PROCESS MAPPING
Key elements
• S – Suppliers, those who supply input
into the process.
• I – Inputs, data, knowledge, resources
needed to generate at output.
• P – Process, high level view of the
process, an activity that transforms the
inputs to outputs.
Key elements
• O – Output, what comes out of the
process as a result of a transformation
• C – Customer, person receiving the
output
1. Process Mapping (SIPOC,
Detailed)
2. Cause & Effect (Root Cause
Analysis)
3. Failure Mode Effect Analysis
(FMEA )
Introduction to
Tools
Process Mapping (SIPOC) Objectives
1. What is SIPOC
2. What is the purpose
3. Key Elements of a SIPOC
4. Step to Generate a SIPOC
5. Example
Process Mapping (SIPOC)
SIPOC is a high level mapping
tool that allows the user to see
the process with limited detail.
It is often used to narrow down
the focus of a bigger process or
to aid in project selection.
Process Mapping (SIPOC)
1. Map Process
2. Define Outputs
3. List Customers (who receive output)
4. Identify Inputs (Resources, information)
5. List Suppliers (source of input)
Detailed Process Mapping Objectives
Why Do We Process Map (Benefits)
Who Should do a Process Map
Key Elements of a Detailed Process Map
Step to Generate a Detailed Process Map
Symbols
Example
Detailed Process Mapping
Benefits
Detailed Process Mapping
Benefits
Detailed Process Mapping
Benefits
Detailed Process Mapping
Detailed Process Mapping
Benefits
Key Elements of a Detailed
Process Map
•KPIV / KPOV
•Type of Input
•Value Added (VA) or Non-Value
•Added (NVA)
•Specifications
•Quality Indicator
KPIV=KEY PERFORMANCE INPUT VARIABLES
KPOV=KEY PERTFORMANCE OUTPUT VARIABLES
Key Elements of a Detailed Process Map
• Inspection opportunities
• Control Parameters
• Cost Per Unit
• Etc.
Steps to Detailed Process Mapping
Steps to Detailed Process Mapping
Steps to Detailed Process
Mapping
Detailed Process Symbols
Process mapping Symbols from Excel
Process Step
Connector
Decision
Start/Stop
Detailed Process In Excel
Detailed Process In Excel
Detailed Process In Excel
Detailed Process Mapping
Input Type KPIV Specs/Tolerance
Value
Added KPOV Specs Data Quality Indices
SOP Location 6" from split NVA
Correct
Location
Measure
d
Flush with Table
edge Visual
Parallel to side
SOP Location Right Edge NVA
Correct
Position Visual
Flush to Catapult
Base
SOP Location
Parallel to base of
Table NVA
Correct
Position
Measure
d
Flush with back
edge Visual
C Secure? NVA Secure Tape Visual
C Pin Placement 1
Proper Pin
Placement 1 Visual 120 +/- 2
C Stop Position 2 NVA
Proper Stop
Position 2 Visual 120 +/- 2
C Pull Back Angle 180 +/- 1
Proper Pull
Back Angle 180 +/- 1
Measure
d 120 +/- 2
C Ball Type Rubber Right Ball Rubber Visual 120 +/- 2
SOP
Implement Start
Positions NVA Inspection of Catapult
C
Operator
Position Sitting
Operator
Sitting Sitting Visual
SOP Ball Type Rubber NVA Proper Ball Rubber Visual
Start
Position Catapult
Clamp Catapult
Position Tape Measure
Secure Tape Measure
Determine Start Position
from Historical Data
Set Up Catapult
Place Proper Ball in Cup
Detailed Process Mapping
Input Type KPIV Specs/Tolerance
Value
Added KPOV Specs Data Quality Indices
C
Holding
Position
2 Fingers beneath
cup VA
Holding
Position
2 Fingers
beneath cup
Measure
d 120 +/- 2
C Firing Position Align with left side
Firing
Position
Align with
left side
Measure
d 120 +/- 2
N Hold Time < 2 seconds Hold Time < 2 seconds
Measure
d 120 +/- 2
C # of Measurers 2 NVA
# of
Measurers 2
Measure
d 120 +/- 2
C
Tape Measure Calibrated/Standard
inch tape measure
& Secured
Tape
Measure
Calibrated/St
andard inch
tape
measure &
Secured
Measure
d
120 +/- 2
N
Location of
Measurer +/1 12 inches
Location of
Measurer
+/1 12
inches
Measure
d 120 +/- 2
No
Yes
Fire Catapult
Measure and Record
Data
Did Ball
Hit
Target?
Stop
Root Cause Analysis Objectives
What is a root cause analysis
Why perform a root cause analysis
How to set up a root cause analysis
using the fishbone diagram
Steps to generate a root cause analysis
using the fishbone diagram
Example
What is a root cause analysis?
Why perform a root cause
analysis?
How to set up a fish bone diagram
Cause and Effect Diagram organizes
causes into 6 “M” distinct categories.
1.Man
2.Machine
3.Natural causes
4.Method
5.Measurement
6.Material
Steps to generate a fish bone
diagram
Organize the 6 M’s around the fishbone
MEASUREMENT METHODS MATERIALS
MANPOWER MACHINES MOTHER
NATURE
Steps to generate a fish bone
diagram
Steps to generate a fish bone
diagram
MEASUREMENT METHODS MATERIALS
MANPOWER MACHINES MOTHER
NATURE
Customer leaves
restaurant
dissatisfied rating
Food in uncooked
Food is over-cooked
Rating not discriminatory
Server is rude Restaurant is cold
Restaurant is hot
Limited menu
Cash register quit
Incorrect amount on bill
Food taste bad
Oven malfunctionedServer non-responsive
Don’t take credit
Don’t take checks
Not enough servers
Not enough cooks
FMEA Objectives
1. What is an FMEA
2. What areas typically use an FMEA
and why
3. How to set up an FMEA
4. Steps to generate an FMEA
5. Example
What is an FMEA
What areas typically use an FMEA
• Manufacturing processes
• Management Systems
• Design of new products and processes
• Service industries to maximize customer
satisfaction
• Defect minimization
• Identifying Safety Hazards
Each of these areas use FMEA to determine and
minimize
risk.
FMEA Template
Step Failure
Mode
Effect of
Failure
Mode
Severity
of Effect
(1-10)
Causes of
Failure
Likelihood
of Cause
(1-10)
Control to
Detect
Failure
Likelihood
of
Detection
(1-10)
RPN
Severity Scoring of FMEA
Effect of Failure Mode Severity of Effect Rank
Catastrophic without warning Failure is catastrophic with no warning 10
Catastrophic with warning Failure is catastrophic with warning 9
Very High Between 75%-100% of product is rejected.
Customer is immediately lost if defect is detected.
8
High 50%-75% of product is rejected. Customer will
eventually be lost if other options exist.
7
Medium 25-50% of the product is scrapped without sorting.
Customer is aware of the issue and begins looking
for other suppliers.
6
Low 0% of product is rejected. 75%-100% of product
reworked. Customer is dissatisfied, but loyal.
5
Very Low 50%-75% of product is reworked. Greater than
50% of customers notice the defect if found.
4
Minor 25%-50% of product is re-worked. Between 25%-
50% of customer notice the defect if found.
3
Very Minor Less than 25% of product is re-worked. Less than
25% of customers notice the defect if found.
2
None No effect 1
Occurrence Scoring of FMEA
Likelihood of
Cause
Probability of Cause Rank
Inevitable Between 90%-100% 10
Very high Between 75%-90% 9
High Between 50%-75% 8
Moderately High Between 25%-50% 7
Moderate Between 5%-25% 6
Moderately Low Between 1%-5% 5
Low Between .001%-1% 4
Very Low Between .0001%-.001% 3
Rare Between .000001%-.0001% 2
Extremely Rare Less than .000001% 1
Detection Scoring of FMEA
Detection Likelihood that Defect is Detected Rank
Not Detectable 0% chance of detecting defect 10
Very Rarely 0%-5% chance of detecting defect 9
Rarely 5%-10% chance of detecting defect 8
Low 10%-25% chance of detecting defect 7
Moderately Low 25%-40% chance of detecting defect 6
Moderate 40%-60% chance of detecting defect 5
Moderately High 60%-75% chance of detecting defect 4
High 75%-95% chance of detecting defect 3
Very High 95%-99.999% chance of detecting
defect
2
Almost Certain Greater than 99.999% chance of
detecting defect
1
Steps to perform an FMEA
Steps to perform an FMEA
Steps to perform an FMEA
FMEA Example
Step Failure
Mode
Effect of
Failure
Mode
Severity of
Effect
(1-10)
Causes of
Failure
Likelihood
(Occurrence)
of Cause
(1-10)
Control to
Detect
Failure
Likelihood
of Detection
(1-10)
RPN
Call
911
All lines
are busy
Must wait
for open
line
10
(catastrophic)
Not
enough
phone
lines
3
(very low)
Phone
usage logs
by phone
company
6
(moderately
low)
180
Not
enough
operators
5
(moderately
low)
Budgeting
for
number of
calls
received
3
(high)
150
Call is not
answered
Ambulance
not
dispatched
10
(catastrophic)
Not
enough
operators
5
(moderately
low)
Budgeting
for
number of
calls
received
3
(high)
150
All
Operators
are on
lunch
break
2
(rare)
Time card
system
2
(very high)
40

Weitere ähnliche Inhalte

Was ist angesagt?

Process mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaProcess mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaHaris Naved Ahmed
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with exampleMouhcine Nahal
 
1. introduction to process & process management
1. introduction to process & process management1. introduction to process & process management
1. introduction to process & process managementHakeem-Ur- Rehman
 
Lean Six Sigma Mistake-Proofing Process Training Module
Lean Six Sigma Mistake-Proofing Process Training ModuleLean Six Sigma Mistake-Proofing Process Training Module
Lean Six Sigma Mistake-Proofing Process Training ModuleFrank-G. Adler
 
Process Mapping and Process Improvement for the Small Business Owner
Process Mapping and Process Improvement  for the Small Business OwnerProcess Mapping and Process Improvement  for the Small Business Owner
Process Mapping and Process Improvement for the Small Business OwnerMichiko Diby
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlKate Sevilla
 
Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Frank-G. Adler
 
Process mapping --- business process reengineering
Process mapping --- business process reengineeringProcess mapping --- business process reengineering
Process mapping --- business process reengineeringRishabh Bansal
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma OverviewRon Drew
 
Work Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process MappingWork Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process MappingTKMG, Inc.
 

Was ist angesagt? (19)

Process Mapping
Process MappingProcess Mapping
Process Mapping
 
090 Process Mapping
090 Process Mapping090 Process Mapping
090 Process Mapping
 
Process mapping session final-Lean Six Sigma
Process mapping session final-Lean Six SigmaProcess mapping session final-Lean Six Sigma
Process mapping session final-Lean Six Sigma
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Value stream mapping study with example
Value stream mapping study with exampleValue stream mapping study with example
Value stream mapping study with example
 
Process Flow Mapping
Process Flow MappingProcess Flow Mapping
Process Flow Mapping
 
1. introduction to process & process management
1. introduction to process & process management1. introduction to process & process management
1. introduction to process & process management
 
Process Mapping
Process MappingProcess Mapping
Process Mapping
 
What is process mapping?
What is process mapping?What is process mapping?
What is process mapping?
 
Lean Six Sigma Mistake-Proofing Process Training Module
Lean Six Sigma Mistake-Proofing Process Training ModuleLean Six Sigma Mistake-Proofing Process Training Module
Lean Six Sigma Mistake-Proofing Process Training Module
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Lean section 2
Lean section 2Lean section 2
Lean section 2
 
Process Mapping and Process Improvement for the Small Business Owner
Process Mapping and Process Improvement  for the Small Business OwnerProcess Mapping and Process Improvement  for the Small Business Owner
Process Mapping and Process Improvement for the Small Business Owner
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module
 
Process mapping --- business process reengineering
Process mapping --- business process reengineeringProcess mapping --- business process reengineering
Process mapping --- business process reengineering
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
 
Work Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process MappingWork Standardization & Metrics-Based Process Mapping
Work Standardization & Metrics-Based Process Mapping
 

Andere mochten auch

Checking code-with-pmd
Checking code-with-pmdChecking code-with-pmd
Checking code-with-pmd3trg
 
Exercise E Answers Examples
Exercise E   Answers ExamplesExercise E   Answers Examples
Exercise E Answers ExamplesEMBS2007
 
Defect prevention software
Defect prevention softwareDefect prevention software
Defect prevention softwareZarko Acimovic
 
ARP4754a, DO-178C 발표자료
ARP4754a, DO-178C 발표자료ARP4754a, DO-178C 발표자료
ARP4754a, DO-178C 발표자료Hongseok Lee
 
Quality Quick Session #1 Big Y, Little Y And All The Xs
Quality Quick Session #1 Big Y, Little Y And All The XsQuality Quick Session #1 Big Y, Little Y And All The Xs
Quality Quick Session #1 Big Y, Little Y And All The XsJames Deaton (MBA, MBB)
 
DMAIC implementation
DMAIC implementationDMAIC implementation
DMAIC implementationriyankadaga
 
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...RAKESH RANA
 
Qualification of Eclipse-based Tools according to ISO 26262
Qualification of Eclipse-based Tools according to ISO 26262Qualification of Eclipse-based Tools according to ISO 26262
Qualification of Eclipse-based Tools according to ISO 26262Oscar Slotosch
 
Achieve iso 26262 certification
Achieve iso 26262 certificationAchieve iso 26262 certification
Achieve iso 26262 certificationPRQA
 
Introduction to arp4754a
Introduction to arp4754aIntroduction to arp4754a
Introduction to arp4754aHongseok Lee
 
ISO26262-6 Software development process (Ver 3.0)
ISO26262-6 Software development process (Ver 3.0)ISO26262-6 Software development process (Ver 3.0)
ISO26262-6 Software development process (Ver 3.0)Hongseok Lee
 
Basic quality tools and others
Basic quality tools and othersBasic quality tools and others
Basic quality tools and othersLynja C. Refugio
 
ISO 26262 Approval of Automotive Software Components
ISO 26262 Approval of Automotive Software ComponentsISO 26262 Approval of Automotive Software Components
ISO 26262 Approval of Automotive Software ComponentsReal-Time Innovations (RTI)
 
6 Sigma Catapult Project
6 Sigma Catapult Project6 Sigma Catapult Project
6 Sigma Catapult Projecttrojanbrewer
 
Risk Management by using FMEA
Risk Management by using FMEARisk Management by using FMEA
Risk Management by using FMEANukool Thanuanram
 
ISO 26262 introduction
ISO 26262 introductionISO 26262 introduction
ISO 26262 introductionKoenLeekens
 

Andere mochten auch (19)

Checking code-with-pmd
Checking code-with-pmdChecking code-with-pmd
Checking code-with-pmd
 
Exercise E Answers Examples
Exercise E   Answers ExamplesExercise E   Answers Examples
Exercise E Answers Examples
 
Defect prevention software
Defect prevention softwareDefect prevention software
Defect prevention software
 
ARP4754a, DO-178C 발표자료
ARP4754a, DO-178C 발표자료ARP4754a, DO-178C 발표자료
ARP4754a, DO-178C 발표자료
 
Quality Quick Session #1 Big Y, Little Y And All The Xs
Quality Quick Session #1 Big Y, Little Y And All The XsQuality Quick Session #1 Big Y, Little Y And All The Xs
Quality Quick Session #1 Big Y, Little Y And All The Xs
 
DMAIC implementation
DMAIC implementationDMAIC implementation
DMAIC implementation
 
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
Increasing Efficiency of ISO 26262 Verification and Validation by Combining F...
 
Qualification of Eclipse-based Tools according to ISO 26262
Qualification of Eclipse-based Tools according to ISO 26262Qualification of Eclipse-based Tools according to ISO 26262
Qualification of Eclipse-based Tools according to ISO 26262
 
Achieve iso 26262 certification
Achieve iso 26262 certificationAchieve iso 26262 certification
Achieve iso 26262 certification
 
Introduction to arp4754a
Introduction to arp4754aIntroduction to arp4754a
Introduction to arp4754a
 
ISO26262-6 Software development process (Ver 3.0)
ISO26262-6 Software development process (Ver 3.0)ISO26262-6 Software development process (Ver 3.0)
ISO26262-6 Software development process (Ver 3.0)
 
Fmea
FmeaFmea
Fmea
 
Basic quality tools and others
Basic quality tools and othersBasic quality tools and others
Basic quality tools and others
 
ISO 26262 Approval of Automotive Software Components
ISO 26262 Approval of Automotive Software ComponentsISO 26262 Approval of Automotive Software Components
ISO 26262 Approval of Automotive Software Components
 
6 Sigma Catapult Project
6 Sigma Catapult Project6 Sigma Catapult Project
6 Sigma Catapult Project
 
Risk Management by using FMEA
Risk Management by using FMEARisk Management by using FMEA
Risk Management by using FMEA
 
ISO 26262 introduction
ISO 26262 introductionISO 26262 introduction
ISO 26262 introduction
 
CTQ Matrix
CTQ MatrixCTQ Matrix
CTQ Matrix
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 

Ähnlich wie 091 Process Mapping

Risk management using FMEA in pharma
Risk management using FMEA in pharmaRisk management using FMEA in pharma
Risk management using FMEA in pharmaSandeep Naik
 
Managing Quality
Managing QualityManaging Quality
Managing QualityAli BARAN
 
Quality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. BhangeQuality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. BhangeSaurabh Bhange
 
ISO-9001-2015-training.pptx
ISO-9001-2015-training.pptxISO-9001-2015-training.pptx
ISO-9001-2015-training.pptxWilfredoMina1
 
Iso 9001-2015-training
Iso 9001-2015-trainingIso 9001-2015-training
Iso 9001-2015-trainingUmesh Hajare
 
Iso 9001-2015-training
Iso 9001-2015-trainingIso 9001-2015-training
Iso 9001-2015-trainingJPPaner
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACJulian Kalac P.Eng
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC Julian Kalac P.Eng
 
2006 pfmea presentation
2006 pfmea presentation2006 pfmea presentation
2006 pfmea presentationilker kayar
 
Ch 8 Quality Management-1. mm.ppt
Ch 8 Quality Management-1.         mm.pptCh 8 Quality Management-1.         mm.ppt
Ch 8 Quality Management-1. mm.pptparth160410119053
 
Global qa conference updated
Global qa conference updatedGlobal qa conference updated
Global qa conference updatedJohnny Chan
 
"How did I learn how not to run a Data Science project" by Florian Bonnet
"How did I learn how not to run a Data Science project" by Florian Bonnet"How did I learn how not to run a Data Science project" by Florian Bonnet
"How did I learn how not to run a Data Science project" by Florian BonnetData Products Meetup
 
Chapter 4 _for slideshare.ppt
Chapter 4 _for slideshare.pptChapter 4 _for slideshare.ppt
Chapter 4 _for slideshare.pptGulaHangus
 

Ähnlich wie 091 Process Mapping (20)

Risk management using FMEA in pharma
Risk management using FMEA in pharmaRisk management using FMEA in pharma
Risk management using FMEA in pharma
 
FMEA
FMEAFMEA
FMEA
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
Quality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. BhangeQuality control and quality managment philosophies by Prof.Saurabh S. Bhange
Quality control and quality managment philosophies by Prof.Saurabh S. Bhange
 
Cost reduction beyond price
Cost reduction beyond priceCost reduction beyond price
Cost reduction beyond price
 
ISO-9001-2015-training.pptx
ISO-9001-2015-training.pptxISO-9001-2015-training.pptx
ISO-9001-2015-training.pptx
 
Iso 9001-2015-training
Iso 9001-2015-trainingIso 9001-2015-training
Iso 9001-2015-training
 
Iso 9001-2015-training
Iso 9001-2015-trainingIso 9001-2015-training
Iso 9001-2015-training
 
WWAsia14_IFMA_Speaker-_RAO
WWAsia14_IFMA_Speaker-_RAOWWAsia14_IFMA_Speaker-_RAO
WWAsia14_IFMA_Speaker-_RAO
 
Listen to your process (LYP)
Listen to your process (LYP)Listen to your process (LYP)
Listen to your process (LYP)
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALAC
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
 
2006 pfmea presentation
2006 pfmea presentation2006 pfmea presentation
2006 pfmea presentation
 
Ch 8 Quality Management-1. mm.ppt
Ch 8 Quality Management-1.         mm.pptCh 8 Quality Management-1.         mm.ppt
Ch 8 Quality Management-1. mm.ppt
 
Global qa conference updated
Global qa conference updatedGlobal qa conference updated
Global qa conference updated
 
Restaurant Prototype Study Presentation
Restaurant Prototype Study PresentationRestaurant Prototype Study Presentation
Restaurant Prototype Study Presentation
 
"How did I learn how not to run a Data Science project" by Florian Bonnet
"How did I learn how not to run a Data Science project" by Florian Bonnet"How did I learn how not to run a Data Science project" by Florian Bonnet
"How did I learn how not to run a Data Science project" by Florian Bonnet
 
Chapter 4 _for slideshare.ppt
Chapter 4 _for slideshare.pptChapter 4 _for slideshare.ppt
Chapter 4 _for slideshare.ppt
 
What is kaizen
What is kaizenWhat is kaizen
What is kaizen
 
Deviations Permissibility & Handling in GMP
Deviations Permissibility & Handling in GMPDeviations Permissibility & Handling in GMP
Deviations Permissibility & Handling in GMP
 

Mehr von Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrun028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

Mehr von Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrun028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Kürzlich hochgeladen

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 

Kürzlich hochgeladen (20)

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

091 Process Mapping

  • 3.
  • 4.
  • 5. Key elements • S – Suppliers, those who supply input into the process. • I – Inputs, data, knowledge, resources needed to generate at output. • P – Process, high level view of the process, an activity that transforms the inputs to outputs.
  • 6. Key elements • O – Output, what comes out of the process as a result of a transformation • C – Customer, person receiving the output
  • 7. 1. Process Mapping (SIPOC, Detailed) 2. Cause & Effect (Root Cause Analysis) 3. Failure Mode Effect Analysis (FMEA ) Introduction to Tools
  • 8. Process Mapping (SIPOC) Objectives 1. What is SIPOC 2. What is the purpose 3. Key Elements of a SIPOC 4. Step to Generate a SIPOC 5. Example
  • 9. Process Mapping (SIPOC) SIPOC is a high level mapping tool that allows the user to see the process with limited detail. It is often used to narrow down the focus of a bigger process or to aid in project selection.
  • 10. Process Mapping (SIPOC) 1. Map Process 2. Define Outputs 3. List Customers (who receive output) 4. Identify Inputs (Resources, information) 5. List Suppliers (source of input)
  • 11. Detailed Process Mapping Objectives Why Do We Process Map (Benefits) Who Should do a Process Map Key Elements of a Detailed Process Map Step to Generate a Detailed Process Map Symbols Example
  • 17. Key Elements of a Detailed Process Map •KPIV / KPOV •Type of Input •Value Added (VA) or Non-Value •Added (NVA) •Specifications •Quality Indicator KPIV=KEY PERFORMANCE INPUT VARIABLES KPOV=KEY PERTFORMANCE OUTPUT VARIABLES
  • 18. Key Elements of a Detailed Process Map • Inspection opportunities • Control Parameters • Cost Per Unit • Etc.
  • 19. Steps to Detailed Process Mapping
  • 20. Steps to Detailed Process Mapping
  • 21. Steps to Detailed Process Mapping
  • 22. Detailed Process Symbols Process mapping Symbols from Excel Process Step Connector Decision Start/Stop
  • 26. Detailed Process Mapping Input Type KPIV Specs/Tolerance Value Added KPOV Specs Data Quality Indices SOP Location 6" from split NVA Correct Location Measure d Flush with Table edge Visual Parallel to side SOP Location Right Edge NVA Correct Position Visual Flush to Catapult Base SOP Location Parallel to base of Table NVA Correct Position Measure d Flush with back edge Visual C Secure? NVA Secure Tape Visual C Pin Placement 1 Proper Pin Placement 1 Visual 120 +/- 2 C Stop Position 2 NVA Proper Stop Position 2 Visual 120 +/- 2 C Pull Back Angle 180 +/- 1 Proper Pull Back Angle 180 +/- 1 Measure d 120 +/- 2 C Ball Type Rubber Right Ball Rubber Visual 120 +/- 2 SOP Implement Start Positions NVA Inspection of Catapult C Operator Position Sitting Operator Sitting Sitting Visual SOP Ball Type Rubber NVA Proper Ball Rubber Visual Start Position Catapult Clamp Catapult Position Tape Measure Secure Tape Measure Determine Start Position from Historical Data Set Up Catapult Place Proper Ball in Cup
  • 27. Detailed Process Mapping Input Type KPIV Specs/Tolerance Value Added KPOV Specs Data Quality Indices C Holding Position 2 Fingers beneath cup VA Holding Position 2 Fingers beneath cup Measure d 120 +/- 2 C Firing Position Align with left side Firing Position Align with left side Measure d 120 +/- 2 N Hold Time < 2 seconds Hold Time < 2 seconds Measure d 120 +/- 2 C # of Measurers 2 NVA # of Measurers 2 Measure d 120 +/- 2 C Tape Measure Calibrated/Standard inch tape measure & Secured Tape Measure Calibrated/St andard inch tape measure & Secured Measure d 120 +/- 2 N Location of Measurer +/1 12 inches Location of Measurer +/1 12 inches Measure d 120 +/- 2 No Yes Fire Catapult Measure and Record Data Did Ball Hit Target? Stop
  • 28. Root Cause Analysis Objectives What is a root cause analysis Why perform a root cause analysis How to set up a root cause analysis using the fishbone diagram Steps to generate a root cause analysis using the fishbone diagram Example
  • 29. What is a root cause analysis?
  • 30. Why perform a root cause analysis?
  • 31. How to set up a fish bone diagram Cause and Effect Diagram organizes causes into 6 “M” distinct categories. 1.Man 2.Machine 3.Natural causes 4.Method 5.Measurement 6.Material
  • 32. Steps to generate a fish bone diagram Organize the 6 M’s around the fishbone MEASUREMENT METHODS MATERIALS MANPOWER MACHINES MOTHER NATURE
  • 33. Steps to generate a fish bone diagram
  • 34. Steps to generate a fish bone diagram
  • 35. MEASUREMENT METHODS MATERIALS MANPOWER MACHINES MOTHER NATURE Customer leaves restaurant dissatisfied rating Food in uncooked Food is over-cooked Rating not discriminatory Server is rude Restaurant is cold Restaurant is hot Limited menu Cash register quit Incorrect amount on bill Food taste bad Oven malfunctionedServer non-responsive Don’t take credit Don’t take checks Not enough servers Not enough cooks
  • 36. FMEA Objectives 1. What is an FMEA 2. What areas typically use an FMEA and why 3. How to set up an FMEA 4. Steps to generate an FMEA 5. Example
  • 37. What is an FMEA
  • 38. What areas typically use an FMEA • Manufacturing processes • Management Systems • Design of new products and processes • Service industries to maximize customer satisfaction • Defect minimization • Identifying Safety Hazards Each of these areas use FMEA to determine and minimize risk.
  • 39. FMEA Template Step Failure Mode Effect of Failure Mode Severity of Effect (1-10) Causes of Failure Likelihood of Cause (1-10) Control to Detect Failure Likelihood of Detection (1-10) RPN
  • 40. Severity Scoring of FMEA Effect of Failure Mode Severity of Effect Rank Catastrophic without warning Failure is catastrophic with no warning 10 Catastrophic with warning Failure is catastrophic with warning 9 Very High Between 75%-100% of product is rejected. Customer is immediately lost if defect is detected. 8 High 50%-75% of product is rejected. Customer will eventually be lost if other options exist. 7 Medium 25-50% of the product is scrapped without sorting. Customer is aware of the issue and begins looking for other suppliers. 6 Low 0% of product is rejected. 75%-100% of product reworked. Customer is dissatisfied, but loyal. 5 Very Low 50%-75% of product is reworked. Greater than 50% of customers notice the defect if found. 4 Minor 25%-50% of product is re-worked. Between 25%- 50% of customer notice the defect if found. 3 Very Minor Less than 25% of product is re-worked. Less than 25% of customers notice the defect if found. 2 None No effect 1
  • 41. Occurrence Scoring of FMEA Likelihood of Cause Probability of Cause Rank Inevitable Between 90%-100% 10 Very high Between 75%-90% 9 High Between 50%-75% 8 Moderately High Between 25%-50% 7 Moderate Between 5%-25% 6 Moderately Low Between 1%-5% 5 Low Between .001%-1% 4 Very Low Between .0001%-.001% 3 Rare Between .000001%-.0001% 2 Extremely Rare Less than .000001% 1
  • 42. Detection Scoring of FMEA Detection Likelihood that Defect is Detected Rank Not Detectable 0% chance of detecting defect 10 Very Rarely 0%-5% chance of detecting defect 9 Rarely 5%-10% chance of detecting defect 8 Low 10%-25% chance of detecting defect 7 Moderately Low 25%-40% chance of detecting defect 6 Moderate 40%-60% chance of detecting defect 5 Moderately High 60%-75% chance of detecting defect 4 High 75%-95% chance of detecting defect 3 Very High 95%-99.999% chance of detecting defect 2 Almost Certain Greater than 99.999% chance of detecting defect 1
  • 43. Steps to perform an FMEA
  • 44. Steps to perform an FMEA
  • 45. Steps to perform an FMEA
  • 46. FMEA Example Step Failure Mode Effect of Failure Mode Severity of Effect (1-10) Causes of Failure Likelihood (Occurrence) of Cause (1-10) Control to Detect Failure Likelihood of Detection (1-10) RPN Call 911 All lines are busy Must wait for open line 10 (catastrophic) Not enough phone lines 3 (very low) Phone usage logs by phone company 6 (moderately low) 180 Not enough operators 5 (moderately low) Budgeting for number of calls received 3 (high) 150 Call is not answered Ambulance not dispatched 10 (catastrophic) Not enough operators 5 (moderately low) Budgeting for number of calls received 3 (high) 150 All Operators are on lunch break 2 (rare) Time card system 2 (very high) 40