Kansas City, Missouri
HYATT REGENCY WALKWAY
COLLAPSE
Hyatt RegencyWalkway Collapse
 The Hyatt Regency hotel walkway collapse was a
major disaster that occurred on July 17, 1981 in
Kansas City, Missouri, United States, killing 114
people and injuring more than 200 others during a
tea dance.
 At the time it was the deadliest structural collapse
in U.S. history.
Background
 Construction on the 40-story Hyatt Regency
Crown Center began in 1978, and the hotel opened
on July 1, 1980 after construction delays including
an incident on October 14, 1979, when 2,700
square feet of the atrium roof collapsed because
one of the roof connection on the north end of the
atrium failed.
 The building was part of a master plan devised by
Edward Larrabee Barnes and specifically designed
by the newly created architect firm PBNDML.
 It was Missouri’s tallest building.
Background
 The collapse was the second major structural
failure in Kansas City in a little more than two
years.
 On June 4, 1979, the roof of the then-empty
Kemper Arena in Kansas City had collapsed
without loss of life.
 The architects and engineering firms at the two
collapses were different.
Background
 One of the defining features of the hotel was its
lobby, which featured a multistory atrium crossed
by suspended concrete walkways on the second,
third, and fourth levels, with the fourth level
walkway directly above the second level walkway.
Kansas City, Missouri
DISASTER
A major cause of
fatalities was the landing
of the concrete 4th floor
walkway onto the
crowded 2nd floor
walkway, both seen here.
Disaster
 On July 17, 1981, approximately 2,000 people had
gathered in the atrium to participate in and watch a
dance contest.
 Dozens stood on the walkways.
 At 7:05 PM, the walkways on the second, third, and
fourth floor were packed with visitors as they watched
over the active lobby, which was also full of people.
 The fourth floor bridge was suspended directly over
the second floor bridge, with the third floor walkway
set off to the side several meters away from the other
two.
Disaster
 Construction difficulties led to a subtle but flawed
design change that doubled the load on the
connection between the fourth floor walkway
support beams and the tie rods carrying the weight
of both walkways.
 This new design could barely handle the dead load
weight of the structure itself, much less the weight
of the spectators standing on it.
 The connection failed and both walkways crashed
on top of the other and then into the lobby below.
Difference between the design and construction of the walkway support
WALKWAY SUPPORT SYSTEM
View of the 4th floor support beam which fell, together with support rod
SUPPORT BEAM WHICH FELL
Viewof the Lobby Floor
INVESTIGATION
Investigation
 Three days after the disaster, Wayne Lischka, a
structural engineer hired by The Kansas City Star
newspaper, discovered a significant change in the
design of the walkways.
 Coverage of the event later earned the Star and its
sister publication the Kansas City Times a Pulitzer
Prize for local news reporting in 1982.
Investigation
 The two walkways were suspended from a set of steel
tie rods, with the second floor walkway hanging
directly underneath the fourth floor walkway.
 The walkway platform was supported on 3 cross-beams
suspended by steel rods retained by nuts.
 The cross-beams were box beams made from C-
channels welded toe-to-toe.
 The original design by Jack D. Gillum and Associates
called for three pairs of rods running from the second
floor all the way to the ceiling.
Investigation
 Investigators eventually determined that this
design supported only 60% of the minimum load
required by Kansas City building codes.
Investigation
 Havens Steel Company, the contractor responsible
for manufacturing the rods, objected to the
original plan of Jack D. Gillum and Associates,
since it required the whole of the rod below the
fourth floor to be threaded in order to screw on
the nuts to hold the fourth floor walkway in place.
 These thread would probably have been damaged
beyond use as the structure for the fourth floor
was hoisted into position.
Investigation
 Havens therefore proposed an alternate plan in
which two separate sets of tie rods would be used:
one connecting the fourth floor walkway to the
ceiling, and the other connecting the second floor
walkway to the fourth floor walkway.
 This design change would prove fatal.
 In the original design, the beams of the fourth
floor walkway had to support only the weight of
the fourth floor walkway itself, with the weight of
the second floor walkway supported completely by
the rods.
Investigation
 In the revised design, however, the fourth floor
beams were required to support both the fourth
floor walkway and the second floor walkway
hanging from it.
 With the load on the fourth-floor beams doubled,
Haven’s proposed design could bear only 30% of
the mandated minimum load.
Investigation
 The serious flaws of the revised design were
further compounded by the fact that both designs
placed the bolts directly in a welded joint between
two facing C-channels, the weakest structural
point in the box beams.
 Photographs of the wreckage show excessive
deformations of the cross-section.
 In the failure the box beams split at the weld and
the nut supporting them slipped through.
Investigation
 Investigators concluded that the basic problem
was a lack of proper communications between Jack
D. Gillum and Associates and Havens Steel.
 In particular, the drawings prepared by Jack D.
Gillum and Associates were only preliminary
sketches but were interpreted by Havens as
finalized drawings.
 Jack D. Gillum and Associates failed to review the
initial design thoroughly, and accepted Haven’s
proposed plan without performing basic
calculations that would have revealed its flaws.
AFTERMATH
Aftermath view. The 4th
floor and 2nd floor
walkways were
positioned at the now
boarded entrances. A
parallel 3rd floor walkway
to the left was left intact.
Aftermath
 The Missouri Board of Architects, Professional
Engineers, and Land Surveyors convicted the
engineers employed by Jack D. Gillum and
Associates who had signed off on the final
drawings of gross negligence, misconduct, and
unprofessional conduct in the practice of
engineering;
 They all lost their engineering licenses in the states
of Missouri and Texas and their membership to
ASCE.
Aftermath
 While Jack D. Gillum and Associates itself was
cleared of criminal negligence, it was stripped of
its license to be an engineering firm.
Aftermath
 At least $140 million was awarded to victims and
their families in both judgments and settlements
in subsequent civil lawsuits;
 A large amount of this money came from Crown
Center Corporation, a wholly owned subsidiary of
Hallmark Cards which was the owner of the actual
hotel franchise.
 Life and health insurance companies probably
absorbed even larger uncompensated losses in
policy payouts.
Aftermath
 The Hyatt tragedy remains a classic model for the
study of engineering ethics and errors.
 After the disaster, the lobby was reconstructed
with only one crossing on the second floor.
 Unlike the previous walkways, the new bridge is
supported by several columns underneath it rather
than being suspended from the ceiling.
Aftermath
 The hotel later reopened, and has been renamed
Hyatt Regency Crown Center.
 It has since been renovated and now serves as one
of the city’s most luxurious hotels.
Kansas City Collapse

Weitere ähnliche Inhalte

Was ist angesagt?

Triangle shirtwaist factory fire
Triangle shirtwaist factory fireTriangle shirtwaist factory fire
Triangle shirtwaist factory fireJohn Newquist
 
Tubine foundation design
Tubine foundation designTubine foundation design
Tubine foundation designniketmahajan
 
Triangle Fire, a turning point
Triangle Fire, a turning pointTriangle Fire, a turning point
Triangle Fire, a turning pointRA Harris
 
Becoming a World Power - Alaska and Hawaii
Becoming a World Power - Alaska and HawaiiBecoming a World Power - Alaska and Hawaii
Becoming a World Power - Alaska and Hawaiimabest
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 reportAdelinetingg
 
World trade centre collapse
World trade centre collapse World trade centre collapse
World trade centre collapse Sonali Shah
 
The War Of 1812 - Powerpoint
The War Of 1812 - PowerpointThe War Of 1812 - Powerpoint
The War Of 1812 - PowerpointLilDipper
 
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.DevagyaGandhi
 
Implied term in building contracts
Implied term in building contractsImplied term in building contracts
Implied term in building contractsHafizul Mukhlis
 
The challenger disaster Case Study
The challenger disaster Case StudyThe challenger disaster Case Study
The challenger disaster Case StudyFaiq Iqbal
 
Remembering 9 11 Power Point
Remembering 9 11 Power PointRemembering 9 11 Power Point
Remembering 9 11 Power Pointjillaja
 
Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)
Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)
Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)HarshitGandhi16
 
4 week summer training report
4 week summer training report4 week summer training report
4 week summer training reportanand bhatnagar
 
Politics Of The 1920s
Politics Of The 1920sPolitics Of The 1920s
Politics Of The 1920sKevin A
 
Nixon and watergate
Nixon and watergateNixon and watergate
Nixon and watergateewaszolek
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structureRanjeet Patil
 

Was ist angesagt? (20)

Triangle shirtwaist factory fire
Triangle shirtwaist factory fireTriangle shirtwaist factory fire
Triangle shirtwaist factory fire
 
Tubine foundation design
Tubine foundation designTubine foundation design
Tubine foundation design
 
Triangle Fire, a turning point
Triangle Fire, a turning pointTriangle Fire, a turning point
Triangle Fire, a turning point
 
Tacoma bridge
Tacoma bridge  Tacoma bridge
Tacoma bridge
 
Becoming a World Power - Alaska and Hawaii
Becoming a World Power - Alaska and HawaiiBecoming a World Power - Alaska and Hawaii
Becoming a World Power - Alaska and Hawaii
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Sky Scrapers
Sky ScrapersSky Scrapers
Sky Scrapers
 
World trade centre collapse
World trade centre collapse World trade centre collapse
World trade centre collapse
 
The War Of 1812 - Powerpoint
The War Of 1812 - PowerpointThe War Of 1812 - Powerpoint
The War Of 1812 - Powerpoint
 
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
 
Implied term in building contracts
Implied term in building contractsImplied term in building contracts
Implied term in building contracts
 
The challenger disaster Case Study
The challenger disaster Case StudyThe challenger disaster Case Study
The challenger disaster Case Study
 
Remembering 9 11 Power Point
Remembering 9 11 Power PointRemembering 9 11 Power Point
Remembering 9 11 Power Point
 
TX History Ch 16.3
TX History Ch 16.3TX History Ch 16.3
TX History Ch 16.3
 
Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)
Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)
Market survey of orient cement at ahmednagar (Customer & dealer satisfaction)
 
Jaipur Fire
Jaipur FireJaipur Fire
Jaipur Fire
 
4 week summer training report
4 week summer training report4 week summer training report
4 week summer training report
 
Politics Of The 1920s
Politics Of The 1920sPolitics Of The 1920s
Politics Of The 1920s
 
Nixon and watergate
Nixon and watergateNixon and watergate
Nixon and watergate
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structure
 

Andere mochten auch

(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981
(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981
(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981Ali Faizan Wattoo
 
walkway collapse analysis
walkway collapse analysiswalkway collapse analysis
walkway collapse analysisMeng Lu
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Learning from Failures
Learning from FailuresLearning from Failures
Learning from Failuressefindia
 
Case study on whistleblowing
Case study on whistleblowingCase study on whistleblowing
Case study on whistleblowingParveen Bano
 
Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Rizalshah Zulkifli
 

Andere mochten auch (8)

(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981
(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981
(Part 2/2)COLLAPSE OF THE HYATT REGENCY WALKWAYS 1981
 
walkway collapse analysis
walkway collapse analysiswalkway collapse analysis
walkway collapse analysis
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
2015_MST15_PPT_MIC Final
2015_MST15_PPT_MIC Final2015_MST15_PPT_MIC Final
2015_MST15_PPT_MIC Final
 
Learning from Failures
Learning from FailuresLearning from Failures
Learning from Failures
 
Senses of engineering ethics1
Senses of engineering ethics1Senses of engineering ethics1
Senses of engineering ethics1
 
Case study on whistleblowing
Case study on whistleblowingCase study on whistleblowing
Case study on whistleblowing
 
Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)Contoh Laporan Latihan Industri (FULL)
Contoh Laporan Latihan Industri (FULL)
 

Ähnlich wie Kansas City Collapse

Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the worldAnishaJalathota
 
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfCase Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfSANDEEPARIHANT
 
U.S.S.C Presentation
U.S.S.C PresentationU.S.S.C Presentation
U.S.S.C PresentationHannodeKramer
 
The Ingalls Building Professor Knutson CON 1.docx
The Ingalls Building Professor Knutson CON 1.docxThe Ingalls Building Professor Knutson CON 1.docx
The Ingalls Building Professor Knutson CON 1.docxcherry686017
 
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfWrite about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfarjuntelecom26
 
Bridge Fails: Famous Bridge Collapses Due to Corrosion
Bridge Fails: Famous Bridge Collapses Due to CorrosionBridge Fails: Famous Bridge Collapses Due to Corrosion
Bridge Fails: Famous Bridge Collapses Due to CorrosionRobert Heidersbach
 
Lecture13 Piers ( Highway Engineering )
Lecture13  Piers ( Highway Engineering )Lecture13  Piers ( Highway Engineering )
Lecture13 Piers ( Highway Engineering )Hossam Shafiq I
 
Detailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxDetailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxsimonithomas47935
 
L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2chuhonsan
 
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINALJoe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINALJoseph Kaufman
 
William Le Baron Jenney
William Le Baron JenneyWilliam Le Baron Jenney
William Le Baron JenneyGrace Henry
 
Engineering Disasters
Engineering DisastersEngineering Disasters
Engineering Disastersdsmulski
 
Golden gate bridge 2
Golden gate bridge 2Golden gate bridge 2
Golden gate bridge 2caltec
 
Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...
Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...
Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...drezdzond
 
US Second Industrial Revolution
US Second Industrial RevolutionUS Second Industrial Revolution
US Second Industrial Revolutionawltech
 

Ähnlich wie Kansas City Collapse (20)

Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the world
 
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfCase Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
 
U.S.S.C Presentation
U.S.S.C PresentationU.S.S.C Presentation
U.S.S.C Presentation
 
The Ingalls Building Professor Knutson CON 1.docx
The Ingalls Building Professor Knutson CON 1.docxThe Ingalls Building Professor Knutson CON 1.docx
The Ingalls Building Professor Knutson CON 1.docx
 
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfWrite about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
 
Bridge Fails: Famous Bridge Collapses Due to Corrosion
Bridge Fails: Famous Bridge Collapses Due to CorrosionBridge Fails: Famous Bridge Collapses Due to Corrosion
Bridge Fails: Famous Bridge Collapses Due to Corrosion
 
Lecture13 Piers ( Highway Engineering )
Lecture13  Piers ( Highway Engineering )Lecture13  Piers ( Highway Engineering )
Lecture13 Piers ( Highway Engineering )
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Ranjitha.S.H
Ranjitha.S.HRanjitha.S.H
Ranjitha.S.H
 
Detailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxDetailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docx
 
Poster
PosterPoster
Poster
 
L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2L4 Vertical Structure Pt2 2
L4 Vertical Structure Pt2 2
 
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINALJoe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
Joe Kaufman SEAoO Scholarship Report 2016 7 Pages Total - REVISED FINAL
 
William Le Baron Jenney
William Le Baron JenneyWilliam Le Baron Jenney
William Le Baron Jenney
 
Chase Tower
Chase TowerChase Tower
Chase Tower
 
Engineering Disasters
Engineering DisastersEngineering Disasters
Engineering Disasters
 
Golden gate bridge 2
Golden gate bridge 2Golden gate bridge 2
Golden gate bridge 2
 
Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...
Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...
Chase Commerce Center History Nordberg manufacturing Rexnord Global power com...
 
Chicago school
Chicago schoolChicago school
Chicago school
 
US Second Industrial Revolution
US Second Industrial RevolutionUS Second Industrial Revolution
US Second Industrial Revolution
 

Mehr von Don W. Lewis

L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionDon W. Lewis
 
L0 Mobile Equipment Power Requirements
L0 Mobile Equipment Power RequirementsL0 Mobile Equipment Power Requirements
L0 Mobile Equipment Power RequirementsDon W. Lewis
 
Contract_Plans_Reading.Plan_Book
Contract_Plans_Reading.Plan_BookContract_Plans_Reading.Plan_Book
Contract_Plans_Reading.Plan_BookDon W. Lewis
 
Contract_Plans_Reading.Textbook
Contract_Plans_Reading.TextbookContract_Plans_Reading.Textbook
Contract_Plans_Reading.TextbookDon W. Lewis
 
The TV Antenna Tower
The TV Antenna TowerThe TV Antenna Tower
The TV Antenna TowerDon W. Lewis
 
Testing Water and Ethics
Testing Water and EthicsTesting Water and Ethics
Testing Water and EthicsDon W. Lewis
 
The Space Shuttle Disasters
The Space Shuttle DisastersThe Space Shuttle Disasters
The Space Shuttle DisastersDon W. Lewis
 
Engineers in Organizations
Engineers in OrganizationsEngineers in Organizations
Engineers in OrganizationsDon W. Lewis
 
Masters Report.PDF
Masters Report.PDFMasters Report.PDF
Masters Report.PDFDon W. Lewis
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering EthicsDon W. Lewis
 
Analyzing Risk-Based corrective action plans
Analyzing Risk-Based corrective action plansAnalyzing Risk-Based corrective action plans
Analyzing Risk-Based corrective action plansDon W. Lewis
 

Mehr von Don W. Lewis (18)

L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
L0 Mobile Equipment Power Requirements
L0 Mobile Equipment Power RequirementsL0 Mobile Equipment Power Requirements
L0 Mobile Equipment Power Requirements
 
Contract_Plans_Reading.Plan_Book
Contract_Plans_Reading.Plan_BookContract_Plans_Reading.Plan_Book
Contract_Plans_Reading.Plan_Book
 
Contract_Plans_Reading.Textbook
Contract_Plans_Reading.TextbookContract_Plans_Reading.Textbook
Contract_Plans_Reading.Textbook
 
Lewis_D
Lewis_DLewis_D
Lewis_D
 
The TV Antenna Tower
The TV Antenna TowerThe TV Antenna Tower
The TV Antenna Tower
 
Testing Water and Ethics
Testing Water and EthicsTesting Water and Ethics
Testing Water and Ethics
 
The Space Shuttle Disasters
The Space Shuttle DisastersThe Space Shuttle Disasters
The Space Shuttle Disasters
 
The Bruening Case
The Bruening CaseThe Bruening Case
The Bruening Case
 
Business Ethics
Business EthicsBusiness Ethics
Business Ethics
 
Anger Management
Anger ManagementAnger Management
Anger Management
 
Legal Ethics
Legal EthicsLegal Ethics
Legal Ethics
 
Medical Ethics
Medical EthicsMedical Ethics
Medical Ethics
 
Leading Teams
Leading TeamsLeading Teams
Leading Teams
 
Engineers in Organizations
Engineers in OrganizationsEngineers in Organizations
Engineers in Organizations
 
Masters Report.PDF
Masters Report.PDFMasters Report.PDF
Masters Report.PDF
 
Engineering Ethics
Engineering EthicsEngineering Ethics
Engineering Ethics
 
Analyzing Risk-Based corrective action plans
Analyzing Risk-Based corrective action plansAnalyzing Risk-Based corrective action plans
Analyzing Risk-Based corrective action plans
 

Kansas City Collapse

  • 1. Kansas City, Missouri HYATT REGENCY WALKWAY COLLAPSE
  • 2. Hyatt RegencyWalkway Collapse  The Hyatt Regency hotel walkway collapse was a major disaster that occurred on July 17, 1981 in Kansas City, Missouri, United States, killing 114 people and injuring more than 200 others during a tea dance.  At the time it was the deadliest structural collapse in U.S. history.
  • 3. Background  Construction on the 40-story Hyatt Regency Crown Center began in 1978, and the hotel opened on July 1, 1980 after construction delays including an incident on October 14, 1979, when 2,700 square feet of the atrium roof collapsed because one of the roof connection on the north end of the atrium failed.  The building was part of a master plan devised by Edward Larrabee Barnes and specifically designed by the newly created architect firm PBNDML.  It was Missouri’s tallest building.
  • 4. Background  The collapse was the second major structural failure in Kansas City in a little more than two years.  On June 4, 1979, the roof of the then-empty Kemper Arena in Kansas City had collapsed without loss of life.  The architects and engineering firms at the two collapses were different.
  • 5. Background  One of the defining features of the hotel was its lobby, which featured a multistory atrium crossed by suspended concrete walkways on the second, third, and fourth levels, with the fourth level walkway directly above the second level walkway.
  • 6. Kansas City, Missouri DISASTER A major cause of fatalities was the landing of the concrete 4th floor walkway onto the crowded 2nd floor walkway, both seen here.
  • 7. Disaster  On July 17, 1981, approximately 2,000 people had gathered in the atrium to participate in and watch a dance contest.  Dozens stood on the walkways.  At 7:05 PM, the walkways on the second, third, and fourth floor were packed with visitors as they watched over the active lobby, which was also full of people.  The fourth floor bridge was suspended directly over the second floor bridge, with the third floor walkway set off to the side several meters away from the other two.
  • 8. Disaster  Construction difficulties led to a subtle but flawed design change that doubled the load on the connection between the fourth floor walkway support beams and the tie rods carrying the weight of both walkways.  This new design could barely handle the dead load weight of the structure itself, much less the weight of the spectators standing on it.  The connection failed and both walkways crashed on top of the other and then into the lobby below.
  • 9.
  • 10. Difference between the design and construction of the walkway support WALKWAY SUPPORT SYSTEM
  • 11.
  • 12.
  • 13.
  • 14. View of the 4th floor support beam which fell, together with support rod SUPPORT BEAM WHICH FELL
  • 15.
  • 17.
  • 19. Investigation  Three days after the disaster, Wayne Lischka, a structural engineer hired by The Kansas City Star newspaper, discovered a significant change in the design of the walkways.  Coverage of the event later earned the Star and its sister publication the Kansas City Times a Pulitzer Prize for local news reporting in 1982.
  • 20. Investigation  The two walkways were suspended from a set of steel tie rods, with the second floor walkway hanging directly underneath the fourth floor walkway.  The walkway platform was supported on 3 cross-beams suspended by steel rods retained by nuts.  The cross-beams were box beams made from C- channels welded toe-to-toe.  The original design by Jack D. Gillum and Associates called for three pairs of rods running from the second floor all the way to the ceiling.
  • 21. Investigation  Investigators eventually determined that this design supported only 60% of the minimum load required by Kansas City building codes.
  • 22. Investigation  Havens Steel Company, the contractor responsible for manufacturing the rods, objected to the original plan of Jack D. Gillum and Associates, since it required the whole of the rod below the fourth floor to be threaded in order to screw on the nuts to hold the fourth floor walkway in place.  These thread would probably have been damaged beyond use as the structure for the fourth floor was hoisted into position.
  • 23. Investigation  Havens therefore proposed an alternate plan in which two separate sets of tie rods would be used: one connecting the fourth floor walkway to the ceiling, and the other connecting the second floor walkway to the fourth floor walkway.  This design change would prove fatal.  In the original design, the beams of the fourth floor walkway had to support only the weight of the fourth floor walkway itself, with the weight of the second floor walkway supported completely by the rods.
  • 24. Investigation  In the revised design, however, the fourth floor beams were required to support both the fourth floor walkway and the second floor walkway hanging from it.  With the load on the fourth-floor beams doubled, Haven’s proposed design could bear only 30% of the mandated minimum load.
  • 25. Investigation  The serious flaws of the revised design were further compounded by the fact that both designs placed the bolts directly in a welded joint between two facing C-channels, the weakest structural point in the box beams.  Photographs of the wreckage show excessive deformations of the cross-section.  In the failure the box beams split at the weld and the nut supporting them slipped through.
  • 26. Investigation  Investigators concluded that the basic problem was a lack of proper communications between Jack D. Gillum and Associates and Havens Steel.  In particular, the drawings prepared by Jack D. Gillum and Associates were only preliminary sketches but were interpreted by Havens as finalized drawings.  Jack D. Gillum and Associates failed to review the initial design thoroughly, and accepted Haven’s proposed plan without performing basic calculations that would have revealed its flaws.
  • 27. AFTERMATH Aftermath view. The 4th floor and 2nd floor walkways were positioned at the now boarded entrances. A parallel 3rd floor walkway to the left was left intact.
  • 28. Aftermath  The Missouri Board of Architects, Professional Engineers, and Land Surveyors convicted the engineers employed by Jack D. Gillum and Associates who had signed off on the final drawings of gross negligence, misconduct, and unprofessional conduct in the practice of engineering;  They all lost their engineering licenses in the states of Missouri and Texas and their membership to ASCE.
  • 29. Aftermath  While Jack D. Gillum and Associates itself was cleared of criminal negligence, it was stripped of its license to be an engineering firm.
  • 30. Aftermath  At least $140 million was awarded to victims and their families in both judgments and settlements in subsequent civil lawsuits;  A large amount of this money came from Crown Center Corporation, a wholly owned subsidiary of Hallmark Cards which was the owner of the actual hotel franchise.  Life and health insurance companies probably absorbed even larger uncompensated losses in policy payouts.
  • 31. Aftermath  The Hyatt tragedy remains a classic model for the study of engineering ethics and errors.  After the disaster, the lobby was reconstructed with only one crossing on the second floor.  Unlike the previous walkways, the new bridge is supported by several columns underneath it rather than being suspended from the ceiling.
  • 32. Aftermath  The hotel later reopened, and has been renamed Hyatt Regency Crown Center.  It has since been renovated and now serves as one of the city’s most luxurious hotels.