Construction Tender Process
Tender steps between Client,
Contractor and Subcontractor
Dr A Kimmance
Planning and Design Stages in the
Construction Process – Contractor
Contractor
Planning
Phase
Contractor
Design
Phase
Construction
Projects
Tendering
Bidding
Phase
Start-Up
Mobilization
Lessons
Learned
Hand Over
Closure
Each stage has a systematic set of interfaced proceedings,
events, activities and processes.
Clients Tender Invite – Process
Instruction/Invitation to Tender sent to contractor (need to
identify which tender approach as they are different)
Contractor receives the request for bids (open or selective)
Tender Assessment by Contractor (strategic board review,
dependant on size of project and tender type)
De-briefing of tenderers (scrutinise)
Client issue Letter of Intent (may be optional, depending on tender
type, selective or open)
Award Construction Contract
Project, Goods and/or Services delivered (depending on contract to
be used; (lump sum, cost reimbursement, etc)
Project Payment and statutory document realized
Project Closure
 Invites contractors (open or select contractor) to submit
the price for which they are willing to carry out a project
(e.g., business, technical, economical, management)
 Typically depends on type of competitive, open or selective
tender; contractor relies on level of information contained in
tender, pre-lim drawings, specifications , bills of quantities
prepared on behalf of the client (e.g., architects, consultants).
 Tender type (dictates the level of design, cost and construction)
 Open (anyone, may include 2 stage pre-qualification )
 Selective (usually have worked with the client)
 One or two stages, closed (combination)
Client Tender - Invite Contractor
Client advertises openly in press or trade publications inviting
contractors to apply for the project
Contractor that is able to under take the project would request a
tender document (depending of type of tender)
After receiving the tender (open or selective) from the client (e.g.,
clients architect, design team, procurement department),
contractor may need to give deposit to ensure a bona fide tender.
Filter out the contractors who are not interested in submitting a
tender.
Open tender is sent to contractor, treated as offer to do work for
assured sum of money, generally preceded by a prequalification
document and statement of works, lists, requests, etc.
Clients Process - Approach
1) Introduction to Tender (purpose reviewed at board level to attain
decision)
2) Project background (scope , location, size), quantity Survey
3) Legal issues (type of contract), Tender scrutiny
4) Maintaining issues (acceptance criteria)
5) Contractor / Supplier response required (contract period; topically
90 days)
6) Timetable for choosing contractor / supplier (program, planning &
scheduling)
7) Requirements (standards, specifications, IT, resources)
8) Preliminary Designs (basic schematics for taking off)
9) Bill of Quantities (high level quantities and measurements)
10) Miscellaneous: Other Issues (risk, quality H&S, performance,
control, etc)
Typical Tender Process - Contractor
 It is assumed that the contractor possesses the in-
house capacity to carry out for example; all designs,
bills of quantities, topological, geographical and site
surveys , sewerage and drainage (utilities).
 The contracting company possesses the equipment
necessary to carry out basic tasks with its own
specialized equipment such as haulage, cranes, JCB’s
and scaffolding.
Making Assumptions
Contractors Process – High-Level
Typically starts with contractor reviewing / planning tender
(systematic scrutiny of tender documents)
Typically involves site survey to establish project scope,
type, location, geotecs, cost estimate and quantity take offs
Planning Tender & Building Site Survey (contractor)
Bill of Quantity:
materials,
resources (technical abilities)
Equipment (plant – tools)
Labour
Construction Tender - Road Example
Contractor / trade contractor collects information needed to
work out the tender bid, and then complete the bid.
Completion of the bid takes place primarily by filling in bid
schedules and drawing up a covering letter to the client.
Information in the covering letter should included:
The basis for tender bid
Invitation to tender
Minutes from clarification meetings
Cancellation letters related to tender documents
Relevant legislation
Assumptions constituting the basis for the tender bid
Reservations – if any and Submit
Relationship Between Parties
Construction
Procurement
Strategy
Contractual
Agreement
Bidding
Strategy
Client
Construction
Road Sector
Supply Side
Demand Side
Market Mechanism
Contractor Tender Documents
Contract Forms and Tender Stages
Legislation (legal department)
 Governmental order typically on Fixed Price and Time or
target cost and CE
 Clients Act (government) on Tender Procedures
 UK / KSA / ASCE Directives
 Governmental order on Quality Assurance
Insurances
 All risks
 Contractor’s insurance
Building site insurance (CDM & commercial)
Contractor Tender Documents
Building project specifications
 Deviations from standard contract terms.
 Are reservations accepted?
Time schedule (planning)
 In compliance with Contract Codes
 Realistic & Achievable
Bid schedules
Realistic quantities
 Is the tender deadline realistic?
 Is the bid acceptance period acceptable?
 Are contract conditions acceptable?
 Sufficient geotechnical analysis?
 Tender selection criteria: Lowest price or competition on quality?

Weitere ähnliche Inhalte

Was ist angesagt?

Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentationArchDuty
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessPrateek Kashyap
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTVISHNU VIJAYAN
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 

Was ist angesagt? (20)

Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Tendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award ProcessTendering process, Bid Evaluation & Award Process
Tendering process, Bid Evaluation & Award Process
 
Construction contract
Construction contract Construction contract
Construction contract
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Construction process
Construction processConstruction process
Construction process
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 

Ähnlich wie Construction Tender Process Guide

Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Contract monitoring & evaluation
Contract monitoring & evaluationContract monitoring & evaluation
Contract monitoring & evaluationjama osman
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5cesarqueiroz
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
Purchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingPurchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingYuriy Starodubtsev
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub ContractArunkumar Shirawalmath
 
Estamating seminar chapter 1 (QS)
Estamating seminar chapter 1 (QS)Estamating seminar chapter 1 (QS)
Estamating seminar chapter 1 (QS)Hasif Alias
 

Ähnlich wie Construction Tender Process Guide (20)

Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Chapter -Two (2).pdf
Chapter -Two (2).pdfChapter -Two (2).pdf
Chapter -Two (2).pdf
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Contract monitoring & evaluation
Contract monitoring & evaluationContract monitoring & evaluation
Contract monitoring & evaluation
 
ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Tenders.ppt
 Tenders.ppt Tenders.ppt
Tenders.ppt
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
 
TENDERS.pptx
TENDERS.pptxTENDERS.pptx
TENDERS.pptx
 
Procurement Plan
Procurement PlanProcurement Plan
Procurement Plan
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Purchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By StarodubtsevtenderingPurchasing (Procurement) By Starodubtsevtendering
Purchasing (Procurement) By Starodubtsevtendering
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
procurement overview
procurement overviewprocurement overview
procurement overview
 
Tender
TenderTender
Tender
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
Estamating seminar chapter 1 (QS)
Estamating seminar chapter 1 (QS)Estamating seminar chapter 1 (QS)
Estamating seminar chapter 1 (QS)
 

Mehr von Dr Andrew Kimmance PhD, MSc, BSc, MAPM, CIOB, AHEA

Mehr von Dr Andrew Kimmance PhD, MSc, BSc, MAPM, CIOB, AHEA (15)

Mechanical principles and applications pres
Mechanical principles and applications presMechanical principles and applications pres
Mechanical principles and applications pres
 
Risk Management 1 (2)
Risk Management 1 (2)Risk Management 1 (2)
Risk Management 1 (2)
 
Managing Quality Lecture 1
Managing Quality Lecture 1Managing Quality Lecture 1
Managing Quality Lecture 1
 
PM_Project LifeCycle
PM_Project LifeCyclePM_Project LifeCycle
PM_Project LifeCycle
 
Network Anaysis_ critical path methods
Network Anaysis_ critical path methodsNetwork Anaysis_ critical path methods
Network Anaysis_ critical path methods
 
Prequal-Front Page
Prequal-Front PagePrequal-Front Page
Prequal-Front Page
 
QUALITY MANUAL System
QUALITY MANUAL SystemQUALITY MANUAL System
QUALITY MANUAL System
 
Best Practice Airports
Best Practice AirportsBest Practice Airports
Best Practice Airports
 
project management phase guide
project management phase guideproject management phase guide
project management phase guide
 
KAIA Project Management Plan[1]
KAIA Project Management Plan[1]KAIA Project Management Plan[1]
KAIA Project Management Plan[1]
 
Business and Sale plan
Business and Sale planBusiness and Sale plan
Business and Sale plan
 
project management phase guide
project management phase guideproject management phase guide
project management phase guide
 
Project Management Fundamentals Workshop
Project Management Fundamentals WorkshopProject Management Fundamentals Workshop
Project Management Fundamentals Workshop
 
Integrated Information System for Construction Operations
Integrated Information System for Construction OperationsIntegrated Information System for Construction Operations
Integrated Information System for Construction Operations
 
Business Development for start
Business Development for startBusiness Development for start
Business Development for start
 

Kürzlich hochgeladen

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Construction Tender Process Guide

  • 1. Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance
  • 2. Planning and Design Stages in the Construction Process – Contractor Contractor Planning Phase Contractor Design Phase Construction Projects Tendering Bidding Phase Start-Up Mobilization Lessons Learned Hand Over Closure Each stage has a systematic set of interfaced proceedings, events, activities and processes.
  • 3. Clients Tender Invite – Process Instruction/Invitation to Tender sent to contractor (need to identify which tender approach as they are different) Contractor receives the request for bids (open or selective) Tender Assessment by Contractor (strategic board review, dependant on size of project and tender type) De-briefing of tenderers (scrutinise) Client issue Letter of Intent (may be optional, depending on tender type, selective or open) Award Construction Contract Project, Goods and/or Services delivered (depending on contract to be used; (lump sum, cost reimbursement, etc) Project Payment and statutory document realized Project Closure
  • 4.  Invites contractors (open or select contractor) to submit the price for which they are willing to carry out a project (e.g., business, technical, economical, management)  Typically depends on type of competitive, open or selective tender; contractor relies on level of information contained in tender, pre-lim drawings, specifications , bills of quantities prepared on behalf of the client (e.g., architects, consultants).  Tender type (dictates the level of design, cost and construction)  Open (anyone, may include 2 stage pre-qualification )  Selective (usually have worked with the client)  One or two stages, closed (combination) Client Tender - Invite Contractor
  • 5. Client advertises openly in press or trade publications inviting contractors to apply for the project Contractor that is able to under take the project would request a tender document (depending of type of tender) After receiving the tender (open or selective) from the client (e.g., clients architect, design team, procurement department), contractor may need to give deposit to ensure a bona fide tender. Filter out the contractors who are not interested in submitting a tender. Open tender is sent to contractor, treated as offer to do work for assured sum of money, generally preceded by a prequalification document and statement of works, lists, requests, etc. Clients Process - Approach
  • 6. 1) Introduction to Tender (purpose reviewed at board level to attain decision) 2) Project background (scope , location, size), quantity Survey 3) Legal issues (type of contract), Tender scrutiny 4) Maintaining issues (acceptance criteria) 5) Contractor / Supplier response required (contract period; topically 90 days) 6) Timetable for choosing contractor / supplier (program, planning & scheduling) 7) Requirements (standards, specifications, IT, resources) 8) Preliminary Designs (basic schematics for taking off) 9) Bill of Quantities (high level quantities and measurements) 10) Miscellaneous: Other Issues (risk, quality H&S, performance, control, etc) Typical Tender Process - Contractor
  • 7.  It is assumed that the contractor possesses the in- house capacity to carry out for example; all designs, bills of quantities, topological, geographical and site surveys , sewerage and drainage (utilities).  The contracting company possesses the equipment necessary to carry out basic tasks with its own specialized equipment such as haulage, cranes, JCB’s and scaffolding. Making Assumptions
  • 8. Contractors Process – High-Level Typically starts with contractor reviewing / planning tender (systematic scrutiny of tender documents) Typically involves site survey to establish project scope, type, location, geotecs, cost estimate and quantity take offs Planning Tender & Building Site Survey (contractor) Bill of Quantity: materials, resources (technical abilities) Equipment (plant – tools) Labour
  • 9. Construction Tender - Road Example Contractor / trade contractor collects information needed to work out the tender bid, and then complete the bid. Completion of the bid takes place primarily by filling in bid schedules and drawing up a covering letter to the client. Information in the covering letter should included: The basis for tender bid Invitation to tender Minutes from clarification meetings Cancellation letters related to tender documents Relevant legislation Assumptions constituting the basis for the tender bid Reservations – if any and Submit
  • 11. Contractor Tender Documents Contract Forms and Tender Stages Legislation (legal department)  Governmental order typically on Fixed Price and Time or target cost and CE  Clients Act (government) on Tender Procedures  UK / KSA / ASCE Directives  Governmental order on Quality Assurance Insurances  All risks  Contractor’s insurance Building site insurance (CDM & commercial)
  • 12. Contractor Tender Documents Building project specifications  Deviations from standard contract terms.  Are reservations accepted? Time schedule (planning)  In compliance with Contract Codes  Realistic & Achievable Bid schedules Realistic quantities  Is the tender deadline realistic?  Is the bid acceptance period acceptable?  Are contract conditions acceptable?  Sufficient geotechnical analysis?  Tender selection criteria: Lowest price or competition on quality?