1. CURRICULUM VITAE
NAME : MR. EDWARD AFFUL-PACKSON
DATE OF BIRTH : 25TH
APRIL 1961
NATIONALITY : SOUTH AFRICAN
LANGUAGES : ENGLISH
TWI (Ghanaian Language)
GA (Ghanaian Language)
DRIVERS LICENCE : CODE 8
ID No. : 6104255332086
E-mail : edpackson@yahoo.co.uk
edpackson25@gmail.com
EDUCATION
1. BUILDING DRAUGHTMANSHIP - GRADE II
2. EBENEZER SECONDARY SCHOOL. ACCRA. 1976 – 1981- GRADE II
3. ST. AQUINAS SECONDARY SCHOOL, ACCRA. 1981–1982 GRADE II
SOFTWARE APPLICATIONS EXPERIENCE
Autodesk/AutoCAD Designer Software –Excellent.
ArcGIS Software - Average knowledge.
Microsoft Excel Programme - Excellent.
Microsoft Word Programme - Excellent.
Information Technology – Average
PROFESSIONAL REGISTRATION
SOUTH AFRICAN INSTITUTE OF DRAUGHTING – AFFILIATE MEMBER
( # AF 16007)
Furthermore has gained great experience in the following fields:
• Project Management – AutoCAD Quality Review
• Site Investigations, Supervisions & Inspections
• Training of technicians in the use of AutoCAD software
2. PREVIOUS EMPLOYERS EXPERIENCE
OSEI-KUFUOR SOHNE AND PARTNERS(1986-1990)
I was the AutoCAD operator involved in the architectural, electrical, mechanical,
civil and structural drawings using AutoCAD software on the following projects in
various parts of Ghana:
a) PERGASUS HOUSE – ACCRA
Estimated value $160,000.00
b) GHANA COMMERCIAL BANK- ACCRA NEW TOWN
Estimated value $480,000.00
c) SHELL FILLING STATION- ACCRA
Estimated value $380,000.00
d) GHANA COMMERCIAL BANK- TEMALE
Estimated value $550,000.00
e) CHINESE EMBASSY-ACCRA
Estimated value $1,250,000.00
ERGS CONSORTIUM (1990-1998)
a. KORLE-BU TEACHING HOSPITAL, ACCRA
i) Maternity Block
ii) Surgical Block
Iii) Children’s Block
b. ACCRA SPORTS STADIUM FLOOD LIGHTS
c. EFFIA-NKWANTA REGIONAL HOSPITAL, SEKONDI-TAKORADI
d. KOMFO ANOKYE TEACHING HOSPITAL, KUMASI
e. YENDI DISTRICT HOSPITAL, YENDI
f. KIBI DISTRICT HOSPITAL, KIBI
g. KETA DISTRICT HOSPITAL, KETA
h. SHELF HELP ELECTRIFICATION PROJECT (SHEP)
i. SSNIT OFFICE COMPLEX, ACCRA
j. NEW CENTRAL REGIONAL HOSPITAL – PEDU, CAPE COAST.
k. BEKWAI DISTRICT HOSPITAL, BEKWAI
l. TARKWA DISTRICT HOSPITAL, TARKWA
3. STONE AND WEBSTER WEST AFRICA (1998-2002)
i) Construction of Takoradi Thermal Power Plant
ii) Estimated value $40,250,000.00
My responsibilities included modification of all constructional OF civil, electrical,
mechanical and preparation of all as-built drawings using AutoCAD software.
HANI MALIK PROJECTS (2002-2007)
WATER & IRRIGATION SCHEMES:
a) Cobosi Water Supply
b) Jojweni Water Supply
c) Tshatshu Irrigation Scheme
d) Xonxa Irrigation Scheme
ACCESS ROADS
e) TENTERGATE ACCESS ROADS AND STORMWATER
f) DUBENI ACCESS ROAD.
Length of road – 5.455m.
g) NEW MTHONYAMA PRIMARY SCHOOL –TENTERGATE
Estimated value R2, 537,778.00
h) NEW NANISO PRIMARY SCHOOL – TENTERGATE
Estimated cost at R3, 063,259.00
i) NEW KWINANA PRIMARY SCHOOL -TENTERGATE
Estimated cost at R784, 776.00
j) NXUBA PRIMARY SCHOOL – CRADOCK
Estimated cost at R2, 428,200.00
k) SOYISILE SENIOR SECONDARY SCHOOL – WHITTLESEA
Estimated cost at R2,755,283.95
l) MARUPING PRIMARY SCHOOL - BURGERSDORP
Estimated cost at R4,670,000.00
m) EGQILI HIGH SCHOOL – ALIWAL NORTH
) Estimated cost at R4, 690,447.00
n) JONAS GODUKA SENIOR SECONDARY SCHOOL –SKERTSPRUIT
Estimated cost at R2, 916,554.40
o) EMERGENCY MEDICAL SERVICES CONTROL CENTRE
– QUEENSTOWN
Estimated cost at R8,000,000.00
p) NEW MACUBENI CLINIC – LADY FRERE
Estimated cost at R3, 524,916.00
4. SIGODI MARAH MARTIN (2007-2010)
1) SEYISI ROAD RENOVATIONS:
Estimated construction value at R6,000,000.00
2) MISSIONVALE BEP (BUCKET ERADICATION PROGRAMME)
WATER RETICULATION
SEWER RETICULATION
Estimated construction value at R100,000,000.00
3) MODAL INTERCHANGE PROJECTS FOR 2010 PROJECTS
Estimated construction value at R60,000,000.00
4) NEW BRIGHTON TAXI RANK CONTRACT
MODAL INTERCHANGE PROJECTS FOR 2010 PROJECTS
Estimated construction value at R2,520,000.00
5) PORT ELIZABETH CENTRAL BUSINESS DISTRICT PROJECT
Estimated construction value at R60,000,000.00
6) EXTENSION OF TYINIRA STREET PROJECT
Estimated construction value at R50,000,000.00
7) KWANOBOHLE WATER AND SEWERAGE PROJECT
Estimated construction value at R10,000,000.00
8) UITENHAGE-KWANOBOHLE TARRING OF GRAVEL ROADS PROJECT
Estimated construction value at R200,000,000.00
9) KWADWESI ROADS PROJECT
Estimated construction value at R4,000,000.00
8) RESERVOIR REHABILITATION PROJECTS
Estimated construction value at R40,000,000.00
10) COEGA ZONE 6 -ROADS AND SEWERAGE PROJECT
Estimated construction value at R700,000,000.00
5. CAMDEKON ENGINEERS (3RD
SEPTEMBER, 2010- JUNE, 2015)
1. OR TAMBO DISTRICT PROJECTS
Bridge Inspection Drawings
2. ALFRED NZO DISTRICT PROJECTS
Technical Support design Drawings
3. CHRIS HANI DISTRICT MUNICIPALITY PROJECTS
Rocklands Roads Upgrade design drawings
Beccles Farm Roads Upgrade design drawings
4. COEGA DEVELOPMENT CORPORATION-IDZ ZONE 6
AutoCAD Designer and Quality Review of all Infrastructure Services
drawings via Camdekon Engineers on behalf other Joint Venture
members.
5. NELSON MANDELA BAY MUNICIPALITY
DROUGHT EMERGENCY PROJECT
AutoCAD Designer responsible for infrastructure services drawings for the
municipality.
6. DEPARTMENT OF PUBLIC WORKS - BHISO SAPS ACADEMY
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs
drawings for the department.
7. DEPARTMENT OF PUBLIC WORKS - KING WILLIAMS PRISON
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
8. DEPARTMENT OF PUBLIC WORKS – UGIE MAGISTRATE OFFICE
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
6. 9. DEPARTMENT OF PUBLIC WORKS - CWERELAND SAPS
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
10. DEPARTMENT OF PUBLIC WORKS – KWAAIMAN SAPS
STRUCTURAL REPAIRS
AutoCAD Designer responsible for infrastructure services repairs drawings
for the department.
11. AIRPORT COMPANY OF SOUTH AFRICA PE Airport
AutoCAD Designer and Quality Review of all Infrastructure Services
drawings via Camdekon Engineers on behalf other Joint Venture
members.
CURRENT EMPLOYERS EXPERIENCE
BVI CONSULTING ENGINEERS (1ST JULY, 2015 TO DATE)
1. NMBM DROUGHT EMERGENCY
AutoCAD Designer and Quality Review of all detailed Drawings.
2. GRAAFF REINET WATER PLAN
AutoCAD Designer and Quality Review of all Infrastructure Services
and details.
7. REFEREES
1. MR. ANDRE SCHEEPERS
DIRECTOR
BVI CONSULTING ENGINEERS EASTERN CAPE (Pty) LTD
72, RING ROAD
3RD
FLOOR, CORPORATE PLACE
GREENACRES
PORT ELIZABETH, 6045
SOUTH AFRICA.
PHONE: +27 41 373 4343
CELL: +27 72 227 2191
E-mail: as@bviec.co.za
2. MR. FRANCOIS VAN GRAAN
HEAD OF CIVILS DEPARTMENT
BVI CONSULTING ENGINEERS EASTERN CAPE (Pty) LTD
72, RING ROAD
3RD FLOOR, CORPORATE PLACE
GREENACRES
PORT ELIZABETH, 6045
SOUTH AFRICA.
PHONE: +27 41 373 4343
CELL: +27 82 852 7725
E-mail: fvg@bviec.co.za
3. MR. BARRY LIZAMORE
(Pr Tech Eng) PrC Mentor SACPEMP
LA CONSULTING ENGINEER
No. 36, UNIT 3
NEWTON STREET, NEWTON PARK
PORT ELIZABETH, 6045
SOUTH AFRICA.
PHONE: +27 (0)
FAX: +27 (0)
CELL: +27 82 445 8828
E-mail: barry@la-eng.co.za