Weitere ähnliche Inhalte
Ähnlich wie PTAS Presentation 2015
Ähnlich wie PTAS Presentation 2015 (20)
PTAS Presentation 2015
- 3. – Engineering
– Single Line Diagrams, Schematics
– General Arrangements, Termination
Diagrams, Block Diagrams
– Cable Schedules
– Project Management
– System Integration
– SCADA Packages
Company Capabilities
– Manufacturing
– Switchboard & Motor Control Centre
– DB’s, LCS’s, JB’s, PLC’s, VSD’s, UPS Systems
– Custom Busbar Fabrication
– Internal/External Labelling
– Complete Installations
– Switchroom Supply/Fit out & Delivery to Site
- 7. Project Management/Engineering
Capabilities
‐ Fully Packaged Electrical Design Packages ‐ SLD’s, GA’s,
Schematics, Termination Diagrams, Block Diagrams, Bill of
materials
‐ Power systems analysis ‐ Load flow calculations, Harmonic
Studies, Arc Flash, Short Circuit, Earthing Studies, Motor
Protection, Curve diagrams, Energy Management, System
Optimization
‐ In house REPQ sign‐off/verification
‐ Experienced Project Management
‐ Quality Assurance Manager
‐ Programming/SCADA Packages – RSLogix, Siemens, Modicon,
RS View, Citec WinCC, IFix, Mitsubishi, Digital
- 8. Installation Capabilities
PT Automation Solutions have specially trained & certified installation team
that are certified to work on open cut mining & coal seam gas projects as
well as building sites throughout Australia and around the globe
‐ X2 20 foot containers fully kitted out work benches and storage
‐ X2 Customised Trailers fully kitted out with work benches and storage
‐ Cable pulling systems
‐ Jacks/Lifting equipment
‐ Cable labelling machinery
Recently completed installation projects
‐ Coal Seam Gas – X18 sites including Ruby Jo, David, Orana 1
‐ Mining ‐ Acland Coal Mine, Mount Isa Mine, Middlemount Mine,
Whitehaven Coal
‐ Food & Beverage ‐ Smith snack foods, Arnott’s Biscuits, Cargill
Beef, Castlemaine XXXX, Top‐cuts,
‐ Infrastructure – Gold Coast Council, Logan Council, Seq Water, Wet
N Wild, Seaworld, Visy, Hinze Dam,
- 11. GD Pipeline (QGC) – Water
Monitoring System
‐ X15 Remote DC Operated (Solar) System
‐PTAS Scope ‐ Design, Manufacture, Integration,
Factory Acceptance Test, Deliver to site, Installation &
Commissioning
Custom Outdoor Enclosure IP66
PLC Section
Solar System
Battery Back‐up (5 days)
Distribution Section
HMI
- 13. Rio Tinto – Boyne Smelter CBF4 Project
– 26m Transportable Modular Switchroom
• Separate LV & HV Switchrooms
• 3500A Unlimited Arc Containment SWB
• 160 Fully Withdrawable Motor Starters
• 40 Feeders
• 3 Incoming ACB’s with Bus Tie
• Vamp Arc Flash Detection System
• 22 Wall Mounted VSD’s
• PLC & Safety Panels
• UPS System
• 3 x 2000KVA 11KV/415V Transformers
• 50m of VASS Weather Proof Bus Duct
• Fault Study & Protection Scheme Design
• All Engineering by PTAS
- 15. Wier Minerals (QGC) – Water Gathering Ponds;
Orana 1, Ruby Jo & David
‐ PTAS Scope ‐ Design, Manufacture, Integrate, Factory
Acceptance Test, Deliver to site, Installation &
Commissioning
‐ Fully Packaged Switchroom
‐ Type Tested Form 3b Motor Control Centre IP54
‐ Packaged Kiosk 6.6kV
‐ 350kW VSD Cabinets
‐ Communication Enclosures/Distribution Enclosure
Cassette Enclosure per pump
‐ PLC Enclosure/Marshalling Enclosure
‐ UPS System
‐ Marashel Pluggable Systems