PROBLEM
SOLVING
CA-PDCA
Problem Solving
A Standard Method to Solve Problems as
well as a Management Philosophy for
running the business.
Problem Solving
It All Starts
With Standards
What is a Standard?
• A practice that is widely
recognized or employed,
especially because of its
excellence.
Understanding Problems and
Standards
• The standard is a numerically
defined and measurable
representation of what, and
how, we want to do something
in order to attain an expected
result.
“
Standards…..Why Numerically
Defined?
1.In order to give a precise
understanding of what is needed to
enable everyone to understand.
2.It is not ambiguous (a matter of
opinion)
3.It can be tracked and measured.
What Areas and Activities need to
have Standards?
What Areas and Activities need to
have Standards?
What Areas and Activities need to
have Standards?
Whose responsibility is it to Attain the
Standards that are Established?
How do we establish Standards?
Standards are the basis
(foundation) for
1.Making Improvements
2.Solving Problems
What is a Problem?
• A problem is a discrepancy
(difference) between the current
situation and the standard.
• A difference between what is
happening and what should be
happening.
When Management see a
Problem?
• “Check” what is Happening.
• Contain the Problem.
• Do not let it continue to
happen.
• “Act”-Implement Temporary
fix.
Next Step?
•Once the situation is
contained, Begin the
PDCA Problem Solving
process to find and
eliminate.
To be the Best in the Industry we
must provide
•The Lowest Cost
•The Highest Quality
•The Best Delivery and Service
This means we must always strive to do better How?
Value
Uses for PDCA Process
• The PDCA process is used to solve
problems (bring non-standard
condition back into standard), or
• To reduce the amount of waste
associated with a current standard.
(change the Standard, make an
improvement)
PDCA FOUR-PHASE PROBLEM SOLVING
PROCESS
The PDCA Problem Solving
Process involves four
phases:
Plan
Do
Check
Action
ACTION PLAN
CHECK DO
PDCA FOUR-PHASE PROBLEM SOLVING
PROCESS
The PDCA Problem Solving Process involves four
phases:
Plan-Do-Check-Action
STEPS:
I. Evaluate Results
II. Standardize
effective
Countermeasure(s) OR
III. Start PDCA again
Do II. & III. if Results
are uneven
STEPS:
I. Identify Problem
II. Analyze Cause
III. Formulate Countermeasures
STEPS:
I. Monitor Progress of
Implementation Plan
II. Modify Plan if Necessary
III. Monitor Results
(Effectiveness)
STEPS:
I. Develop Implementation Plan
II. Communicate Plan
III. Execute Plan
ACTION PLAN
CHECK DO
PURPOSE:
Gain thorough
understanding of
problem so it can be
systematically addressed
PURPOSE:
Take action to ensure
countermeasures are
effectively and
efficiently
implemented
PURPOSE:
Check progress of
implementation and
check effectiveness
of results
PURPOSE:
Take action based on
results of check
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
ADVANTAGES……it is standardized.
•Systematic approach (recognizable to all)
•Provides a common language
•Format used to present FACTS and DATA
•Simple - anyone can do
PDCA REPORT FORMAT
Theme
Problem Situation Countermeasure(s)
Implementation
Target
Cause Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PLAN
PLAN
PLAN
PLAN
PLAN
DO
CHECK
PDCA FOUR-PHASE PROBLEM SOLVING
PROCESS (EFFORT)
ACTION
PLAN
CHECK
DO
Evaluate the Problem
• The criteria you use to guide this evaluation
include:
– Importance: how serious is the problem in light of
cost, safety, or quality, etc.?
– Urgency: how soon should it be solved to avoid
more serious problems
– Tendency: is the problem getting worse, staying the
same, or getting better?
• Problems may have high, medium, or low importance,
urgency, or tendency. All of these factors need to be
considered when several problems arise at the same
time and priorities must be set
Problems Important Urgency Tendency
1.
2.
3.
4.
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
PLAN - PRESENT SITUATION
(Should be DETAILED and FACT-FILLED)
•Standard (What should be happening/ what is the standard or
standard way)
•Current Situation (What is actually happening)
•Discrepancy (What is difference between standard and actual?)
•Extent (What is trend/ when did it start/ who is affected/ how
often does it occur/ where does it happen/ etc...?)
•Rationale (Why should this problem be addressed/ what would
happen if it weren’t addressed?)
Obtain Relevant
Facts Relating to the Standard
Extent:Extent:
• Seek facts relating to when the standard is
achieved and when it is not
• Define important details about the current
situation vs. the standard situation
What’s different?
How often?
When is the problem
occurring (not occurring)?
Where is the problem
located (not located)? Find
the POC (point of cause)
What’s changed?
When did it start?
What is the trend?
PDCA REPORT FORMAT
PLAN - PRESENT SITUATION
(Should be DETAILED and FACT-FILLED)
•Standard PU shift changeover time target is 15 minutes
•Current Situation Changeover time has averaged 25 minutes over
45 days (Oct. 15 – Nov. 30)
•Discrepancy Changeover is 10 minutes longer than target
•Extent Both shifts for at least 45 days, different operators,
different machines
•Rationale Productivity loss of 450 minutes (7.5 hours) over 45
day period – can not meet needs of Stockfit (internal customer)
PDCA REPORT FORMAT
PLAN - PRESENT SITUATION
PU Shift Changeover Time
0
10
20
30
40
15/10/2002
17/10/2002
19/10/2002
21/10/2002
23/10/2002
25/10/2002
27/10/2002
29/10/2002
31/10/2002
02/11/2002
04/11/2002
06/11/2002
08/11/2002
10/11/2002
12/11/2002
Week of
Time(minutes)
Target
Actual
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
PLAN - TARGET
(Should be QUANTIFIABLE, MEASUREABLE,
ACHIEVEABLE, TIME-BOUND )
•Do What: (Action word - Increase, Reduce, Decrease)
•To What: (Object of the action - Focus Area)
•How Much: (Quantifiable measurement - relates to
STANDARD)
•By When: (Specific date - month, day, year)
PDCA REPORT FORMAT
PLAN - TARGET
(Should be QUANTIFIABLE, MEASUREABLE,
ACHIEVEABLE, TIME-BOUND )
•Do What: Reduce
•To What: PU shift changeover time
•How Much: from 25 to 15 minutes (per changeover)
•By When: 12/15/2002
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
PLAN - THEME
(General “Grasp the Situation” - One
Sentence/ Phrase )
•Theme: (What do you REALLY want to
accomplish -
Do What - To What)
PDCA REPORT FORMAT
PLAN - THEME
(General “Grasp the Situation” - One
Sentence/ Phrase )
•Theme: Reduce time for PU shift
changeover.
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
PLAN - ANALYSIS
(Based on FACTS)
•Potential Causes: (List of all possible causes/ source of
problem - fishbone diagram is useful tool)
•How Checked? (Method to confirm reasonableness of
potential cause(s) )
•Result? (Result of check - Go and See!)
•Most Likely Cause: (Based on FACT, investigation
results, reasonable assumptions)
PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)
•Describes relationship between variables
•Used in brainstorming sessions to identify possible causes
of a problem or condition
•Focuses on causes, not symptoms
EFFECT
(Undesirable
Outcome)
PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)
EFFECT
(Undesirable
Outcome)
Major
CAUSE
category
Major
CAUSE
category
Major
CAUSE
category
Major
CAUSE
category
Major
CAUSE
category
PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)
Major CAUSE Categories can generally be classified as:
MAN METHOD MACHINE
-Skill Level -Work Sequence -Function
-Individual Morale -Takt Time Properly
-Training -Ergonomics -Capable
-Ability
MATERIAL ENVIRONMENT
-Available as Needed -Group/Team Morale
-Meets Standard -Area Lighting
-Climate
-Work Area Arrangement
PDCA REPORT FORMAT
PLAN - ANALYSIS
(Based on FACTS)
Most Likely Cause: Inconsistent method
Potential Causes How Checked Result?
Operator cycle time longer
than standard cycle time
Observe (check cycle time) Operator skill OK
Inconsistent method Check operator method to
SWS (standardized work
sheet)
Missing some standardized
work at some operations
Equipment not working
properly
Check equipment check
sheet to actual operating
conditions
Equipment operating
conditions consistent with
check sheet
PDCA REPORT FORMAT
PLAN - ANALYSIS
•Problem: Problem Statement (direct cause)
•5-Whys?: Method to confirm potential cause - go and see/ first
hand investigation is a MUST
•Problem Statement – one phrase stating problem
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•ROOT CAUSE
PDCA REPORT FORMAT
PLAN - ANALYSIS
•Root cause: Root cause has been found when:
•It can be dealt with directly
•An effective countermeasure can be applied
directly to prevent recurrence
•If inconsistency is corrected, condition will
return to standard
•Confirm using the “therefore” test
PDCA REPORT FORMAT
PLAN - ANALYSIS
Therefore test:
•ROOT CAUSE…
-Therefore Why5 –
-Therefore… Why 4-
-Therefore… Why 3-
-Therefore… Why 2-
-Therefore… Why 1-
Therefore…Problem Statement.
PDCA REPORT FORMAT
PLAN - ANALYSIS
•Problem: Problem Statement (direct cause)
•5-Whys?: Method to confirm potential cause - go and see/ first
hand investigation is a MUST
•Problem Statement - Changeover time has averaged 25 minutes
•Why? Operator time inconsistent
•Why? Operator doesn’t follow work instruction
•Why? Work instruction not communicated with operators
•Why? Standardized work not completed for operation
•Why? No system for approving and posting STW
•ROOT CAUSE No system for approving and posting STW
PDCA REPORT FORMAT
PLAN - ANALYSIS
Therefore test:
No system for approving and posting STW
-Therefore… Standardized work not completed for operation
-Therefore… Work instruction not communicated with
operators
-Therefore… Operator doesn’t follow work instruction
-Therefore… Operator time inconsistent
-Therefore… Changeover time has
averaged 25 minutes .
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
PLAN - COUNTERMEASURE
•Short term: Contains the problem.
•Long term: Addresses root cause
•Recurrence prevention: Prevents problem from
ever happening again for same root cause
•Why recommended: Evaluate based on cost,
timeliness, feasibility, effectiveness, impact
PDCA REPORT FORMAT
PLAN - COUNTERMEASURE
•Short term: Team leader for all shifts prepare and present work
instruction (standardized work) to all team members
•Long term: Develop and post new standardized work with input
from team members
•Recurrence prevention: Set up system to approve and post
standardized work
•Why recommended: Positive impact on all areas (clarifies
standard for how, when to implement and post standardized work);
prevents problem from happening for same root cause; low cost
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
DO - IMPLEMENTATION
•Action Plan: What, Where, Who, When, Status
•Communication: All affected people understand
(and support) plan
•Execution: Do it!
PDCA REPORT FORMAT
DO - IMPLEMENTATION
•Action Plan
WHAT WHERE WHO WHEN STATUS
Team Leader
for operations
determine
STW
PU work
station
Team Leader
(S. Nguyen)
11/18/2002
Team Leader
share STW
with all
operators
PU work
stations
Team Leader
(S. Nguyen)
11/19/2002
Determine
procedure for
creating,
updating STW
Factory Manager –
ABC Dept.
12/31/2002
Follow
procedure for
updating STW
PU work
station
Team Leader
(S. Nguyen)
1/31/2003
PDCA REPORT FORMAT
Theme
Present Situation Countermeasure(s)
Implementation
Target
Analysis
Follow-Up
Standard
Current Situation
Discrepancy
Extent
Rationale
Do What
To What
How Much
By When
Potential Causes/ Investigation
5-Why Root Cause Analysis
Short Term
Long Term
Recurrence Prevention
Why Recommended
What Where Who When
What Where Who When
Target
Actual
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•How check: Method (visual, with tool, etc.)
•When check: When/how often
•Who check: Responsible person
•Graph: Quick visual: Target vs. actual - relates back to
standard
•Implementation progress: On schedule?
•Countermeasure effectiveness: Has problem recurred? Is
situation brought back to standard?
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•How check: Stopwatch – last good part shift 1 to first good part
shift 2
•When check: Daily at shift change
•Who check: Team leader (S. Nguyen)
•Graph: PU Shift Changeover Tim e
0
10
20
30
40
12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb
Week of
Time(minutes)
Target
Actual
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•Implementation progress:
WHAT WHERE WHO WHEN STATUS
Team Leader
for operations
determine
STW
PU work
station
Team Leader
(S. Nguyen)
11/18/2002 100%
Team Leader
share STW
with all
operators
PU work
stations
Team Leader
(S. Nguyen)
11/19/2002 100%
Determine
procedure for
creating,
updating STW
Factory Manager –
ABC Dept.
12/31/2002 100%
Follow
procedure for
updating STW
PU work
station
Team Leader
(S. Nguyen)
1/31/2003 100%
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•Countermeasure effectiveness: Meeting target? Yes!
PU Shift Changeover Time
0
10
20
30
40
12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb
Week of
Time(minutes)
Target
Actual
PDCA REPORT FORMAT
ACTION - FOLLOW-UP
•Based on results of CHECK phase
•Meet target: Standardize countermeasure(s)
•Meet target (but problem could recur): Repeat
PDCA
•Not meeting target: Repeat PDCA
•Mixed results: Standardize effective
countermeasure(s) and repeat PDCA
Major Areas for Possible Problems
• Quality:
– Review data on defects
– Check process/product at
startup/breaks
– Observe complete process or
product
– Review standardized work
charts
• Cost:
– Overtime
– Operating supply cost
– Material Usage
Safety:
 Review injury data reports
 Check safety wear
 Observe whether
standardized work is being
followed
Major Areas for Possible Problems
• Personnel:
– Attendance chart
– Job rotation chart
– Training and
development chart
– Review suggestions
from team members
• Production (Quantity):
– Number of pairs of shoes off line
– Andon
– Productivity rate
– Balanced Manpower, Demand
and Inventory.
– Review scrap reports
Other:
 Maintenance check sheet
Remember…..
• It all begins with establishing
Standards and monitoring the
results of your Standards.
Managements Focus
• Ensure the organization is following the set
Standards through daily monitoring.
• Use PDCA to bring situations back into
Standard.
• Work to improve upon current Standards.

Weitere ähnliche Inhalte

Was ist angesagt?

Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysisgatelyw396
 
Sample project-Quality Circle
Sample project-Quality CircleSample project-Quality Circle
Sample project-Quality CircleMohamed Yusuff
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Fishbone diagam guide
Fishbone diagam guideFishbone diagam guide
Fishbone diagam guide丹 丹
 
Root cause analysis - tools and process
Root cause analysis - tools and processRoot cause analysis - tools and process
Root cause analysis - tools and processCharles Cotter, PhD
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentationPRASHANT KSHIRSAGAR
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Six Sigma Project Charter
Six Sigma Project CharterSix Sigma Project Charter
Six Sigma Project CharterVijay Rasam
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause AnalysisDavid Hanson
 
04.Customer complaint register.doc
04.Customer complaint register.doc04.Customer complaint register.doc
04.Customer complaint register.docKABIRCHOPRA4
 
5 why analysis training presentaion
5 why analysis training presentaion5 why analysis training presentaion
5 why analysis training presentaionDharmesh Panchal
 

Was ist angesagt? (20)

Root cause analysis training
Root cause analysis trainingRoot cause analysis training
Root cause analysis training
 
Process Troubleshooting
Process TroubleshootingProcess Troubleshooting
Process Troubleshooting
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Root-Cause-Analysis.pptx
Root-Cause-Analysis.pptxRoot-Cause-Analysis.pptx
Root-Cause-Analysis.pptx
 
Sample project-Quality Circle
Sample project-Quality CircleSample project-Quality Circle
Sample project-Quality Circle
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
Fishbone diagam guide
Fishbone diagam guideFishbone diagam guide
Fishbone diagam guide
 
ROOT CAUSE ANALYSIS PRESENTATION
ROOT CAUSE ANALYSIS PRESENTATIONROOT CAUSE ANALYSIS PRESENTATION
ROOT CAUSE ANALYSIS PRESENTATION
 
Root cause analysis - tools and process
Root cause analysis - tools and processRoot cause analysis - tools and process
Root cause analysis - tools and process
 
Root Cause Analysis (RCA)
Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Root Cause Analysis (RCA)
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentation
 
Foreign Material Mgt 2010 02 27 0901
Foreign Material Mgt  2010 02 27 0901Foreign Material Mgt  2010 02 27 0901
Foreign Material Mgt 2010 02 27 0901
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
 
Six Sigma Project Charter
Six Sigma Project CharterSix Sigma Project Charter
Six Sigma Project Charter
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
04.Customer complaint register.doc
04.Customer complaint register.doc04.Customer complaint register.doc
04.Customer complaint register.doc
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
5 why analysis training presentaion
5 why analysis training presentaion5 why analysis training presentaion
5 why analysis training presentaion
 

Ähnlich wie Reduce PU Shift Changeover Time with PDCA

Seda emdedding learning technologies evaluating and sustainability3
Seda emdedding learning technologies   evaluating and sustainability3Seda emdedding learning technologies   evaluating and sustainability3
Seda emdedding learning technologies evaluating and sustainability3BrianKilpatrick
 
Lean Projects with A3 Method
Lean Projects with A3 MethodLean Projects with A3 Method
Lean Projects with A3 MethodNitor
 
Introduction to Lean and PDSA Thinking
Introduction to Lean and PDSA ThinkingIntroduction to Lean and PDSA Thinking
Introduction to Lean and PDSA ThinkingRachel Janzen
 
Discovery Workshop Template
Discovery Workshop TemplateDiscovery Workshop Template
Discovery Workshop Templatedesigner DATA
 
ToC_training slide_set_Sniffer Aug 2015 v2 num-sm
ToC_training slide_set_Sniffer Aug 2015 v2 num-smToC_training slide_set_Sniffer Aug 2015 v2 num-sm
ToC_training slide_set_Sniffer Aug 2015 v2 num-smDr Seán Doolan, MBA
 
FOCUS PDCA Quality Imporvement Methodology
FOCUS PDCA  Quality Imporvement MethodologyFOCUS PDCA  Quality Imporvement Methodology
FOCUS PDCA Quality Imporvement MethodologyJoven Botin Bilbao
 
Applying TQM and the Toyota Production System in Development of Software Arti...
Applying TQM and the Toyota Production System in Development of Software Arti...Applying TQM and the Toyota Production System in Development of Software Arti...
Applying TQM and the Toyota Production System in Development of Software Arti...Dave Litwiller
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...admford
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"admford
 
Project Management For The Curious
Project Management For The CuriousProject Management For The Curious
Project Management For The Curiousdwhelbourn
 
Changing culture and building efficiencies by applying the Lean principles to...
Changing culture and building efficiencies by applying the Lean principles to...Changing culture and building efficiencies by applying the Lean principles to...
Changing culture and building efficiencies by applying the Lean principles to...Association for Project Management
 
Process Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptxProcess Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptxJanMohammed3
 
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicThe Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicDave Litwiller
 
Are you in control of Testing, or does Testing control you?
Are you in control of Testing, or does Testing control you? Are you in control of Testing, or does Testing control you?
Are you in control of Testing, or does Testing control you? SQALab
 
259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibertMario Charlin
 
PI Boot Camp 2015.06 Participant Packet
PI Boot Camp 2015.06 Participant PacketPI Boot Camp 2015.06 Participant Packet
PI Boot Camp 2015.06 Participant PacketMike Rudolf
 
Chapter 5 successful problem solving & task mgt
Chapter 5   successful problem solving & task mgtChapter 5   successful problem solving & task mgt
Chapter 5 successful problem solving & task mgtNasz Zainuddin
 

Ähnlich wie Reduce PU Shift Changeover Time with PDCA (20)

Seda emdedding learning technologies evaluating and sustainability3
Seda emdedding learning technologies   evaluating and sustainability3Seda emdedding learning technologies   evaluating and sustainability3
Seda emdedding learning technologies evaluating and sustainability3
 
Lean Projects with A3 Method
Lean Projects with A3 MethodLean Projects with A3 Method
Lean Projects with A3 Method
 
Introduction to Lean and PDSA Thinking
Introduction to Lean and PDSA ThinkingIntroduction to Lean and PDSA Thinking
Introduction to Lean and PDSA Thinking
 
IntroSCRUM
IntroSCRUMIntroSCRUM
IntroSCRUM
 
Discovery Workshop Template
Discovery Workshop TemplateDiscovery Workshop Template
Discovery Workshop Template
 
ToC_training slide_set_Sniffer Aug 2015 v2 num-sm
ToC_training slide_set_Sniffer Aug 2015 v2 num-smToC_training slide_set_Sniffer Aug 2015 v2 num-sm
ToC_training slide_set_Sniffer Aug 2015 v2 num-sm
 
FOCUS PDCA Quality Imporvement Methodology
FOCUS PDCA  Quality Imporvement MethodologyFOCUS PDCA  Quality Imporvement Methodology
FOCUS PDCA Quality Imporvement Methodology
 
Applying TQM and the Toyota Production System in Development of Software Arti...
Applying TQM and the Toyota Production System in Development of Software Arti...Applying TQM and the Toyota Production System in Development of Software Arti...
Applying TQM and the Toyota Production System in Development of Software Arti...
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?” - Ci...
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
 
Project Management For The Curious
Project Management For The CuriousProject Management For The Curious
Project Management For The Curious
 
FOCUS PDCA
FOCUS PDCAFOCUS PDCA
FOCUS PDCA
 
Changing culture and building efficiencies by applying the Lean principles to...
Changing culture and building efficiencies by applying the Lean principles to...Changing culture and building efficiencies by applying the Lean principles to...
Changing culture and building efficiencies by applying the Lean principles to...
 
Process Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptxProcess Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptx
 
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicThe Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
 
Are you in control of Testing, or does Testing control you?
Are you in control of Testing, or does Testing control you? Are you in control of Testing, or does Testing control you?
Are you in control of Testing, or does Testing control you?
 
259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert
 
PI Boot Camp 2015.06 Participant Packet
PI Boot Camp 2015.06 Participant PacketPI Boot Camp 2015.06 Participant Packet
PI Boot Camp 2015.06 Participant Packet
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Chapter 5 successful problem solving & task mgt
Chapter 5   successful problem solving & task mgtChapter 5   successful problem solving & task mgt
Chapter 5 successful problem solving & task mgt
 

Mehr von Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

Mehr von Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Kürzlich hochgeladen

Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 

Kürzlich hochgeladen (20)

Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 

Reduce PU Shift Changeover Time with PDCA

  • 2. CA-PDCA Problem Solving A Standard Method to Solve Problems as well as a Management Philosophy for running the business.
  • 4. It All Starts With Standards
  • 5. What is a Standard? • A practice that is widely recognized or employed, especially because of its excellence.
  • 6. Understanding Problems and Standards • The standard is a numerically defined and measurable representation of what, and how, we want to do something in order to attain an expected result. “
  • 7. Standards…..Why Numerically Defined? 1.In order to give a precise understanding of what is needed to enable everyone to understand. 2.It is not ambiguous (a matter of opinion) 3.It can be tracked and measured.
  • 8.
  • 9.
  • 10. What Areas and Activities need to have Standards?
  • 11. What Areas and Activities need to have Standards?
  • 12. What Areas and Activities need to have Standards?
  • 13. Whose responsibility is it to Attain the Standards that are Established?
  • 14. How do we establish Standards?
  • 15.
  • 16. Standards are the basis (foundation) for 1.Making Improvements 2.Solving Problems
  • 17. What is a Problem? • A problem is a discrepancy (difference) between the current situation and the standard. • A difference between what is happening and what should be happening.
  • 18. When Management see a Problem? • “Check” what is Happening. • Contain the Problem. • Do not let it continue to happen. • “Act”-Implement Temporary fix.
  • 19. Next Step? •Once the situation is contained, Begin the PDCA Problem Solving process to find and eliminate.
  • 20. To be the Best in the Industry we must provide •The Lowest Cost •The Highest Quality •The Best Delivery and Service This means we must always strive to do better How? Value
  • 21. Uses for PDCA Process • The PDCA process is used to solve problems (bring non-standard condition back into standard), or • To reduce the amount of waste associated with a current standard. (change the Standard, make an improvement)
  • 22. PDCA FOUR-PHASE PROBLEM SOLVING PROCESS The PDCA Problem Solving Process involves four phases: Plan Do Check Action ACTION PLAN CHECK DO
  • 23. PDCA FOUR-PHASE PROBLEM SOLVING PROCESS The PDCA Problem Solving Process involves four phases: Plan-Do-Check-Action STEPS: I. Evaluate Results II. Standardize effective Countermeasure(s) OR III. Start PDCA again Do II. & III. if Results are uneven STEPS: I. Identify Problem II. Analyze Cause III. Formulate Countermeasures STEPS: I. Monitor Progress of Implementation Plan II. Modify Plan if Necessary III. Monitor Results (Effectiveness) STEPS: I. Develop Implementation Plan II. Communicate Plan III. Execute Plan ACTION PLAN CHECK DO PURPOSE: Gain thorough understanding of problem so it can be systematically addressed PURPOSE: Take action to ensure countermeasures are effectively and efficiently implemented PURPOSE: Check progress of implementation and check effectiveness of results PURPOSE: Take action based on results of check
  • 24. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 25. PDCA REPORT FORMAT ADVANTAGES……it is standardized. •Systematic approach (recognizable to all) •Provides a common language •Format used to present FACTS and DATA •Simple - anyone can do
  • 26. PDCA REPORT FORMAT Theme Problem Situation Countermeasure(s) Implementation Target Cause Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Why Recommended What Where Who When What Where Who When Target Actual PLAN PLAN PLAN PLAN PLAN DO CHECK
  • 27. PDCA FOUR-PHASE PROBLEM SOLVING PROCESS (EFFORT) ACTION PLAN CHECK DO
  • 28. Evaluate the Problem • The criteria you use to guide this evaluation include: – Importance: how serious is the problem in light of cost, safety, or quality, etc.? – Urgency: how soon should it be solved to avoid more serious problems – Tendency: is the problem getting worse, staying the same, or getting better? • Problems may have high, medium, or low importance, urgency, or tendency. All of these factors need to be considered when several problems arise at the same time and priorities must be set
  • 29. Problems Important Urgency Tendency 1. 2. 3. 4.
  • 30. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 31. PDCA REPORT FORMAT PLAN - PRESENT SITUATION (Should be DETAILED and FACT-FILLED) •Standard (What should be happening/ what is the standard or standard way) •Current Situation (What is actually happening) •Discrepancy (What is difference between standard and actual?) •Extent (What is trend/ when did it start/ who is affected/ how often does it occur/ where does it happen/ etc...?) •Rationale (Why should this problem be addressed/ what would happen if it weren’t addressed?)
  • 32. Obtain Relevant Facts Relating to the Standard Extent:Extent: • Seek facts relating to when the standard is achieved and when it is not • Define important details about the current situation vs. the standard situation What’s different? How often? When is the problem occurring (not occurring)? Where is the problem located (not located)? Find the POC (point of cause) What’s changed? When did it start? What is the trend?
  • 33. PDCA REPORT FORMAT PLAN - PRESENT SITUATION (Should be DETAILED and FACT-FILLED) •Standard PU shift changeover time target is 15 minutes •Current Situation Changeover time has averaged 25 minutes over 45 days (Oct. 15 – Nov. 30) •Discrepancy Changeover is 10 minutes longer than target •Extent Both shifts for at least 45 days, different operators, different machines •Rationale Productivity loss of 450 minutes (7.5 hours) over 45 day period – can not meet needs of Stockfit (internal customer)
  • 34. PDCA REPORT FORMAT PLAN - PRESENT SITUATION PU Shift Changeover Time 0 10 20 30 40 15/10/2002 17/10/2002 19/10/2002 21/10/2002 23/10/2002 25/10/2002 27/10/2002 29/10/2002 31/10/2002 02/11/2002 04/11/2002 06/11/2002 08/11/2002 10/11/2002 12/11/2002 Week of Time(minutes) Target Actual
  • 35. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 36. PDCA REPORT FORMAT PLAN - TARGET (Should be QUANTIFIABLE, MEASUREABLE, ACHIEVEABLE, TIME-BOUND ) •Do What: (Action word - Increase, Reduce, Decrease) •To What: (Object of the action - Focus Area) •How Much: (Quantifiable measurement - relates to STANDARD) •By When: (Specific date - month, day, year)
  • 37. PDCA REPORT FORMAT PLAN - TARGET (Should be QUANTIFIABLE, MEASUREABLE, ACHIEVEABLE, TIME-BOUND ) •Do What: Reduce •To What: PU shift changeover time •How Much: from 25 to 15 minutes (per changeover) •By When: 12/15/2002
  • 38. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 39. PDCA REPORT FORMAT PLAN - THEME (General “Grasp the Situation” - One Sentence/ Phrase ) •Theme: (What do you REALLY want to accomplish - Do What - To What)
  • 40. PDCA REPORT FORMAT PLAN - THEME (General “Grasp the Situation” - One Sentence/ Phrase ) •Theme: Reduce time for PU shift changeover.
  • 41. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 42. PDCA REPORT FORMAT PLAN - ANALYSIS (Based on FACTS) •Potential Causes: (List of all possible causes/ source of problem - fishbone diagram is useful tool) •How Checked? (Method to confirm reasonableness of potential cause(s) ) •Result? (Result of check - Go and See!) •Most Likely Cause: (Based on FACT, investigation results, reasonable assumptions)
  • 43. PDCA REPORT FORMAT FISHBONE DIAGRAM (Cause & Effect) •Describes relationship between variables •Used in brainstorming sessions to identify possible causes of a problem or condition •Focuses on causes, not symptoms EFFECT (Undesirable Outcome)
  • 44. PDCA REPORT FORMAT FISHBONE DIAGRAM (Cause & Effect) EFFECT (Undesirable Outcome) Major CAUSE category Major CAUSE category Major CAUSE category Major CAUSE category Major CAUSE category
  • 45. PDCA REPORT FORMAT FISHBONE DIAGRAM (Cause & Effect) Major CAUSE Categories can generally be classified as: MAN METHOD MACHINE -Skill Level -Work Sequence -Function -Individual Morale -Takt Time Properly -Training -Ergonomics -Capable -Ability MATERIAL ENVIRONMENT -Available as Needed -Group/Team Morale -Meets Standard -Area Lighting -Climate -Work Area Arrangement
  • 46. PDCA REPORT FORMAT PLAN - ANALYSIS (Based on FACTS) Most Likely Cause: Inconsistent method Potential Causes How Checked Result? Operator cycle time longer than standard cycle time Observe (check cycle time) Operator skill OK Inconsistent method Check operator method to SWS (standardized work sheet) Missing some standardized work at some operations Equipment not working properly Check equipment check sheet to actual operating conditions Equipment operating conditions consistent with check sheet
  • 47. PDCA REPORT FORMAT PLAN - ANALYSIS •Problem: Problem Statement (direct cause) •5-Whys?: Method to confirm potential cause - go and see/ first hand investigation is a MUST •Problem Statement – one phrase stating problem •Why? (investigate - get facts) •Why? (investigate - get facts) •Why? (investigate - get facts) •Why? (investigate - get facts) •Why? (investigate - get facts) •ROOT CAUSE
  • 48. PDCA REPORT FORMAT PLAN - ANALYSIS •Root cause: Root cause has been found when: •It can be dealt with directly •An effective countermeasure can be applied directly to prevent recurrence •If inconsistency is corrected, condition will return to standard •Confirm using the “therefore” test
  • 49. PDCA REPORT FORMAT PLAN - ANALYSIS Therefore test: •ROOT CAUSE… -Therefore Why5 – -Therefore… Why 4- -Therefore… Why 3- -Therefore… Why 2- -Therefore… Why 1- Therefore…Problem Statement.
  • 50. PDCA REPORT FORMAT PLAN - ANALYSIS •Problem: Problem Statement (direct cause) •5-Whys?: Method to confirm potential cause - go and see/ first hand investigation is a MUST •Problem Statement - Changeover time has averaged 25 minutes •Why? Operator time inconsistent •Why? Operator doesn’t follow work instruction •Why? Work instruction not communicated with operators •Why? Standardized work not completed for operation •Why? No system for approving and posting STW •ROOT CAUSE No system for approving and posting STW
  • 51. PDCA REPORT FORMAT PLAN - ANALYSIS Therefore test: No system for approving and posting STW -Therefore… Standardized work not completed for operation -Therefore… Work instruction not communicated with operators -Therefore… Operator doesn’t follow work instruction -Therefore… Operator time inconsistent -Therefore… Changeover time has averaged 25 minutes .
  • 52. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 53. PDCA REPORT FORMAT PLAN - COUNTERMEASURE •Short term: Contains the problem. •Long term: Addresses root cause •Recurrence prevention: Prevents problem from ever happening again for same root cause •Why recommended: Evaluate based on cost, timeliness, feasibility, effectiveness, impact
  • 54. PDCA REPORT FORMAT PLAN - COUNTERMEASURE •Short term: Team leader for all shifts prepare and present work instruction (standardized work) to all team members •Long term: Develop and post new standardized work with input from team members •Recurrence prevention: Set up system to approve and post standardized work •Why recommended: Positive impact on all areas (clarifies standard for how, when to implement and post standardized work); prevents problem from happening for same root cause; low cost
  • 55. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 56. PDCA REPORT FORMAT DO - IMPLEMENTATION •Action Plan: What, Where, Who, When, Status •Communication: All affected people understand (and support) plan •Execution: Do it!
  • 57. PDCA REPORT FORMAT DO - IMPLEMENTATION •Action Plan WHAT WHERE WHO WHEN STATUS Team Leader for operations determine STW PU work station Team Leader (S. Nguyen) 11/18/2002 Team Leader share STW with all operators PU work stations Team Leader (S. Nguyen) 11/19/2002 Determine procedure for creating, updating STW Factory Manager – ABC Dept. 12/31/2002 Follow procedure for updating STW PU work station Team Leader (S. Nguyen) 1/31/2003
  • 58. PDCA REPORT FORMAT Theme Present Situation Countermeasure(s) Implementation Target Analysis Follow-Up Standard Current Situation Discrepancy Extent Rationale Do What To What How Much By When Potential Causes/ Investigation 5-Why Root Cause Analysis Short Term Long Term Recurrence Prevention Why Recommended What Where Who When What Where Who When Target Actual
  • 59. PDCA REPORT FORMAT CHECK - FOLLOW-UP •How check: Method (visual, with tool, etc.) •When check: When/how often •Who check: Responsible person •Graph: Quick visual: Target vs. actual - relates back to standard •Implementation progress: On schedule? •Countermeasure effectiveness: Has problem recurred? Is situation brought back to standard?
  • 60. PDCA REPORT FORMAT CHECK - FOLLOW-UP •How check: Stopwatch – last good part shift 1 to first good part shift 2 •When check: Daily at shift change •Who check: Team leader (S. Nguyen) •Graph: PU Shift Changeover Tim e 0 10 20 30 40 12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb Week of Time(minutes) Target Actual
  • 61. PDCA REPORT FORMAT CHECK - FOLLOW-UP •Implementation progress: WHAT WHERE WHO WHEN STATUS Team Leader for operations determine STW PU work station Team Leader (S. Nguyen) 11/18/2002 100% Team Leader share STW with all operators PU work stations Team Leader (S. Nguyen) 11/19/2002 100% Determine procedure for creating, updating STW Factory Manager – ABC Dept. 12/31/2002 100% Follow procedure for updating STW PU work station Team Leader (S. Nguyen) 1/31/2003 100%
  • 62. PDCA REPORT FORMAT CHECK - FOLLOW-UP •Countermeasure effectiveness: Meeting target? Yes! PU Shift Changeover Time 0 10 20 30 40 12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb Week of Time(minutes) Target Actual
  • 63. PDCA REPORT FORMAT ACTION - FOLLOW-UP •Based on results of CHECK phase •Meet target: Standardize countermeasure(s) •Meet target (but problem could recur): Repeat PDCA •Not meeting target: Repeat PDCA •Mixed results: Standardize effective countermeasure(s) and repeat PDCA
  • 64. Major Areas for Possible Problems • Quality: – Review data on defects – Check process/product at startup/breaks – Observe complete process or product – Review standardized work charts • Cost: – Overtime – Operating supply cost – Material Usage Safety:  Review injury data reports  Check safety wear  Observe whether standardized work is being followed
  • 65. Major Areas for Possible Problems • Personnel: – Attendance chart – Job rotation chart – Training and development chart – Review suggestions from team members • Production (Quantity): – Number of pairs of shoes off line – Andon – Productivity rate – Balanced Manpower, Demand and Inventory. – Review scrap reports Other:  Maintenance check sheet
  • 66. Remember….. • It all begins with establishing Standards and monitoring the results of your Standards.
  • 67. Managements Focus • Ensure the organization is following the set Standards through daily monitoring. • Use PDCA to bring situations back into Standard. • Work to improve upon current Standards.