PRE – ENGINEERED
BUILDINGS AND THEIR
APPLICATIONS
Dr K M Soni
Chief Engineer, CPWD, Mumbai
Buildings
• CONVENTIONAL BUILDINGS
– LOAD BEARING
– RCC FRAMED STRUCTURES
– STEEL STRUCTURES
– COMPOSITE STRUCTURES
– SEMI-TEMPORARY/TEMPORARY BUILDINGS
• PRE-FABRICATED BUILDINGS
• PRE-ENGINEERED BUILDINGS
Conventional Buildings
• CAN BE DESIGNED AND CONSTRUCTED WITH
ANY ARCHITECTURAL DESIGN AND FEATURES
• SITE CONSTRUCTION AND SUCH DEVIATIONS
ARE FEASIBLE
• LOCAL MATERIALS AND TECHNIQUES CAN BE
APPLIED
• NO MONOTONY
• NEW MODERN TECHNIQUES
New Modern Construction
Techniques
• MONOLITHIC CONSTRUCTION
– JUMP SHUTTERING
– TUNNEL FORMWORK
– ALUMINUM FORMWORK
– SHUTTERINGS WITH OTHER MATERIALS
– PATENTED TECHNOLOGIES
Jump Shuttering
http://www.formworkscaffoldingsystems.com/sale-9583608-multi-function-
hydraulic-jump-form-shuttering-system-oem-odm-available.html
Useful and economic for
high rise buildings
http://www.cityu.edu.hk/CIVCAL/
production/advanced/jump_form
.html
Tunnel Formwork
https://theconstructor.org/concrete/tunnel-
form-construction-technique/8574/
Tunnel Formwork
http://www.parsianghaleb.com/en/page/196/t
unnel-form-system
https://irjet.net/archives/V4/i3/IRJET-
V4I397.pdf
https://www.forconstructionpros.com/concrete/equipment-
products/article/12321527/tunnel-forms-build-a-castle
http://www.neru.com.tr/en/index2.php?Id=17
http://www.concrete.org.uk/fingertips-
nuggets.asp?cmd=display&id=862
Suitable for repetitive buildings
Monolithic construction with
Aluminium formwork
http://www.tectonica-online.com/products/peri/aluminium-formwork-
monolithic-concrete-housing-construction/2801/
http://navkaargroup.in/aluminium-formwork/
Suitable for repetitive buildings
http://tacsystem.blogspot.com/2013/01/pic-
aluminium-formwork-system.html
Monolithic Construction
• Faster construction
• Repetitive construction
• Quality controlled
• Useful for repetitive work and multistoreyed buildings
• Specialised work
• Limitations of architectural features, corners etc
• Sometimes limit of spans
• RCC walls suitable for coastal areas?
• Services are to be pre-planned and provided before
casting
• Providing services after construction difficult
• CPWD adopting such technologies
cpwd.gov.in
cpwd.gov.in
cpwd publication
cpwd publication
Pre-Fabricated Buildings
• CONCRETE BUILDINGS
• STEEL BUILDINGS
• COMPOSITE STRUCTURES
Pre-Cast Concrete Buildings
• PRE-CAST STRUCTURAL MEMBERS
• SLABS, BEAMS, WALLS, STAIRCASES ETC
• FACTORY MADE MEMBERS
• QUALITY PRODUCTS
• FAST CONSTRUCTION
• LITTLE CAST IN SITU CONSTRUCTION
• SOMETIMES SIZE LIMITATIONS
http://www.vaughnconcreteproducts.com/pre
cast-roof-slab
http://www.preca.in/precast-concrete-
products.html
http://www.preca.in/precast-concrete-
products.html
http://www.preca.in/precast-concrete-
products.html
http://www.preca.in/precast-concrete-
products.html
http://www.midsouthprestress.com/concrete-
products/precast-beams-columns
http://www.preca.in/precast-concrete-
products.html
http://www.preca.in/precast-concrete-
products.html
http://www.preca.in/precast-concrete-
products.html
https://www.housingauthority.gov.hk/en/busin
ess-partnerships/resources/prefabrication-in-
housing-blocks/precast-staircases/index.html
http://www.preca.in/precast-concrete-
products.html
Pre-cast Concrete
Construction
• FASTER CONSTRUCTION
• QUALITY CONTROLLED
• SUITED FOR INDIVIDUAL AND MASS
CONSTRUCTION
• SUITED FOR SITES HAVING SPACE
CONSTRAINTS
• LIMITATION OF ARCHITECTURAL FEATURES
• LIMITATIONS OF MODULE SIZES
Pre-cast Concrete
Construction
• CPWD has constructed Multi level car parking
block for SBI Data centre at Hyderabad in which;
• Pre-cast external and internal wall panels,
• Pre-cast parapet wall panels,
• Pre-cast pre-stressed beams,
• Pre-cast hollow core slabs,
• Pre-cast staircase,
• Pre-cast columns and precast solid slabs for
ramp landings are used.
cpwd publication
cpwd publication
Pre-cast Steel Construction
Pre-cast Steel Construction
• SUITED FOR SITES HAVING SPACE CONSTRAINTS
• LARGER MODULES FEASIBLE
• QUALITY CONTROL
• FASTER CONSTRUCTION
• SPECIALISED WORK DUE TO WELDING
• FIRE RETARDANT PAINTS/COATINGS TO BE
APPLIED
• FALSE CEILING REQUIRED
Pre–engineered Building
Pre-engineered building is defined as a
building designed to be fabricated using a
pre-determined inventory of raw materials
and manufacturing methods that can
efficiently satisfy design and functional
requirements.
Pre–engineered Building
• CUSTOM DESIGNED
• FABRICATED IN FACTORY
• NO WELDING
• ONLY BOLTING
Comparison
Pre-engineered building
• Self weight lighter
(@30%)
• Primary member
tapered
• Secondary members –
light weight rolled Z or
C sections
• Less erection time and
cost
Pre fab steel Buildings
• Heavier than PEB
• Primary member – I
sections
• Secondary members – I
or C sections
• More erection time and
cost
http://www.globalsources.com/gsol/I/Steel-
building/p/sm/1153305732.htm
http://www.itac.us.com/specialty-
services/metal-buildings.html
Commercial buildings
http://www.mid-
weststeel.com/portfolio_category/warehouse-
distribution/page/2/
Aircraft Hangars
https://rmsteel.com/building-types/aircraft-
hangars/
Residential Buildings
http://www.robison-construction.com/pre-
engineered.php
Industries
http://matconindia.org/
Schools
http://www.chgbuildingsystems.com/Projects/
chgbethelschoold.html
Schools
Offices
http://centuryconstruction.com/projects-pre-
engineered-metal-buildings/
ADVANTAGES OF PEB
Reduce construction time
Buildings can be constructed in less time
compared to others once the design is
approved. Foundation and anchor bolts can
be cast parallel, ready for the site bolting.
This also allows faster occupancy and earlier
realization of revenue.
Low space requirements for
storage at site
Conventional buildings require a considerable
space to store materials during construction
for a long time. Since this method reduces
the requirements of the materials and space
requirement at site, there is a considerable
saving on account of the same
Lower Cost
Due to less dead load, well designed
economic sections, manufacturing in the
factory and time saving in construction, cost
saving is feasible though their technical
consultancy of design may require some
additional expenses
Expansion Flexibility
Buildings can be easily expanded in length by
adding additional bays provided future
provision of expansion in width is already
kept. Also, it is easier to increase the height
of the structures.
Larger Spans
Buildings can be made with larger spans
without supports in between i.e. without
columns. Most of the efficiently used
exhibition and convention halls are
constructed having column free inside space
Quality Assurance
As components are manufactured completely
in the factory under controlled conditions,
the quality is assured
Lower Maintenance
Buildings can be manufactured with
automotive high quality materials to suit
ambient conditions at the site resulting into
durability and low maintenance costs.
Better Seismic Resistance
Due to low weight flexible frame, seismic
resistance of such structures is high
compared to conventional structures.
Eco-friendly
• Steel members are recyclable, hence qualifies
for eco-friendly sustainable structures
• Do not spread dust
• Avoids use of natural materials like
aggregates, stones etc.
Light Weight Foundation
As the structures have less dead load, the
foundation required is light weight. In case of
low bearing capacity of soil also, the
structures can be designed as per the
requirements.
Applications
• Industrial buildings
• Warehouses
• Commercial buildings
• Showrooms
• Offices
• Shades and garages
• Schools and primary health centres
• Stadiums
• Exhibition halls and Convention centres
• Gas stations
• Metro stations, Bus terminals, Railway stations/platforms
and Parking lots
• Assembly places
Limitations
• Aesthetics
• Very limited architectural features
• Life of members
• Foundation design/erection
• Deviations on site, not feasible
• Limited to low rise buildings
Pre-engineered buildings
• Are they only metal buildings? Now metallic
PEBs, are known as PE metallic buildings
• Let us again check the definition. A building
designed to be fabricated using a pre-
determined inventory of raw materials and
manufacturing methods that can efficiently
satisfy design and functional requirements
• Thus any type of building can be categorised in
PEB provided satisfy design and functional
requirements and is a fabricated one
Pre-engineered buildings
• Let us review fabricated buildings
• Let us consider fabricated means factory
made
• Thus, let us include pre-fab concrete
members in PEB.
• Thus, PEB means all buildings in which pre-
fab members are used satisfying design and
functional requirements.
https://www.pmd-global.com/single-
post/2016/02/11/Precast-Concrete-
Technology-Building-System
http://www.ultraspan.ca/building-with-
precast/
http://www.lonestarprestress.com/city-of-
humble.htm
So let us go ahead with PEB
with wider definition
https://www.slideshare.net/Deltasteel/pre-engineered-steel-buildings-38695951
https://www.slideshare.net/ShubhamParab/pre-engineered-building-ppt-
rit?next_slideshow=1
https://www.slideshare.net/hlksd/88254718-
preengineeredsteelbuildings?next_slideshow=2
https://www.slideshare.net/hlksd/115659118-preengineeredbuildings-
46415466?next_slideshow=1
References

Weitere ähnliche Inhalte

Was ist angesagt?

PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
Sagar Shah
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 
Tensile
TensileTensile
Tensile
padandare
 

Was ist angesagt? (20)

Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structures
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast Elements
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Pre Engineered Steel Buildings
Pre Engineered Steel BuildingsPre Engineered Steel Buildings
Pre Engineered Steel Buildings
 
Gluelamb
GluelambGluelamb
Gluelamb
 
Mivan
MivanMivan
Mivan
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
Aluminium As a Building Material
Aluminium As a Building MaterialAluminium As a Building Material
Aluminium As a Building Material
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Slipform
SlipformSlipform
Slipform
 
Plastics as a building material
Plastics as a building materialPlastics as a building material
Plastics as a building material
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Mivan shuttering
Mivan shutteringMivan shuttering
Mivan shuttering
 
Peb ss
Peb ssPeb ss
Peb ss
 
Tensile
TensileTensile
Tensile
 
Alternative for wall construction
Alternative for wall   constructionAlternative for wall   construction
Alternative for wall construction
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
 
Structural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methodsStructural systems in high rise building and analysis methods
Structural systems in high rise building and analysis methods
 
Design of Steel Structures.pptx
Design of Steel Structures.pptxDesign of Steel Structures.pptx
Design of Steel Structures.pptx
 

Ähnlich wie Pre engineered and other buildings

Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
Yee Len Wan
 
Kailash PEBs
Kailash PEBsKailash PEBs
Kailash PEBs
Ramani swamy
 
88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings
hlksd
 

Ähnlich wie Pre engineered and other buildings (20)

MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptxINTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
INTRODUCTION TO PRE ENGINEERED BUILDINGS.pptx
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptx
 
Kailash PEBs
Kailash PEBsKailash PEBs
Kailash PEBs
 
Construction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz KhanConstruction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz Khan
 
88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings
 
The Merits of Structural Steelwork
The Merits of Structural SteelworkThe Merits of Structural Steelwork
The Merits of Structural Steelwork
 
16 Hybrid.ppt [Compatibility Mode].pdf
16 Hybrid.ppt [Compatibility Mode].pdf16 Hybrid.ppt [Compatibility Mode].pdf
16 Hybrid.ppt [Compatibility Mode].pdf
 
BSS552 LECT 2.pptx
BSS552 LECT 2.pptxBSS552 LECT 2.pptx
BSS552 LECT 2.pptx
 
DRM Prefab Workshop & Warehouse
DRM Prefab Workshop & WarehouseDRM Prefab Workshop & Warehouse
DRM Prefab Workshop & Warehouse
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
peb ppt.ppt
peb ppt.pptpeb ppt.ppt
peb ppt.ppt
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
PEB.pptx
PEB.pptxPEB.pptx
PEB.pptx
 
Steel buildings
Steel buildings  Steel buildings
Steel buildings
 
Form-woks-additional.pptx
Form-woks-additional.pptxForm-woks-additional.pptx
Form-woks-additional.pptx
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
neotech.pptx
neotech.pptxneotech.pptx
neotech.pptx
 

Mehr von Dr K M SONI

Mehr von Dr K M SONI (20)

Heritage Conservation
Heritage ConservationHeritage Conservation
Heritage Conservation
 
Project Management
Project ManagementProject Management
Project Management
 
You are also a leader
You are also a leaderYou are also a leader
You are also a leader
 
Contract Management
Contract Management Contract Management
Contract Management
 
Contract and agreements
Contract and agreementsContract and agreements
Contract and agreements
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
 
Variations in works contracts
Variations in works contractsVariations in works contracts
Variations in works contracts
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
Anchors in civil engineering works
Anchors in civil engineering worksAnchors in civil engineering works
Anchors in civil engineering works
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
Deconstruction
DeconstructionDeconstruction
Deconstruction
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Net zero energy building
Net zero energy buildingNet zero energy building
Net zero energy building
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
 
EPC and other types of contracts
EPC and other types of contractsEPC and other types of contracts
EPC and other types of contracts
 
Contract Management
Contract Management Contract Management
Contract Management
 
EPS Geofoam Blocks
EPS Geofoam BlocksEPS Geofoam Blocks
EPS Geofoam Blocks
 
Aesthetics and Functionality through Glass
Aesthetics and Functionality through GlassAesthetics and Functionality through Glass
Aesthetics and Functionality through Glass
 
EPC Contracts
EPC Contracts EPC Contracts
EPC Contracts
 

KĂźrzlich hochgeladen

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

KĂźrzlich hochgeladen (20)

FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 

Pre engineered and other buildings