This document summarizes Derek Hilleren's engineering internship from May 2014 to August 2014 with CNH Industrial. It details the goals of taking part in the full design process, applying classroom knowledge to real-world problems, and focusing on energy conservation. It provides summaries of two projects: modifying the battery box mounting design to reduce parts and standardizing the design, and validating the performance of alternative bumper suppliers through testing. The internship helped improve Derek's professional skills like time management, project management, communication, organization, and problem solving while providing insight into the work of design engineers.
1. Contains confidential proprietary and trade secrets information of CNH Industrial. Any use of this work without express written consent is strictly prohibited.
August 12, 2014
Internship In Review
May 2014 – August 2014
Derek Hilleren, Engineering Design Intern
Benson, MN
2. FooterAugust, 13 2014 2
Take part in each step of the design process and learn from a talented team of
engineers. Work with the team to solve problems and be a part of the solution
with opportunities to implement my ideas.
Apply my engineering “book knowledge” to real world problems to help find
solutions. An opportunity to see how and where my knowledge can be applied
in the real world.
Design a part/ system/ assembly with energy conservation being a high priority.
Energy conservation can be achieved by looking at:
Reducing
Reusing
Recycling
Internship Goals
3. FooterAugust, 13 2014 3
Summary:
• Resolve the battery box mounting issue observed on the 3340 while keeping
mounting hardware to a minimum and keeping a commonized battery box among
all models of sprayers.
Projects
Battery Box Mounting
4. FooterAugust, 13 2014 4
Solution:
• Adding mounting tabs to the rear axle gussets of the 3340 and 4440 eliminates the
need for the long bolts that cross the frame.
Projects
Battery Box Mounting
5. FooterAugust, 13 2014 5
Challenges
• Keeping a communized battery box among all sprayers
• Sizing the tabs correctly via hand calculations in order to withstand the specified
stresses
Learning Outcomes
• Experience the design process and how such a small change can drastically
improve the product and manufacturing efficiency
• Opportunity to work with manufacturing and implement this change on the assembly
line
• Applied my engineering knowledge with static and dynamic stress calculations and
compared my results to FEA results
Projects
Battery Box Mounting
6. FooterAugust, 13 2014 6
Summary:
• Alternate supplier part validation
Validate weather or not the jounce and extruded bumpers from an alternate supplier meet
or exceed the performance of our current production bumpers
o Conducted extensive research on rubber properties in order to devise a procedure with testing
parameters that would give us definitive results
o Work with a testing facility to conduct testing based on my testing procedure
o Participated in design review meetings in regards to testing fixtures designed for this project
Projects
Bumper Testing
7. FooterAugust, 13 2014 7
Challenges
• Devising a testing procedure that will produce definitive results
• Keeping the project
Learning Outcomes
• Opportunity to work along side test engineers and get valued feedback on
conducting quality testing procedures
• Clear communication, organization, and persistency are important in
order to keep projects on a scheduled timeline.
Projects
Bumper Testing
8. FooterAugust, 13 2014 8
Summary:
• Shorten the right side boom cradle support tube by 3 in. This change will narrow
the frame, allowing manufacturing to paint the frame with a more efficient process.
Projects
Boom Cradle Support Tube
Boom Cradle Support Tube
9. FooterAugust, 13 2014 9
2250 Belly Pan Drawings
• Created production drawings for parts of the 2250 belly pan kit
4440 ROW Fuel Line Package
• Communized 4440 fuel line with ROW unit and located correct fitting for connecting
to the ECU
2250 Decals
• Located all decals on the 2250 and documented location
Hydraulic tube drawings
• Create drawings for hydraulic jumper tubes
2250/3240 Battery Box Spacer Brackets
• Looked at possible solutions for communizing the battery box spacer brackets
between the 2250 and 3240.
Product maintenance work in Engineering Central
• Updated EBOMs on various assemblies
Projects
Other
10. FooterAugust, 13 2014 10
Opportunity to improve professional skills:
• Time Management
Presented with many projects and deadlines
• Project Management
Responsible for making sure others are getting work done on time in order to keep my
projects on track
• Communication
Communicating with coworkers on a day to day basis to find answers to my questions
Organizing meetings and presenting ideas to engineers from multiple departments
• Organization
Keeping track of multiple projects at the same time
• Problem Solving
Presented with problems and expected to find solutions
Valuable insight on what a design engineer does
Opportunities to observe and learn from professional engineers
Internship Outcomes