SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Erik H. Neilsen PE, CCE
Environmental Engineering
4433 Edgarton Dr.
Grove City, OH 43123
(614) 370-6874 (cell)
erikhn777@gmail.com
OBJECTIVE To be a key contributor for an environmental/regulatory compliance organization.
BACKGROUND Over 25 years of direct applicable experience involving:
SUMMARY
* Radioactive Waste Management * Waste Packaging, Shipping & Storage
* Project Management * Safety Basis Documents Preparation
* Waste Sampling & Characterization
* Baseline & Change Analysis * Government Regulations (DOE 413)
* Scope of Work Compliance * Assisted in Risk Management
* 10 years Commercial Nuclear * 20 years Hanford Site Experience
Experience
WORK
EXPERIENCE
Environmental Engineering
AMEC Earth & Environmental 7/2004 – 5/2005
Sr. Engineer
Worked on a DOE-STD-3009 safety basis document to support a vitrification demonstration of buried transuranic
waste at the Hanford Site. I prepared a systems description manual for the AMEC engineering scale ICV (In-
container vitrification) process system. This equipment is used to test operating parameters prior to incorporating them
into the full-scale bulk vitrification waste process system. The system description manual includes a description of all
process subsystems, process flow diagrams and equipment assembly/fabrication drawings.
Duratek Federal Services, Inc. 7/1999 – 2/2002
Principal Engineer
Prepared a Safety Analysis Reports for Packaging (SARP) for Finished Fuel Assembly Shipping Packages. As lead
engineer, I was responsible for client interface, costs, schedule, staff engineering assignments and final deliverable.
Also performed as a project manager,prepared Engineering Change Notices. Additionally I served as project lead on
Radtran a software program that tracks dose estimates from radioactive waste shipments.
H&R Technical Associates, Inc 4/1998 – 5/1999
Sr. Engineer
Provided technical support services to prepare Packaging Design Criteria documents for radioactive waste for
vitrification projects at the Hanford Site. My work included reviewing conceptual design and regulatory requirements,
identifying package and container specifications, determining radionuclide source terms,preparing dose consequences
analyses and shielding analyses.
WastrenTechnical Services 10/1997–1/1999
Engineer
Characterized and validated as-built master pump shutdown equipment components for the waste transfer system for
Hanford Tank Farms. This work involved obtaining engineering drawings of the safety equipment list and field
verifying changes to these drawings.
Erik Neilsen PE, CCE
2
Westinghouse Hanford Company 7/1989 – 2/1997
Sr. Engineer
Worked as a lead engineer for sampling of high-level radioactive waste storage tanks. Prepared engineering change
notes, hazards analyses, work procedures,work packages to support vapor sampling. Designed a portable vapor
sampler to obtain organic/radioactive contaminates samples from underground radioactive waste storage tanks. My
design ultimately provided cost savings in the amount of $1.400K.
Public Service Company of Colorado 1986 - 1988
Nuclear Fuels Engineer
Assisted in contract negotiations with both DOE and General Atomics Technologies. Developed a working knowledge
of nuclear fuel cycle. Prepared spent fuelfee reports, nuclear fuel data reports. Additionally, provided control rod
activation analyses. Also reviewed criticality safety evaluations. Also updated and maintained spent nuclear fuel
shipping cask licensing documentation. Responsibilities included review of state and federal regulations to ensure
compliance with design basis accidents and related modeling codes.
Chem-Nuclear Systems, Inc. 1984 - 1986
Manager, Product Development
Administered research projects that supported the operations and marketing departments. Supervised 3 R&D staff.
Met with clients to discuss waste treatment,packaging, transport and disposal issues. Interfaced with researchers
developing new methods of radioactive waste processing and treatment.
Toledo Edison Company 1981 - 1984
Sr. Assistant Engineer
Toledo Edison Company (now First Energy Corporation) operates the Davis-Besse Nuclear Power Station.
Responsible for start-up and testing of radioactive waste processing and disposal systems. Represented Toledo Edison
at monthly meetings of the Edison Electric Institute and the Ohio Radioactive Material Users Group. Other
responsibilities included review of radiation protection and emergency planning.
CostEstimating
American Electric Power, Columbus, OH: Supervisor, Project Estimating 9/2013 to 9/2015
I supervised 3 cost estimators who prepared capital and O&M estimates for the Generation Division. These projects
included coal to gas conversions, dual fuel installations, environmental projects, coal conveyor repair, catalyst
replacements, turbine control upgrades, pump upgrades, and demolition/decommissioning work. Projects ranged up to
$100 million. Our work scope included oversight evaluations on large capital estimates prepared by Sargent & Lundy
and Worley Parsons. This work entailed working closely with the project controls team, including project manager,
lead engineer, cost and schedule analysts, contractors and vendors to develop risk analyses, code of accounts,work
breakdown structure (WBS), trending and forecasting throughout the project.
(Short Term Contract Basis – 6 Companies) 10/2009 to 4/2013
RC Engineering & Construction Management Company: Cost Estimator. I worked for client, Fluor Babcock
Portsmouth on a team using MCsquared software to develop a cost estimate for a large nuclear waste disposal facility.
This multiyear project is estimated to exceed $0.5B and extend to 2021. Particular emphasis has drawn upon my
experience in Basis of Estimate and EVMS.
Project Assistance Corporation: Cost Estimator. I worked for client (Department of Energy-Office of River
Protection) on an Independent Government Cost Estimate (IGCE) for the Hanford Waste Treatment Plant. I developed
unit rates for exempt & non exempt labor, equipment, material and crews for this project. I prepared material take-off
sheets and basis of estimates for this IGCE.
Erik Neilsen PE, CCE
3
Future Unlimited:Cost Estimator I prepared basis of estimates for baseline budget changes for the Hanford Tank
Farms. Verified quantities, unit rates,labor, subcontract, schedule and cost performance for waste retrieval and
processing for Hanford Tank farms.
Wastren-Energx Mission Support: Cost Estimator. I prepared basis of estimates for grounds maintenance,
janitorial, fleet services, road/parking lot repair, shipping & receiving for the Portsmouth Gaseous Diffusion Facility.
This work included verification and review of historical quantities, labor types, unit rates and schedule and cost
performance for maintenance, operations and demolition activities.
Jacobs Engineering Group: Cost Estimator. I provided basis of estimates for roads & building maintenance, fleet
services, radioactive testing laboratory operations, labor health monitoring and industrial hygiene and safety services to
the Mission Support Alliance (MSA). These services included preparing estimates in support of Baseline Change
Requests and Requests for Equitable Adjustments.
Project Services Group: Cost Estimator. I prepared cost estimates for large operational and maintenance cost
supporting construction projects. Also provided basis of estimates for waste retrieval and processing operations
budgets for CHPRC the Maintenance & Operations contractor for the Hanford Site.
Project Time & Cost, Inc. 1/2006- 7/2009
Sr. Cost Engineer/ Cost Estimator
Provided project controls and cost estimating support to the DOE (Dept of Energy - Office of River Protection) which
is overseeing the contractor Bechtel, for the WTP Hanford Vitrification Plant. I prepared independent cost estimates,
baseline changes and Requests for Equitable Adjustments (REAs). Also reviewed progress in the Earned Value
Management System.
EDUCATION
Graduate Courses, Environmental Engineering, University of Toledo
& Washington State University
B.S., Nuclear Engineering, Pennsylvania State University
B.A.,Chemistry, College of Wooster
PROFESSIONAL REGISTRATIONS
Professional Engineer, State of Ohio
Professional Engineer, State of Washington
Certificate of Merit, Nuclear Engineering
Certified Cost Engineer, Association for the Advancement of Cost Engineering International
(AACEI)
PROFESSIONAL SKILLS
WinEst ® Cost Estimating Software
Excel® Cost Estimating Worksheets
Mathcad
Toastmaster’s International - Member

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (19)

EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Resume - John D Miller
Resume - John D MillerResume - John D Miller
Resume - John D Miller
 
Due Diligence Presentation (Preview)
Due Diligence Presentation (Preview)Due Diligence Presentation (Preview)
Due Diligence Presentation (Preview)
 
One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Eng. Doaa Mostafa Saleh CV
Eng. Doaa Mostafa Saleh  CVEng. Doaa Mostafa Saleh  CV
Eng. Doaa Mostafa Saleh CV
 
Jordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - ResumeJordan Dorwart, P.E. - Resume
Jordan Dorwart, P.E. - Resume
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
McManus_Shane_Resume
McManus_Shane_ResumeMcManus_Shane_Resume
McManus_Shane_Resume
 
KJGResume2015
KJGResume2015KJGResume2015
KJGResume2015
 
Tringale Resume 9-2-14
Tringale Resume 9-2-14Tringale Resume 9-2-14
Tringale Resume 9-2-14
 
BhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskarNeogi - Resume
BhaskarNeogi - Resume
 
Tolu Adesanwo _Resume
Tolu Adesanwo _ResumeTolu Adesanwo _Resume
Tolu Adesanwo _Resume
 
Project List 1
Project List 1Project List 1
Project List 1
 
Due Diligence Presentation
Due Diligence PresentationDue Diligence Presentation
Due Diligence Presentation
 
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry PanelFEDCON Summit: Environmental Engineering & Remediation Industry Panel
FEDCON Summit: Environmental Engineering & Remediation Industry Panel
 
New Resume scott
New Resume scottNew Resume scott
New Resume scott
 
Maryse Speckner Resume 2012
Maryse Speckner Resume 2012Maryse Speckner Resume 2012
Maryse Speckner Resume 2012
 

Andere mochten auch

Geraldine's Resume_2015
Geraldine's Resume_2015Geraldine's Resume_2015
Geraldine's Resume_2015
Geraldine Yim
 
CMAD Group Workbook 3.3 Op Model Enable
CMAD Group Workbook 3.3 Op Model Enable CMAD Group Workbook 3.3 Op Model Enable
CMAD Group Workbook 3.3 Op Model Enable
Alexander Doré
 

Andere mochten auch (12)

smartmed poduction
smartmed poductionsmartmed poduction
smartmed poduction
 
Wetmore_Andrew_Resume
Wetmore_Andrew_ResumeWetmore_Andrew_Resume
Wetmore_Andrew_Resume
 
Geraldine's Resume_2015
Geraldine's Resume_2015Geraldine's Resume_2015
Geraldine's Resume_2015
 
CMAD Group Workbook 3.3 Op Model Enable
CMAD Group Workbook 3.3 Op Model Enable CMAD Group Workbook 3.3 Op Model Enable
CMAD Group Workbook 3.3 Op Model Enable
 
Guía de 1er año estudios de la naturaleza profa edely herrera
Guía de 1er año estudios de la naturaleza profa edely herreraGuía de 1er año estudios de la naturaleza profa edely herrera
Guía de 1er año estudios de la naturaleza profa edely herrera
 
Digital fabrication technologies in support of the visually impaired Edoardo...
Digital fabrication technologies in support of the visually impaired  Edoardo...Digital fabrication technologies in support of the visually impaired  Edoardo...
Digital fabrication technologies in support of the visually impaired Edoardo...
 
Learner journey maps
Learner journey mapsLearner journey maps
Learner journey maps
 
How to Design for Mobile
How to Design for MobileHow to Design for Mobile
How to Design for Mobile
 
02 hanlin english book 4 unit 2 mark is the happiest farmer in the world frui...
02 hanlin english book 4 unit 2 mark is the happiest farmer in the world frui...02 hanlin english book 4 unit 2 mark is the happiest farmer in the world frui...
02 hanlin english book 4 unit 2 mark is the happiest farmer in the world frui...
 
Seamless Learning oder Seam-aware Learning?
Seamless Learning oder Seam-aware Learning?Seamless Learning oder Seam-aware Learning?
Seamless Learning oder Seam-aware Learning?
 
SOCIOLINGUISTICS:Language Maintenance, Shift and Death
SOCIOLINGUISTICS:Language Maintenance, Shift and DeathSOCIOLINGUISTICS:Language Maintenance, Shift and Death
SOCIOLINGUISTICS:Language Maintenance, Shift and Death
 
Datenschutz 2014
Datenschutz 2014Datenschutz 2014
Datenschutz 2014
 

Ähnlich wie ENeilsenresume- Dec2015PE

Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
Sam DiPasquale
 
Mark Kavanagh CV 2016 no dates
Mark Kavanagh CV  2016 no datesMark Kavanagh CV  2016 no dates
Mark Kavanagh CV 2016 no dates
Mark Kavanagh
 
Keller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUMEKeller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUME
Keith H. Keller
 
Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16
Joe Wood
 
AAA September 2014 Resume
AAA September 2014 ResumeAAA September 2014 Resume
AAA September 2014 Resume
Chris Leitsch
 
Keller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUME
Keith H. Keller
 
0716 John Rosburg Resume
0716 John Rosburg Resume0716 John Rosburg Resume
0716 John Rosburg Resume
John Rosburg
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
Ron Roof
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager Resume
John Bloom
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
Ron Roof
 

Ähnlich wie ENeilsenresume- Dec2015PE (20)

Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Mark Kavanagh CV 2016 no dates
Mark Kavanagh CV  2016 no datesMark Kavanagh CV  2016 no dates
Mark Kavanagh CV 2016 no dates
 
Resume dennis r. barrick 3-18-2018
Resume   dennis r. barrick 3-18-2018Resume   dennis r. barrick 3-18-2018
Resume dennis r. barrick 3-18-2018
 
Keller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUMEKeller, Keith MULTIPURPOSE RESUME
Keller, Keith MULTIPURPOSE RESUME
 
Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16Wood Joe Resume_14Jul16
Wood Joe Resume_14Jul16
 
Resume Rev 02 (1)
Resume Rev 02 (1)Resume Rev 02 (1)
Resume Rev 02 (1)
 
Resume Rev 02 (1)
Resume Rev 02 (1)Resume Rev 02 (1)
Resume Rev 02 (1)
 
AAA September 2014 Resume
AAA September 2014 ResumeAAA September 2014 Resume
AAA September 2014 Resume
 
RobertKulick2016
RobertKulick2016RobertKulick2016
RobertKulick2016
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
 
RobertKulick_2016
RobertKulick_2016RobertKulick_2016
RobertKulick_2016
 
Keller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUME
 
Mary ebert resume 4 1 2016
Mary ebert resume 4 1 2016Mary ebert resume 4 1 2016
Mary ebert resume 4 1 2016
 
0716 John Rosburg Resume
0716 John Rosburg Resume0716 John Rosburg Resume
0716 John Rosburg Resume
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager Resume
 
RFSresume16v2
RFSresume16v2RFSresume16v2
RFSresume16v2
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
JCKResume2016linkedin
JCKResume2016linkedinJCKResume2016linkedin
JCKResume2016linkedin
 
prscv_2015_rev2
prscv_2015_rev2prscv_2015_rev2
prscv_2015_rev2
 

ENeilsenresume- Dec2015PE

  • 1. Erik H. Neilsen PE, CCE Environmental Engineering 4433 Edgarton Dr. Grove City, OH 43123 (614) 370-6874 (cell) erikhn777@gmail.com OBJECTIVE To be a key contributor for an environmental/regulatory compliance organization. BACKGROUND Over 25 years of direct applicable experience involving: SUMMARY * Radioactive Waste Management * Waste Packaging, Shipping & Storage * Project Management * Safety Basis Documents Preparation * Waste Sampling & Characterization * Baseline & Change Analysis * Government Regulations (DOE 413) * Scope of Work Compliance * Assisted in Risk Management * 10 years Commercial Nuclear * 20 years Hanford Site Experience Experience WORK EXPERIENCE Environmental Engineering AMEC Earth & Environmental 7/2004 – 5/2005 Sr. Engineer Worked on a DOE-STD-3009 safety basis document to support a vitrification demonstration of buried transuranic waste at the Hanford Site. I prepared a systems description manual for the AMEC engineering scale ICV (In- container vitrification) process system. This equipment is used to test operating parameters prior to incorporating them into the full-scale bulk vitrification waste process system. The system description manual includes a description of all process subsystems, process flow diagrams and equipment assembly/fabrication drawings. Duratek Federal Services, Inc. 7/1999 – 2/2002 Principal Engineer Prepared a Safety Analysis Reports for Packaging (SARP) for Finished Fuel Assembly Shipping Packages. As lead engineer, I was responsible for client interface, costs, schedule, staff engineering assignments and final deliverable. Also performed as a project manager,prepared Engineering Change Notices. Additionally I served as project lead on Radtran a software program that tracks dose estimates from radioactive waste shipments. H&R Technical Associates, Inc 4/1998 – 5/1999 Sr. Engineer Provided technical support services to prepare Packaging Design Criteria documents for radioactive waste for vitrification projects at the Hanford Site. My work included reviewing conceptual design and regulatory requirements, identifying package and container specifications, determining radionuclide source terms,preparing dose consequences analyses and shielding analyses. WastrenTechnical Services 10/1997–1/1999 Engineer Characterized and validated as-built master pump shutdown equipment components for the waste transfer system for Hanford Tank Farms. This work involved obtaining engineering drawings of the safety equipment list and field verifying changes to these drawings.
  • 2. Erik Neilsen PE, CCE 2 Westinghouse Hanford Company 7/1989 – 2/1997 Sr. Engineer Worked as a lead engineer for sampling of high-level radioactive waste storage tanks. Prepared engineering change notes, hazards analyses, work procedures,work packages to support vapor sampling. Designed a portable vapor sampler to obtain organic/radioactive contaminates samples from underground radioactive waste storage tanks. My design ultimately provided cost savings in the amount of $1.400K. Public Service Company of Colorado 1986 - 1988 Nuclear Fuels Engineer Assisted in contract negotiations with both DOE and General Atomics Technologies. Developed a working knowledge of nuclear fuel cycle. Prepared spent fuelfee reports, nuclear fuel data reports. Additionally, provided control rod activation analyses. Also reviewed criticality safety evaluations. Also updated and maintained spent nuclear fuel shipping cask licensing documentation. Responsibilities included review of state and federal regulations to ensure compliance with design basis accidents and related modeling codes. Chem-Nuclear Systems, Inc. 1984 - 1986 Manager, Product Development Administered research projects that supported the operations and marketing departments. Supervised 3 R&D staff. Met with clients to discuss waste treatment,packaging, transport and disposal issues. Interfaced with researchers developing new methods of radioactive waste processing and treatment. Toledo Edison Company 1981 - 1984 Sr. Assistant Engineer Toledo Edison Company (now First Energy Corporation) operates the Davis-Besse Nuclear Power Station. Responsible for start-up and testing of radioactive waste processing and disposal systems. Represented Toledo Edison at monthly meetings of the Edison Electric Institute and the Ohio Radioactive Material Users Group. Other responsibilities included review of radiation protection and emergency planning. CostEstimating American Electric Power, Columbus, OH: Supervisor, Project Estimating 9/2013 to 9/2015 I supervised 3 cost estimators who prepared capital and O&M estimates for the Generation Division. These projects included coal to gas conversions, dual fuel installations, environmental projects, coal conveyor repair, catalyst replacements, turbine control upgrades, pump upgrades, and demolition/decommissioning work. Projects ranged up to $100 million. Our work scope included oversight evaluations on large capital estimates prepared by Sargent & Lundy and Worley Parsons. This work entailed working closely with the project controls team, including project manager, lead engineer, cost and schedule analysts, contractors and vendors to develop risk analyses, code of accounts,work breakdown structure (WBS), trending and forecasting throughout the project. (Short Term Contract Basis – 6 Companies) 10/2009 to 4/2013 RC Engineering & Construction Management Company: Cost Estimator. I worked for client, Fluor Babcock Portsmouth on a team using MCsquared software to develop a cost estimate for a large nuclear waste disposal facility. This multiyear project is estimated to exceed $0.5B and extend to 2021. Particular emphasis has drawn upon my experience in Basis of Estimate and EVMS. Project Assistance Corporation: Cost Estimator. I worked for client (Department of Energy-Office of River Protection) on an Independent Government Cost Estimate (IGCE) for the Hanford Waste Treatment Plant. I developed unit rates for exempt & non exempt labor, equipment, material and crews for this project. I prepared material take-off sheets and basis of estimates for this IGCE.
  • 3. Erik Neilsen PE, CCE 3 Future Unlimited:Cost Estimator I prepared basis of estimates for baseline budget changes for the Hanford Tank Farms. Verified quantities, unit rates,labor, subcontract, schedule and cost performance for waste retrieval and processing for Hanford Tank farms. Wastren-Energx Mission Support: Cost Estimator. I prepared basis of estimates for grounds maintenance, janitorial, fleet services, road/parking lot repair, shipping & receiving for the Portsmouth Gaseous Diffusion Facility. This work included verification and review of historical quantities, labor types, unit rates and schedule and cost performance for maintenance, operations and demolition activities. Jacobs Engineering Group: Cost Estimator. I provided basis of estimates for roads & building maintenance, fleet services, radioactive testing laboratory operations, labor health monitoring and industrial hygiene and safety services to the Mission Support Alliance (MSA). These services included preparing estimates in support of Baseline Change Requests and Requests for Equitable Adjustments. Project Services Group: Cost Estimator. I prepared cost estimates for large operational and maintenance cost supporting construction projects. Also provided basis of estimates for waste retrieval and processing operations budgets for CHPRC the Maintenance & Operations contractor for the Hanford Site. Project Time & Cost, Inc. 1/2006- 7/2009 Sr. Cost Engineer/ Cost Estimator Provided project controls and cost estimating support to the DOE (Dept of Energy - Office of River Protection) which is overseeing the contractor Bechtel, for the WTP Hanford Vitrification Plant. I prepared independent cost estimates, baseline changes and Requests for Equitable Adjustments (REAs). Also reviewed progress in the Earned Value Management System. EDUCATION Graduate Courses, Environmental Engineering, University of Toledo & Washington State University B.S., Nuclear Engineering, Pennsylvania State University B.A.,Chemistry, College of Wooster PROFESSIONAL REGISTRATIONS Professional Engineer, State of Ohio Professional Engineer, State of Washington Certificate of Merit, Nuclear Engineering Certified Cost Engineer, Association for the Advancement of Cost Engineering International (AACEI) PROFESSIONAL SKILLS WinEst ® Cost Estimating Software Excel® Cost Estimating Worksheets Mathcad Toastmaster’s International - Member