SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Page 1 of 4 8 May 2015
Curriculum Vitae
David Bates CEng. MIMechE. APMP
I am a Chartered Engineer with an extensive background in the UK nuclear industry through
employment with client and contractor organisations including NNC Ltd, Nuclear Electric,
BNFL, DRDL, UKAEA, BNG, Jacobs Engineering, ABS Consulting and Magnox Ltd. My
involvement has been across a broad range of the activities that compose the life cycle of
facilities across the breadth of the UK nuclear industry.
EXPERIENCE:
Magnox Ltd: Senior Project Engineer, Sizewell A.
Active Effluent Treatment Plant refurbishment/upgrade project. Contractor supervision, Work
Order and Risk Assessment preparation: modification documentation; project Technical
Specifications.
Magnox Ltd: Project Engineer, Bradwell.
ILW resin and sludge retrieval and packaging project - technically co-ordinating and expediting
the delivery of the projects from design through procurement, construction into commissioning
and successful operations:
 On Site project delivery
 Management of engineering delivery of site enabling work for project installation.
 Preparation of maintenance of the programme schedule; project Technical Specifications;
modification documentation.
 Management of project interfaces and programme integration.
 Preparation of project commissioning strategy, oversight and supervision of the test
programme.
Magnox South: Project Engineer, Sizewell A.
Engineering technical support for the Systems & Structures Preservation Projects: Contractor
supervision, Work Order and Risk Assessment preparation: modification documentation; project
Technical Specifications.
Jacobs Engineering UK Ltd: Project Engineer, Magnox South, Dungeness A.
Engineering technical support for the Systems & Structures Preservation Projects.
Preparation of decommissioning project commissioning strategies:
 Sludge retrieval, processing and disposal.
 Site Electrical Overlay System
ABS Consulting: Project Engineer, Derby.
Project support to a Rolls-Royce Safety Case campaign for the Royal Navy nuclear submarine
programme. Development and establishment of the:
 Interface Management Arrangements.
 Safety Case Implementation Plan.
Curriculum Vitae David Bates
Page 2 of 4 8 May 2015
Jacobs Engineering UK Ltd:
Project Engineer, Magnox South, Dungeness A:
Provision of engineering technical support for the following projects:
 ILW Storage Augmentation Project (ILW Ministore): Preparation of Commissioning
Strategy Document, associated documentation and QA Plan. Scoping and defining the
test programme logic, identifying the testing required by the Safety Case.
 Liquor Storage Tank Characterisation Project: Preparation of tank characterisation and
inspection reports for ILW storage tanks.
British Energy, Sizewell B:
A member of the Jacobs UK team fulfilling the following roles:
Project Engineer, ILW resin handling and storage project.
 Origination of the commissioning strategy, testing scope and programme.
 Preparation and delivery of the suite of commissioning test documentation.
 Station personnel/Off-site design team interface management.
Quality Interface Engineer.
 Generation of top tier Quality Assurance arrangements for the project portfolio.
 Oversight of quality documentation delivering expectations and requirements.
 Provision of advice and guidance on procedural compliance.
 Point of contact interface with British Energy for quality matters.
Design Lead Engineer, British Nuclear Group, Bradwell.
Front end design and specification for LLW Management Facility and FED Dissolution Plant
including Statement of Requirements, Design Risk Assessment and Functional Specification.
British EnergyGeneration Ltd: Project Engineer, Sizewell B.
Refurbishment and technical upgrade of Encapsulation Machine and ILW waste processing
facilities. Responsible for Contractor/Station interface issues.
UKAEA: Engineering Substantiation Project Engineer, Dounreay.
Project and progress control management of engineering substantiation for identified UKAEA
facilities. Delivery of the Engineering Substantiation assessments:
 Task scope specification for contractor organisations.
 Contractual and financial issues management.
 Proposal technical content, programme and price assessment and scope agreement.
 Management of projects following award to completion.
 Co-ordination of internal and external interfaces with stakeholders.
 Management of document suite production for several facilities in parallel.
 Multi-discipline co-ordination using specific technical specialist advice as necessary.
Management of Independent Peer Review activities for Safety Case support documentation.
DML: Safety Engineer, Devonport Royal Dockyard Ltd.
Nuclear submarine refit facility project. Assessment and review of test documentation to ensure
Safety Case functional performance claims and requirements were adequately addressed.
UKAEA: Commissioning Support Engineer, Dounreay.
Fast Reactor liquid metal alloy coolant (NaK) Disposal Plant (NDP) project team:
 Review of contractor design submissions.
 Project programme development.
 Setting out and documenting commissioning arrangements and commissioning strategy.
Curriculum Vitae David Bates
Page 3 of 4 8 May 2015
British Nuclear Fuels plc: Commissioning Project Engineer, Waste Retrieval &
Decommissioning, Risley.
Pre-commissioning commencement activities for the Sellafield Drypac Plant project interfacing
with project design teams:
 Preparation of commissioning strategy documentation.
 Test schedule specification and commissioning test programme logic.
 Commissioning management arrangements.
 Assessment of plant design and layout to enable and facilitate commissioning activities.
Nuclear Electric plc:
Project Engineer, Waste and Decommissioning Group, Barnwood, Sep 1996 - Dec 1996:
 Solid waste management engineering and technical support.
 Technical manager for ILW packaging development and mobile waste solidification plant.
 Management of drum procurement contract.
Engineer, Projects and Station Support Department, Sizewell B:
 Project and engineering support following station handover.
 Completion of outstanding commissioning activities.
 Specification, management and acceptance of work carried out by contractors.
 Organisation and control of warranty work during first refuelling outage.
Commissioning Test TeamLeader, PWR Project Group, Sizewell B:
Lead engineer for Solid Waste Management Systems start-up and commissioning: Resin
Transfer System, Encapsulation machine, filter handling equipment, hoists, cranes, Waste Store
manipulator and Decontamination System.
Setting to work and performance testing from construction handover to operator take-over:
 Specification of handover requirements from construction.
 Detailed planning preparation within the overall planning function.
 Operation of test team interfaces with internal / external organisations.
 Organisation, management and direction of a multi-discipline test team.
 Ensuring appropriate resource levels.
 Completion of test programmes.
 Operator training within the test teams.
 Satisfying customer acceptance criteria to operate the plant.
Site Commissioning Engineer, Sizewell B:
 Commissioning documentation preparation.
 Development of commissioning test programmes.
 Review and comment on project test documentation submissions.
NNC Ltd:
Systems Engineer, Technical Services & SafetyDept., Knutsford:
Assessment of operator actions to restore overside services to vessels in normal and fault
conditions for facilities at HMNB Rosyth.
Systems Engineer, Reliability Analysis, PWR Systems, Knutsford:
 Fault tree analysis for beyond design basis conditions for the Sizewell B PWR examining
potential modes of failure of individual essential safety systems.
 Feasibility study for the Sellafield combined cycle power station assessing overall
availabilities from loss of plant and service systems.
Curriculum Vitae David Bates
Page 4 of 4 8 May 2015
Commissioning Engineer, Heysham 2:
 Preparation of commissioning test procedures for Heysham 2 & Torness.
 Planning and execution of testing and initial plant operation.
 Organisation and direction of test team members.
 Preparation and issue of commissioning test reports.
Mechanical Design Engineer, Architect Engineers Dept, Knutsford:
 Engineering design of AGR post trip cooling systems.
 Preparation of specifications, substantiation and system design documentation.
 Assessment of contractor design submissions.
 Plant layout and area co-ordination.

Weitere ähnliche Inhalte

Was ist angesagt?

GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster WheelerGareth White
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
George Soliman Basta-CV
George Soliman Basta-CVGeorge Soliman Basta-CV
George Soliman Basta-CVGeorge Basta
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15jim matthews
 
IDJ CV SEPT 2016
IDJ CV SEPT 2016IDJ CV SEPT 2016
IDJ CV SEPT 2016Ian Jones
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017Shaukat Mahmood Khan
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015Philip Turner
 
Dluge Edward J Resume 6
Dluge Edward J Resume 6Dluge Edward J Resume 6
Dluge Edward J Resume 6ejd111
 
Kelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin Soice
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 

Was ist angesagt? (20)

GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
George Soliman Basta-CV
George Soliman Basta-CVGeorge Soliman Basta-CV
George Soliman Basta-CV
 
M.foreman's resume'
M.foreman's resume'M.foreman's resume'
M.foreman's resume'
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
Topside
TopsideTopside
Topside
 
Rengaraj n c vdone
Rengaraj  n c vdoneRengaraj  n c vdone
Rengaraj n c vdone
 
IDJ CV SEPT 2016
IDJ CV SEPT 2016IDJ CV SEPT 2016
IDJ CV SEPT 2016
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
 
Ahmed Reedy CVf
Ahmed Reedy CVfAhmed Reedy CVf
Ahmed Reedy CVf
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015
 
Dluge Edward J Resume 6
Dluge Edward J Resume 6Dluge Edward J Resume 6
Dluge Edward J Resume 6
 
Richard (Rik) Stuart Barnett Resume
Richard (Rik) Stuart Barnett ResumeRichard (Rik) Stuart Barnett Resume
Richard (Rik) Stuart Barnett Resume
 
Kelvin - Geophysical - Formal
Kelvin - Geophysical - FormalKelvin - Geophysical - Formal
Kelvin - Geophysical - Formal
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
sharndencv
sharndencvsharndencv
sharndencv
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 

Ähnlich wie CV 08 May 2015 ncd

Ähnlich wie CV 08 May 2015 ncd (20)

CV Claire McCann
CV Claire McCannCV Claire McCann
CV Claire McCann
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
1.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 20171.0 RESUME S SITTNER 2017
1.0 RESUME S SITTNER 2017
 
Andrew Walker-CV
Andrew Walker-CVAndrew Walker-CV
Andrew Walker-CV
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Resume 2016 - Product Scheduler
Resume 2016 - Product SchedulerResume 2016 - Product Scheduler
Resume 2016 - Product Scheduler
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
Challenor-paul 13-01-16
Challenor-paul 13-01-16Challenor-paul 13-01-16
Challenor-paul 13-01-16
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Shivang raval 2018
Shivang raval 2018Shivang raval 2018
Shivang raval 2018
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 

CV 08 May 2015 ncd

  • 1. Page 1 of 4 8 May 2015 Curriculum Vitae David Bates CEng. MIMechE. APMP I am a Chartered Engineer with an extensive background in the UK nuclear industry through employment with client and contractor organisations including NNC Ltd, Nuclear Electric, BNFL, DRDL, UKAEA, BNG, Jacobs Engineering, ABS Consulting and Magnox Ltd. My involvement has been across a broad range of the activities that compose the life cycle of facilities across the breadth of the UK nuclear industry. EXPERIENCE: Magnox Ltd: Senior Project Engineer, Sizewell A. Active Effluent Treatment Plant refurbishment/upgrade project. Contractor supervision, Work Order and Risk Assessment preparation: modification documentation; project Technical Specifications. Magnox Ltd: Project Engineer, Bradwell. ILW resin and sludge retrieval and packaging project - technically co-ordinating and expediting the delivery of the projects from design through procurement, construction into commissioning and successful operations:  On Site project delivery  Management of engineering delivery of site enabling work for project installation.  Preparation of maintenance of the programme schedule; project Technical Specifications; modification documentation.  Management of project interfaces and programme integration.  Preparation of project commissioning strategy, oversight and supervision of the test programme. Magnox South: Project Engineer, Sizewell A. Engineering technical support for the Systems & Structures Preservation Projects: Contractor supervision, Work Order and Risk Assessment preparation: modification documentation; project Technical Specifications. Jacobs Engineering UK Ltd: Project Engineer, Magnox South, Dungeness A. Engineering technical support for the Systems & Structures Preservation Projects. Preparation of decommissioning project commissioning strategies:  Sludge retrieval, processing and disposal.  Site Electrical Overlay System ABS Consulting: Project Engineer, Derby. Project support to a Rolls-Royce Safety Case campaign for the Royal Navy nuclear submarine programme. Development and establishment of the:  Interface Management Arrangements.  Safety Case Implementation Plan.
  • 2. Curriculum Vitae David Bates Page 2 of 4 8 May 2015 Jacobs Engineering UK Ltd: Project Engineer, Magnox South, Dungeness A: Provision of engineering technical support for the following projects:  ILW Storage Augmentation Project (ILW Ministore): Preparation of Commissioning Strategy Document, associated documentation and QA Plan. Scoping and defining the test programme logic, identifying the testing required by the Safety Case.  Liquor Storage Tank Characterisation Project: Preparation of tank characterisation and inspection reports for ILW storage tanks. British Energy, Sizewell B: A member of the Jacobs UK team fulfilling the following roles: Project Engineer, ILW resin handling and storage project.  Origination of the commissioning strategy, testing scope and programme.  Preparation and delivery of the suite of commissioning test documentation.  Station personnel/Off-site design team interface management. Quality Interface Engineer.  Generation of top tier Quality Assurance arrangements for the project portfolio.  Oversight of quality documentation delivering expectations and requirements.  Provision of advice and guidance on procedural compliance.  Point of contact interface with British Energy for quality matters. Design Lead Engineer, British Nuclear Group, Bradwell. Front end design and specification for LLW Management Facility and FED Dissolution Plant including Statement of Requirements, Design Risk Assessment and Functional Specification. British EnergyGeneration Ltd: Project Engineer, Sizewell B. Refurbishment and technical upgrade of Encapsulation Machine and ILW waste processing facilities. Responsible for Contractor/Station interface issues. UKAEA: Engineering Substantiation Project Engineer, Dounreay. Project and progress control management of engineering substantiation for identified UKAEA facilities. Delivery of the Engineering Substantiation assessments:  Task scope specification for contractor organisations.  Contractual and financial issues management.  Proposal technical content, programme and price assessment and scope agreement.  Management of projects following award to completion.  Co-ordination of internal and external interfaces with stakeholders.  Management of document suite production for several facilities in parallel.  Multi-discipline co-ordination using specific technical specialist advice as necessary. Management of Independent Peer Review activities for Safety Case support documentation. DML: Safety Engineer, Devonport Royal Dockyard Ltd. Nuclear submarine refit facility project. Assessment and review of test documentation to ensure Safety Case functional performance claims and requirements were adequately addressed. UKAEA: Commissioning Support Engineer, Dounreay. Fast Reactor liquid metal alloy coolant (NaK) Disposal Plant (NDP) project team:  Review of contractor design submissions.  Project programme development.  Setting out and documenting commissioning arrangements and commissioning strategy.
  • 3. Curriculum Vitae David Bates Page 3 of 4 8 May 2015 British Nuclear Fuels plc: Commissioning Project Engineer, Waste Retrieval & Decommissioning, Risley. Pre-commissioning commencement activities for the Sellafield Drypac Plant project interfacing with project design teams:  Preparation of commissioning strategy documentation.  Test schedule specification and commissioning test programme logic.  Commissioning management arrangements.  Assessment of plant design and layout to enable and facilitate commissioning activities. Nuclear Electric plc: Project Engineer, Waste and Decommissioning Group, Barnwood, Sep 1996 - Dec 1996:  Solid waste management engineering and technical support.  Technical manager for ILW packaging development and mobile waste solidification plant.  Management of drum procurement contract. Engineer, Projects and Station Support Department, Sizewell B:  Project and engineering support following station handover.  Completion of outstanding commissioning activities.  Specification, management and acceptance of work carried out by contractors.  Organisation and control of warranty work during first refuelling outage. Commissioning Test TeamLeader, PWR Project Group, Sizewell B: Lead engineer for Solid Waste Management Systems start-up and commissioning: Resin Transfer System, Encapsulation machine, filter handling equipment, hoists, cranes, Waste Store manipulator and Decontamination System. Setting to work and performance testing from construction handover to operator take-over:  Specification of handover requirements from construction.  Detailed planning preparation within the overall planning function.  Operation of test team interfaces with internal / external organisations.  Organisation, management and direction of a multi-discipline test team.  Ensuring appropriate resource levels.  Completion of test programmes.  Operator training within the test teams.  Satisfying customer acceptance criteria to operate the plant. Site Commissioning Engineer, Sizewell B:  Commissioning documentation preparation.  Development of commissioning test programmes.  Review and comment on project test documentation submissions. NNC Ltd: Systems Engineer, Technical Services & SafetyDept., Knutsford: Assessment of operator actions to restore overside services to vessels in normal and fault conditions for facilities at HMNB Rosyth. Systems Engineer, Reliability Analysis, PWR Systems, Knutsford:  Fault tree analysis for beyond design basis conditions for the Sizewell B PWR examining potential modes of failure of individual essential safety systems.  Feasibility study for the Sellafield combined cycle power station assessing overall availabilities from loss of plant and service systems.
  • 4. Curriculum Vitae David Bates Page 4 of 4 8 May 2015 Commissioning Engineer, Heysham 2:  Preparation of commissioning test procedures for Heysham 2 & Torness.  Planning and execution of testing and initial plant operation.  Organisation and direction of test team members.  Preparation and issue of commissioning test reports. Mechanical Design Engineer, Architect Engineers Dept, Knutsford:  Engineering design of AGR post trip cooling systems.  Preparation of specifications, substantiation and system design documentation.  Assessment of contractor design submissions.  Plant layout and area co-ordination.