For more information contact your region engineer,
call 800-371-7470 or visit geopier.com
SRT™
Description: For the Caltrans Route 20/Highway 5
Separation Project, the fill for the overpass ramp
embankments consists of clayey, highly expansive
soils obtained from nearby sources. After about ten
years, the stability of the embankment slopes began
to deteriorate as evidenced by slope creep and shallow
slides. The slope movement deteriorated the
pavement causing numerous cracks parallel to the
pavement edge combined with lateral spreading.
Additionally, guard rail posts were undermined by
shallow slides.
Geopier Solution: Caltrans considered several
methods for stabilizing the slopes: lime treatment of
the slope, slope inclination reduction using imported
fill, non-expansive fill slope overlay, and Geopier SRT™
stabilization. The final project design included a
combination of slope reduction, imported fill, and
Geopier SRT stabilization. Plate Piles™ were selected
to stabilize about 1.5 miles of ramp slopes as a cost
saving measure, with minimal earthwork operations
and shorter construction time.
The General Contractor scheduled 100 working days to
complete the installation of the approximately 8,800
Plate Piles. Installation was completed in
approximately 70 days at an average rate of 125 Plate
Piles per day. Approximately 2,700 six-foot-long Plate
Piles, and 6,100 ten-foot-long Plate Piles were
installed using both hydraulic hammers and vibrator
plates adapted for installation. The Geopier SRT
system for the 20/Highway 5 Separation Project
saved Caltrans over $3 million dollars and months of
additional construction time. Caltrans has been
monitoring the stabilized slopes for three years. After
two years, the slopes and new pavement have
performed well with no slope failures or signs of creep.
Plate Piles™ Stabilize Deteriorating Interchange Ramp Slopes
Williams, California
Project:
Caltrans Route 20/Highway 5
System:
Geopier SRT
Installation:
8,800 Plate Piles
PROJECT highlights
PROJECT SUMMARY | S04
Slope Reinforcement Technology
GEOPIER_PS_S04

Weitere ähnliche Inhalte

Mehr von EMIN Sistemas Geotecnicos

Mehr von EMIN Sistemas Geotecnicos (20)

Emin sg hubbell anclaje
Emin sg hubbell anclajeEmin sg hubbell anclaje
Emin sg hubbell anclaje
 
Emin sg herramientas anclaje
Emin sg herramientas anclajeEmin sg herramientas anclaje
Emin sg herramientas anclaje
 
Emin sg fundaciones subestaciones transmision
Emin sg fundaciones subestaciones transmisionEmin sg fundaciones subestaciones transmision
Emin sg fundaciones subestaciones transmision
 
Emin sg fundaciones pilotes helicoidales energia solar
Emin sg fundaciones pilotes helicoidales energia solarEmin sg fundaciones pilotes helicoidales energia solar
Emin sg fundaciones pilotes helicoidales energia solar
 
Emin sg chance torres transmision brasil
Emin sg chance torres transmision brasilEmin sg chance torres transmision brasil
Emin sg chance torres transmision brasil
 
Emin sg chance sistema anclaje
Emin sg chance sistema anclajeEmin sg chance sistema anclaje
Emin sg chance sistema anclaje
 
Emin sg aplicaciones energia solar
Emin sg aplicaciones energia solarEmin sg aplicaciones energia solar
Emin sg aplicaciones energia solar
 
Emin sistemas geotecnicos catalogo mantas control erosion tensar
Emin sistemas geotecnicos catalogo mantas control erosion tensarEmin sistemas geotecnicos catalogo mantas control erosion tensar
Emin sistemas geotecnicos catalogo mantas control erosion tensar
 
Emin sistemas geotecnicos catalogo sistemas control erosion tensar
Emin sistemas geotecnicos catalogo sistemas control erosion tensarEmin sistemas geotecnicos catalogo sistemas control erosion tensar
Emin sistemas geotecnicos catalogo sistemas control erosion tensar
 
Sistema Refuerzo Pavimentos Glasgrid
Sistema Refuerzo Pavimentos GlasgridSistema Refuerzo Pavimentos Glasgrid
Sistema Refuerzo Pavimentos Glasgrid
 
Tubos Geotextil Catalogo 2014
Tubos Geotextil Catalogo 2014Tubos Geotextil Catalogo 2014
Tubos Geotextil Catalogo 2014
 
Mantas Control Erosion North American Green Catalogo
Mantas Control Erosion North American Green CatalogoMantas Control Erosion North American Green Catalogo
Mantas Control Erosion North American Green Catalogo
 
Control Erosion Aplicacion Hidraulica Tensar
Control Erosion Aplicacion Hidraulica TensarControl Erosion Aplicacion Hidraulica Tensar
Control Erosion Aplicacion Hidraulica Tensar
 
Geoceldas Envirogrid Ficha Tecnica
Geoceldas Envirogrid Ficha TecnicaGeoceldas Envirogrid Ficha Tecnica
Geoceldas Envirogrid Ficha Tecnica
 
Geo Productos Fcha Tecnica
Geo Productos Fcha TecnicaGeo Productos Fcha Tecnica
Geo Productos Fcha Tecnica
 
Drenes Atlantis Guia Productos 2016
Drenes Atlantis Guia Productos 2016Drenes Atlantis Guia Productos 2016
Drenes Atlantis Guia Productos 2016
 
Celdas Atlantis EMIN SG 15mm Ficha
Celdas Atlantis EMIN SG 15mm FichaCeldas Atlantis EMIN SG 15mm Ficha
Celdas Atlantis EMIN SG 15mm Ficha
 
EMIN SG Tensar Brochure Contencion Residuos
EMIN SG Tensar Brochure Contencion ResiduosEMIN SG Tensar Brochure Contencion Residuos
EMIN SG Tensar Brochure Contencion Residuos
 
Sistema Heli Pile Guia
Sistema Heli Pile GuiaSistema Heli Pile Guia
Sistema Heli Pile Guia
 
EMIN SG Proyectos Recapado Asfaltico
EMIN SG Proyectos Recapado AsfalticoEMIN SG Proyectos Recapado Asfaltico
EMIN SG Proyectos Recapado Asfaltico
 

Kürzlich hochgeladen

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Emin sg caso pilates sistema taludes geopier srt

  • 1. For more information contact your region engineer, call 800-371-7470 or visit geopier.com SRT™ Description: For the Caltrans Route 20/Highway 5 Separation Project, the fill for the overpass ramp embankments consists of clayey, highly expansive soils obtained from nearby sources. After about ten years, the stability of the embankment slopes began to deteriorate as evidenced by slope creep and shallow slides. The slope movement deteriorated the pavement causing numerous cracks parallel to the pavement edge combined with lateral spreading. Additionally, guard rail posts were undermined by shallow slides. Geopier Solution: Caltrans considered several methods for stabilizing the slopes: lime treatment of the slope, slope inclination reduction using imported fill, non-expansive fill slope overlay, and Geopier SRT™ stabilization. The final project design included a combination of slope reduction, imported fill, and Geopier SRT stabilization. Plate Piles™ were selected to stabilize about 1.5 miles of ramp slopes as a cost saving measure, with minimal earthwork operations and shorter construction time. The General Contractor scheduled 100 working days to complete the installation of the approximately 8,800 Plate Piles. Installation was completed in approximately 70 days at an average rate of 125 Plate Piles per day. Approximately 2,700 six-foot-long Plate Piles, and 6,100 ten-foot-long Plate Piles were installed using both hydraulic hammers and vibrator plates adapted for installation. The Geopier SRT system for the 20/Highway 5 Separation Project saved Caltrans over $3 million dollars and months of additional construction time. Caltrans has been monitoring the stabilized slopes for three years. After two years, the slopes and new pavement have performed well with no slope failures or signs of creep. Plate Piles™ Stabilize Deteriorating Interchange Ramp Slopes Williams, California Project: Caltrans Route 20/Highway 5 System: Geopier SRT Installation: 8,800 Plate Piles PROJECT highlights PROJECT SUMMARY | S04 Slope Reinforcement Technology GEOPIER_PS_S04