2. Personal Profile
Name: Dominic Joseph Tanner
Address: 55 Yorston Street, Warner’s Bay, Newcastle. N.S.W. 2282
Telephone: 02 4965 7308 Mobile: 0406 753 046
Work: 0400 509 611
E-mail: dom_tanner@yahoo.com
Date of Birth: 7th September 1965
Marital Status: Permanent Relationship
Drivers License: Class C No. 4826zt
Sport/Interests: Competitive sailing, soccer, surfing and fishing, renovating.
Education
High School Certificate (Year 10) 1981. Warner’s Bay High School
Qualifications and Work Experience
Mines Supervisor Surface Extraction
2013
Builders Lic: 216560c
Diploma of Structural Engineering.
2002
Trade Certificate, Carpentry and
Joinery. 1993
Building Contracting Management.
1993
Construction Certificates as follows:
Occupational Health and Safety
Induction Training for Construction
Work. 2000
Falsework and Formwork. 1997
Rigger class 1. 1989
Scaffolder. 1989
Explosive-powered Tool Operator.
1989
Crane Chaser. 1989
Dogman class 2. 1989
Power Crane Driver class 24C. 1987
Senior First Aid 2006
Occupational Health & Safety Line
Managers Training. 2006
Elevated Work Platform. 2006
Bobcat ticket 2010
Dozer Operator
Excavator Ticket 2010
3. Personal Qualities
Leadership and supervision experience.
Organisational ability and daily running of construction sites
Understanding of the building industry and engineering principles
Resource management
Strong communication skills
Ability to harness talents and skills of team to deliver determined
outcomes
Conscientious and diligent in application to duties
Flexible and adaptable
Referees
Daniel Sutcliffe, SMEC Engineers. Ph 0420 977 248
Craig Hughes, BMA Ph 0477 302 053
Letters of Recommendation
F. Scanlon JP.
WORK HISTORY
Current
Lead Superintendent
Bechtel (Oct 2014 - Present)
Wheatstone LNG (Chevron)
I was lead of team of superintendents and supervisors organizing all
material, equipment, modules, cranage and rigging, transport and logistics,
stores, cleaning, site accommodation. Worked with construction for delivery and
installation of structural steel, mechanical equipment, large and small bore
carbon steel pipe. Also worked back to back with nightshift area
superintendent.
Direct supervision of craft. I had 90 craft working for me.
Construction of the process part of the plant.
Marine Supervisor
Bechtel (Feb 2014-Oct 2014)
BMA HPX3 Coal Loading Facility
Supervision of 21barges and 7 tugs receiving, loading, scheduling and
unloading of construction equipment, materials and consumables for
construction of new 1.5km long jetty and ship loading facilities.
Generally I spent my days out on the main tug coordinating and
organizing deliveries, checking lifting plans, organizing barge maintenance,
constant coordination with construction guys on the jetty. Organising riggers on
the barges and boats. Worked both Day and Nightshift.
4. Civil Supervisor
Bechtel (Feb 2013-Feb 2014)
BMA Caval Ridge Coal Mine (South)
Supervision of Abigroup contractor bulk earthworks, Raw Coal Stockpile,
Utilities, CPP earthworks and utilities, HV Haul Roads, Nth ROM and RE Wall,
Rejects Stockpile ,Cherwell and 9 mile creek culvert crossings, MIA HV roads, go
line, fuel depot, lube pads, warehouse, drainage culverts. 12n Dam
construction, Mine Water Dam Constructions.
Bechtel (June 2012- Feb2013)
Construction Superintendent
Bechtel (June 2012- Feb2013)
Kooragang Expansion Project (Port Waratah Coal Service)
Supervision of Downer Rail contractor installing new rail loop for Dump
Station No.4 including 1 arrivals road and 3 departures, ballast/sleeper/rail, all
signaling, earthworks, Services Relocation (Mains power, 3km of 1050
stormwater, 3km of Mains and process water 300mm DICL, Fire waterlines, 2km
Telstra, HV power overhead lines). Construction of Rail Viaduct.
Supervisor (Earthworks)
Bechtel (August 2011-June 2012)
www.bechtel.com
QCLNG for BG Group
Curtis Island, Gladstone, Queensland.
Value $ Million
Duties.
Supervisor QCLNG project - Implementation and enforcing of site safety via
prestart meetings, toolbox, start card, lock out procedures, observation and
inspection of workers and methods used, - Directly supervise, organize, plan
works, machinery and men. Excavation, haulage and placement of materials.
Earthworks for electrical trenching and concrete foundations excavation and
backfill to design. Control of dumping areas and stockpiles. Machinery used
onsite – D6, D8 dozer, 815 Compactor, 3 x 25T / 2 x 36T / 1 x 30T/ 1 x 8T/ 1 x 3T
Excavator, 740 and 725 Moxy ADT, 14H Grader, 2/Watercart, 2 x 966 Loader, 930
Loader, 3 x 297 Skid Steer, 4 x 563 Roller and various other compaction
equipment and tools.
Site Supervisor/Foreman
Contract Richard Crookes Construction (June 2011-Aug 2011)
Singleton Army Base NSW.
5. Supervision of building trades for army accommodation building and armory.
Site Supervisor
Thiess Services (June 2010-June 2011)
www.thiess-services.com.au
Hunter River Remediation Project
BHPB Newcastle N.S.W. Australia
Value $430 Million
Duties.
Supervisor Hunter River Remediation Project.(BHPB)- Implementation and
enforcing of site safety via prestart meetings, toolbox, start card, lock out
procedures, observation and inspection of workers and methods used, -
Construction and set up of berthing and unloading facilities for dredged
material received in barges. Pump out facilities for dewatering of barges.
Monitoring and control of water storage (tank farm) ready for pump out to
sediment ponds and water treatment plant. Control 2 berths with 2 x 100t
Excavators loading into 40t articulated trucks. Maintain truck wash facility,
maintain traffic management and haul routes.
Construction of emplacement cells for treated sediment at Kooragang Island.
Implement strategies for traffic, route, receival and unloading of treated
sediment (contaminated) for placement in cells. Strict enforcing of PPE for all
workers in contact with treated sediment. Control up to 197 truck and dogs
unloading per 12 hr shift. Control and operation of D5,D6,D8 Dozer and Swamp
Dozer, 30t Excavator, Various rollers, water cart, graders. Stockpile maintenance.
Contractor and machinery timekeeping and safety checks. Control of labour
force.
Survey, shaping finishing and trim to contours and batters.
Full reporting to managers and shift change over communications, 24 hr
operations.
WA Karatha Site Manager
Whitten Bros Contracting (April 2009-December2010)
www.whittenbros.com.au
Woodside Pluto LNG.
Karratha Western Australia.
Value $5.8 Million
General Foreman
Abigroup Contractors (Jan 2007- April 2009)
Development and Construction
www.abigroup.com.au
6. Newcastle Mater Hospital Re-Development
Waratah, Newcastle. N.S.W
Value $170 Million
Site Manager
Hansen Yuncken (2005-2006)
Development and Construction
http://www.hansenyuncken.com.au/
BI-LO Supermarket
Wadalba N.S.W.
Value $4.0 Million
Williamtown RAAF Base N.S.W
Redevelopment Stage 1
Value $84 Million
G.T.E.S.P.O. Building
(Ground Telecommunications Equipment Systems Program Office)
Value $4.0 Million
Site Manager
Quasar Constructions (2002-2005)
http://www.quasargroup.com.au/
Anglican Retirement Village Castle Hill Value $15 Million
Wollondilly Anglican College Stage Two Value $4.1 Million
Wollondilly Anglican College Stage One Value $3.9 Million
Woolworth’s Glendale Store Refurbishment Value $500,000
Woolworth’s Kotara Store Refurbishment Value $500,000
7. Site Manager/ Foreman
Industrial-Commercial-Domestic.
Working directly with site management team in control of all trades, material
and safety. Duties include material order, supervision, quality control and
inspection to specification, implementation and policing of OH&S of the
following trades: -
Dredging- control of underloading dredge and barges,set up and construction
of specialized berths. Organisation and control of earth moving equipment, 100 t
excavators, clamshell attachments, 40t moxy dump trucks, pumping stations,
asphalt works.
Civil works – road construction, survey set-out, bulk out, grades, levels, building
pads, foundations and drainage. All machine types and sizes from 3tonne up to
100tonne for removal, transportation and importation of all materials.
Hydraulics – pipe work in ground installation for storm-water, sewer, water,
irrigation and all pipe rough-in and fixture installation to structures and buildings
Electrical – supply of infrastructure, in ground consumer mains, pillars, distribution
boards, direct wiring, lighting, power and fixtures installation to structures and
buildings.
Mechanical – Condenser installation, roof units, pipe and power install, drainage,
ductwork, cassette install, volume inspection.
Form workers – ground slab, suspended slab, high-rise.
Steel Fixers – columns, beams, mesh, bridge works.
Concreters – ground and suspended slabs, ultra-floor, pathways, retaining
structures, bridge stock ends, mass piers, pad and strip footings, all types of
finishes.
Riggers and Steelworkers – all types of structure erection and manufacture of
structural steel members and elements, cranage and installation.
Bricklayers and Renderers – Face work in Commercial and Domestic
applications, blockwork, blockfill, retaining walls, setout and gauge.
Carpenters and Joiners – all framing and roofing, flooring, paneling, moulding,
fix-out.
Roofing – metal and masonry materials order, safety, quality control.
Gyprock – lining, fire rating, wet area lining, setting and finishes.
Ceramic Tiler - supply and installation.
Painters – Quality control on all internal and external finishes.
8. Full Time Student -February 2001 – December 2003
Hunter Institute of Technology, Tighes Hill.
Structural Engineering Diploma (completed
Contract Carpenter - September 2000 to February 2001
Glenwood Industrial Buildings, Thornton Industrial Estate
Foundations for industrial sheds.
Control earth works on site including excavation, leveling, heavy
machinery and compaction.
Control site set out and liaise with surveyor, engineer and contractor.
Control foundations and concrete constructions for foundations bolts.
Contract Carpenter - November/December 2000
Civil Build, Carrington (Charlestown By Pass/Barclay Mowlem)
Form work carpenter on overhead bridge at Hillsborough Road
Intersection
Set scaffolding and direct platform for concrete structures.
Construct formwork for concrete walls, bridge and road foundations.
Prepare reinforcing steelwork for bridge columns and stock heads.
Contract Carpenter - January 2000 to January 2001
Warren Lee, Lake Constructions (Rafferty's Resort)
Townhouse developments
Number of units varied between 8. 22. To 38.
Set out and read floor plans.
Erection of frames and trusses, eave linings.
Erection of decks, pergolas, awnings.
Hang doors and moulding.
Working in a team of carpenters and/or apprentices.
Roof frame erection
9. Contract Carpenter - June 1999 to December 1999
Mick Hinchey, Hinchey Building Pty Ltd
Pole frame homes.
Set out and read floor plans.
Erection of frames and trusses, eave linings.
Erection of decks, pergolas, awnings.
Hang doors and moulding.
Pitching roofs, bearers and joists.
Installation of windows and gyprock.
Supervision of 1 carpenter and 1 labourer.
Installation of laminated veneer lumber beams, high span joists.
Contract Carpenter - January 1999 to June 1999
M & C Buckley Building Services
5-unit development.
Mould out units.
Hang doors.
Erect fencing - timber and steel.
Install cupboards.
Contract Carpenter
D J Tanner Carpentry
Extension to house at Eleebana.
Prepared quotation.
Supply and erection building.
Verandah and deck including foundation.
Floor, frame, roof, stairs, balustrade.
10. Contract Carpenter
Lloyd Hills Concreting (Rafferty's Resort)
Supervisory role.
3,500 square metres of concrete driveway including excavation,
machinery, labour and materials.
Liaised with builder, plumber, electrician and architect.
Various other sites in Newcastle:
Form work and false work for housing and suspended concrete slabs.
Contract Carpenter
L D Phillips
Housing construction.
Metal roofing.
Formwork Carpenter and Concreter
Trutek
Suspended slabs and walls.
Slab on ground.
Pier and Beam construction.
Retaining structures.
Contract Carpenter/Rigger
Rabal Developments
Steel warehouse erection.
Controlling labour cranes and erection.
Erection of lightweight concrete panels, sheeting and steel roof trusses.
Office framework and fitout.
11. Contract Lead Hand Rigger/Erector
D & M Sharp (Newcastle/ Central Coast)
Steel warehouse erection.
Footing and holding bolt setout.
Controlling labour cranes and erection.
Erection of lightweight concrete panels, sheeting and steel roof trusses.
Leading Hand.
Contract Framework Carpenter
D K Concreting (Newcastle/Central Coast)
Housing sites.
Read plans.
Set out excavation.
Form work.
Further information is available on request.