Bhagwan Mahavir College of
Engineering and Technology
PRESENTATION
ON
Prepared by : Ankit Gangani : 140060106055
OUTLINE
 Introduction
 Necessity of CDWs
 Types of CDWs
 Classification of Aqueducts & Siphon
Aqueducts
Selection of type of CDWs
Selection Of Site
How to avoid CDWs
Reference
Introduction
WHAT IS CROOS DRAINAGE WORK…
 when the network of main canals, branch canals,
distributaries, etc.. are provided, then these canals may
have to cross the natural drainages like rivers,
streams, nallahs, etc. at different points.The crossing
of the canals with such obstacle cannot be avoided.
So, suitable structures is constructed at the crossing
point for the easy flow of water of the canal and
drainage in the respective directions. These structures are
known as cross-drainage works.
 Irrigational Canals while carrying water have to cross few
natural drainage streams, rivers, etc.. To cross those
drainages safely by the canals, some suitable structures
are required to construct. Works required to construct, to
cross the drainage are called Cross Drainage Works
(CDWs). At the meeting point of canals and drainages,
bed levels may not be same. Depending on their bed
levels, different structures are constructed and accordingly
they are known by different names.
WHAT IS CROSS DRAINAGE WORK..
NECESSITY OF CDWs
TYEPS OF CDWs
(1) Type I (Irrigation canal passes over the drainage)
(a) Aqueduct,
(b) Siphon aqueduct.
(2) Type II (Drainage passes over the irrigation
canal)
(a) Super passage,
(b) Siphon super passage.
(3) Type III (Drainage and canal intersection each other
of the same level)
(a) Level Crossing,
(b) Inlet and outlet.
 Aqueduct
The hydraulic structure in which the irrigation canal is
taken over the drainage (such as river, stream etc..) is
known as aqueduct. This structure is suitable when bed
level of canal is above the highest flood level of drainage.
In this case, the drainage water passes clearly below the
canal.
 Siphon Aqueduct
In a hydraulic structure where the canal is taken over the
drainage, but the drainage water cannot pass clearly
below the canal. It flows under siphonic action. So, it is
known as siphon aqueduct. This structure is suitable when
the bed level of canal is below the highest flood level.
 Super Passage
The hydraulic structure in which the drainage is taken over
the irrigation canal is known as super passage. The
structure is suitable when the bed level of drainage is
above the full supply level of the canal. The water of the
canal passes clearly below the drainage.
 Siphon Super Passage
The hydraulic structure in which the drainage is taken over
the irrigation canal, but the canal water passes below the
drainage under siphonic action is known as siphon super
passage. This structure is suitable when the bed level of
drainage is below the full supply level of the canal.
 Level Crossings
When the bed level of canal and the stream are
approximately the same and quality of water in canal and
stream is not much different, the cross drainage work
constructed is called level crossing where water of canal
and stream is allowed to mix. With the help of regulators
both in canal and stream, water is disposed through
canal and stream in required quantity. Level crossing
consists of following components (i) crest wall (ii)
Stream regulator (iii) Canal regulator.
 Inlet and Outlet
When irrigation canal meets a small stream or drain
at same level, drain is allowed to enter the canal as
in inlet. At some distance from this inlet point, a
part of water is allowed to drain as outlet which
eventually meets the original stream. Stone pitching
is required at the inlet and outlet. The bed and
banks between inlet and outlet are also protected by
stone pitching. This type of CDW is called Inlet and
Outlet.
Classification of Aqueducts &
Siphon Aqueducts
 Depending upon the nature of the sides of the aqueduct or
siphon aqueduct it may be classified under three headings:
 Type I:Sides of the aqueduct in earthen banks with
complete earthen slopes. The length of culvert should be
sufficient to accommodate both, water section of canal, as
well as earthen banks of canal with aqueduct slope.
Classification of Aqueducts &
Siphon Aqueducts
 Type II : Sides of the aqueduct in earthen banks, with
other slopes supported by masonry wall. In this case, canal
continues in its earthen section over the drainage but the
outer slopes of the canal banks are replaced by retaining
wall, reducing the length of drainage culvert.
Classification of Aqueducts &
Siphon Aqueducts
 Type III:
 Sides of the aqueduct made of concrete or masonry. Its
earthen section of the canal is discontinued and canal
water is carried in masonry or concrete trough, canal is
generally flumed in this section.
SELECTION OF TYPES OF CDWs
 Relative Bed Level
According to the relative bed levels of the canal
and the river or drainage, the type of cross
drainage work are generally selected which has
been discussed earlier.
 The following points should be remembered
while recommending the type of work,
(a) The crossing should be at right angle to
each other,
(b) Well defined cross-section of the river or
drainage should be available.
(c) At the crossing point the drainage should be
straight for a considerable length.
(d) The width of the drainage should be narrow
as far as possible.
Availability of Suitable Foundation
 For the construction of cross drainage works suitable
foundation is required. By boring test, if suitable
foundation is not available, then the type of cross
drainage work should be selected to site Condition.
Economic Consideration
 The cost of construction of cross drainage works should
be justified with respect to the project cost and overall
benefits of the project. So, the type of works should be
selected considering the economical point of view.
Discharge of the drainage
Practically the discharge of the drainage is very uncertain in
rainy season. So, the structure should be carefully selected
so that it may not be destroyed due to unexpected heavy
discharge of the river or drainage.
Construction Problems
 Different types of constructional problems may arise at the
site such as sub soil water, construction materials,
communication, availability of land etc. So the type of works
should be selected according to the site condition.
 water , water table
 Earthwork
 Materials
 Weather
 Land acquisition
Selection of Site
 1. At the site, the drainage should cross the
canal alignment at right angles. Such a
site provides good flow conditions and also
the cost of the structure is usually
a minimum.
 2. The stream at the site should be stable
and should have stable banks.
 3. For economical design and construction of
foundations, a firm and strong sub-stratum
should exit below the bed of the drainage at
a reasonable depth.
Selection of Site
 4. The site should be such that long and high
approaches of the canal are not required.5.
The length and height of the marginal banks
and guide banks for the drainage should be
small.
 6. In the case of an aqueduct, sufficient
headway should be available between the
canal trough and the high flood level of the
drainage.
 7. The water table at the site should not be
high, because it will create dewatering
problems for laying foundations.
Selection of Site
 8. As far as possible, the site should be selected d/s of the
confluence of two streams, thereby avoiding the necessity
of construction of two cross-drainage works.
 9. The possibility of diverting one stream into another
stream upstream of the canal crossing should also be
considered and adopted, if found feasible and economical.
 10. A cross-drainage work should be combined with a
bridge, if required. If necessary, the bridge site can be
shifted to the cross-drainage work or vice versa. The cost
of the combined structure is usually less. Moreover, the
marginal banks and guide banks required for the
river training can be used as the approaches for the village
roads.
How to avoid CDW
 Change the alignment of canals
 Diverting small drainage into large drainage.
Reference
 http://uap-bd.edu/ce/Handouts/CE-461/Doc/Chapter-9.pdf
 https://theconstructor.org/water-resources/cross-drainage-works-types/12051/
 http://www.idc-
online.com/technical_references/pdfs/civil_engineering/Cross_Drainage_Works.pdf
 http://www.aboutcivil.org/cross-drainage-works.html
 http://nptel.ac.in/courses/105106114/pdfs/Unit1/1_3.pdf
 http://civilpddc2013.weebly.com/uploads/2/2/5/5/22556782/14_-
_cross_drainage_works.pdf
 Irrigation Engineering by Dr. R P Rethaliya
presentation : cross drainage work

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
 
Unit 4-canal lining
Unit 4-canal liningUnit 4-canal lining
Unit 4-canal lining
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
L 8 stormwater sewr design
L 8 stormwater sewr designL 8 stormwater sewr design
L 8 stormwater sewr design
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Irrigation canals
Irrigation canalsIrrigation canals
Irrigation canals
 
Silt excluders
Silt excludersSilt excluders
Silt excluders
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONS
 
design of aqueduct
design of aqueductdesign of aqueduct
design of aqueduct
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 

Ähnlich wie presentation : cross drainage work

Cross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham HabibCross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham HabibEhtisham Habib
 
Cross drainage work
Cross drainage work Cross drainage work
Cross drainage work meetmaniya
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work holegajendra
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...Denish Jangid
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage worksJaydeep Dave
 
Crossdrainageworks
CrossdrainageworksCrossdrainageworks
Crossdrainageworkssaibabu48
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfGOWTHAM14499
 
CROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptxCROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptxAjayDevgan20
 
DRAINAGE-.pptx
DRAINAGE-.pptxDRAINAGE-.pptx
DRAINAGE-.pptxMood Naik
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Latif Hyder Wadho
 
intakes and transportation of water
intakes and transportation of waterintakes and transportation of water
intakes and transportation of wateratul azad
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineeringAnuj Kumar
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineeringBittuRajkumar
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksAbdul Sahid
 
WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTS
 WHAT IS  CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC  DESIGN ASPECTS WHAT IS  CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC  DESIGN ASPECTS
WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTSSufiyanAhmedJeddy
 

Ähnlich wie presentation : cross drainage work (20)

Cross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham HabibCross Drainage Works by Engr. Ehtisham Habib
Cross Drainage Works by Engr. Ehtisham Habib
 
Cross drainage work
Cross drainage work Cross drainage work
Cross drainage work
 
14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf14. Cross Drainage Works.pdf
14. Cross Drainage Works.pdf
 
Cross Drainage Work
Cross Drainage Work Cross Drainage Work
Cross Drainage Work
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works
 
Cross drainage work.pptx
Cross drainage work.pptxCross drainage work.pptx
Cross drainage work.pptx
 
Crossdrainageworks
CrossdrainageworksCrossdrainageworks
Crossdrainageworks
 
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdfCROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
CROSS DRAINAGE WORKS _ MODULE III.pdf CROSS DRAINAGE WORKS _ MODULE III.pdf
 
CROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptxCROSS DRAINAGE WORKS.pptx
CROSS DRAINAGE WORKS.pptx
 
DRAINAGE-.pptx
DRAINAGE-.pptxDRAINAGE-.pptx
DRAINAGE-.pptx
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
intakes and transportation of water
intakes and transportation of waterintakes and transportation of water
intakes and transportation of water
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Cross drainage works irrigation engineering
Cross drainage works irrigation engineeringCross drainage works irrigation engineering
Cross drainage works irrigation engineering
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineering
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTS
 WHAT IS  CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC  DESIGN ASPECTS WHAT IS  CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC  DESIGN ASPECTS
WHAT IS CROSS DRAINAGE WORKS AND WHAT ARE ITS HYDRAULIC DESIGN ASPECTS
 
cross drainage work
cross drainage workcross drainage work
cross drainage work
 

Mehr von Eddy Ankit Gangani

types of flood & flood mitigation/management techniques - damages
types of  flood & flood mitigation/management techniques - damagestypes of  flood & flood mitigation/management techniques - damages
types of flood & flood mitigation/management techniques - damagesEddy Ankit Gangani
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & unitsEddy Ankit Gangani
 
Applied fluid mechanics flows & applications
Applied fluid mechanics flows & applicationsApplied fluid mechanics flows & applications
Applied fluid mechanics flows & applicationsEddy Ankit Gangani
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit systemEddy Ankit Gangani
 

Mehr von Eddy Ankit Gangani (8)

House Drainage System
House Drainage SystemHouse Drainage System
House Drainage System
 
types of flood & flood mitigation/management techniques - damages
types of  flood & flood mitigation/management techniques - damagestypes of  flood & flood mitigation/management techniques - damages
types of flood & flood mitigation/management techniques - damages
 
traffic engineering
traffic engineeringtraffic engineering
traffic engineering
 
Classification of bridges
Classification of bridgesClassification of bridges
Classification of bridges
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & units
 
Applied fluid mechanics flows & applications
Applied fluid mechanics flows & applicationsApplied fluid mechanics flows & applications
Applied fluid mechanics flows & applications
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Scc-Self compacting concrete
Scc-Self compacting concreteScc-Self compacting concrete
Scc-Self compacting concrete
 

Kürzlich hochgeladen

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 

Kürzlich hochgeladen (20)

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

presentation : cross drainage work

  • 1. Bhagwan Mahavir College of Engineering and Technology PRESENTATION ON
  • 2. Prepared by : Ankit Gangani : 140060106055
  • 3. OUTLINE  Introduction  Necessity of CDWs  Types of CDWs  Classification of Aqueducts & Siphon Aqueducts Selection of type of CDWs Selection Of Site How to avoid CDWs Reference
  • 5. WHAT IS CROOS DRAINAGE WORK…  when the network of main canals, branch canals, distributaries, etc.. are provided, then these canals may have to cross the natural drainages like rivers, streams, nallahs, etc. at different points.The crossing of the canals with such obstacle cannot be avoided. So, suitable structures is constructed at the crossing point for the easy flow of water of the canal and drainage in the respective directions. These structures are known as cross-drainage works.
  • 6.  Irrigational Canals while carrying water have to cross few natural drainage streams, rivers, etc.. To cross those drainages safely by the canals, some suitable structures are required to construct. Works required to construct, to cross the drainage are called Cross Drainage Works (CDWs). At the meeting point of canals and drainages, bed levels may not be same. Depending on their bed levels, different structures are constructed and accordingly they are known by different names. WHAT IS CROSS DRAINAGE WORK..
  • 8. TYEPS OF CDWs (1) Type I (Irrigation canal passes over the drainage) (a) Aqueduct, (b) Siphon aqueduct. (2) Type II (Drainage passes over the irrigation canal) (a) Super passage, (b) Siphon super passage. (3) Type III (Drainage and canal intersection each other of the same level) (a) Level Crossing, (b) Inlet and outlet.
  • 9.  Aqueduct The hydraulic structure in which the irrigation canal is taken over the drainage (such as river, stream etc..) is known as aqueduct. This structure is suitable when bed level of canal is above the highest flood level of drainage. In this case, the drainage water passes clearly below the canal.
  • 10.
  • 11.  Siphon Aqueduct In a hydraulic structure where the canal is taken over the drainage, but the drainage water cannot pass clearly below the canal. It flows under siphonic action. So, it is known as siphon aqueduct. This structure is suitable when the bed level of canal is below the highest flood level.
  • 12.  Super Passage The hydraulic structure in which the drainage is taken over the irrigation canal is known as super passage. The structure is suitable when the bed level of drainage is above the full supply level of the canal. The water of the canal passes clearly below the drainage.
  • 13.
  • 14.  Siphon Super Passage The hydraulic structure in which the drainage is taken over the irrigation canal, but the canal water passes below the drainage under siphonic action is known as siphon super passage. This structure is suitable when the bed level of drainage is below the full supply level of the canal.
  • 15.
  • 16.  Level Crossings When the bed level of canal and the stream are approximately the same and quality of water in canal and stream is not much different, the cross drainage work constructed is called level crossing where water of canal and stream is allowed to mix. With the help of regulators both in canal and stream, water is disposed through canal and stream in required quantity. Level crossing consists of following components (i) crest wall (ii) Stream regulator (iii) Canal regulator.
  • 17.
  • 18.  Inlet and Outlet When irrigation canal meets a small stream or drain at same level, drain is allowed to enter the canal as in inlet. At some distance from this inlet point, a part of water is allowed to drain as outlet which eventually meets the original stream. Stone pitching is required at the inlet and outlet. The bed and banks between inlet and outlet are also protected by stone pitching. This type of CDW is called Inlet and Outlet.
  • 19.
  • 20. Classification of Aqueducts & Siphon Aqueducts  Depending upon the nature of the sides of the aqueduct or siphon aqueduct it may be classified under three headings:  Type I:Sides of the aqueduct in earthen banks with complete earthen slopes. The length of culvert should be sufficient to accommodate both, water section of canal, as well as earthen banks of canal with aqueduct slope.
  • 21. Classification of Aqueducts & Siphon Aqueducts  Type II : Sides of the aqueduct in earthen banks, with other slopes supported by masonry wall. In this case, canal continues in its earthen section over the drainage but the outer slopes of the canal banks are replaced by retaining wall, reducing the length of drainage culvert.
  • 22. Classification of Aqueducts & Siphon Aqueducts  Type III:  Sides of the aqueduct made of concrete or masonry. Its earthen section of the canal is discontinued and canal water is carried in masonry or concrete trough, canal is generally flumed in this section.
  • 23. SELECTION OF TYPES OF CDWs  Relative Bed Level According to the relative bed levels of the canal and the river or drainage, the type of cross drainage work are generally selected which has been discussed earlier.  The following points should be remembered while recommending the type of work, (a) The crossing should be at right angle to each other, (b) Well defined cross-section of the river or drainage should be available. (c) At the crossing point the drainage should be straight for a considerable length. (d) The width of the drainage should be narrow as far as possible.
  • 24. Availability of Suitable Foundation  For the construction of cross drainage works suitable foundation is required. By boring test, if suitable foundation is not available, then the type of cross drainage work should be selected to site Condition.
  • 25. Economic Consideration  The cost of construction of cross drainage works should be justified with respect to the project cost and overall benefits of the project. So, the type of works should be selected considering the economical point of view.
  • 26. Discharge of the drainage Practically the discharge of the drainage is very uncertain in rainy season. So, the structure should be carefully selected so that it may not be destroyed due to unexpected heavy discharge of the river or drainage.
  • 27. Construction Problems  Different types of constructional problems may arise at the site such as sub soil water, construction materials, communication, availability of land etc. So the type of works should be selected according to the site condition.  water , water table  Earthwork  Materials  Weather  Land acquisition
  • 28. Selection of Site  1. At the site, the drainage should cross the canal alignment at right angles. Such a site provides good flow conditions and also the cost of the structure is usually a minimum.  2. The stream at the site should be stable and should have stable banks.  3. For economical design and construction of foundations, a firm and strong sub-stratum should exit below the bed of the drainage at a reasonable depth.
  • 29. Selection of Site  4. The site should be such that long and high approaches of the canal are not required.5. The length and height of the marginal banks and guide banks for the drainage should be small.  6. In the case of an aqueduct, sufficient headway should be available between the canal trough and the high flood level of the drainage.  7. The water table at the site should not be high, because it will create dewatering problems for laying foundations.
  • 30. Selection of Site  8. As far as possible, the site should be selected d/s of the confluence of two streams, thereby avoiding the necessity of construction of two cross-drainage works.  9. The possibility of diverting one stream into another stream upstream of the canal crossing should also be considered and adopted, if found feasible and economical.  10. A cross-drainage work should be combined with a bridge, if required. If necessary, the bridge site can be shifted to the cross-drainage work or vice versa. The cost of the combined structure is usually less. Moreover, the marginal banks and guide banks required for the river training can be used as the approaches for the village roads.
  • 31. How to avoid CDW  Change the alignment of canals  Diverting small drainage into large drainage.
  • 32. Reference  http://uap-bd.edu/ce/Handouts/CE-461/Doc/Chapter-9.pdf  https://theconstructor.org/water-resources/cross-drainage-works-types/12051/  http://www.idc- online.com/technical_references/pdfs/civil_engineering/Cross_Drainage_Works.pdf  http://www.aboutcivil.org/cross-drainage-works.html  http://nptel.ac.in/courses/105106114/pdfs/Unit1/1_3.pdf  http://civilpddc2013.weebly.com/uploads/2/2/5/5/22556782/14_- _cross_drainage_works.pdf  Irrigation Engineering by Dr. R P Rethaliya