achieved at hemisphere area by setting the azimuth angle to 180 "PV oriented to south orientation" and the hemisphere south the azimuth angle is 0. • Tilt angle is fixed to your latitude building +15 in winter and -15 in summer; • the fixed tilt angle over year is the average angle between tilt angle in summer and winter
  • 52. • AS/NZS 4509.2 • AS/NZS 5033:2014 • PVTRIN Handbook