SlideShare ist ein Scribd-Unternehmen logo
Sustainable Transport Solutions in Emerging Economies
Working Session - 10:30am-12:30pm
May 15, 2013
Future Megacities in Action Conference
Holger Dalkmann
Director, EMBARQ
World Resources Institute
The Global Network of EMBARQ
CONGESTION
ROAD SAFETY
CLIMATE CHANGE
PUBLIC HEALTH
2-5 cost of GDP through traffic
congerestion
Transport accounts for one-quarter of
global CO2 emissions
Traffic fatalities lead to 1.2 million deaths
every year and many more injuries
Physical inactivity causes 1 in 10 deaths
worldwide, on par with smoking
Paradigm Shift: Trend vs. Leapfrogging
Cheonggyecheon, Seoul, South Korea
Ahmedabad, India
3.3 million 1992 6.4 million 2011
Two Options: Sustainable or Unsustainable?
Today
Ahmedabad, India
Population: 5.4m
Trips: 5.6m/yr
Year 2041
Population: 13.2m
Trips: 39.8m/yr
Automobility
Area: 6,484 sq. km
Emissions: 12.32m tCO2/yr
Traffic Fatalities: 5,232/yr
Sustainable Transport
Area: 50% reduction
Emissions: 84% reduction
Traffic Fatalities: 74% reduction
• Same population
• Same number of trips
• Very different outcomes
Transport Infrastructure Investment Estimates
Source: CEPT University, 12FYP, 2011
$10 Million
2030
0.4 Billion
USD/Year
0.6 Billion
USD/Year
1.2 Billion
USD/Year
0.8 Billion
USD/Year
8
9
Non-motorized
mobility
Public Transport
Public Spaces
Compact
development
with mixed-uses
Ground Floor for
commercial use
Parking & car
management
Community
Participation
Rethinking Urban Development: Mobility
Non-motorized
mobility
Public Transport
Public Spaces
Compact
development
with mixed-uses
Ground Floor for
commercial use
Parking & car
management
Community
Participation
Rethinking Urban Development: Mobility
Bus Rapid Transport in Mexico
Photo:CTS EMBARQ Mexico
Photo: CTS EMBARQ Mexico
Photo:CTS EMBARQ Mexico
Photo:CTS EMBARQ Mexico
Photo:CTSEMBARQMexico
Photo:CTS EMBARQ Mexico
Photo:CTS EMBARQ Mexico
Photo:CTS EMBARQ Mexico
Photo:CTS EMBARQ Mexico
Evolution of BRT system in Mexico
2003 2005 2008 2009 2011
Length: 26 km
Fleet: 61
Length: 46 km
Fleet: 156
Length: 55 km
Fleet: 216
Length: 92 km
Fleet: 330
Length: 128 km
Fleet: 472
1,164,000
pp/day
2012
Length: 156 km
Fleet: 526
1,114,000
pp/day814,000
pp/day552,000
pp/day497,000
pp/day
237,000
pp/day
4 lines, 156 km in 9 years, 500 buses, 1.160,000 people/day
Replaced 1,383 obsolete, highly polluting microbuses
17% of the users come from individual motor vehicles
110,000 tons of CO2 per year reduced (total 385,000 tons
reduced so far)
40% travel time savings per user (180,000 hours per year)
35% reduction in exposure to particulate matter (PM 2.5)
Metrobus in Numbers
Particulate matter emissions from ULSD
with technologies are similar to CNG
ULSD +
tech
Non-ULSD
+ no
filters
Integrated Transport Systems: Mexico City
Inter-urban transport
companies
Airport
BRT system
Metro system
Bike system
Suburban rail system
In 2009, the Mexican Federal government instituted the
Public Transportation Federal Support Program
(PROTRAM) to fund public transportation improvements
BRT systems are being promoted in 35 cities in Mexico with
the support from the Federal government
PROTRAM funds mass transit systems in cities with
population over 500 thousand people
Upscaling: Mass Transit Program (PROTRAM)
35 BRT Systems:
o 5 build/under construction
o 30 under review / identification
BRT systems in Mexico
EMBARQ provides
technical advisory for
the implementation of
BRT systems:
1) identification
2) Preparation
3) Evaluation
4) Implementation
5) Monitoring
BRT Chihuahua
BRT Mexicali
BRT Ecovía Monterrey
BRT Chimalhuacán
BRT Tampico
BRT Acapulco
BRT Lechería
BRT Tijuana
BRT Puebla
Metrobus Line 5
BRT Monterrey
BRT Villahermosa
BRT Cd. Azteca - Tecámac
BRT Toluca
Authorized
Under review
Tren Sub 1 Cuautitlán
BRT Oaxaca
BT Puebla 2
Tren LRT Guadalajara
BRT Pachuca
BRT Cd Juarez
BRT León
Under construction
Opposition from private bus operators to bus transport
improvements, including BRT systems
Institutional capacity to design and implement BRT projects
Despite rapid implementation, BRT systems are influenced
by the time of political appointments
Scrapping buses only in a limited number of cases; in most
cases “replaced buses” are reallocated in other areas
Limited strategies to socialize the project to the public both
before and after completion
Challenges in the planning and implementation process
0
25
50
75
100
125
150
175
0
5
10
15
20
25
1970 1975 1980 1985 1990 1995 2000 2005 2010
CumulativeNumberofCities
NewCitiesTracking BRT Adoption: Expanding Mobility
Around the World
2010: Guangzhou, Hefei, Yancheng, Zaozhuang – China;
Jaipur - India; Bangkok - Thailand; East London Transit –
UK; Barranquilla, Bucaramanga – Colombia;
Ecatepec- Mexico; Lima - Peru; Brampton – Canada; …
2000: Bogotá
(TransMilenio),
Colombia
1974: Curitiba
source: BRTdata.org, April, 2013
BRT Use is Expanding Around the World
source: EMBARQ, 2011
Planned / in
construction
(83 cities)
In expansion
(23 cities)
In operation
(156 cities)
Flickr user: mariordo59
Curitiba, Colombia Delhi, India
Guangzhou, China Rio de Janeiro, Brazil
Non-motorized
mobility
Public Transport
Public Spaces
Compact
development
with mixed-uses
Ground Floor for
commercial use
Parking & car
management
Community
Participation
Rethinking Urban Development: Mobility
Solutions need to be integrated and enable
accessibility
First step of innovation is easy – continuation is the
main challenge
Only managing the supply, but not the demand is
insufficient
Institutional arrangement is a pre-condition for
enabling change
National financial framework can help to upscale
solutions
Final remarks
Thank you
Holger Dalkmann - HDalkmann@wri.org
EMBARQ.org
TheCityFix.com
Questions? Comments? Contact us at embarq@wri.org
Follow us on Twitter: @EMBARQnetwork
Contact

Weitere ähnliche Inhalte

Andere mochten auch

Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...
Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...
Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...
WRI Ross Center for Sustainable Cities
 
Sustainable Transportation 2003
Sustainable Transportation 2003Sustainable Transportation 2003
Sustainable Transportation 2003
Elisa Sutanudjaja
 
Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...
Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...
Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...
BRTCoE
 

Andere mochten auch (15)

The New EMBARQ Brand
The New EMBARQ BrandThe New EMBARQ Brand
The New EMBARQ Brand
 
Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...
Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...
Sustainable Urban Transport Fuels and Vehicles - Dario Hidalgo - EMBARQ - Tra...
 
Urban Transport Financing in China: Ongoing reforms to introduce sustainable ...
Urban Transport Financing in China: Ongoing reforms to introduce sustainable ...Urban Transport Financing in China: Ongoing reforms to introduce sustainable ...
Urban Transport Financing in China: Ongoing reforms to introduce sustainable ...
 
Sustainable Transport: The EMBARQ Footprint
Sustainable Transport: The EMBARQ FootprintSustainable Transport: The EMBARQ Footprint
Sustainable Transport: The EMBARQ Footprint
 
Road Safety and Urban Environment - Claudia Adriazola-Steil - EMBARQ
Road Safety and Urban Environment - Claudia Adriazola-Steil - EMBARQ Road Safety and Urban Environment - Claudia Adriazola-Steil - EMBARQ
Road Safety and Urban Environment - Claudia Adriazola-Steil - EMBARQ
 
Action Plan for Road Safety – Luxembourg - Transforming Transportation 2016
Action Plan for Road Safety –  Luxembourg - Transforming Transportation 2016Action Plan for Road Safety –  Luxembourg - Transforming Transportation 2016
Action Plan for Road Safety – Luxembourg - Transforming Transportation 2016
 
International Study on Women’s Personal Security and Public Transport – Phase...
International Study on Women’s Personal Security and Public Transport – Phase...International Study on Women’s Personal Security and Public Transport – Phase...
International Study on Women’s Personal Security and Public Transport – Phase...
 
Traffic Safety on Bus Priority Systems - Graphics - EMBARQ
Traffic Safety on Bus Priority Systems - Graphics - EMBARQTraffic Safety on Bus Priority Systems - Graphics - EMBARQ
Traffic Safety on Bus Priority Systems - Graphics - EMBARQ
 
Sustainable Transportation
Sustainable TransportationSustainable Transportation
Sustainable Transportation
 
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
EMBARQ Türkiye Yol Güvenliği Laboratuvarı-RSLab Projesi (EMBARQ Turkey Road S...
 
New Initiatives for Clean Mobility: Building a Sustainable Urban Future - Tra...
New Initiatives for Clean Mobility: Building a Sustainable Urban Future - Tra...New Initiatives for Clean Mobility: Building a Sustainable Urban Future - Tra...
New Initiatives for Clean Mobility: Building a Sustainable Urban Future - Tra...
 
Sustainable Transportation 2003
Sustainable Transportation 2003Sustainable Transportation 2003
Sustainable Transportation 2003
 
Cities Safer by Design: Designing Safer Streets and Communities - Transformin...
Cities Safer by Design: Designing Safer Streets and Communities - Transformin...Cities Safer by Design: Designing Safer Streets and Communities - Transformin...
Cities Safer by Design: Designing Safer Streets and Communities - Transformin...
 
Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...
Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...
Webinar: Embarq Brasil and Rio - A partnership to implement a BRT network for...
 
Sustainable transport - will it ever really count?
Sustainable transport - will it ever really count?Sustainable transport - will it ever really count?
Sustainable transport - will it ever really count?
 

Mehr von WRI Ross Center for Sustainable Cities

Mehr von WRI Ross Center for Sustainable Cities (20)

Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
 
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
 
Restoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. PuneRestoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. Pune
 
Restoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts VenturesRestoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts Ventures
 
Restoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for CitiesRestoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for Cities
 
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYDRestoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
 
Restoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_AyalaRestoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_Ayala
 
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYDRestoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
 
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 
CK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, ColombiaCK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, Colombia
 
CK2018: Land value capture in Brazil
CK2018: Land value capture in BrazilCK2018: Land value capture in Brazil
CK2018: Land value capture in Brazil
 
CK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from MexicoCK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from Mexico
 
CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action Planning
 
CK2018: GHG Platform India
CK2018: GHG Platform IndiaCK2018: GHG Platform India
CK2018: GHG Platform India
 
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCCCK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
 
CK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus FleetsCK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus Fleets
 
CK2018: Electric Vehicle Financing
CK2018: Electric Vehicle FinancingCK2018: Electric Vehicle Financing
CK2018: Electric Vehicle Financing
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCustom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Buy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdfBuy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdf
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara Laskowska
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 
Buy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptxBuy Epson EcoTank L3210 Colour Printer Online.pptx
Buy Epson EcoTank L3210 Colour Printer Online.pptx
 
Top 10 Symfony Development Companies 2024
Top 10 Symfony Development Companies 2024Top 10 Symfony Development Companies 2024
Top 10 Symfony Development Companies 2024
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
 
PLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. StartupsPLAI - Acceleration Program for Generative A.I. Startups
PLAI - Acceleration Program for Generative A.I. Startups
 

Sustainable Transport Solutions in Emerging Economies - Holger Dalkmann - EMBARQ - Future Megacities in Action 2013 - 15 May 2013

  • 1. Sustainable Transport Solutions in Emerging Economies Working Session - 10:30am-12:30pm May 15, 2013 Future Megacities in Action Conference Holger Dalkmann Director, EMBARQ World Resources Institute
  • 2. The Global Network of EMBARQ
  • 3. CONGESTION ROAD SAFETY CLIMATE CHANGE PUBLIC HEALTH 2-5 cost of GDP through traffic congerestion Transport accounts for one-quarter of global CO2 emissions Traffic fatalities lead to 1.2 million deaths every year and many more injuries Physical inactivity causes 1 in 10 deaths worldwide, on par with smoking
  • 4. Paradigm Shift: Trend vs. Leapfrogging Cheonggyecheon, Seoul, South Korea
  • 5. Ahmedabad, India 3.3 million 1992 6.4 million 2011
  • 6. Two Options: Sustainable or Unsustainable? Today Ahmedabad, India Population: 5.4m Trips: 5.6m/yr Year 2041 Population: 13.2m Trips: 39.8m/yr Automobility Area: 6,484 sq. km Emissions: 12.32m tCO2/yr Traffic Fatalities: 5,232/yr Sustainable Transport Area: 50% reduction Emissions: 84% reduction Traffic Fatalities: 74% reduction • Same population • Same number of trips • Very different outcomes
  • 7. Transport Infrastructure Investment Estimates Source: CEPT University, 12FYP, 2011 $10 Million 2030 0.4 Billion USD/Year 0.6 Billion USD/Year 1.2 Billion USD/Year 0.8 Billion USD/Year
  • 8. 8
  • 9. 9
  • 10. Non-motorized mobility Public Transport Public Spaces Compact development with mixed-uses Ground Floor for commercial use Parking & car management Community Participation Rethinking Urban Development: Mobility
  • 11. Non-motorized mobility Public Transport Public Spaces Compact development with mixed-uses Ground Floor for commercial use Parking & car management Community Participation Rethinking Urban Development: Mobility
  • 12. Bus Rapid Transport in Mexico
  • 22. Evolution of BRT system in Mexico 2003 2005 2008 2009 2011 Length: 26 km Fleet: 61 Length: 46 km Fleet: 156 Length: 55 km Fleet: 216 Length: 92 km Fleet: 330 Length: 128 km Fleet: 472 1,164,000 pp/day 2012 Length: 156 km Fleet: 526 1,114,000 pp/day814,000 pp/day552,000 pp/day497,000 pp/day 237,000 pp/day
  • 23. 4 lines, 156 km in 9 years, 500 buses, 1.160,000 people/day Replaced 1,383 obsolete, highly polluting microbuses 17% of the users come from individual motor vehicles 110,000 tons of CO2 per year reduced (total 385,000 tons reduced so far) 40% travel time savings per user (180,000 hours per year) 35% reduction in exposure to particulate matter (PM 2.5) Metrobus in Numbers
  • 24. Particulate matter emissions from ULSD with technologies are similar to CNG ULSD + tech Non-ULSD + no filters
  • 25. Integrated Transport Systems: Mexico City Inter-urban transport companies Airport BRT system Metro system Bike system Suburban rail system
  • 26. In 2009, the Mexican Federal government instituted the Public Transportation Federal Support Program (PROTRAM) to fund public transportation improvements BRT systems are being promoted in 35 cities in Mexico with the support from the Federal government PROTRAM funds mass transit systems in cities with population over 500 thousand people Upscaling: Mass Transit Program (PROTRAM)
  • 27. 35 BRT Systems: o 5 build/under construction o 30 under review / identification BRT systems in Mexico EMBARQ provides technical advisory for the implementation of BRT systems: 1) identification 2) Preparation 3) Evaluation 4) Implementation 5) Monitoring BRT Chihuahua BRT Mexicali BRT Ecovía Monterrey BRT Chimalhuacán BRT Tampico BRT Acapulco BRT Lechería BRT Tijuana BRT Puebla Metrobus Line 5 BRT Monterrey BRT Villahermosa BRT Cd. Azteca - Tecámac BRT Toluca Authorized Under review Tren Sub 1 Cuautitlán BRT Oaxaca BT Puebla 2 Tren LRT Guadalajara BRT Pachuca BRT Cd Juarez BRT León Under construction
  • 28. Opposition from private bus operators to bus transport improvements, including BRT systems Institutional capacity to design and implement BRT projects Despite rapid implementation, BRT systems are influenced by the time of political appointments Scrapping buses only in a limited number of cases; in most cases “replaced buses” are reallocated in other areas Limited strategies to socialize the project to the public both before and after completion Challenges in the planning and implementation process
  • 29. 0 25 50 75 100 125 150 175 0 5 10 15 20 25 1970 1975 1980 1985 1990 1995 2000 2005 2010 CumulativeNumberofCities NewCitiesTracking BRT Adoption: Expanding Mobility Around the World 2010: Guangzhou, Hefei, Yancheng, Zaozhuang – China; Jaipur - India; Bangkok - Thailand; East London Transit – UK; Barranquilla, Bucaramanga – Colombia; Ecatepec- Mexico; Lima - Peru; Brampton – Canada; … 2000: Bogotá (TransMilenio), Colombia 1974: Curitiba source: BRTdata.org, April, 2013
  • 30. BRT Use is Expanding Around the World source: EMBARQ, 2011 Planned / in construction (83 cities) In expansion (23 cities) In operation (156 cities)
  • 31. Flickr user: mariordo59 Curitiba, Colombia Delhi, India Guangzhou, China Rio de Janeiro, Brazil
  • 32. Non-motorized mobility Public Transport Public Spaces Compact development with mixed-uses Ground Floor for commercial use Parking & car management Community Participation Rethinking Urban Development: Mobility
  • 33. Solutions need to be integrated and enable accessibility First step of innovation is easy – continuation is the main challenge Only managing the supply, but not the demand is insufficient Institutional arrangement is a pre-condition for enabling change National financial framework can help to upscale solutions Final remarks
  • 35. Holger Dalkmann - HDalkmann@wri.org EMBARQ.org TheCityFix.com Questions? Comments? Contact us at embarq@wri.org Follow us on Twitter: @EMBARQnetwork Contact