SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
Result Driven
     Team Synergy
Development and Practice


     14th September2011
       Ibadan, Nigeria
         Errol Goetsch
       +27 78 573 5046
        errol@xe4.org
      www.xmentors.us


                           1
Errol Goetsch
 errol@xe4.org
Family                                      Founded
2 sons Adam (11) and Ethan (9)
Live: Johannesburg Born: Windhoek           PPASA Centre of Excellence
                                            The XE4 Foundation for Excellence
Studied                                     The Centre for Social Impact
BA Honours LLB MBA now PhD
Lecturer                                    Projects
Economics / Strategy / Project Management Zambia Commodity Exchange
Managerial Finance / Marketing            Swaziland Textile Industry revival
Organisational Behaviour / Politics       LoveLife HIV/Aids
                                          Durban Waterfront
Past Employ                               Cato Manor Land Scheme
Merchant Investors Group (London)         Ndwedwe Electrification Programme
Inkatha Institute                         Water 2000
Boland / Absa Group / Nedcor Banks        National Housing Conference
IQ Group                                  KwaZulu Local Economic Development
Various Consultancies                     Durban Ordnances Rewrite
                                          KwaZulu Finance Corporation collateralisation
Audited                                   East London Municipality HIV/Aids impact
100’s of projects                         Sedibeng District Municipality Service Level Protest
                                              Prediction and Management
Developed                                 Banking mergers
Software for auditing / managing          Corporate Governance
M&E Reports / Sustainability / Impact     Electronic banking systems
    Capacity / Balanced Scorecards / KAP Information system rollout
    tools / HIV Aids Impact

                                                                           2
TEAMS WITHOUT SYNERGY ACHIEVE THIS!




                                      3
RESULTS-DRIVEN TEAM SYNERGY
Project results are the aim of Management by Objectives


Project
Term-limited (defined end-date)
Special purpose (unique outcome)
Objectives (set targets) for cost, period, product and outcome
Results scores against targets                                      Results
Results                                                             of team
The COST of getting the project back on track                      synergy =
- in money – vs budget over-run
- in time – vs project plan delay
- in product – vs delivery shortfall
- in outcome – vs needs unmet                                    Actual       %
                                                                          =
Synergy                                                      Target           Date
The VALUE of being on track
- in money – vs budget - Economy
- in time – vs project plan - Efficiency
- in productivity – vs delivery - Effectiveness
- in impact – vs cost benefit ratio - Equity

                                                                     4
Key Learning Points
      1 A of Projects 2 Q's of Objectives 3 Dimensions of Governance 4
      Elements of Excellence 7 Steps in Development 10 Physical Results

    1 The       Actual                        7 The            Community
                             = 100 %
    Aim         Target                        Context         Benefits
                                                           Projects
                                                        Agencies            Pay off
Q     2 The                     4 The               Programmes            Proof
      Axes                      Project        Intermediaries         Progress
         Q                                     Donors               Products
                                   E
                                                                 Premises
            D                                                   Power
                                                                          10 The
                         E        X=      E                   People
            D                                                             Results
                                                        Payments
                                   E                   Payers
            D
                                                   Policies
    3 The
    Organisation                                                         5
Key Lessons
 The Team needs to work together to achieve their individual results

1 - Aim of Team Synergy                 Answer: Current Score
2 - Q’s of Synergy Measurement          Answer: Quantity and Quality
3 - Dimensions of Team Work             Answer: Assessment
4 - Elements of Team Performance        Answer: Excellence
5 - Results of Team Work                Answer: Strategic & Operational Results
7 - Steps in defining Teams             Answer: Steps
10 - Physical Assets of Managers        Answer: Capacity




                                                                       6
THE TEAM: Who Does What
The set of 10 Physical Results from the management team

Function        Activity: Workplan / Budget                      Quality

1 R&D           Why: Designing solutions to problems             Policy

2 Marketing     What for: Attracting people who care             Payers

3 Finance       What with: Budgets to match income to expenses   Payment

4 HR            Who with: Hiring people who work                 People

5 Facilities    Where: Getting places to work                    Premises

6 Procurement   How: Getting inputs that work                    Power

7 Project       When: Getting outputs on time                    Products

8 Quality       What if: Solving risks                           Progress

9 Information   What: Producing evidence                         Proof

10 Strategy     Who for: Satisfying stakeholders                 Payoff


                                                                    7
TEAM CONTEXT: Cash Flow
    The 7 Steps in roles, tasks, and reports

           See SOLUTION
                                                                           Impact
Results     Community     change Actual direct + indirect beneficiaries    Assessment

Benefits                                                                   End-Term
             Benefits     deliver Set of products and services delivered   reports
      =
                                                                           Mid-Term
             Projects     design Delivery mechanism
                                                                           reports
                                                                           Progress
  Work       Agencies     decide    Designer and Implementer of Solution
                                                                           reports
   Time
           Programmes     choose Development priority                      Work Plans
      x
           Intermediaries collect   Government / Donor Agency / Bank       Budgets

 Money        Donors      care      Taxpayer / Shareholder / Benefactor    Receipts

  Costs    See PROBLEM                                                     Baseline

                                                                     8
TEAM CONTEXT: Governance
The 3 Dimensions of Results in the organisation




      Who / Where     Do / Need What          Result

       Directors      Decide Strategy        TARGETS
       Board Room     balance / authority    questions

                                                         Actuals
       Managers       Design System
                                             SCORE                 = Score %
       Head Office    Organisation / skill
                                                         Targets
       Staff          Deliver Operations     ACTUALS
       Field Office   work / effort          answers

       Team Synergy
       = Corporate Governance
       = ability to get good Decisions, Designs and Delivery
       = 100%

                                                         9
RESULTS: Measuring Synergy
When managers are missing or messing


The least cost for a      The least time for       The most delivery    The most impact
given level of output     a given level of         for a given cost /   for a given cost /
/ Target                  output / Target          Target               Target
Procurement               Human Resources          Project              Strategy
team                      team                     team                 team

              COSTS                        Time                    BENEFITS
             Try reduce                    Work                    Try increase
                                      Organisations
              $                        Performance                            #
           Inputs                       Efficiency                         Outputs
       Factor Market                                                    Goods Market
                                               %
          Capacity                                                         Benefits
                                        Outcomes
          Economy                                                        Effectiveness
                                       Households
                                          Impact
                                        C/B Equity
                                                                    10
RESULTS: Measuring Synergy
The effect of team synergy on a project


Economy             Efficiency            Effectiveness       Cost/Benefit
                                                              Equity

X   = E       X    C       E      L       L       E       N       C          E

X   = %                    %                      %                          %

                                  Work
                                   50%

          Inputs                                              Outputs
          50%                                                  50%

                                 Outcomes
                                   50%

                                                          11
TEAM WORK: Measuring Capacity
      Missing or Messing Managers don’t give questions or get answers


 100%




                            Perfect – Level - can carry load
Policy Payers Payments People Places          Power Products       Progress Proof Pay off

R&D     Marketing Finance   HR      Facilities Procur    Project   Risk    M&E    Strategy
                                               ement
Why     What     What       Who     Where How            When      What    What   Who
        for      with       with                                   If             For
                                                                      12
MEASUREMENT: Results
    The 2 Q’s of Results
                                                           Pass rate

                                                        XTarget = 100%
              100%
                                                         40 x 80 = 3200
                                                         20 x 40 = 800
Quantity                                                 Actual = 25%

Graduates                        25%
              50%                   X
How much               Success          Failure
Target = 40
Actual = 20




       Benefit:                          How well
       School        Quality      50%
                                         Target = 80%
                                         Actual = 40%
                                                        100%

       Graduates     Marks

                                                         13
MEASUREMENT: R&D
    R&D produces Policies
                                                            Policies

                                                         XTarget = 100%
               100%

                                                          10 x 30
Quantity
Problems                           25%
               50%                    X
How much                 Success          Failure
Target = 10
Actual = 5




              R&D                          How well
                      Quality       50%
                                           Target = 30
                                           Actual = 15
                                                         100%


                      Solutions

                                                          14
MEASUREMENT: Marketing
    Marketing produces Payers
                                                            Payers

                                                         XTarget = 100%
             100%

                                                          2 x 1000 000
Quantity
Donors                          25%
             50%                   X
How much              Success          Failure
Target = 2
Actual = 1




       Marketing                        How well
                    Quality      50%
                                        Target = 1000 000
                                        Actual = 500 000
                                                         100%


                    Donations

                                                         15
MEASUREMENT: Finance
     Finance produces Payments
                                                                      Payments

                                                                   XTarget = 100%
                 100%

                                                                    100% x 100%
Quantity
Income (payment in)                      25%
                 50%                        X
How much                   Success               Failure
Target = 2000 000
Actual = 500 000




           Finance                                How well
                        Quality            50%
                                                  Target = 500 000
                                                  Actual = 250 000
                                                                   100%


                        Expenses (payment out)

                                                                   16
MEASUREMENT: HR
    HR produces People
                                                               People

                                                            XTarget = 100%
                  100%

                                                             10 000
Quantity
Staff                                 25%
                  50%                    X
How much                    Success          Failure
Target = 20
Actual = 10




              Human                           How well
              Results    Quality       50%
                                              Target = 10
                                              Actual = 5
                                                            100%


                         Skills

                                                             17
MEASUREMENT: Facilities
    Facilities produces Premises
                                                               Premises

                                                            XTarget = 100%
                  100%

                                                             1 000 x 10
Quantity
Locations                             25%
                  50%                    X
How much                    Success          Failure
Target = 1000m2
Actual = 500m2




        Facilities                            How well
                         Quality       50%
                                              Target = 10
                                              Actual = 5
                                                            100%


                         Features

                                                             18
MEASUREMENT: Procurement
    Procurement produces Power
                                                            Power

                                                         XTarget = 100%
               100%

                                                          1 000
Quantity
Inputs                             25%
               50%                    X
How much                 Success          Failure
Target = 100
Actual = 50




    Procurement                            How well
                      Quality       50%
                                           Target = 10
                                           Actual = 5
                                                         100%


                      Features

                                                          19
MEASUREMENT: Project
    Project produces Products
                                                               Products

                                                            XTarget = 100%
                100%

                                                             2 000
Quantity
Outputs                                25%
                50%                       X
How much                  Success             Failure
Target = 1000
Actual = 500




         Project                               How well
      Production       Quality          50%
                                               Target = 2
                                               Actual = 1
                                                            100%


                       Functionality

                                                             20
MEASUREMENT: Quality
    Quality produces Progress
                                                                     Progress

                                                                  XTarget = 100%
                  100%

                                                                   10 000
Quantity
Benefits                                 25%
                  50%                       X
How much                    Success             Failure
Target = 10
Actual = 5




                Risk                             How well
              Quality    Quality          50%
                                                 Target = 1 000
                                                 Actual = 500
                                                                  100%


                         Beneficiaries

                                                                   21
MEASUREMENT: Audit / Info / M&E
    M&E produces Proof
                                                            Proof

                                                         XTarget = 100%
              100%

                                                          200
Quantity
Reports                            25%
              50%                     X
How much                 Success          Failure
Target = 20
Actual = 10




      Information                          How well
      Audit / M&E    Quality        50%
                                           Target = 10
                                           Actual = 5
                                                         100%


                     Coverage

                                                          22
MEASUREMENT: Strategy
    Strategy produces Payoffs
                                                                Payoff

                                                             X
                100%                                          Target = 100%

                                                              10 000
Quantity
Stakeholders                          25%
                50%                      X
How much                  Success            Failure
Target = 1500
Actual = 750




         Strategy                             How well
                       Quality         50%
                                              Target = 5
                                              Actual = 2.5
                                                             100%


                       Satisfaction

                                                              23
Result Driven
     Team Synergy
Development and Practice
      DISCUSSION

     14th September2011
       Ibadan, Nigeria
         Errol Goetsch
       +27 78 573 5046
        errol@xe4.org
      www.xmentors.us


                           24

Weitere ähnliche Inhalte

Was ist angesagt?

Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
NASAPMC
 
Agile werkt - Hennie Huijgens - NESMA najaarsbijeenkomst 2012
Agile werkt -  Hennie Huijgens - NESMA najaarsbijeenkomst 2012Agile werkt -  Hennie Huijgens - NESMA najaarsbijeenkomst 2012
Agile werkt - Hennie Huijgens - NESMA najaarsbijeenkomst 2012
Nesma
 
High Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic ApproachHigh Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic Approach
IT Weekend
 
The Chief Skeptical Officer – A New C-Level Role
The Chief Skeptical Officer – A New C-Level RoleThe Chief Skeptical Officer – A New C-Level Role
The Chief Skeptical Officer – A New C-Level Role
Alan McSweeney
 
Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011
NASAPMC
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
NASAPMC
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
NASAPMC
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
NASAPMC
 

Was ist angesagt? (20)

Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
"The myth of Certainty - Is implementation a naughty word?" by Steve Bell
"The myth of Certainty - Is implementation a naughty word?" by Steve Bell"The myth of Certainty - Is implementation a naughty word?" by Steve Bell
"The myth of Certainty - Is implementation a naughty word?" by Steve Bell
 
"Information needs for the lean organization" by Jean Cunningham
"Information needs for the lean organization" by Jean Cunningham"Information needs for the lean organization" by Jean Cunningham
"Information needs for the lean organization" by Jean Cunningham
 
Lukas
LukasLukas
Lukas
 
Agile werkt - Hennie Huijgens - NESMA najaarsbijeenkomst 2012
Agile werkt -  Hennie Huijgens - NESMA najaarsbijeenkomst 2012Agile werkt -  Hennie Huijgens - NESMA najaarsbijeenkomst 2012
Agile werkt - Hennie Huijgens - NESMA najaarsbijeenkomst 2012
 
High Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic ApproachHigh Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic Approach
 
Detecon - Organizational Energy Workshop
Detecon - Organizational Energy WorkshopDetecon - Organizational Energy Workshop
Detecon - Organizational Energy Workshop
 
Doug Personal
Doug PersonalDoug Personal
Doug Personal
 
Sierra brochure
Sierra brochureSierra brochure
Sierra brochure
 
The Chief Skeptical Officer – A New C-Level Role
The Chief Skeptical Officer – A New C-Level RoleThe Chief Skeptical Officer – A New C-Level Role
The Chief Skeptical Officer – A New C-Level Role
 
Business Finance For Engineering Leaders
Business Finance For Engineering LeadersBusiness Finance For Engineering Leaders
Business Finance For Engineering Leaders
 
T353 Web Asmi
T353 Web AsmiT353 Web Asmi
T353 Web Asmi
 
Katalyst
KatalystKatalyst
Katalyst
 
Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011
 
2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before2.0 Adoption in the Enterprise - The Before
2.0 Adoption in the Enterprise - The Before
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
206580 primavera in an it shop
206580 primavera in an it shop206580 primavera in an it shop
206580 primavera in an it shop
 
Selling Agile At Your Company
Selling Agile At Your CompanySelling Agile At Your Company
Selling Agile At Your Company
 

Andere mochten auch (13)

Synergy Powerpoint
Synergy PowerpointSynergy Powerpoint
Synergy Powerpoint
 
Team Synergy
Team SynergyTeam Synergy
Team Synergy
 
Team synergy
Team synergyTeam synergy
Team synergy
 
Writing workshop pd for middle school 2
Writing workshop pd for middle school 2Writing workshop pd for middle school 2
Writing workshop pd for middle school 2
 
Synergy
SynergySynergy
Synergy
 
Im presentation
Im presentationIm presentation
Im presentation
 
Team building, power of we, synergy, team
Team building, power of we, synergy, teamTeam building, power of we, synergy, team
Team building, power of we, synergy, team
 
Synergy - Main Aspects
Synergy - Main AspectsSynergy - Main Aspects
Synergy - Main Aspects
 
Synergy
SynergySynergy
Synergy
 
Communication Skills Ppt
Communication Skills PptCommunication Skills Ppt
Communication Skills Ppt
 
Communication skills ppt
Communication skills   pptCommunication skills   ppt
Communication skills ppt
 
Writing Skills (Written Communication)
Writing Skills (Written Communication)Writing Skills (Written Communication)
Writing Skills (Written Communication)
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Ähnlich wie Result-Driven Project Team Synergy

Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
NASAPMC
 
Hospital management consulting v1 client.
Hospital management consulting v1 client.Hospital management consulting v1 client.
Hospital management consulting v1 client.
Kalpit Sanghvi
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
mandrew182
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
mandrew182
 

Ähnlich wie Result-Driven Project Team Synergy (20)

Project Management by Results / by Objectives
Project Management by Results / by ObjectivesProject Management by Results / by Objectives
Project Management by Results / by Objectives
 
Practical M&E
Practical M&EPractical M&E
Practical M&E
 
M&E Project (Africa) Presentation
M&E Project (Africa) PresentationM&E Project (Africa) Presentation
M&E Project (Africa) Presentation
 
U1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdfU1 - S1 - Modern Project Management.pdf
U1 - S1 - Modern Project Management.pdf
 
Practical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar SlidesPractical Strategies for Project Recovery Webinar Slides
Practical Strategies for Project Recovery Webinar Slides
 
India value chain development planning
India value chain development planningIndia value chain development planning
India value chain development planning
 
Vietnam value chain development planning
Vietnam value chain development planningVietnam value chain development planning
Vietnam value chain development planning
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 
Hospital management consulting v1 client.
Hospital management consulting v1 client.Hospital management consulting v1 client.
Hospital management consulting v1 client.
 
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
 
Measuring the Blended Value of Corporate Social Responsibility and Social Ent...
Measuring the Blended Value of Corporate Social Responsibility and Social Ent...Measuring the Blended Value of Corporate Social Responsibility and Social Ent...
Measuring the Blended Value of Corporate Social Responsibility and Social Ent...
 
Eservices project planning
Eservices project planningEservices project planning
Eservices project planning
 
Process improvement without technology investments?
Process improvement without technology investments?Process improvement without technology investments?
Process improvement without technology investments?
 
Project governance
Project governanceProject governance
Project governance
 
Value Of Pm Organization
Value Of Pm OrganizationValue Of Pm Organization
Value Of Pm Organization
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change Agent
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
 
Unpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management ToolboxUnpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management Toolbox
 

Kürzlich hochgeladen

🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...
🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...
🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
Call Girls in Gagan Vihar (delhi) call me [🔝 9953056974 🔝] escort service 24X7
Call Girls in Gagan Vihar (delhi) call me [🔝  9953056974 🔝] escort service 24X7Call Girls in Gagan Vihar (delhi) call me [🔝  9953056974 🔝] escort service 24X7
Call Girls in Gagan Vihar (delhi) call me [🔝 9953056974 🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls * UPA...
Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls  * UPA...Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls  * UPA...
Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls * UPA...
mahaiklolahd
 

Kürzlich hochgeladen (20)

🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...
🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...
🌹Attapur⬅️ Vip Call Girls Hyderabad 📱9352852248 Book Well Trand Call Girls In...
 
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
 
Call Girls Kolkata Kalikapur 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl Se...
Call Girls Kolkata Kalikapur 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl Se...Call Girls Kolkata Kalikapur 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl Se...
Call Girls Kolkata Kalikapur 💯Call Us 🔝 8005736733 🔝 💃 Top Class Call Girl Se...
 
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
All Time Service Available Call Girls Marine Drive 📳 9820252231 For 18+ VIP C...
 
Call Girls Jaipur Just Call 9521753030 Top Class Call Girl Service Available
Call Girls Jaipur Just Call 9521753030 Top Class Call Girl Service AvailableCall Girls Jaipur Just Call 9521753030 Top Class Call Girl Service Available
Call Girls Jaipur Just Call 9521753030 Top Class Call Girl Service Available
 
Call Girls in Gagan Vihar (delhi) call me [🔝 9953056974 🔝] escort service 24X7
Call Girls in Gagan Vihar (delhi) call me [🔝  9953056974 🔝] escort service 24X7Call Girls in Gagan Vihar (delhi) call me [🔝  9953056974 🔝] escort service 24X7
Call Girls in Gagan Vihar (delhi) call me [🔝 9953056974 🔝] escort service 24X7
 
Call Girls in Delhi Triveni Complex Escort Service(🔝))/WhatsApp 97111⇛47426
Call Girls in Delhi Triveni Complex Escort Service(🔝))/WhatsApp 97111⇛47426Call Girls in Delhi Triveni Complex Escort Service(🔝))/WhatsApp 97111⇛47426
Call Girls in Delhi Triveni Complex Escort Service(🔝))/WhatsApp 97111⇛47426
 
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service AvailableCall Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
Call Girls Ahmedabad Just Call 9630942363 Top Class Call Girl Service Available
 
Russian Call Girls Service Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
Russian Call Girls Service  Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...Russian Call Girls Service  Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
Russian Call Girls Service Jaipur {8445551418} ❤️PALLAVI VIP Jaipur Call Gir...
 
Call Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service AvailableCall Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service Available
Call Girls Rishikesh Just Call 8250077686 Top Class Call Girl Service Available
 
Models Call Girls In Hyderabad 9630942363 Hyderabad Call Girl & Hyderabad Esc...
Models Call Girls In Hyderabad 9630942363 Hyderabad Call Girl & Hyderabad Esc...Models Call Girls In Hyderabad 9630942363 Hyderabad Call Girl & Hyderabad Esc...
Models Call Girls In Hyderabad 9630942363 Hyderabad Call Girl & Hyderabad Esc...
 
Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...
Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...
Call Girls Service Jaipur {9521753030} ❤️VVIP RIDDHI Call Girl in Jaipur Raja...
 
Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...
Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...
Call Girls Vasai Virar Just Call 9630942363 Top Class Call Girl Service Avail...
 
Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...
Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...
Manyata Tech Park ( Call Girls ) Bangalore ✔ 6297143586 ✔ Hot Model With Sexy...
 
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
 
Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...
Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...
Jogeshwari ! Call Girls Service Mumbai - 450+ Call Girl Cash Payment 90042684...
 
Low Rate Call Girls Bangalore {7304373326} ❤️VVIP NISHA Call Girls in Bangalo...
Low Rate Call Girls Bangalore {7304373326} ❤️VVIP NISHA Call Girls in Bangalo...Low Rate Call Girls Bangalore {7304373326} ❤️VVIP NISHA Call Girls in Bangalo...
Low Rate Call Girls Bangalore {7304373326} ❤️VVIP NISHA Call Girls in Bangalo...
 
Premium Call Girls In Jaipur {8445551418} ❤️VVIP SEEMA Call Girl in Jaipur Ra...
Premium Call Girls In Jaipur {8445551418} ❤️VVIP SEEMA Call Girl in Jaipur Ra...Premium Call Girls In Jaipur {8445551418} ❤️VVIP SEEMA Call Girl in Jaipur Ra...
Premium Call Girls In Jaipur {8445551418} ❤️VVIP SEEMA Call Girl in Jaipur Ra...
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
 
Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls * UPA...
Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls  * UPA...Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls  * UPA...
Call Girl in Indore 8827247818 {LowPrice} ❤️ (ahana) Indore Call Girls * UPA...
 

Result-Driven Project Team Synergy

  • 1. Result Driven Team Synergy Development and Practice 14th September2011 Ibadan, Nigeria Errol Goetsch +27 78 573 5046 errol@xe4.org www.xmentors.us 1
  • 2. Errol Goetsch errol@xe4.org Family Founded 2 sons Adam (11) and Ethan (9) Live: Johannesburg Born: Windhoek PPASA Centre of Excellence The XE4 Foundation for Excellence Studied The Centre for Social Impact BA Honours LLB MBA now PhD Lecturer Projects Economics / Strategy / Project Management Zambia Commodity Exchange Managerial Finance / Marketing Swaziland Textile Industry revival Organisational Behaviour / Politics LoveLife HIV/Aids Durban Waterfront Past Employ Cato Manor Land Scheme Merchant Investors Group (London) Ndwedwe Electrification Programme Inkatha Institute Water 2000 Boland / Absa Group / Nedcor Banks National Housing Conference IQ Group KwaZulu Local Economic Development Various Consultancies Durban Ordnances Rewrite KwaZulu Finance Corporation collateralisation Audited East London Municipality HIV/Aids impact 100’s of projects Sedibeng District Municipality Service Level Protest Prediction and Management Developed Banking mergers Software for auditing / managing Corporate Governance M&E Reports / Sustainability / Impact Electronic banking systems Capacity / Balanced Scorecards / KAP Information system rollout tools / HIV Aids Impact 2
  • 3. TEAMS WITHOUT SYNERGY ACHIEVE THIS! 3
  • 4. RESULTS-DRIVEN TEAM SYNERGY Project results are the aim of Management by Objectives Project Term-limited (defined end-date) Special purpose (unique outcome) Objectives (set targets) for cost, period, product and outcome Results scores against targets Results Results of team The COST of getting the project back on track synergy = - in money – vs budget over-run - in time – vs project plan delay - in product – vs delivery shortfall - in outcome – vs needs unmet Actual % = Synergy Target Date The VALUE of being on track - in money – vs budget - Economy - in time – vs project plan - Efficiency - in productivity – vs delivery - Effectiveness - in impact – vs cost benefit ratio - Equity 4
  • 5. Key Learning Points 1 A of Projects 2 Q's of Objectives 3 Dimensions of Governance 4 Elements of Excellence 7 Steps in Development 10 Physical Results 1 The Actual 7 The Community = 100 % Aim Target Context Benefits Projects Agencies Pay off Q 2 The 4 The Programmes Proof Axes Project Intermediaries Progress Q Donors Products E Premises D Power 10 The E X= E People D Results Payments E Payers D Policies 3 The Organisation 5
  • 6. Key Lessons The Team needs to work together to achieve their individual results 1 - Aim of Team Synergy Answer: Current Score 2 - Q’s of Synergy Measurement Answer: Quantity and Quality 3 - Dimensions of Team Work Answer: Assessment 4 - Elements of Team Performance Answer: Excellence 5 - Results of Team Work Answer: Strategic & Operational Results 7 - Steps in defining Teams Answer: Steps 10 - Physical Assets of Managers Answer: Capacity 6
  • 7. THE TEAM: Who Does What The set of 10 Physical Results from the management team Function Activity: Workplan / Budget Quality 1 R&D Why: Designing solutions to problems Policy 2 Marketing What for: Attracting people who care Payers 3 Finance What with: Budgets to match income to expenses Payment 4 HR Who with: Hiring people who work People 5 Facilities Where: Getting places to work Premises 6 Procurement How: Getting inputs that work Power 7 Project When: Getting outputs on time Products 8 Quality What if: Solving risks Progress 9 Information What: Producing evidence Proof 10 Strategy Who for: Satisfying stakeholders Payoff 7
  • 8. TEAM CONTEXT: Cash Flow The 7 Steps in roles, tasks, and reports See SOLUTION Impact Results Community change Actual direct + indirect beneficiaries Assessment Benefits End-Term Benefits deliver Set of products and services delivered reports = Mid-Term Projects design Delivery mechanism reports Progress Work Agencies decide Designer and Implementer of Solution reports Time Programmes choose Development priority Work Plans x Intermediaries collect Government / Donor Agency / Bank Budgets Money Donors care Taxpayer / Shareholder / Benefactor Receipts Costs See PROBLEM Baseline 8
  • 9. TEAM CONTEXT: Governance The 3 Dimensions of Results in the organisation Who / Where Do / Need What Result Directors Decide Strategy TARGETS Board Room balance / authority questions Actuals Managers Design System SCORE = Score % Head Office Organisation / skill Targets Staff Deliver Operations ACTUALS Field Office work / effort answers Team Synergy = Corporate Governance = ability to get good Decisions, Designs and Delivery = 100% 9
  • 10. RESULTS: Measuring Synergy When managers are missing or messing The least cost for a The least time for The most delivery The most impact given level of output a given level of for a given cost / for a given cost / / Target output / Target Target Target Procurement Human Resources Project Strategy team team team team COSTS Time BENEFITS Try reduce Work Try increase Organisations $ Performance # Inputs Efficiency Outputs Factor Market Goods Market % Capacity Benefits Outcomes Economy Effectiveness Households Impact C/B Equity 10
  • 11. RESULTS: Measuring Synergy The effect of team synergy on a project Economy Efficiency Effectiveness Cost/Benefit Equity X = E X C E L L E N C E X = % % % % Work 50% Inputs Outputs 50% 50% Outcomes 50% 11
  • 12. TEAM WORK: Measuring Capacity Missing or Messing Managers don’t give questions or get answers 100% Perfect – Level - can carry load Policy Payers Payments People Places Power Products Progress Proof Pay off R&D Marketing Finance HR Facilities Procur Project Risk M&E Strategy ement Why What What Who Where How When What What Who for with with If For 12
  • 13. MEASUREMENT: Results The 2 Q’s of Results Pass rate XTarget = 100% 100% 40 x 80 = 3200 20 x 40 = 800 Quantity Actual = 25% Graduates 25% 50% X How much Success Failure Target = 40 Actual = 20 Benefit: How well School Quality 50% Target = 80% Actual = 40% 100% Graduates Marks 13
  • 14. MEASUREMENT: R&D R&D produces Policies Policies XTarget = 100% 100% 10 x 30 Quantity Problems 25% 50% X How much Success Failure Target = 10 Actual = 5 R&D How well Quality 50% Target = 30 Actual = 15 100% Solutions 14
  • 15. MEASUREMENT: Marketing Marketing produces Payers Payers XTarget = 100% 100% 2 x 1000 000 Quantity Donors 25% 50% X How much Success Failure Target = 2 Actual = 1 Marketing How well Quality 50% Target = 1000 000 Actual = 500 000 100% Donations 15
  • 16. MEASUREMENT: Finance Finance produces Payments Payments XTarget = 100% 100% 100% x 100% Quantity Income (payment in) 25% 50% X How much Success Failure Target = 2000 000 Actual = 500 000 Finance How well Quality 50% Target = 500 000 Actual = 250 000 100% Expenses (payment out) 16
  • 17. MEASUREMENT: HR HR produces People People XTarget = 100% 100% 10 000 Quantity Staff 25% 50% X How much Success Failure Target = 20 Actual = 10 Human How well Results Quality 50% Target = 10 Actual = 5 100% Skills 17
  • 18. MEASUREMENT: Facilities Facilities produces Premises Premises XTarget = 100% 100% 1 000 x 10 Quantity Locations 25% 50% X How much Success Failure Target = 1000m2 Actual = 500m2 Facilities How well Quality 50% Target = 10 Actual = 5 100% Features 18
  • 19. MEASUREMENT: Procurement Procurement produces Power Power XTarget = 100% 100% 1 000 Quantity Inputs 25% 50% X How much Success Failure Target = 100 Actual = 50 Procurement How well Quality 50% Target = 10 Actual = 5 100% Features 19
  • 20. MEASUREMENT: Project Project produces Products Products XTarget = 100% 100% 2 000 Quantity Outputs 25% 50% X How much Success Failure Target = 1000 Actual = 500 Project How well Production Quality 50% Target = 2 Actual = 1 100% Functionality 20
  • 21. MEASUREMENT: Quality Quality produces Progress Progress XTarget = 100% 100% 10 000 Quantity Benefits 25% 50% X How much Success Failure Target = 10 Actual = 5 Risk How well Quality Quality 50% Target = 1 000 Actual = 500 100% Beneficiaries 21
  • 22. MEASUREMENT: Audit / Info / M&E M&E produces Proof Proof XTarget = 100% 100% 200 Quantity Reports 25% 50% X How much Success Failure Target = 20 Actual = 10 Information How well Audit / M&E Quality 50% Target = 10 Actual = 5 100% Coverage 22
  • 23. MEASUREMENT: Strategy Strategy produces Payoffs Payoff X 100% Target = 100% 10 000 Quantity Stakeholders 25% 50% X How much Success Failure Target = 1500 Actual = 750 Strategy How well Quality 50% Target = 5 Actual = 2.5 100% Satisfaction 23
  • 24. Result Driven Team Synergy Development and Practice DISCUSSION 14th September2011 Ibadan, Nigeria Errol Goetsch +27 78 573 5046 errol@xe4.org www.xmentors.us 24