Construction Project Manager
Client focused Construction Project Manager with
35 years experience, including Ground up New Builds , Tenant Improvements (TI’s)
Hospital Renovations and Real Estate Development
Introduction
I am a Registered Architect and Licensed Builder in Arizona and Michigan with a wide range of
experience including Ground up New Builds, Large TI’s and Real Estate Development including
Adaptive Reuse and Multi-Family Residential Lofts. I am experienced in Design Management,
Budget Development, Value Engineering, Estimating, Scheduling, Bid Packaging and Analysis,
Contract Negotiations, Client Relations and Project Management. Client responsibilities include
assistance in site selection and site plan approval, providing building evaluations, cost estimating
for project alternatives.
BS Architecture- Lawrence Technological Institute- 1978
Licensed Architect- Michigan- 1983
Licensed Architect-Arizona- 2014
Licensed Builder Michigan- 1982
Licensed Builder-Arizona- 2013
Career Summary
6/2013 Senior Project Manager
Present Canyon Building & Design-Phoenix, AZ
6/05 Mineral Springs Development- Detroit, MI
6/2013 President
6/05 George W. Auch Company- Pontiac, MI
4/88 Vice President
4/88 HC Real Estate (BCBSM)-Detroit, MI
10/83 Director Design & Construction
2. Page Two
Detailed Experience
6/13 Canyon Building & Design
Present Construction Manager- Nationwide Charter School Design-Build
Canyon Experience-Since June 2013 (Average Profits $750,000-$800,000/ year)
Basis Chandler Shoppes 8.1 Million (Negotiated 2016 Project in Pre-Construction Phase)
RideNow Powersports 10.3 Million
North Carolina Leadership Academy- 6.9 Million
Basis Goodyear- 8.2 Million
Skyline Charter School, Chandler 5.5 Million
Basis Scottsdale 2 Story Addition- 2.3Million
Ben Franklin Charter School-10 Classroom Addition- 1.3 Million
Pardes Jewish Day School- 1.9 Million
Basis Ahwatukee Renovations-$ 623,000
Jade Palace Restaurant, Scottsdale- $ 450,000
Sir Vezas Restaurant, Chandler- $ 465,000
Multiple smaller projects
6/05 Mineral Springs Development, LLC
6/2013 President
10/11 Detroit East, Inc General Contract for 4.5Million Multiphase Development
3/13
Detroit East Inc.
4th
Floor Renovation $350,000
Clinic Building Renovation $ 1,200,000
Exterior Site renovations and Bandshell $500,000
Mack 4 Story Renovations $ 1,500,000
6/05 Mineral Springs Development, LLC
6/2013 President
Started a development business constructing commercial and residential multifamily Loft
Buildings, for sale and for lease properties. Designed, gained approvals, constructed,
marketed and sold 56 units over 3 years.
Anton Art Center- 1.2 million addition to existing Carnegie Library c. 1900. This project
included interior historic renovations and adaptive reuse of the original 1908 library.
3. Purchased and completed adaptive reuse of 1910 “Washington Hotel” converted to 12,000
sf office building.
Page Three
Purchased 120 year old residence and converted to office building.
Purchased former VFW Hall, converted to 13 residential lofts
Constructed 13 Townhouses on vacant riverfront property.
Constructed 24 unit loft project on former VFW Parking Lot.
Converted 1908 Gilbert Baptist Church to 6 residential lofts
4/88 GEORGE W. AUCH COMPANY- Pontiac, MI
6/2005 Vice President
Began as project manager for retail, office, youth home, churches and other. Last 12 years
were health care with mostly negotiated long term clients with most major hospitals. Final
position as Vice President.
Project Management
Duties include Client Relations, which includes anything the client says it includes. I have
completed many competitive bid- lump sum GC projects. My emphasis has been on negotiated
GC and CM projects. Once awarded a project my skills include scheduling, progress tracking,
reporting, value engineering, change control and managemen
Significant Projects:
Childrens Hospital of Michigan
Surgery Department Renovation- 10 phase renovation of entire surgery department while
keeping the unit operational at all times.
Neo-natal ICU- Multi-phase renovation of NICU including “quiet demolition” and extreme
life-safety measure to assure safety of patients.
Patient Unit Renovations- 16 phase renovation of all patient rooms over a four year span.
Stat Laboratory, Robotic Pharmacy, Lobby Renovations, Gift Shop Replacement, Chapel,
etc.
4. Over 150 negotiated projects over 10 years touching most areas of the hospital.
Page Four
Harper Hospital
Bone Marrow Transplant Unit- 10,000 SF renovation of the 10th
floor to create a “State of
the Art” Bone Marrow Transplant Unit. The project was a competitively bid lump sum
contract bid from schematic designs. We worked with the architect to design and construct
the project within the budget and schedule.
Multiple projects were completed at Harper over several years.
Detroit Receiving Hospital
Psychiatric Unit Renovation- multiphase renovation of the unit while maintaining an active
unit.
Emergency Room CT Scanner
Multiple renovation projects over 5 years
Beaumont Grosse Pointe Hospital
Ten years negotiated contracts including:
Surgery Department – Total renovation of the entire Surgery Department including a new
infill addition to the hospital, 12 phases of construction over several years with an entire
new HVAC system in new penthouses. Much of the work completed during off hours.
Emergency Department- Total renovation of the entire E/R including a new addition
needed for the expansion. Again about a dozen phases over 3 years with much of the
work completed at night. Complex shutdowns and utilities work.
Numerous negotiated contracts over 10 years.
Cottage Hospital ( Henry Ford Health Services)
5. Surgery Department Renovation- Total renovation of surgery department in 9 phases while
maintaining services.
Oncology Addition- Construct addition to house MRI Unit and create a new oncology
department at this campus. Included multi-phase renovations to create this new unit.
Page Five
New Entrance- Constructed new Oncology Entrance including all Sitework, historic
structure interface, utilities, etc.
Renovated multiple units over 5 years
Oakwood Hospital
Construction of Skilled Nursing Building at Dearborn Site- New Construction of 2 story 150
bed Skilled Nursing Building
Oakwood Southshore Hospital- multiple renovations of much of the hospital over 2 years.
Emergency Department Renovations
Surgery Department Renovation
LDRP- Renovations of maternity unit with additions of several LDRP and renovation of the
remaining areas.
Various other renovations to meet clients needs
Henry Ford Hospital
Fairlane Medical Center- Multiple renovations over several years
Wyandotte Hospital
Patient Unit Renovations- Multi-phase renovation of patient rooms over several years
Emergency Department- Multi- phase renovation of emergency department over several
years
Maternity Unit- Addition of 2 LDRP’s and renovations of various related areas
Eye Surgery Unit
Morgue Renovations
6. CT Scanner addition and renovation
MRI Addition and renovation
Page 6
St. Joseph Hospital- Pontiac, MI
Elevator Addition-
Added two 6 story elevators and related lobbies to existing parking structure.
Lobby Renovation & Entrance Canopy
Added entrance canopy and renovated hospital main entrance and lobby. Included
associated site work.
Gift Shop
Constructed new gift shop off main lobby
Chapel
Constructed new chapel off renovated lobby
Lakeside Nursing Home-
Addition and Renovations to Lakeside Nursing Home, Southfield , MI. New 2 story
addition and renovation of the remaining facility.
Non-Health Care Significant Projects
John Hancock Office Building- 10 million , 150,000 SF three story office building in
Dearborn, MI
Northland Mall- Building O Addition and renovation- 3 million retail addition and renovation
Juvenile Detention Facility- 3 million detention facility in Detroit
Lutheran Youth Home – 2 million detention facility in Detroit
References:
Henry Ford Hospital- Marco Capicchioni, Vice President- 734-246-6063
7. Beaumont Hospital ( Bon Secours) Tom Kwiatkowski, Director of Facilities-313-343-1534
Childrens Hospital (Detroit Medical Center)- Darla Breese-313-966-9939
Oakwood Hospital- Samy Houseini-313-791-5261
Gebran S. Anton- President, Anton Development- 586-469-8000