NVPILAR 2008
GENERAL GUIDELINES
THIS DEPARTMENT ORDER SETS THE FORMULATION OF POLICIES,
RULES AND PROCEDURES RELATIVE TO THE PREPARATION OF THE
“APPROVED BUDGET FOR THE CONTRACT” (ABC) ISSUED FOR THE
GUIDANCE OF ALL CONCERNED.
ALL THE ITEMS OF WORK TO BE USED SHALL BE IN ACCORDANCE
WITH DPWH STANDARD SPECIFICATIONS.
NVPILAR 2008
COST ESTIMATES
(D0 57 S.2002)
DIRECT COST INDIRECT COST
A. COST OF MATERIALS
1. COST AT SOURCE, INCL. PROCESSING
ROYALTIES, LOCAL TAXES & ETC.
2. EXPENSES FOR HAULING TO PROJ. SITE
3. HANDLING EXPENSES
4. STORAGE
5. ALLOWANCE FOR WASTE/OR LOSSES
B. COST OF LABOR
1. SALARIES & WAGES AS AUTHORIZED
BY DOLE
2. FRINGE BENEFITS SUCH AS VACATION
& SICK LEAVES, GSIS & SSS CONTR.
ALLOWANCES, BONUSES AND ETC.
C. EQUIPMENT EXPENSES
1. RENTAL RATE SHALL BE BASED ON
ACEL RATE AS APPRVD BY DPWH .
OPERATED RENTAL RATE ARE
PREFERRED OVER BARE RENTAL RATE
2. MOB./DEMOB OF EQUIPMENT SHALL BE
ON CASE TO CASE BASIS BUT IN NO
CASE EXCEED 1% OF TOTAL CIVIL
WORK ITEMS.
A. OVERHEAD EXPENSES – (6-7% CEILING)
DIRECT COST.
1. ENGINEERING & ADMINISTRATIVE
SUPERVISION
2. TRANSPORTATION ALLOWANCES
3. OFFICE EXPENSES (EQPT & SUPPLIES)
4. CONTRACTORS ALL RISK INSURANCE
5. FINANCING COST INCL.
-PREMIUM ON BID SECURITY
-PREMIUM ON PERFORMANCE SECURITY
-PREMIUM/CHARGES ON CREDIT LINES
-COST OF MONEY TO FINANCE THE PROJ.
B. CONTINGENCY – 3-5% OF DC.
C. MISCELLANEOUS – 1% OF DC.
INCLUDES LABORATORY TEST.
D. CONTRACTORS PROFIT
EST. DIRECT COST OCM PROFIT MOB/DEMOB MAX. TOTAL
UP TO P1M.
ABOVE P1M-5M
ABOVE P5M-10M
ABOVE P10M-20M
ABOVE P50M
ABOVE P20M-50M
13
12
12
11
11
10 10
11
15
12
13
14
29
27
26
24
23
21
1
1
1
1
1
1
VAT
NVPILAR 2008
3-5% PM Fee
“ THOSE WHO PREPARED/REVIEWED/CHECKED THE
ESTIMATES SHALL SEE TO IT THAT IN CASE THEY ARE
CALLED UPON TO MAKE GOOD THEIR ESTIMATES, THEY
CAN PERFORM THE JOB THEMSELVES AT THE COST THEY
HAVE GENERATED.”
NVPILAR 2008
PURPOSE
THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO
BE FOLLOWED BY ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF
LABOR AND EMPLOYMENT D.O. No. 13(DOLE D.O. No.13), SERIES OF 1998
OTHERWISE KNOWN AS THE “GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND
HEALTH IN THE CONSTRUCTION INDUSTRY”, WITH EMPHASIS GIVEN ON THE
METHODOLOGY TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFETY
AND HEALTH PROGRAM AS REQUIRED IN SECTION 17.
GENERAL GUIDELINES
IN COMPLIANCE WITH SECTION 17 OF DOLE D.O. No. 13, THE IMPLENTATION OF
CONSTRUCTION SAFETY SHALL BE CONSIDERED IN ALL STAGES OF PROJECT
PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL
BE INTEGRATED TO THE OVERALL PROJECT COST UNDER PAY ITEM “SPL-
CONSTRUCTION SAFETY AND HEALTH” AS A LUMPSUM AMOUNT, TO BE
QUANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL REQUIREMENTS,
PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF
CONSTRUCTION SAFETY AND HEALTH IN EVERY PROJECT SHALL BE INCLUDED IN
THE PROJECT BIDDING DOCUMENTS SPECIFICALLY UNDER THE INSTRUCTION TO
BIDDERS.
NVPILAR 2008
CONCTRUCTION PROJECT
(D.O. No. 56 S. 2005)
CONSTRUCTION SAFETY AND HEALTH PROGRAM ( CSHP )
THE REQUIRED CSHP FOR SPECIFIC PROJECT SHALL INCLUDE BUT NOT LIMITED TO THE FF :
1. COMPOSITION OF SAFETY & HEALTH PERSONNEL RESPONSIBLE FOR THE IMPLENTATION OF CSHP;
2. SPECIFIC SAFETY POLICIES W/C SHALL BE UNDERTAKEN IN THE CONSTRUCTION SITE INCLUDING
FREQUENCY OF & PERSONS RESPONSIBLE FOR CONDUCTING TOOL BOX AND GANG MEETING;
3. PENALTIES AND SANCTIONS FOR VIOLATIONS OF THE CSHP;
4. FREQUENCY, CONTENT AND PERSONS RESPONSIBLE FOR ORIENTING, INSTRUCTING AND TRAINING
ALL WORKERS AT THE SITE WITH REGARD TO THE CSHP WHICH THEY OPERATE; &
5. THE MANNER OF DISPOSING WASTE ARISING FROM THE CONSTRUCTION.
MANPOWER EQUIPMENT/FACILITIES
1. SAFETY ENGINEER / OFFICER
2. SAFETY MAN / OFFICER
-AS RECOMMENDED BY DOLE, FOR EVERY
CONST. PROJ. W 100 & ABOVE WORKERS, AN
ACCREDTED SAFETY OFFICER BY DOLE-BWC
SHALL BE EMPLOYED. ONLY THE COST FOR THE
CONST. SAFETY & HEALTH OFICER , WHETHER
ON FULL OR PART TIME BASIS ASSIGNED ON
SITE SHALL BE INCLUDED IN THE ESTIMATE.
3. HEALTH PERSONNEL
-ONLY THE MEDICAL AND DENTAL
PRACTITIONERS ACTUALLY ASSIGNED IN THE
PROJECT SHALL BE INCLUDED IN THE COST OF
SAFETY.
1. PERSONAL PROTECTIVE EQUPMENT (PPE)
-FOR GENERAL CONST. THE REQUIRED BASIC
PPE FOR ALL WORKERS SHALL BE SAFETY
HELMET, SAFETY GLOVES AND SAFETY SHOES.
SPECIALTY PPE SHALL BE PROVIDED IN ADDITION
TO OR IN LIEU OF THE CORRESPONDING PPE AS
THE WORK ACTIVITY REQUIRES.
2. SIGNAGES AND BARRICADES
-SHALL BE PROVIDED AS A PRECAUTION TO
ADVICE THE WORKERS & THE GENERAL PUBLIC
OF THE HAZARDS EXISTING AT THE WORKSITE.
3. FACILITIES
- W ADEQUTE SAFE DRINKING WATER;
SANITARY & WASHING FACILITIES: LIVING
ACCOMODATIONS FOR WORKERS.
COSTING
PAY ITEM “SPL – CONSTRUCTION SAFETY AND HEALTH” AS
A LUMP SUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED
ESTIMATE.
NVPILAR 2008
NOTE : DERIVED FROM CPES MANUAL NVPILAR 2008
SAFE CONDITION MANDATORY ACTION STOP OR
PROHIBITION
CAUTION OR RISK TRAFFIC AND
HOUSEKEEPING
ALERT RADIATION
DPWH STD.SPECS.,VOL.II, 2004 ED.
NVPILAR 2008
DPWH STD.SPECS.,VOL.III, 1995 ED.
DPWH STD.SPECS., VOL. I, 1988, ED.
REFERENCE :
SPECIFICATIONS
BOOKS
1. ESTIMATING BILL OF MATERIALS BY VICENTE TAGAYUN
2. SIMPLIFIED CONSTRUCTION ESTIMATE BY MAX B. FAJARDO JR.
3. HANDBOOK OF CONSTRUCTION ESTIMATE BY RHENO A. VELASCO
4. PLUMBING DESIGN & ESTIMATE BY MAX B. FAJARDO JR.
5. ELECTRICAL LAYOUT & ESTIMATE BY MAX B. FAJARDO JR.
OTHER CODES AND SPECIFICATIONS:
P.D.1096 – NATIONAL BUILDING CODE
R.A. 7160 – LOCAL GOVT. CODE OF 1991
DOLE D.O. 13 SERIES 1998 – CONSTRUCTION SAFETY
DPWH D.O. 56 SERIES 2005 – CONSTRUCTION SAFETY
B.P. 344 – ACCESSIBILITY LAW
NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
AMERICAN CONCRETE INSTITUTE ( ACI )
AMERICAN SOCIETY OF TESTING MATERIALS ( ASTM )
ELECTRICAL CODE OF THE PHILIPPINES
PLUMBING CODE OF THE PHILIPPINES
PHILIPPINE MECHANICAL ENGINEERING CODE
ALL MATERIALS QUALITY TESTING CODE
NVPILAR 2008
NATIONAL BUILDING CODE
( P.D. 1096 )
5 MAJOR DIVISIONS IN BUILDING PLANS SUBJECT TO ESTIMATE
ARCHITECTURAL AESTHETIC
STRUCTURAL
ELECTRICAL/
ELECTRONIC
SANITARY/
PLUMBING
MECHANICAL
STRENGTH
ELECTL ENGR/
ELECTRONIC ENGR
POWER, LIGHTING
& COMMUNICATION
HEALTH AND
SANITATION
NECESSITIES MECHANICAL ENGR
SANITARY ENGR/
MASTER PLUMBER
CIVIL ENGR
ARCHITECT
NVPILAR 2008
CLASSIFICATION OF BUILDING STRUCTURES
RESIDENTIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR USE OF
OWNER, “ON CAMPUS” DORMITORIES, RECTORIES, CONVENTS
AND MONASTERIES, RESIDENTIAL CONDOMINIUMS OWNED BY
OCCUPANTS, ARMY BARRACKS, ETC.
COMMERCIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR LEASE,
BOARDING HOUSES, APARTMENTS, ACCESORIAS, HOTELS AND
INNS, “OFF CAMPUS” DORMITORIES, TRANSPORTATION
TERMINALS AND STATIONS, NIGHT CLUBS AND DANCE HALLS,
RESTAURANTS, MARKETS AND SHOPPING CENTERS, THEATERS,
SPORTS STADIA, GRANDSTANDS, GASOLINE SERVICE STATIONS,
PARKING GARAGES, FUNERAL PARLORS, ETC.
INDUSTRIAL – FACTORIES, PLANTS, MILLS, ARSENALS, BREWERIES, PROCESSING
PLANTS, GAS GENERATING PLANTS, SHIPYARDS, AIRCRAFT
HANGARS, SLIPWAYS, DRYDOCKS AND PIERS, LUMBER MILLS,
WAREHOUSE, STORAGE TANKS, GRAIN AND CEMENT SILOS,
ETC.
NVPILAR 2008
INSTITUTIONAL – EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS,
CLUBHOUSES, HOSPITALS, SANITARIA, ASYLUMS, HOMES
FOR THE AGED, JAILS, POLICE AND FIRE STATIONS, PLACES
OF WORSHIP, ETC.
RECREATIONAL – CINEMAS, BILLIARD HALLS, DISCO PADS, AMUSEMENT HOUSES,
ETC.
AGRICULTURAL – BARNS, POULTRY HOUSES, HATCHERIES, PIGGERIES,
STABLES, GREENHOUSES, GRANARIES, ETC.
ANCILLARY – GARAGES, CARPORTS, TANKS, TOWERS, SMOKESTACKS AND
CHIMNEYS, VAULTS, SWIMMING POOLS, PELOTA COURTS,
AVIARIES, AQUARIUMS, ZOO STRUCTURES, FIERE WALLS AND
FENCES OVER 1.8O METERS IN HEIGHT, ETC.
TEMPORARY – FIELD OFFICES, LABORERS’ QUARTERS, CANOPIES AND
RAILINGS, PROTECTIVE FENCINGS, ETC.
OTHERS – CEMETERY STRUCTURES AND MOUSOLEUMS, TOMBS, MULTI-LEVEL
NICHES, ETC.
NVPILAR 2008
TYPES OF CONSTRUCTION
( P.D. 1096, CHAPTER 4, SECTION 401 )
TYPE I - TYPE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL
ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE.
TYPE II - TYPE II BUILDING SHALL BE OF WOOD CONSTRUCTION WITH PROTECTIVE
FIRE RESISTANT MATERIALS AND ONE-HOUR FIRE RESISTIVE
THROUGHOUT: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS
MAY USE FIRE-RETARDANT TREATED WOOD WITHIN THE FRAMING
ASSEMBLY.
TYPE III – TYPE III BUILDING SHALL BE OF MASONRY AND WOOD CONSTRUCTION,
STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED
BY THIS CODE: PROVIDED, THAT THE BUILDING SHALL BE ONE-HOUR
FIRE – RESISTIVE THROUGHOUT. EXTERIOR WALLS SHALL BE
INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION
TYPE IV – TYPE IV BUILDING SHALL BE OF STEEL, IRON, CONCRETE OR MASONRY
CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL
BE OF INCOMBUSTIBLE FIRE RESISTIVE CONSTRUCTION: EXCEPT, THAT
PERMANENT NON-BEARING PARTITIONS OF ONE-HOUR FIRE RESISTIVE
CONSTRUCTION MAY USE FIRE RETARTANT TREATED WOOD WITHIN THE
FRAMING ASSEMBLY.
TYPE V - TYPE V BUILDING SHALL BE FIRE-RESISTIVE. THE STRUCTURAL
ELEMENTS SHALL BE OF STEEL, IRON, CONCRETE, OR MASONRY
CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL
BE OF INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION.
NVPILAR 2008
BURJ DUBAI ( DUBAI TOWER )
THE BURJ DUBAI IS A SUPERTALL SKYSCRAPER CURRENTLY UNDER CONSTRUCTION IN DUBAI, UNITED ARAB
EMIRATES. IT IS CURRENTLY THE TALLEST FREE STANDING STRUCTURES IN THE WORLD HAVING AN EXPECTED
HEIGHT OF 818 METERS BUT COULD REACH UP TO 940 METERS UPON THE SCHEDULED COMPLETION IN
SEPTEMBER 2009. THE BUILDING IS BEING BUILT BY A JOINT VENTURE OF THE SOUTH KOREAN COMPANY
SAMSUNG, THE BELGIAN COMPANY BESIX AND THE UAE COMPANY ARABTEC. IT WAS DESIGN BY ADRIAN SMITH
OF SKIDMORE, OWING AND MERRIL CONSULTANCY. THE TOTAL BUDGET FOR THE BURJ DUBAI PROJECT IS
ABOUT 4.1 BILLION DOLLARS.
*PICTURE & INFO FROM INTERNET NVPILAR 2008
SCOPE OF WORKS IN BUILDING CONSTRUCTION
PART - A - MOBILIZATION
PART - B - EARTHWORKS
PART - C - TERMITE CONTROL & WOOD PRESERVATIONS
PART - D - FOUNDATION WORKS
PART - E - DAMP PROOFING / MOISTURE CONTROL
PART - F - CONCRETE WORKS
PART - G - MASONRY WORKS
PART - H - CARPENTRY WORKS
PART - I - FABRICATED MATERIALS AND HARDWARE
PART - J - ROOF FRAMING WORKS
PART - K - ROOFING WORKS
PART - L - FINISHES
PART - M - PAINTING / VARNISHING
PART - N - WATER PROOFING
PART - O - SANITARY WORKS
PART - P - ELECTRICAL WORKS
PART - Q - MECHANICAL WORKS
PART - R - CONSTRUCTION SAFETY AND HEALTH (DO. 56)
NVPILAR 2008
PROJECT: ONE(1) STOREY (7X7 MODIFIED) CLASSROOM SCHOOL BUILDING
ARCHITECTURAL PLAN
FRONT ELEVATION REAR ELEVATION CROSS SECTION
1 2 3 3 2 1 A B C
W-1 W-1
D-1 D-1
GA 26 CORR. G I.
ROOFING
GA 26 CORR. G I.
ROOFING
W-2 W-2
D-1 W-2
CLASSROOM
FLOOR PLAN
1 2 3 1
1
2
2 3
3
A
A
A
B
B
B
C
C C
REFLECTED CEILING ROOF PLAN
CLASSROOM
CORRIDOR
D-1
D-1 W-1
W-1
W-2
W-2
EXPOSED
STEEL ‘C’
PURLINS AND
RAFTERS
SLOPE
SLOPE
SCH. OF DOORS & WINDOWS
D-1
FLUSH TYPE
HOLLOW CORE
DOOR W MARINE
PLYWOOD FACING
ON WOOD FRAME
W-1 & W-2
GLASS JALOUSIE
WINDOWS ON
ALUMINUM HOUSIG
*PLANS BY BOD NVPILAR 2008
STRUCTURAL PLAN
DETAIL CROSS SECTION
A B C
BASE PLATE W LONG
ANCHOR BOLTS
ROOF INSULATION CEILING
FIN. COMPRESSED BETWEEN
PURLINS AND RAFTER
CLASSROOM
COL. FTG.
WALL FTG
WELL COMPACTED
GRAVEL FILL
NGL
FGL
FFL
CORRIDOR
DOWEL
LB LB
D-1 W-2
C-PURLINS
RAFTER
ANGULAR
BRACE
CORR. GI
SHEETS
FOUNDATION PLAN
C1-F1 C1-F1
C1-F1
C1-F1
C1-F1 C1-F1
C1-F1
C1-F1
SLAB ON FILL
WF-1 WF-1
WF-1 WF-1
WF-1
WF-1
WF-1
WF-1
FOOTING COLUMN WALL FOOTING
LINTEL BEAM SPOT DETAIL
LINTEL BEAMS
*PLANS BY BOD NVPILAR 2008
WATER MAIN
CORPORATION COCK
METER SHUT-OFF
WATER METER
WATER PIPE
CONN. TO
WATER MAIN
GATE
VALVE
IN-HOUSE WATER
SUPPLY PIPE
KITCHEN
SINK
LAVATORY
HORIZONTAL
VENT PIPE
VENT PIPE
THRU ROOF
WATER
CLOSET
SHOWER
ROOF
GUTTER
DOWNSPOUT
CATCH
BASIN
SEPTIC
VAULT
SOIL/WASTE PIPE
CLEAN-
OUT
STORM
DRAINAGE PIPE
CATCH
BASIN
TO DRAINAGE
CANAL/SEWER
PLUMBING AND SANITARY CYCLE
( ONE STOREY STRUCTURE )
*PICTURE FROM BOOKS OF TAGAYUN
NVPILAR 2008
PLUMBING SYSTEM
WATER LINE INCLUDING DRAINAGE, WASTE AND VENTILATION SYSTEM OF BUILDING
VENTILATION THROUGH ROOF ( VTR )
MAIN VENT
DRY VENT
WET VENT
WASTE / SOIL PIPE
CLEAN OUT
FITTINGS
FLOOR DRAIN
HOT WATER LINE
W/ ACCESSORIES
WATER HEATER
HOT WATER RETURN
COLD WATER LINE
W/ ACCESORIES
KITCHEN SINK
FIXTURES
LAVATORIES
FIXTURES
WATER CLOSET
BATH TUB
SHOWER W/ ACCESORIES
*PICTURE FROM BOOKS OF FAJARDO. NVPILAR 2008
ELECTRICAL SYSTEM LAYOUT
( ONE STOREY STRUCTURES )
LIGHTING LAYOUT CONVENIENCE OUTLET LAYOUT PANEL BOARD & CABINETS
*PICTURE FROM BOOKS OF FAJARDO.
NVPILAR 2008
SCOPE OF WORKS % AMOUNT
I. MOBILIZATION / DEMOBILIZATION 1.0 P3,000.00
II. EARTHWORKS 2.29 6,870.00
III. SOIL POISONING 0.56 1,680.00
IV. DAMPROOFING WORKS 0.47 1,410.00
V. CONCRETE WORKS 29.65 88,950.00
VI. MASONRY WORKS 3.21 9,630.00
VII. CARPENTRY WORKS 3.54 10,620.00
VIII. FAB. MATERIALS & HARDWARE 9.08 27,240.00
IX. ROOF FRAMING WORKS 9.87 29610.00
X. ROOFING WORKS 7.20 21,600.00
XI. FINISHES 12.23 36,690.00
XII. PAINTING WORKS 6.50 19,500.00
XIII. SANITARY / PLUMBING WORKS 4.06 12,180.00
XIV. ELECTRICAL WORKS 5.34 16,020.00
XV. MECHANICAL WORKS 5.00 15,000.00
TOTAL 100.00 300,000.00
CONST. OF ONE STOREY SCHOOL BUILDING
FRONT ELEVATION
1 2 3
W-1 W-1
D-1 D-1
GA 26 CORR. G I.
ROOFING
REAR ELEVATION
3 2 1
GA 26 CORR. G I.
ROOFING
W-2 W-2
CROSS SECTION
A B C
D-1 W-2
CLASSROOM
NVPILAR 2008
FOUNDATION PLAN
C1-F1 C1-F1
C1-F1
C1-F1
C1-F1 C1-F1
C1-F1
C1-F1
SLAB ON FILL
WF-1 WF-1
WF-1 WF-1
WF-1
WF-1
WF-1
WF-1
SCH. OF DOORS & WINDOWS
D-1
FLUSH TYPE
HOLLOW CORE
DOOR W MARINE
PLYWOOD FACING
ON WOOD FRAME
W-1 & W-2
GLASS JALOUSIE
WINDOWS ON
ALUMINUM HOUSING
FLOOR PLAN
1 2 3
A
B
C
CLASSROOM
CORRIDOR
D-1 W-1
W-2
W-2
W-1 D-1
PREPARATION OF PROGRAM OF WORKS
A T
Q
N
M
C H
F
B V
E G
I W
K O R U
D
J
S
P
MOVE-
IN
EARTH
WORKS
2
WAIT
SOIL
POISONING
CONCRETE
WORKS
WAIT
BACKFILL
MASONRY
WORKS
PROCUREMENT/DELIVERY OF CONSTRUCTION MATERIALS
26
2
1 2
3
4
5
5
6
3
2
1
WAIT
ELECTRICAL/SANITARY ROUGH-IN
14
DAMPROOFING/SLAB ON FILL
7
3
ROOF FRAMING
8
5
WAIT
2
INST. OF PURLINS
9
ROOFING
1O
4
2
INST. GUTTER &
FLUSHING
WAIT
11
FINISHES
13
4
CARPENTRY WORKS
12
2
INST. FAB. MATLS &
HARDWARE
4
14
WAIT
PAINTING
3
15
INST. ELECT/
MECH/SANITARY
FIXTURES
1
16
MOVE
OUT
2
17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
CALENDAR DAYS
BUILDING CONSTRUCTION METHODOLOGY
PROJECT: ONE(1) STOREY (7m X 7m) MODIFIED SCHOOL BUILDING
( BY PERT/CPM DIAGRAM)
LEGEND:
A B
ES LS EF LF
A
ES LS
NETWORK -
ACTIVITY -
EVENT -
DUMMY -
CRITICAL PATH -
NVPILAR 2008
I. MOBILIZATION/DEMOB
II. EARTHWORKS
III. SOIL POISONING
IV. DAMP PROOFING WORKS
V. CONCRETE WORKS
VI. MASONRY WORKS
VII. CARPENTRY WORKS
VIII. FAB. MATLS & H’WARE
IX. ROOF FRAMING WORKS
X. ROOFING WORKS
XI. FINISHES
XII. PAINTING WORKS
XIII. SANITARY WORKS
XIV. ELECTRICAL WORKS
XV. MECHANICAL WORKS
TOTAL
PROJECTED CASH FLOW (P)
PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)
SCOPE OF WORKS WT.(%)
1.00
2.29
0.56
0.47
29.65
300,000.00
3.21
3.54
9.08
9.87
7.20
12.23
6.50
4.06
5.34
5.00
100.00
AMOUNT
(PHP)
CALENDAR DAYS
5 10 15 20 25 30
3,000.00
6,870.00
1,680.00
1,410.00
88,950.00
9,630.00
10,620.00
10,620.00
27,240.00
29,610.00
21,600.00
36,690.00
19,500.00
16,020.00
15,000.00
- CRITICAL ACTIVITY
- PARALLEL ACTIVITY
NVPILAR 2008
I. MOBILIZATION/DEMOB
II. EARTHWORKS
III. SOIL POISONING
IV. DAMP PROOFING WORKS
V. CONCRETE WORKS
VI. MASONRY WORKS
VII. CARPENTRY WORKS
VIII. FAB. MATLS & H’WARE
IX. ROOF FRAMING WORKS
X. ROOFING WORKS
XI. FINISHES
XII. PAINTING WORKS
XIII. SANITARY WORKS
XIV. ELECTRICAL WORKS
XV. MECHANICAL WORKS
TOTAL
PROJECTED CASH FLOW (P)
PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)
SCOPE OF WORKS WT.(%)
1.00
2.29
0.56
0.47
29.65
1,500.00
3,435.00 3,435.00
1,680.00
1,410.00
11,118.75 44,475.00 33,356.25
3,210.00 6,420.00
10,620.00
13,620.00 13,620.00
17,766.00 11,844.00
1,500.00
16,200.00 5,400.00
36,690.00
19,500.00
676.67 3,383.33 3,383.33 3,383.33 1,353.34
890.00 4,450.00 4,450.00 4,450.00 1,780.00
833.33 4,166.67 4,166.67 4,166.67 1,666.66
17,733.75
17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00
300,000.00
39,420.00
90,174.00
45,966.00
53,186.25
53,520.00
3.21
3.54
9.08
9.87
7.20
12.23
6.50
4.06
5.34
5.00
100.00
AMOUNT
(PHP)
CALENDAR DAYS
5 10 15 20 25 30
3,000.00
6,870.00
1,680.00
1,410.00
88,950.00
9,630.00
10,620.00
10,620.00
27,240.00
29,610.00
21,600.00
36,690.00
19,500.00
16,020.00
15,000.00
5.91
5.91
17.84
23.75
17.73
41.48
15.32
56.80
30.06
86.86
13.14
100.00
NVPILAR 2008
I. MOBILIZATION/DEMOB
II. EARTHWORKS
III. SOIL POISONING
IV. DAMP PROOFING WORKS
V. CONCRETE WORKS
VI. MASONRY WORKS
VII. CARPENTRY WORKS
VIII. FAB. MATLS & H’WARE
IX. ROOF FRAMING WORKS
X. ROOFING WORKS
XI. FINISHES
XII. PAINTING WORKS
XIII. SANITARY WORKS
XIV. ELECTRICAL WORKS
XV. MECHANICAL WORKS
TOTAL
PROJECTED CASH FLOW (P)
PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)
SCOPE OF WORKS WT.(%)
1.00
2.29
0.56
0.47
29.65
17,733.75
17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00
300,000.00
39,420.00
90,174.00
45,966.00
53,186.25
53,520.00
3.21
3.54
9.08
9.87
7.20
12.23
6.50
4.06
5.34
5.00
100.00
AMOUNT
(PHP)
CALENDAR DAYS
5 10 15 20 25 30
3,000.00
6,870.00
1,680.00
1,410.00
88,950.00
9,630.00
10,620.00
10,620.00
27,240.00
29,610.00
21,600.00
36,690.00
19,500.00
16,020.00
15,000.00
5.91
5.91
17.84
23.75
17.73
41.48
15.32
56.80
30.06
86.86
13.14
100.00
25%
75%
50%
100%
5.91
56.80
41.48
23.75
86.86
TIME ELAPSED
SCHEDULED
ACCOMPLIHMENT
ACTUAL
ACCOMPLISHMENT
NVPILAR 2008
RES. ENGINEER
CONST. FOREMAN
LEADMAN
CARPENTER
MASON
STEEL MAN
WELDER
TINSMITH
PLUMBER
PAINTER
ELECTRICIAN
LABORER
SAFETY OFFICER
FIRST AIDER
NURSES
TOTAL
RATE/DAY
TOTAL
AMOUNT
CALENDAR DAYS
5 10 15 20 25 30
1
MANPOWER
1
1 1
1 1 1 1 1 1 1
1
1 1
1 1 1
1
1
1
1
1
1
1
1
1
1
1
1 1
1 1
1
1 1 1 1 1
1 1
1 1
1 1
1
1
1 1
1
1 1 1
1
1 1 1
1
1
1 1 1
1
1
1
1
1 1
1
1 1
1
1 1 1
1
1 1
1
1
1 1
1
1 1
1
1
1 1
1
1 1
1
1
1
1
1
1
1
1 1 1
1 1
1
1 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
2
2
2
2
2
2 2
2
2
2 2
2
2
2
2
2
2
2 2
2
2
2 2
2 2
2
2
2
2
2
2
2
2
2
2
2
2
2
2 2
2
2
2
2
2 2
3 3
3 3
3 3
3
3 3
3
3
3 3
3
3 3
3
3
3
3 3
3
3 3
3 3
3 3
3
3
8
8 6
6 13
13
13
13 14 10
10
10 16
16 10
10 10
10
10
10 10 1210
12
12
12
12
12 8 6
NVPILAR 2008
TOTAL
RATE/DAY
TOTAL
AMOUNT
CALENDAR DAYS
5 10 15 20 25 30
1
1
1 1
1 1 1 1 1 1 1
1
1 1
1 1 1
1
1
1
1
1
1
1
1
1
1
1
1 1
1 1
1 1
1
1
1
1
1 1
1
1 1
1
1 1
1
1
1
1
1
1
1 1
1
1 1
1
1
1
1
1
1
1
1
EQUIPTMENT
MINOR TOOL ACC.
C0NCRETE MIXER
CONC. VIBRATOR
BAR CUTTER
BAR BENDER
WELDING MACHINE 1
NVPILAR 2008
MANPOWER REQUIREMENT
TECHNICAL SAFETY & HEALTH
(DO 56 S.2005)
SKILLED / UNSKILLED
PROJECT ENGINEER
RESIDENT ENGINEER
MTQC ENGINEER
QTY./COST ENGINEER
SANITARY ENGINEER
ELECTRICAL ENGINEER
MECHANICAL ENGINEER
SAFETY ENGINEER
SAFETY OFFICER
FIRST AIDER
NURSES
CONST. FOREMAN
LEADMAN
CARPENTER
MASON
STEEL MAN
WELDER
TINSMITH
INSTALLER
PAINTER
PLUMBER
ELECTRICIAN
LABORER
NVPILAR 2008
NVPILAR 2008
EXCAVATOR-USE IN
LARGE DIMENSION
EXCAVATION & DIGGING
PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING EQUIPMENT
SMALL DRILLING EQPT.
USE FOR MICRO PILES
DROP HAMMER DRIVING
RIG FOR PRE CAST PILES
HEAVY BORING RIG W/ VIBRO
HAMMER FOR BORED PILES
HEAVY CABLE GRAB
FOR BARRETTE PILES
TRUCK MIXER TANDEM WITH
PUMPCRETE USE IN POURING OF
HEAVY FOUNDATIONS.
TRUCK MOUNTED/CRAWLER CRANE -
USE TO CARRY & MANEUVER PRE CAST
PILE & STEEL CAGES.
WHEEL LOADER TANDEM W/ DUMP TRUCK -
USE FOR HAULING & DISPOSAL OF DEBRIS
AND OTHER EXCAVATED MATERIALS.
NVPILAR 2008
GENERATOR SET / WELDING MACHINE –
USE AS CONNECTORS ON HEAVY
STRUCTURAL STEEL MEMBERS.
TOWER CRANE – USE AS
CIRCUMFERENTIAL LIFTING
MECHANISM TO TRANSPORT
VITAL CONSTRUCTION
MATERIALS & EQUIPMENT
WHEEL LOADER TANDEM W/ DUMP TRUCK-USE
FOR HAULING & DISPOSAL OF DEBRIS AND
OTHER MATERIALS WITHIN THE PERIPHERAL
OF THE BUILDINGS
TRUCK MIXER TANDEM WITH PUMPCRETE USE
IN POURING OF HEAVY SUPERSTRUCTURE
MEMBERS.
MOBILE CRANES – USE TO
MANEUVER AROUND & OUTSIDE
THE BUILDING TO HOIST
MATERIALS & EQUIPMENT FROM
VARIOUS LOCATIONS
GENERATOR SET / WELDING MACHINE –
USE AS CONNECTORS ON HEAVY
STRUCTURAL STEEL MEMBERS.
FORMS & SCAFFOLDING – USE
AS GUIDE & SUPPORT
SYSTEM IN FORMING &
CHECKING ALIGNMENT OF
STRUCTURAL MEMBERS IN &
AROUND THE BUILDINGS.
NVPILAR 2008
WHEEL LOADER EXCAVATOR/BREAKER BULLDOZER GRADER
ROLLER TRUCK MIXER DUMP TRUCK
TRAILER TRUCK
NVPILAR 2008
NVPILAR 2008
SAMPLING MOLD BAR CUTTER CONCRETE VIBRATOR
RING AND BAR BENDER
1- BAGGER
CONCRETE MIXER
2 – BAGGER
CONCRETE MIXER
PORTA LIFT HOLLOW BLOCK MACHINE
PLATE COMPACTOR TAMPING RAMMER WALK BEHIND ROLLER SUBMERSIBLE PUMP
NVPILAR 2008
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
A. MOBILIZATION / DEMOB. 1% OF DC
B. EARTHWORKS
a) Excavation / Backfill
b) Earth fill
c) Gravel
-
30 %
30 %
C. TERMITE CONTROL /
WOOD PRESERVATION
a) Soil Poisoning
b) Wood Preservation
30 %
30 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
D. FOUNDATION WORKS
1. SHALLOW FOUNDATION
a) Spread
b) Mat
c) Raft
2. DEEP FOUNDATION
a) Micro Piles
b) Pre-Cast Driven Piles
c) Bored Piles
d) Barrette Piles
30 %
30 %
30 %
30 %
30 %
30 %
30 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
E. DAMP PROOFING /
MOISTURE CONTROL
a) On Ground
b) Below Ground
30 %
30 %
F. CONCRETE WORKS
a) Concrete
a.1) Ready Mix
a.2) Job Mix
b) Re-bars
c) Formworks
10 – 15 %
30 %
30 %
30 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
G. MASONRY WORKS
a) Concrete Hollow Blocks 30 %
H. CARPENTRY WORKS
a) Ceiling
b) Partitions
c) Wooden Framing
d) Stairs
e) Cabinets
30 %
30 %
30 %
30 %
30 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
H. FABRICATED MAT’LS
AND HARDWARES
a) Doors
b) Windows
c) Hardware Accessories
I. ROOF FRAMING WORKS
1. Timber Trusses
2. Steel Trusses
a) Fabrication
b) Installation/Erection
c) Equipment
d) Consumables
e) Painting
30% Fab. + 10% Inst.
30% Fab. + 10% Inst.
30%
30%
30%
20%
10 - 25 %
8 %
7 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
K. ROOFING WORKS
a) Roofing Mat’ls & acc.
L. FINISHES
M. PAINTING / VARNISHING
a) Masonry Paint
b) Wooden Paint
c) Metal Paint
d) Varnishing
30 %
30 - 35 %
30 %
30 %
30 %
30 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
N. WATERPROOFING
a) Cement Base (Integral)
b) Membrane Waterproofing
c) Liquid Waterproofing
d) Hydrolithic Waterproofing
O. SANITARY WORKS
a) Plumbing Lines
b) Drainage, Waste & Vent
c) Fixtures & Accessories
30 %
30 %
30 %
30 %
30 %
30 %
15 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
P. ELECTRICAL WORKS
a) Wires & wiring
b) Conduit works
c) Panel boards & Cabinets
d) Fixtures & Accessories
30 %
30 %
5 %
10 %
LABOR COST DISTRIBUTION
(BUILDING ESTIMATE)
MANDAYS
%LABOR OF MAT’LS.
(APPROXIMATE)
SCOPE OF WORKS
NVPILAR 2008
Q. MECHANICAL WORKS
a) Airconditioning &
Refrigeration System
b) Water Pump
c) Automatic Water
Sprinkler System
d) Electric Elevators
e) Electric Dumbwaiter
10% - Labor(Acc.)
15% - Inst. of units
30% - Labor (Pipes & fit.)
15% - Inst. of units
30% - Labor (Pipes & fit.)
15% - Inst. Of units
30%
30%
SCOPE OF WORKS IN BUILDING CONSTRUCTION
PART - A - MOBILIZATION
PART - B - EARTHWORKS
PART - C - TERMITE CONTROL & WOOD PRESERVATIONS
PART - D - FOUNDATION WORKS
PART - E - DAMP PROOFING / MOISTURE CONTROL
PART - F - CONCRETE WORKS
PART - G - MASONRY WORKS
PART - H - CARPENTRY WORKS
PART - I - FABRICATED MATERIALS AND HARDWARE
PART - J - ROOF FRAMING WORKS
PART - K - ROOFING WORKS
PART - L - FINISHES
PART - M - PAINTING / VARNISHING
PART - N - WATER PROOFING
PART - O - SANITARY WORKS
PART - P - ELECTRICAL WORKS
PART - Q - MECHANICAL WORKS
PART - R - CONSTRUCTION SAFETY AND HEALTH (DO. 56)
NVPILAR 2008
DPWH STD.SPECS.,VOL.II, 2004 ED.
DPWH STD.SPECS.,VOL.III, 1995 ED.
DPWH STD. SPECS., VOL. I, 1988, ED.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART A – MOBILIZATION
- M0VING IN OF MANPOWER, EQUIPTMENT & MATERIALS AT THE
PROJECT SITE
PART A – FACILITIES F0R THE ENGINEER
A.1.1- OFFICES & LABORATORIES - L.S.
A.1.2- VEHICLES FOR THE ENGINEER - MO./ EACH
A.1.3- ASSISTANCE TO THE ENGINEER - MONTHS
A.1.4- PHOTOGRAPHS - EACH
NVPILAR 2008
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART B - EARTHWORKS
ITEM 800 – CLEARING & GRUBBING - CU. M.
ITEM 801 – REMOVAL OF STRUCTURES & OBSTRUCTIONS - CU. M.
ITEM 802 – EXCAVATION - CU. M.
ITEM 803 – STRUCTURE EXCAVATION - CU. M.
ITEM 804 – EMBANKMENT - CU. M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART C – TERMITE CONTROL & WOOD PRESERVATION
ITEM 1000(A) – SOIL POISONING - LITER
ITEM 1000(B) – WOOD PRESERVATION - LITER
ITEM 1000(C) – POWDER TERMICIDE - KILOGRAMS
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART D – FOUNDATION WORKS
ITEM 400(4) – PRECAST CONCRETE PILES, FURNISHED - METER
ITEM 400(1) – UNTREATED TIMBER PILES, FURNISHED - METER
ITEM 400(5) – PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED - METER
ITEM 400(2) – TREATED TIMBER PILES, PRESERVATIVE, FURNISHED - METER
ITEM 400(3) – STEEL H-PILES, FURNISHED - METER
ITEM 400(9) – TREATED TIMBER PILES, DRIVEN - METER
ITEM 400(8) – UNTREATED TIMBER PILES, DRIVEN - METER
ITEM 400(6) – STRUCTURAL STEEL SHEET PILES, FURNISHED - METER
ITEM 400(7) – PRECAST CONCRETE SHEET PILES, FURNISHED - METER
ITEM 400(11) – STEEL PIPES PILES - METER
ITEM 400(12) – STRUCTURAL STEEL SHEET PILES, DRIVEN - METER
ITEM 400(10) – STEEL H-PILES, DRIVEN - METER
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 400(13) – PRECAST CONCRETE SHEET PILES, DRIVEN - METER
ITEM 400(17) – CONCRETE PILES CAST IN DRILLED HOLES - METER
ITEM 400(14) – PRECAST CONCRETE PILES, DRIVEN - METER
ITEM 400(18) – CONCRETE PILES CAST IN STEEL SHELLS - METER
ITEM 400(20) – PILE SHOES - METER
ITEM 400(22) – LOAD TEST - METER
ITEM 400(21) – SPLICES - METER
ITEM 400(15) – PRECAST, PRESTRESSED CONCRETE PILES, DRIVEN - METER
ITEM 400(19) – CONCRETE PILES CAST IN STEEL PIPES - METER
ITEM 400(23) – BORED PILES (DIA___ M) - METER
ITEM 400(24) – PERMANENT CASING (DIA___M) - METER
ITEM 400(16) – TEST PILES, FURNISHED AND DRIVEN - METER
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2006
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART E – DAMP PROOFING/MOISTURE CONTROL
SPL (1) – POLYETHELENE SHEETS - SQ. M.
SPL (2) – HYDROLITHIC WATER PROOFING - SQ. M.
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008
PART F - CONCRETE WORKS
ITEM 404 – REINFORCING STEEL - KGS.
ITEM 406(1) – PRE STRESSED STRUCTURAL CONC. MEMBERS - EACH
ITEM 406(2) – PRE STRESSED CONCRETE - L.S.
ITEM 900 R. C. CONCRETE*** -CU.M.
***- Such prices and payment shall be full compensation for furnishing all
materials, including metal water stops, joint fillers, weep holes, and rock
backing and timber bumpers; for all form and false work; for mixing, placing,
furnishing, and curing the concrete; and for all labor, materials, equipment, tools
and incidentals necessary to complete the item…
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART G – MASONRY WORKS
ITEM 506(1)A- MASONRY UNIT (CHB) - SQ. M.
PART H – CARPENTRY AND JOINERY WORKS
ITEM 1OO3(A) – WOODEN CEILING - BD. FT.
ITEM 1OO3(C) – WOODEN CABINETS - BD. FT.
ITEM 1OO3(B) – WOODEN PARTITION - BD. FT.
ITEM 1OO3(D) – WOODEN STAIRS & OTHERS AS
SPECIFIED ON PLANS - BD. FT.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART I – FABRICATED MATERIALS & HARDWARE
ITEM 1004 – HARDWARE -
ITEM 1004.2.1 – ROUGH HARDWARE - PCS/KILO
ITEM 1004.2.2 – FINISHING HARDWARE - PCS/SET
ITEM 1005 – STEEL WINDOWS -
ITEM 1005(A) – RESIDENTIAL CASEMENT - SQ.M.
ITEM 1005(B) – HEAVY DUTY SIDE HINGED VENTILATOR - SQ.M.
ITEM 1005(C) – PROJECTED VENTILATOR - SQ.M.
ITEM 1005(D) – AWNING VENTILATOR - SQ.M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1006 – STEEL DOORS AND FRAMES -
ITEM 1006(A) – HOLLOW STEEL DOORS - SQ.M./SET
ITEM 1006(C) – GRILLE DOOR - SQ.M./SET
ITEM 1006(B) – FLUSH DOOR - SQ.M./SET
ITEM 1006(D) – STEEL LOUVER DOOR - SQ.M./SET
ITEM 1007 – ALUMINUM GLASS DOOR, SLIDING TYPE,
DESIGNATED AS D – ON THE SCHEDULE - SQ.M.
ITEM 1007 – ALUMINUM GLASS DOORS -
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1008 – ALUMINUM GLASS WINDOWS -
ITEM 1008(2) – ALUMINUM CASEMENT WINDOWS - SQ.M.
ITEM 10O8(1) – ALUMINUM SLIDING WINDOWS - SQ.M.
ITEM 1008(3) – ALUMINUM AWNING WINDOWS - SQ.M.
ITEM 1009(1) – GLASS JALOUSIE WINDOWS - SQ.M.
ITEM 1009 – JALOUSIE WINDOWS -
ITEM 1009(2) – WOOD JALOUSIE WINDOWS - SQ.M.
ITEM 1010(A) – FRAMES(JAMBS, SILLS, HEAD, TRANSOMS
AND MULLIONS - SET
ITEM 1010 – WOODEN DOORS AND WINDOWS -
ITEM 1010(C) – WINDOW SACHES - SQ.M.
ITEM 1010(B) – DOOR(FLUSH OR PANEL) - SQ.M.
ITEM 1010(D) – DOOR LOCKS -
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1012 – GLASS AND GLAZING -
ITEM 1011 – ROLLING UP DOORS -
ITEM 1012(A) – FLOAT GLASS - SQ.M.
ITEM 1011(A) – ROLLING UP DOOR(INDICATE METAL
SIZE AND TYPE OF CURTAIN SLATE) - UNIT/SET
ITEM 1012(B) – ORDINARY WINDOW & SHEET GLASS - SQ.M.
ITEM 1012(C) – PLATE GLASS (MIRROR) - SQ.M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008
PART J – ROOF FRAMING WORKS
ITEM 402(2) – TIMBER TRUSSES - BD. FT.
ITEM 402(1) – TIMBER STRUCTURES - SPAN
ITEM 403(1) – STRUCTURAL STEEL ,FURNISHED,
FABRICATED AND ERECTED - KGS
ITEM 403(2) – STRUCTURAL STEEL ,FURNISHED,
FABRICATED AND ERECTED - KGS
ITEM 403(3) – STRUCTURAL STEEL ,FURNISHED & FABRICATED - KGS
ITEM 403(4) – STRUCTURAL STEEL ,FURNISHED & FABRICATED - KGS
ITEM 403(5) – STRUCTURAL STEEL ,ERECTED - KGS
ITEM 403(6) – STRUCTURAL STEEL ,ERECTED - KGS
ITEM 403(7) – STRUCTURAL STEEL ,FURNISHED,
FABRICATED AND ERECTED - KGS
* - Where separate payment is to be made for certain metals or for certain particular components,
other than under the general provision for structural steel, designations of those particular cases
shall be inserted in the space provided in the pay names for Item 403(2), 403(4) or 403(6), as the
case may be.
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART K – ROOFING WORKS
ITEM 1013 – CORRUGATED METAL ROOFING -
ITEM 1013(A) – ROOF INSULATION - SQ.M.
ITEM 1013.2.1 – CORRUGATED ROOFING GAUGE 26 - SQ.M.
ITEM 1013.2.2 – FABRICATED METAL ROOFING ACCESSORIES
(A) – RIDGED/HIP ROLLS, FLASHING, GUTTER
& DOWNSPOUT GAUGE 26 - L.M.
(B) – VALLEYS, COUNTER FLASHING GUTTER
& DOWNSPOUT GAUGE 24 - L.M.
ITEM 1013.2.3 – ROOF VENTILATORS - EACH
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1014 – PRE-PAINTED METAL SHEETS -
ITEM 1014(A) – PRE-PAINTED METAL SHEETS - SQ.M.
ITEM 1015 – CLAY ROOF TILES -
ITEM 1015(A) – CLAY ROOF TILES - SQ.M.
ITEM 1017 – ROOF DRAINS WITH STRAINERS - PCS/SET
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART L - FINISHES
ITEM 1018 – CERAMIC TILES
ITEM 1018.2.1.1 – GLAZED TILES AND TRIMS - SQ.M.
ITEM 1018.2.1.2 – UNGLAZED TILES - SQ.M
ITEM 1019 – WOOD TILES
ITEM 1019(A) – NARRA WOOD TILES - SQ.M.
ITEM 1019(B) – TANGUILE WOOD TILES - SQ.M.
ITEM 1019(C) – OTHER SPECIES AS SPECIFIED - SQ.M.
ITEM 1020 – VINYL FLOOR TILES - SQ.M. OR L.M OR # OF PCS.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1021 - CEMENT FLOOR FINISH
ITEM 1021(A) – PLAIN CEMENT FLOOR FINISH - SQ.M.
ITEM 1021(B) – COLORED CEMENT FLOOR FINISH - SQ.M.
ITEM 1021(A) – CEMENT FLOOR FINISH W/FLOOR HARDINER - SQ.M.
ITEM 1022 - STUCCO FINISH
ITEM 1022(A) - STUCCO FINISH - SQ.M.
ITEM 1023 – GRANOLITHIC MARBLE WORKS
ITEM 1023(A) – CORRIDORS - SQ.M.
ITEM 1023(B) – STAIRS LANDING, RISERS, ETC. - SQ. M. OR L.M.
ITEM 1023(C) – ROOMS AND OTHERS - SQ.M.
ITEM 1024 – PEA GRAVEL WASHOUT FINISH - SQ.M.
ITEM 1024(A) – PEA GRAVEL WASHOUT FINISH - SQ.M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2006
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1025 – BUSH HAMMERED FINISH
ITEM 1025(B) – FLUTED BUSH HAMMERED FINISH - SQ.M.
ITEM 1025(A) – BUSH HAMMERED FINISH - SQ.M.
ITEM 1026 – PEBBLE WASHOUT FINISH
ITEM 1026(A) – PEBBLE WASHOUT FINISH - SQ.M.
ITEM 1027 – CEMENT PLASTER FINISH
ITEM 1027(A) – CEMENT PLASTER FINISH - SQ.M.
ITEM 1027(B) – SIMULATED RED BRICKS, pn. 142 - SQ.M.
ITEM 1028 – SYNTHETIC ADOBE
ITEM 1028(A) – BUSH HAMMERED SYNTHETIC ADOBE FINISH - SQ.M.
ITEM 1028(B) – FLUTTEDBUSH HAMMERED SYNTHETIC ADOBE FINISH - SQ.M.
ITEM 1028(C) - PIQUETA TOOL FINISH / SYNTHETIC FINISH - SQ.M.
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1O29 – GRANATITE WASHOUT FINISH
ITEM 1O29(1) – GRANATITE WASHOUT FINISH - SQ.M., LM
ITEM 1030 – ACCOUSTICAL CEILING
ITEM 1030(A) – ACCOUSTICAL CEILING PANEL - SQ.M OR # OF PCS.
ITEM 1031 – ACCOUSTICAL TREATMENT
ITEM 1031.2.1 – ACCOUSTICAL TILE/BOARD/PANEL - SQ.M.
ITEM 1031.2.2 – SPRAYED-ON ACCOUSTICAL MATERIALS - SQ.M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART M – PAINTING, VARNISHING & OTHER RELATED WORKS
ITEM 1032 A – PAINTING WOKS
ITEM 1032 A(1) – PAINTING WOKS (MASONRY PAINT) - SQ.M.
ITEM 1032 A(2) – PAINTING WOKS (WOOD PAINT) - SQ.M.
ITEM 1032 A(1) – PAINTING WOKS (ROOF PAINT) - SQ.M.
ITEM 1032 E – TEXTURE FINISH - SQ.M.
ITEM 1032 D – DUCCO FINISH - SQ.M.
ITEM 1032 C – SEA-MIST FINISH - SQ.M.
ITEM 1032 B – VARNISHING - SQ.M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART N – WATERPROOFING WORKS
ITEM 1016 - WATERPROOFING
ITEM 1016(A) – CEMENT BASE WATERPROOFING - SQ.M.
ITEM 1016(B) – LIQUID WATERPROOFING - SQ.M.
ITEM 1016(C) – BUILT-UP AND PREFORMED MEMBRANE - SQ.M.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART O – SANITARY WORKS
ITEM 1001 – STORM DRAINAGE AND SEWERAGE SYSTEM
ITEM 1001.2(A) – PIPE (KIND AND SIZE) - METER
ITEM 1001.2(B) – FITTINGS (KIND AND SIZE) - EACH
ITEM 1001.2(C) – CONCRETE GUTTER - METER
ITEM 1001.2(D) – CONCRETE CANAL - METER
ITEM 1001.2(E) – W.I. GRATING - METER
ITEM 1001.2(F) – CATCH BASIN - EACH
ITEM 1001.2(G) – JUNCTION BOX - EACH
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART P – ELECTRICAL WORKS
ITEM 1100 – CONDUITS, FOXES & FITTINGS
(1)-RSC CONDUIT PIPE- MM DIA W/ COUPLING - LENGTH
(2)-LOCKNUT & BUSHING - PAIRS
(3)-CONDULET TYPE - PIECES
(4)-CONDUIT PIPE ELBOW - PIECES
(5)-CONNECTOR - PIECES
(6)-CONDUIT CLAMP - PIECES
(7)-PVC ADAPTER - PIECES
(8)-G.I. WIRE G.A. #14 - KILOS
(9)-HACKSAW BLADE - PIECES
(10)-PVC TAPE 19MM DIA X 18MM - ROLLS
(11)-RUBBER TAPE 19MM DIA X 227G - ROLLS
(12)-PVC SOLVENT CEMENT @ 400 CC. - CANS
(13)-PVC END BALL - PIECES
(14)-OCTAGONAL JUNCTION BOX - PIECES
(15)-UTILITY BOXES - PIECES
(16)-METAL PULL BOX - PIECES
(17)-SQUARE BOX - PIECES
(18)-TELEPHONE CABINET - SET
(19)-REINFORCED CONCRETE PEDESTAL POLE - LOT
(20)-RED LEAD PAINT - LOT
(21)-WEATHER HEAD W/ TYPE F CONDULET - PIECES
(22)-GROUNDING ROD COPPERWELD 20MM DIA. X 3.00M -LENGTH
(23)-APITONG OR APPROVED EQUAL CRESOTED WOOD POLE - PIECES
(24)-ANCHOR ROD__ MM DIA - PIECES
(25)-ANCHOR LOG__ MM DIA - PIECES
(26)-POWERLOAD STUDS WITH NUTS - PIECES
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1101 – WIRES AND WIRING DEVICES
(1)- ELECTRIC WIRE - METER OR ROLLS
(2)- SINGLE POLE TUMBLER SWITCH - PIECES
(3)- TWO-GANG TUMBLER SWITCH - PIECES
(4)- THREE-GANG TUMBLER SWITCH - PIECES
(5)- THREE-WAY TUMBLER SWITCH - PIECES
(6)- DUPLEX CONVENIENCE RECEPTACLES - SET
(7)- HEAVY DUTY CONVENIENCE RECEPTACLES - SET
(8)- STD. TELEPHONE OUTLET BAKELITE COVER W/ 9.52 CENTER HOLE - PIECES
(9)- WDO TYPE AIRCONDITIONING OUTLET 3- PRONG POLARIZED TYPE - PIECES
(10)- BARE COPPER WIRE - METERS
(11)- GROUNDING CLAMPS FOR ELECTRIC WIRES - PIECES
(12)- MESSENGER WIRE - METERS
(13)- GUY WIRE - METERS
(14)- VIBRATING BELL - SET
(15)- TRAFFIC LIGHT CONTROL PANEL - SET
(16)- TRAFFIC LIGHT METAL ENCLOSURES COMPLET WITH RED &
GREEN LIGHT PROVIDED WITH REFLECTORS & 152MM
DIAMETER VIBRATING BELL - SET
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1102 – POWER LOAD CENTER, SWITCHGEAR & PANEL BOARDS
(1)- PANEL BOARD (CIRCUIT BREAKER TYPE) - SET
(2)- PANEL BOARD (SAFETY SWITCH TYPE) - SET
(3)- LOW-VOLTAGE SWITCHGEAR (LVS) COMPLETE W/ METERING
DEVICES AND ACCESSORIES - SET
(4)- POWER FUSES - PIECES
(5)- LIGHTING ARRESTERS - PIECES
(6)- AIR BREAK SWITCH - SET
(7)- ENCLOSED ACB NEMA TYPE 1 - SET
(8)- ENCLOSED ACB NEMA TYPE 3R - SET
(9)- AUTOMATIC TRANSFER SWITCH - SET
(10)- MANUAL TRANSFER SWITCH WITHOUT FUSES - PIECES
(11)- MOTOR CONTROLLER - SET
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART Q – MECHANICAL WORKS
ITEM 1200 – AIR CONDITIONING AND REFRIGERATION SYSTEM
(A)- COMPRESSOR, CONDENSER AND EVAPORATOR - SET
(B)- DIFFUSSER, GRILLES AND VALVES - PIECES
(C)- PIPES - LENGTH
(D)- DUCTS AND INSULATIONS - SQ.M.
(E)- PIPE INSULATIONS - METER
ITEM 1201 – WATER PUMPING
(A)- PUMP AND WATER TANK - SET
(B)- AIR COMPRESSOR - SET
(C)- PIPES - LENGTH
(D)- VALVES AND FITTINGS - PIECE
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1202 – AUTOMATIC WATER SPRINKLER SYSTEM
(A)- FIRE AND JOCKEY PUMPS - SET
(B)- SPRINKLER HEAD, VALVES AND FITTINGS - PIECE
(C)- PIPES - LENGHT
ITEM 1203 – ELECTRIC ELEVATOR
(A)- TRACTION OR HYDRAULIC MACHINE AND CAR - SET
(B)- HOISTWAY DOORS, COUNTER WEIGHT, GUIDE RAILS,
ANNUNCIATORS, AND HALL POSITION INDICATORS - PIECE
(C)- ELECTRICAL WIRES AND CONDUITS - LENGTH
ITEM 1204 – ELECTRIC DUMPWAITER
(A)- MACHINE - SET
(B)- CAR, DOOR AND CABLE - PIECE
(C)- ELECTRICAL WIRES AND CONDUITS - LENGHT
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
ITEM 1205 – OXYGEN, NITROUS OXIDE, VACUUM & FUEL GAS SYSTEM
(A)- OXYGEN, NITROUS OXIDE, GAS MANIFOLD AND
DUPLEX VACUUM PUMP - SET
(B)- HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES - PIECE
(C)- PIPES AND TUBINGS - LENGHT
ITEM 1206 – HEATING SYSTEM
(A)- BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DAY TANK
INCLUDING FOUNDATION - SET
(B)- PIPES - LENGTH
(C)- VALVES AND FITTINGS - PIECES
ITEM 1207 - BOILERS
(A)- STEAM BOILERS, AIR COMPRESSOR, HEAT EXCHANGER
AND FUEL PUMP - SET
(B)- PIPES WITH INSULATION - LENGTH
(C)- VALVES AND FITTINGS - PIECE
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)
PART R- CONSTRUCTION SAFETY AND HEALTH (DO 56)
SPL -1 – PERSONAL PROTECTIVE EQUIPTMENT (PPE) - PCS.
SPL -2 – SAFETY AND HEALTH PERSONNEL - NOS.
SPL -3 – SIGNAGES AND BARRICADES - PCS.
NVPILAR 2008
COST ESTIMATION SYSTEM FOR BUILDINGS
NVPILAR 2008

Weitere ähnliche Inhalte

Was ist angesagt?

Insulated Concrete Forms
Insulated Concrete FormsInsulated Concrete Forms
Insulated Concrete Forms
guest64aa9a
 

Was ist angesagt? (20)

Introduction to green building.
Introduction to green building.Introduction to green building.
Introduction to green building.
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
ANALYSIS AND DESIGN OF G+3 STOREY BUILDING USING STAAD PRO vi8 Software
ANALYSIS AND DESIGN OF G+3 STOREY BUILDINGUSING STAAD PRO vi8 SoftwareANALYSIS AND DESIGN OF G+3 STOREY BUILDINGUSING STAAD PRO vi8 Software
ANALYSIS AND DESIGN OF G+3 STOREY BUILDING USING STAAD PRO vi8 Software
 
Staad pro
Staad proStaad pro
Staad pro
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 
Insulated Concrete Forms
Insulated Concrete FormsInsulated Concrete Forms
Insulated Concrete Forms
 
6.painting
6.painting6.painting
6.painting
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
reuse and recycle of construction material
reuse and recycle of construction materialreuse and recycle of construction material
reuse and recycle of construction material
 
Innovative building materials
Innovative building materialsInnovative building materials
Innovative building materials
 
Modeling masonry in Revit
Modeling masonry in RevitModeling masonry in Revit
Modeling masonry in Revit
 
My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)My project work(analysis and design of g+3 building)
My project work(analysis and design of g+3 building)
 
IRJET- Study on Strength of Timbercrete Blocks
IRJET-  	  Study on Strength of Timbercrete BlocksIRJET-  	  Study on Strength of Timbercrete Blocks
IRJET- Study on Strength of Timbercrete Blocks
 
Final ppt on staad pro
Final ppt on staad proFinal ppt on staad pro
Final ppt on staad pro
 
Presentation on Modern construction materials
Presentation on Modern construction materialsPresentation on Modern construction materials
Presentation on Modern construction materials
 
Note on tunnel form construction
Note on tunnel form constructionNote on tunnel form construction
Note on tunnel form construction
 
Aerocon bricks
Aerocon bricksAerocon bricks
Aerocon bricks
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
 

Ähnlich wie Design estimate.ppt

Hand book on building fire codes
Hand book on building fire codesHand book on building fire codes
Hand book on building fire codes
abhijit9rane
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4
vakil jagdish
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
Antoinette Pope
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15
Sean Roper
 
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
mayas43
 
Statutory requirments on Health Safety Environment
Statutory requirments on Health Safety  EnvironmentStatutory requirments on Health Safety  Environment
Statutory requirments on Health Safety Environment
VikasMore37
 
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning ProtectionKingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
Thorne & Derrick International
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking Garage
Turner Solterman
 

Ähnlich wie Design estimate.ppt (20)

the educational facilities in new york
the educational facilities in new yorkthe educational facilities in new york
the educational facilities in new york
 
Hand book on building fire codes
Hand book on building fire codesHand book on building fire codes
Hand book on building fire codes
 
fire and safty re
fire and safty refire and safty re
fire and safty re
 
F05.pdf fire iitk
F05.pdf fire iitkF05.pdf fire iitk
F05.pdf fire iitk
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 
Occupational Safety & Health Administration (OSHA) 2022 update
Occupational Safety & Health Administration (OSHA) 2022 updateOccupational Safety & Health Administration (OSHA) 2022 update
Occupational Safety & Health Administration (OSHA) 2022 update
 
15199736.ppt
15199736.ppt15199736.ppt
15199736.ppt
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15
 
Provisions of NBC.pptx
Provisions of NBC.pptxProvisions of NBC.pptx
Provisions of NBC.pptx
 
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
 
fire_safety_management.pdf
fire_safety_management.pdffire_safety_management.pdf
fire_safety_management.pdf
 
Statutory requirments on Health Safety Environment
Statutory requirments on Health Safety  EnvironmentStatutory requirments on Health Safety  Environment
Statutory requirments on Health Safety Environment
 
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning ProtectionKingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
 
A unified framework for fire safety regulation - Monideep Dey, PhD, President...
A unified framework for fire safety regulation - Monideep Dey, PhD, President...A unified framework for fire safety regulation - Monideep Dey, PhD, President...
A unified framework for fire safety regulation - Monideep Dey, PhD, President...
 
s11814-021-0820-6.pdf
s11814-021-0820-6.pdfs11814-021-0820-6.pdf
s11814-021-0820-6.pdf
 
Bartec_Basic Concept for Explosion Protection (2018)
Bartec_Basic Concept for Explosion Protection (2018)Bartec_Basic Concept for Explosion Protection (2018)
Bartec_Basic Concept for Explosion Protection (2018)
 
North Campus Parking Garage
North Campus Parking GarageNorth Campus Parking Garage
North Campus Parking Garage
 
Photovoltaic Permit Packet
Photovoltaic Permit PacketPhotovoltaic Permit Packet
Photovoltaic Permit Packet
 
Cv502 homebuilders guide to earthquake resistant design
Cv502 homebuilders guide to earthquake resistant designCv502 homebuilders guide to earthquake resistant design
Cv502 homebuilders guide to earthquake resistant design
 

Kürzlich hochgeladen

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Kürzlich hochgeladen (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Design estimate.ppt

  • 2. GENERAL GUIDELINES THIS DEPARTMENT ORDER SETS THE FORMULATION OF POLICIES, RULES AND PROCEDURES RELATIVE TO THE PREPARATION OF THE “APPROVED BUDGET FOR THE CONTRACT” (ABC) ISSUED FOR THE GUIDANCE OF ALL CONCERNED. ALL THE ITEMS OF WORK TO BE USED SHALL BE IN ACCORDANCE WITH DPWH STANDARD SPECIFICATIONS. NVPILAR 2008
  • 3. COST ESTIMATES (D0 57 S.2002) DIRECT COST INDIRECT COST A. COST OF MATERIALS 1. COST AT SOURCE, INCL. PROCESSING ROYALTIES, LOCAL TAXES & ETC. 2. EXPENSES FOR HAULING TO PROJ. SITE 3. HANDLING EXPENSES 4. STORAGE 5. ALLOWANCE FOR WASTE/OR LOSSES B. COST OF LABOR 1. SALARIES & WAGES AS AUTHORIZED BY DOLE 2. FRINGE BENEFITS SUCH AS VACATION & SICK LEAVES, GSIS & SSS CONTR. ALLOWANCES, BONUSES AND ETC. C. EQUIPMENT EXPENSES 1. RENTAL RATE SHALL BE BASED ON ACEL RATE AS APPRVD BY DPWH . OPERATED RENTAL RATE ARE PREFERRED OVER BARE RENTAL RATE 2. MOB./DEMOB OF EQUIPMENT SHALL BE ON CASE TO CASE BASIS BUT IN NO CASE EXCEED 1% OF TOTAL CIVIL WORK ITEMS. A. OVERHEAD EXPENSES – (6-7% CEILING) DIRECT COST. 1. ENGINEERING & ADMINISTRATIVE SUPERVISION 2. TRANSPORTATION ALLOWANCES 3. OFFICE EXPENSES (EQPT & SUPPLIES) 4. CONTRACTORS ALL RISK INSURANCE 5. FINANCING COST INCL. -PREMIUM ON BID SECURITY -PREMIUM ON PERFORMANCE SECURITY -PREMIUM/CHARGES ON CREDIT LINES -COST OF MONEY TO FINANCE THE PROJ. B. CONTINGENCY – 3-5% OF DC. C. MISCELLANEOUS – 1% OF DC. INCLUDES LABORATORY TEST. D. CONTRACTORS PROFIT EST. DIRECT COST OCM PROFIT MOB/DEMOB MAX. TOTAL UP TO P1M. ABOVE P1M-5M ABOVE P5M-10M ABOVE P10M-20M ABOVE P50M ABOVE P20M-50M 13 12 12 11 11 10 10 11 15 12 13 14 29 27 26 24 23 21 1 1 1 1 1 1 VAT NVPILAR 2008 3-5% PM Fee
  • 4. “ THOSE WHO PREPARED/REVIEWED/CHECKED THE ESTIMATES SHALL SEE TO IT THAT IN CASE THEY ARE CALLED UPON TO MAKE GOOD THEIR ESTIMATES, THEY CAN PERFORM THE JOB THEMSELVES AT THE COST THEY HAVE GENERATED.” NVPILAR 2008
  • 5. PURPOSE THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO BE FOLLOWED BY ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF LABOR AND EMPLOYMENT D.O. No. 13(DOLE D.O. No.13), SERIES OF 1998 OTHERWISE KNOWN AS THE “GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND HEALTH IN THE CONSTRUCTION INDUSTRY”, WITH EMPHASIS GIVEN ON THE METHODOLOGY TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFETY AND HEALTH PROGRAM AS REQUIRED IN SECTION 17. GENERAL GUIDELINES IN COMPLIANCE WITH SECTION 17 OF DOLE D.O. No. 13, THE IMPLENTATION OF CONSTRUCTION SAFETY SHALL BE CONSIDERED IN ALL STAGES OF PROJECT PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL BE INTEGRATED TO THE OVERALL PROJECT COST UNDER PAY ITEM “SPL- CONSTRUCTION SAFETY AND HEALTH” AS A LUMPSUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL REQUIREMENTS, PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF CONSTRUCTION SAFETY AND HEALTH IN EVERY PROJECT SHALL BE INCLUDED IN THE PROJECT BIDDING DOCUMENTS SPECIFICALLY UNDER THE INSTRUCTION TO BIDDERS. NVPILAR 2008
  • 6. CONCTRUCTION PROJECT (D.O. No. 56 S. 2005) CONSTRUCTION SAFETY AND HEALTH PROGRAM ( CSHP ) THE REQUIRED CSHP FOR SPECIFIC PROJECT SHALL INCLUDE BUT NOT LIMITED TO THE FF : 1. COMPOSITION OF SAFETY & HEALTH PERSONNEL RESPONSIBLE FOR THE IMPLENTATION OF CSHP; 2. SPECIFIC SAFETY POLICIES W/C SHALL BE UNDERTAKEN IN THE CONSTRUCTION SITE INCLUDING FREQUENCY OF & PERSONS RESPONSIBLE FOR CONDUCTING TOOL BOX AND GANG MEETING; 3. PENALTIES AND SANCTIONS FOR VIOLATIONS OF THE CSHP; 4. FREQUENCY, CONTENT AND PERSONS RESPONSIBLE FOR ORIENTING, INSTRUCTING AND TRAINING ALL WORKERS AT THE SITE WITH REGARD TO THE CSHP WHICH THEY OPERATE; & 5. THE MANNER OF DISPOSING WASTE ARISING FROM THE CONSTRUCTION. MANPOWER EQUIPMENT/FACILITIES 1. SAFETY ENGINEER / OFFICER 2. SAFETY MAN / OFFICER -AS RECOMMENDED BY DOLE, FOR EVERY CONST. PROJ. W 100 & ABOVE WORKERS, AN ACCREDTED SAFETY OFFICER BY DOLE-BWC SHALL BE EMPLOYED. ONLY THE COST FOR THE CONST. SAFETY & HEALTH OFICER , WHETHER ON FULL OR PART TIME BASIS ASSIGNED ON SITE SHALL BE INCLUDED IN THE ESTIMATE. 3. HEALTH PERSONNEL -ONLY THE MEDICAL AND DENTAL PRACTITIONERS ACTUALLY ASSIGNED IN THE PROJECT SHALL BE INCLUDED IN THE COST OF SAFETY. 1. PERSONAL PROTECTIVE EQUPMENT (PPE) -FOR GENERAL CONST. THE REQUIRED BASIC PPE FOR ALL WORKERS SHALL BE SAFETY HELMET, SAFETY GLOVES AND SAFETY SHOES. SPECIALTY PPE SHALL BE PROVIDED IN ADDITION TO OR IN LIEU OF THE CORRESPONDING PPE AS THE WORK ACTIVITY REQUIRES. 2. SIGNAGES AND BARRICADES -SHALL BE PROVIDED AS A PRECAUTION TO ADVICE THE WORKERS & THE GENERAL PUBLIC OF THE HAZARDS EXISTING AT THE WORKSITE. 3. FACILITIES - W ADEQUTE SAFE DRINKING WATER; SANITARY & WASHING FACILITIES: LIVING ACCOMODATIONS FOR WORKERS. COSTING PAY ITEM “SPL – CONSTRUCTION SAFETY AND HEALTH” AS A LUMP SUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED ESTIMATE. NVPILAR 2008
  • 7. NOTE : DERIVED FROM CPES MANUAL NVPILAR 2008 SAFE CONDITION MANDATORY ACTION STOP OR PROHIBITION CAUTION OR RISK TRAFFIC AND HOUSEKEEPING ALERT RADIATION
  • 8. DPWH STD.SPECS.,VOL.II, 2004 ED. NVPILAR 2008 DPWH STD.SPECS.,VOL.III, 1995 ED. DPWH STD.SPECS., VOL. I, 1988, ED. REFERENCE : SPECIFICATIONS BOOKS 1. ESTIMATING BILL OF MATERIALS BY VICENTE TAGAYUN 2. SIMPLIFIED CONSTRUCTION ESTIMATE BY MAX B. FAJARDO JR. 3. HANDBOOK OF CONSTRUCTION ESTIMATE BY RHENO A. VELASCO 4. PLUMBING DESIGN & ESTIMATE BY MAX B. FAJARDO JR. 5. ELECTRICAL LAYOUT & ESTIMATE BY MAX B. FAJARDO JR.
  • 9. OTHER CODES AND SPECIFICATIONS: P.D.1096 – NATIONAL BUILDING CODE R.A. 7160 – LOCAL GOVT. CODE OF 1991 DOLE D.O. 13 SERIES 1998 – CONSTRUCTION SAFETY DPWH D.O. 56 SERIES 2005 – CONSTRUCTION SAFETY B.P. 344 – ACCESSIBILITY LAW NATIONAL STRUCTURAL CODE OF THE PHILIPPINES AMERICAN CONCRETE INSTITUTE ( ACI ) AMERICAN SOCIETY OF TESTING MATERIALS ( ASTM ) ELECTRICAL CODE OF THE PHILIPPINES PLUMBING CODE OF THE PHILIPPINES PHILIPPINE MECHANICAL ENGINEERING CODE ALL MATERIALS QUALITY TESTING CODE NVPILAR 2008
  • 10. NATIONAL BUILDING CODE ( P.D. 1096 ) 5 MAJOR DIVISIONS IN BUILDING PLANS SUBJECT TO ESTIMATE ARCHITECTURAL AESTHETIC STRUCTURAL ELECTRICAL/ ELECTRONIC SANITARY/ PLUMBING MECHANICAL STRENGTH ELECTL ENGR/ ELECTRONIC ENGR POWER, LIGHTING & COMMUNICATION HEALTH AND SANITATION NECESSITIES MECHANICAL ENGR SANITARY ENGR/ MASTER PLUMBER CIVIL ENGR ARCHITECT NVPILAR 2008
  • 11. CLASSIFICATION OF BUILDING STRUCTURES RESIDENTIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR USE OF OWNER, “ON CAMPUS” DORMITORIES, RECTORIES, CONVENTS AND MONASTERIES, RESIDENTIAL CONDOMINIUMS OWNED BY OCCUPANTS, ARMY BARRACKS, ETC. COMMERCIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR LEASE, BOARDING HOUSES, APARTMENTS, ACCESORIAS, HOTELS AND INNS, “OFF CAMPUS” DORMITORIES, TRANSPORTATION TERMINALS AND STATIONS, NIGHT CLUBS AND DANCE HALLS, RESTAURANTS, MARKETS AND SHOPPING CENTERS, THEATERS, SPORTS STADIA, GRANDSTANDS, GASOLINE SERVICE STATIONS, PARKING GARAGES, FUNERAL PARLORS, ETC. INDUSTRIAL – FACTORIES, PLANTS, MILLS, ARSENALS, BREWERIES, PROCESSING PLANTS, GAS GENERATING PLANTS, SHIPYARDS, AIRCRAFT HANGARS, SLIPWAYS, DRYDOCKS AND PIERS, LUMBER MILLS, WAREHOUSE, STORAGE TANKS, GRAIN AND CEMENT SILOS, ETC. NVPILAR 2008
  • 12. INSTITUTIONAL – EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS, CLUBHOUSES, HOSPITALS, SANITARIA, ASYLUMS, HOMES FOR THE AGED, JAILS, POLICE AND FIRE STATIONS, PLACES OF WORSHIP, ETC. RECREATIONAL – CINEMAS, BILLIARD HALLS, DISCO PADS, AMUSEMENT HOUSES, ETC. AGRICULTURAL – BARNS, POULTRY HOUSES, HATCHERIES, PIGGERIES, STABLES, GREENHOUSES, GRANARIES, ETC. ANCILLARY – GARAGES, CARPORTS, TANKS, TOWERS, SMOKESTACKS AND CHIMNEYS, VAULTS, SWIMMING POOLS, PELOTA COURTS, AVIARIES, AQUARIUMS, ZOO STRUCTURES, FIERE WALLS AND FENCES OVER 1.8O METERS IN HEIGHT, ETC. TEMPORARY – FIELD OFFICES, LABORERS’ QUARTERS, CANOPIES AND RAILINGS, PROTECTIVE FENCINGS, ETC. OTHERS – CEMETERY STRUCTURES AND MOUSOLEUMS, TOMBS, MULTI-LEVEL NICHES, ETC. NVPILAR 2008
  • 13. TYPES OF CONSTRUCTION ( P.D. 1096, CHAPTER 4, SECTION 401 ) TYPE I - TYPE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE. TYPE II - TYPE II BUILDING SHALL BE OF WOOD CONSTRUCTION WITH PROTECTIVE FIRE RESISTANT MATERIALS AND ONE-HOUR FIRE RESISTIVE THROUGHOUT: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS MAY USE FIRE-RETARDANT TREATED WOOD WITHIN THE FRAMING ASSEMBLY. TYPE III – TYPE III BUILDING SHALL BE OF MASONRY AND WOOD CONSTRUCTION, STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE: PROVIDED, THAT THE BUILDING SHALL BE ONE-HOUR FIRE – RESISTIVE THROUGHOUT. EXTERIOR WALLS SHALL BE INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION TYPE IV – TYPE IV BUILDING SHALL BE OF STEEL, IRON, CONCRETE OR MASONRY CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL BE OF INCOMBUSTIBLE FIRE RESISTIVE CONSTRUCTION: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS OF ONE-HOUR FIRE RESISTIVE CONSTRUCTION MAY USE FIRE RETARTANT TREATED WOOD WITHIN THE FRAMING ASSEMBLY. TYPE V - TYPE V BUILDING SHALL BE FIRE-RESISTIVE. THE STRUCTURAL ELEMENTS SHALL BE OF STEEL, IRON, CONCRETE, OR MASONRY CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL BE OF INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION. NVPILAR 2008
  • 14. BURJ DUBAI ( DUBAI TOWER ) THE BURJ DUBAI IS A SUPERTALL SKYSCRAPER CURRENTLY UNDER CONSTRUCTION IN DUBAI, UNITED ARAB EMIRATES. IT IS CURRENTLY THE TALLEST FREE STANDING STRUCTURES IN THE WORLD HAVING AN EXPECTED HEIGHT OF 818 METERS BUT COULD REACH UP TO 940 METERS UPON THE SCHEDULED COMPLETION IN SEPTEMBER 2009. THE BUILDING IS BEING BUILT BY A JOINT VENTURE OF THE SOUTH KOREAN COMPANY SAMSUNG, THE BELGIAN COMPANY BESIX AND THE UAE COMPANY ARABTEC. IT WAS DESIGN BY ADRIAN SMITH OF SKIDMORE, OWING AND MERRIL CONSULTANCY. THE TOTAL BUDGET FOR THE BURJ DUBAI PROJECT IS ABOUT 4.1 BILLION DOLLARS. *PICTURE & INFO FROM INTERNET NVPILAR 2008
  • 15. SCOPE OF WORKS IN BUILDING CONSTRUCTION PART - A - MOBILIZATION PART - B - EARTHWORKS PART - C - TERMITE CONTROL & WOOD PRESERVATIONS PART - D - FOUNDATION WORKS PART - E - DAMP PROOFING / MOISTURE CONTROL PART - F - CONCRETE WORKS PART - G - MASONRY WORKS PART - H - CARPENTRY WORKS PART - I - FABRICATED MATERIALS AND HARDWARE PART - J - ROOF FRAMING WORKS PART - K - ROOFING WORKS PART - L - FINISHES PART - M - PAINTING / VARNISHING PART - N - WATER PROOFING PART - O - SANITARY WORKS PART - P - ELECTRICAL WORKS PART - Q - MECHANICAL WORKS PART - R - CONSTRUCTION SAFETY AND HEALTH (DO. 56) NVPILAR 2008
  • 16. PROJECT: ONE(1) STOREY (7X7 MODIFIED) CLASSROOM SCHOOL BUILDING ARCHITECTURAL PLAN FRONT ELEVATION REAR ELEVATION CROSS SECTION 1 2 3 3 2 1 A B C W-1 W-1 D-1 D-1 GA 26 CORR. G I. ROOFING GA 26 CORR. G I. ROOFING W-2 W-2 D-1 W-2 CLASSROOM FLOOR PLAN 1 2 3 1 1 2 2 3 3 A A A B B B C C C REFLECTED CEILING ROOF PLAN CLASSROOM CORRIDOR D-1 D-1 W-1 W-1 W-2 W-2 EXPOSED STEEL ‘C’ PURLINS AND RAFTERS SLOPE SLOPE SCH. OF DOORS & WINDOWS D-1 FLUSH TYPE HOLLOW CORE DOOR W MARINE PLYWOOD FACING ON WOOD FRAME W-1 & W-2 GLASS JALOUSIE WINDOWS ON ALUMINUM HOUSIG *PLANS BY BOD NVPILAR 2008
  • 17. STRUCTURAL PLAN DETAIL CROSS SECTION A B C BASE PLATE W LONG ANCHOR BOLTS ROOF INSULATION CEILING FIN. COMPRESSED BETWEEN PURLINS AND RAFTER CLASSROOM COL. FTG. WALL FTG WELL COMPACTED GRAVEL FILL NGL FGL FFL CORRIDOR DOWEL LB LB D-1 W-2 C-PURLINS RAFTER ANGULAR BRACE CORR. GI SHEETS FOUNDATION PLAN C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 SLAB ON FILL WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 FOOTING COLUMN WALL FOOTING LINTEL BEAM SPOT DETAIL LINTEL BEAMS *PLANS BY BOD NVPILAR 2008
  • 18. WATER MAIN CORPORATION COCK METER SHUT-OFF WATER METER WATER PIPE CONN. TO WATER MAIN GATE VALVE IN-HOUSE WATER SUPPLY PIPE KITCHEN SINK LAVATORY HORIZONTAL VENT PIPE VENT PIPE THRU ROOF WATER CLOSET SHOWER ROOF GUTTER DOWNSPOUT CATCH BASIN SEPTIC VAULT SOIL/WASTE PIPE CLEAN- OUT STORM DRAINAGE PIPE CATCH BASIN TO DRAINAGE CANAL/SEWER PLUMBING AND SANITARY CYCLE ( ONE STOREY STRUCTURE ) *PICTURE FROM BOOKS OF TAGAYUN NVPILAR 2008
  • 19. PLUMBING SYSTEM WATER LINE INCLUDING DRAINAGE, WASTE AND VENTILATION SYSTEM OF BUILDING VENTILATION THROUGH ROOF ( VTR ) MAIN VENT DRY VENT WET VENT WASTE / SOIL PIPE CLEAN OUT FITTINGS FLOOR DRAIN HOT WATER LINE W/ ACCESSORIES WATER HEATER HOT WATER RETURN COLD WATER LINE W/ ACCESORIES KITCHEN SINK FIXTURES LAVATORIES FIXTURES WATER CLOSET BATH TUB SHOWER W/ ACCESORIES *PICTURE FROM BOOKS OF FAJARDO. NVPILAR 2008
  • 20. ELECTRICAL SYSTEM LAYOUT ( ONE STOREY STRUCTURES ) LIGHTING LAYOUT CONVENIENCE OUTLET LAYOUT PANEL BOARD & CABINETS *PICTURE FROM BOOKS OF FAJARDO. NVPILAR 2008
  • 21. SCOPE OF WORKS % AMOUNT I. MOBILIZATION / DEMOBILIZATION 1.0 P3,000.00 II. EARTHWORKS 2.29 6,870.00 III. SOIL POISONING 0.56 1,680.00 IV. DAMPROOFING WORKS 0.47 1,410.00 V. CONCRETE WORKS 29.65 88,950.00 VI. MASONRY WORKS 3.21 9,630.00 VII. CARPENTRY WORKS 3.54 10,620.00 VIII. FAB. MATERIALS & HARDWARE 9.08 27,240.00 IX. ROOF FRAMING WORKS 9.87 29610.00 X. ROOFING WORKS 7.20 21,600.00 XI. FINISHES 12.23 36,690.00 XII. PAINTING WORKS 6.50 19,500.00 XIII. SANITARY / PLUMBING WORKS 4.06 12,180.00 XIV. ELECTRICAL WORKS 5.34 16,020.00 XV. MECHANICAL WORKS 5.00 15,000.00 TOTAL 100.00 300,000.00 CONST. OF ONE STOREY SCHOOL BUILDING FRONT ELEVATION 1 2 3 W-1 W-1 D-1 D-1 GA 26 CORR. G I. ROOFING REAR ELEVATION 3 2 1 GA 26 CORR. G I. ROOFING W-2 W-2 CROSS SECTION A B C D-1 W-2 CLASSROOM NVPILAR 2008 FOUNDATION PLAN C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 C1-F1 SLAB ON FILL WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 SCH. OF DOORS & WINDOWS D-1 FLUSH TYPE HOLLOW CORE DOOR W MARINE PLYWOOD FACING ON WOOD FRAME W-1 & W-2 GLASS JALOUSIE WINDOWS ON ALUMINUM HOUSING FLOOR PLAN 1 2 3 A B C CLASSROOM CORRIDOR D-1 W-1 W-2 W-2 W-1 D-1 PREPARATION OF PROGRAM OF WORKS
  • 22. A T Q N M C H F B V E G I W K O R U D J S P MOVE- IN EARTH WORKS 2 WAIT SOIL POISONING CONCRETE WORKS WAIT BACKFILL MASONRY WORKS PROCUREMENT/DELIVERY OF CONSTRUCTION MATERIALS 26 2 1 2 3 4 5 5 6 3 2 1 WAIT ELECTRICAL/SANITARY ROUGH-IN 14 DAMPROOFING/SLAB ON FILL 7 3 ROOF FRAMING 8 5 WAIT 2 INST. OF PURLINS 9 ROOFING 1O 4 2 INST. GUTTER & FLUSHING WAIT 11 FINISHES 13 4 CARPENTRY WORKS 12 2 INST. FAB. MATLS & HARDWARE 4 14 WAIT PAINTING 3 15 INST. ELECT/ MECH/SANITARY FIXTURES 1 16 MOVE OUT 2 17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 CALENDAR DAYS BUILDING CONSTRUCTION METHODOLOGY PROJECT: ONE(1) STOREY (7m X 7m) MODIFIED SCHOOL BUILDING ( BY PERT/CPM DIAGRAM) LEGEND: A B ES LS EF LF A ES LS NETWORK - ACTIVITY - EVENT - DUMMY - CRITICAL PATH - NVPILAR 2008
  • 23. I. MOBILIZATION/DEMOB II. EARTHWORKS III. SOIL POISONING IV. DAMP PROOFING WORKS V. CONCRETE WORKS VI. MASONRY WORKS VII. CARPENTRY WORKS VIII. FAB. MATLS & H’WARE IX. ROOF FRAMING WORKS X. ROOFING WORKS XI. FINISHES XII. PAINTING WORKS XIII. SANITARY WORKS XIV. ELECTRICAL WORKS XV. MECHANICAL WORKS TOTAL PROJECTED CASH FLOW (P) PROJECTED ACCPLMENT (%) CUMMULATIVE CASH FLOW(P) CUMMULATIVE ACCPLMNT(%) SCOPE OF WORKS WT.(%) 1.00 2.29 0.56 0.47 29.65 300,000.00 3.21 3.54 9.08 9.87 7.20 12.23 6.50 4.06 5.34 5.00 100.00 AMOUNT (PHP) CALENDAR DAYS 5 10 15 20 25 30 3,000.00 6,870.00 1,680.00 1,410.00 88,950.00 9,630.00 10,620.00 10,620.00 27,240.00 29,610.00 21,600.00 36,690.00 19,500.00 16,020.00 15,000.00 - CRITICAL ACTIVITY - PARALLEL ACTIVITY NVPILAR 2008
  • 24. I. MOBILIZATION/DEMOB II. EARTHWORKS III. SOIL POISONING IV. DAMP PROOFING WORKS V. CONCRETE WORKS VI. MASONRY WORKS VII. CARPENTRY WORKS VIII. FAB. MATLS & H’WARE IX. ROOF FRAMING WORKS X. ROOFING WORKS XI. FINISHES XII. PAINTING WORKS XIII. SANITARY WORKS XIV. ELECTRICAL WORKS XV. MECHANICAL WORKS TOTAL PROJECTED CASH FLOW (P) PROJECTED ACCPLMENT (%) CUMMULATIVE CASH FLOW(P) CUMMULATIVE ACCPLMNT(%) SCOPE OF WORKS WT.(%) 1.00 2.29 0.56 0.47 29.65 1,500.00 3,435.00 3,435.00 1,680.00 1,410.00 11,118.75 44,475.00 33,356.25 3,210.00 6,420.00 10,620.00 13,620.00 13,620.00 17,766.00 11,844.00 1,500.00 16,200.00 5,400.00 36,690.00 19,500.00 676.67 3,383.33 3,383.33 3,383.33 1,353.34 890.00 4,450.00 4,450.00 4,450.00 1,780.00 833.33 4,166.67 4,166.67 4,166.67 1,666.66 17,733.75 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00 300,000.00 39,420.00 90,174.00 45,966.00 53,186.25 53,520.00 3.21 3.54 9.08 9.87 7.20 12.23 6.50 4.06 5.34 5.00 100.00 AMOUNT (PHP) CALENDAR DAYS 5 10 15 20 25 30 3,000.00 6,870.00 1,680.00 1,410.00 88,950.00 9,630.00 10,620.00 10,620.00 27,240.00 29,610.00 21,600.00 36,690.00 19,500.00 16,020.00 15,000.00 5.91 5.91 17.84 23.75 17.73 41.48 15.32 56.80 30.06 86.86 13.14 100.00 NVPILAR 2008
  • 25. I. MOBILIZATION/DEMOB II. EARTHWORKS III. SOIL POISONING IV. DAMP PROOFING WORKS V. CONCRETE WORKS VI. MASONRY WORKS VII. CARPENTRY WORKS VIII. FAB. MATLS & H’WARE IX. ROOF FRAMING WORKS X. ROOFING WORKS XI. FINISHES XII. PAINTING WORKS XIII. SANITARY WORKS XIV. ELECTRICAL WORKS XV. MECHANICAL WORKS TOTAL PROJECTED CASH FLOW (P) PROJECTED ACCPLMENT (%) CUMMULATIVE CASH FLOW(P) CUMMULATIVE ACCPLMNT(%) SCOPE OF WORKS WT.(%) 1.00 2.29 0.56 0.47 29.65 17,733.75 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00 300,000.00 39,420.00 90,174.00 45,966.00 53,186.25 53,520.00 3.21 3.54 9.08 9.87 7.20 12.23 6.50 4.06 5.34 5.00 100.00 AMOUNT (PHP) CALENDAR DAYS 5 10 15 20 25 30 3,000.00 6,870.00 1,680.00 1,410.00 88,950.00 9,630.00 10,620.00 10,620.00 27,240.00 29,610.00 21,600.00 36,690.00 19,500.00 16,020.00 15,000.00 5.91 5.91 17.84 23.75 17.73 41.48 15.32 56.80 30.06 86.86 13.14 100.00 25% 75% 50% 100% 5.91 56.80 41.48 23.75 86.86 TIME ELAPSED SCHEDULED ACCOMPLIHMENT ACTUAL ACCOMPLISHMENT NVPILAR 2008
  • 26. RES. ENGINEER CONST. FOREMAN LEADMAN CARPENTER MASON STEEL MAN WELDER TINSMITH PLUMBER PAINTER ELECTRICIAN LABORER SAFETY OFFICER FIRST AIDER NURSES TOTAL RATE/DAY TOTAL AMOUNT CALENDAR DAYS 5 10 15 20 25 30 1 MANPOWER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 8 8 6 6 13 13 13 13 14 10 10 10 16 16 10 10 10 10 10 10 10 1210 12 12 12 12 12 8 6 NVPILAR 2008
  • 27. TOTAL RATE/DAY TOTAL AMOUNT CALENDAR DAYS 5 10 15 20 25 30 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EQUIPTMENT MINOR TOOL ACC. C0NCRETE MIXER CONC. VIBRATOR BAR CUTTER BAR BENDER WELDING MACHINE 1 NVPILAR 2008
  • 28. MANPOWER REQUIREMENT TECHNICAL SAFETY & HEALTH (DO 56 S.2005) SKILLED / UNSKILLED PROJECT ENGINEER RESIDENT ENGINEER MTQC ENGINEER QTY./COST ENGINEER SANITARY ENGINEER ELECTRICAL ENGINEER MECHANICAL ENGINEER SAFETY ENGINEER SAFETY OFFICER FIRST AIDER NURSES CONST. FOREMAN LEADMAN CARPENTER MASON STEEL MAN WELDER TINSMITH INSTALLER PAINTER PLUMBER ELECTRICIAN LABORER NVPILAR 2008
  • 30. EXCAVATOR-USE IN LARGE DIMENSION EXCAVATION & DIGGING PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING EQUIPMENT SMALL DRILLING EQPT. USE FOR MICRO PILES DROP HAMMER DRIVING RIG FOR PRE CAST PILES HEAVY BORING RIG W/ VIBRO HAMMER FOR BORED PILES HEAVY CABLE GRAB FOR BARRETTE PILES TRUCK MIXER TANDEM WITH PUMPCRETE USE IN POURING OF HEAVY FOUNDATIONS. TRUCK MOUNTED/CRAWLER CRANE - USE TO CARRY & MANEUVER PRE CAST PILE & STEEL CAGES. WHEEL LOADER TANDEM W/ DUMP TRUCK - USE FOR HAULING & DISPOSAL OF DEBRIS AND OTHER EXCAVATED MATERIALS. NVPILAR 2008 GENERATOR SET / WELDING MACHINE – USE AS CONNECTORS ON HEAVY STRUCTURAL STEEL MEMBERS.
  • 31. TOWER CRANE – USE AS CIRCUMFERENTIAL LIFTING MECHANISM TO TRANSPORT VITAL CONSTRUCTION MATERIALS & EQUIPMENT WHEEL LOADER TANDEM W/ DUMP TRUCK-USE FOR HAULING & DISPOSAL OF DEBRIS AND OTHER MATERIALS WITHIN THE PERIPHERAL OF THE BUILDINGS TRUCK MIXER TANDEM WITH PUMPCRETE USE IN POURING OF HEAVY SUPERSTRUCTURE MEMBERS. MOBILE CRANES – USE TO MANEUVER AROUND & OUTSIDE THE BUILDING TO HOIST MATERIALS & EQUIPMENT FROM VARIOUS LOCATIONS GENERATOR SET / WELDING MACHINE – USE AS CONNECTORS ON HEAVY STRUCTURAL STEEL MEMBERS. FORMS & SCAFFOLDING – USE AS GUIDE & SUPPORT SYSTEM IN FORMING & CHECKING ALIGNMENT OF STRUCTURAL MEMBERS IN & AROUND THE BUILDINGS. NVPILAR 2008
  • 32. WHEEL LOADER EXCAVATOR/BREAKER BULLDOZER GRADER ROLLER TRUCK MIXER DUMP TRUCK TRAILER TRUCK NVPILAR 2008
  • 33. NVPILAR 2008 SAMPLING MOLD BAR CUTTER CONCRETE VIBRATOR RING AND BAR BENDER 1- BAGGER CONCRETE MIXER 2 – BAGGER CONCRETE MIXER PORTA LIFT HOLLOW BLOCK MACHINE PLATE COMPACTOR TAMPING RAMMER WALK BEHIND ROLLER SUBMERSIBLE PUMP
  • 35. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 A. MOBILIZATION / DEMOB. 1% OF DC B. EARTHWORKS a) Excavation / Backfill b) Earth fill c) Gravel - 30 % 30 % C. TERMITE CONTROL / WOOD PRESERVATION a) Soil Poisoning b) Wood Preservation 30 % 30 %
  • 36. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 D. FOUNDATION WORKS 1. SHALLOW FOUNDATION a) Spread b) Mat c) Raft 2. DEEP FOUNDATION a) Micro Piles b) Pre-Cast Driven Piles c) Bored Piles d) Barrette Piles 30 % 30 % 30 % 30 % 30 % 30 % 30 %
  • 37. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 E. DAMP PROOFING / MOISTURE CONTROL a) On Ground b) Below Ground 30 % 30 % F. CONCRETE WORKS a) Concrete a.1) Ready Mix a.2) Job Mix b) Re-bars c) Formworks 10 – 15 % 30 % 30 % 30 %
  • 38. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 G. MASONRY WORKS a) Concrete Hollow Blocks 30 % H. CARPENTRY WORKS a) Ceiling b) Partitions c) Wooden Framing d) Stairs e) Cabinets 30 % 30 % 30 % 30 % 30 %
  • 39. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 H. FABRICATED MAT’LS AND HARDWARES a) Doors b) Windows c) Hardware Accessories I. ROOF FRAMING WORKS 1. Timber Trusses 2. Steel Trusses a) Fabrication b) Installation/Erection c) Equipment d) Consumables e) Painting 30% Fab. + 10% Inst. 30% Fab. + 10% Inst. 30% 30% 30% 20% 10 - 25 % 8 % 7 %
  • 40. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 K. ROOFING WORKS a) Roofing Mat’ls & acc. L. FINISHES M. PAINTING / VARNISHING a) Masonry Paint b) Wooden Paint c) Metal Paint d) Varnishing 30 % 30 - 35 % 30 % 30 % 30 % 30 %
  • 41. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 N. WATERPROOFING a) Cement Base (Integral) b) Membrane Waterproofing c) Liquid Waterproofing d) Hydrolithic Waterproofing O. SANITARY WORKS a) Plumbing Lines b) Drainage, Waste & Vent c) Fixtures & Accessories 30 % 30 % 30 % 30 % 30 % 30 % 15 %
  • 42. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 P. ELECTRICAL WORKS a) Wires & wiring b) Conduit works c) Panel boards & Cabinets d) Fixtures & Accessories 30 % 30 % 5 % 10 %
  • 43. LABOR COST DISTRIBUTION (BUILDING ESTIMATE) MANDAYS %LABOR OF MAT’LS. (APPROXIMATE) SCOPE OF WORKS NVPILAR 2008 Q. MECHANICAL WORKS a) Airconditioning & Refrigeration System b) Water Pump c) Automatic Water Sprinkler System d) Electric Elevators e) Electric Dumbwaiter 10% - Labor(Acc.) 15% - Inst. of units 30% - Labor (Pipes & fit.) 15% - Inst. of units 30% - Labor (Pipes & fit.) 15% - Inst. Of units 30% 30%
  • 44. SCOPE OF WORKS IN BUILDING CONSTRUCTION PART - A - MOBILIZATION PART - B - EARTHWORKS PART - C - TERMITE CONTROL & WOOD PRESERVATIONS PART - D - FOUNDATION WORKS PART - E - DAMP PROOFING / MOISTURE CONTROL PART - F - CONCRETE WORKS PART - G - MASONRY WORKS PART - H - CARPENTRY WORKS PART - I - FABRICATED MATERIALS AND HARDWARE PART - J - ROOF FRAMING WORKS PART - K - ROOFING WORKS PART - L - FINISHES PART - M - PAINTING / VARNISHING PART - N - WATER PROOFING PART - O - SANITARY WORKS PART - P - ELECTRICAL WORKS PART - Q - MECHANICAL WORKS PART - R - CONSTRUCTION SAFETY AND HEALTH (DO. 56) NVPILAR 2008
  • 45. DPWH STD.SPECS.,VOL.II, 2004 ED. DPWH STD.SPECS.,VOL.III, 1995 ED. DPWH STD. SPECS., VOL. I, 1988, ED. NVPILAR 2008
  • 46. COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART A – MOBILIZATION - M0VING IN OF MANPOWER, EQUIPTMENT & MATERIALS AT THE PROJECT SITE PART A – FACILITIES F0R THE ENGINEER A.1.1- OFFICES & LABORATORIES - L.S. A.1.2- VEHICLES FOR THE ENGINEER - MO./ EACH A.1.3- ASSISTANCE TO THE ENGINEER - MONTHS A.1.4- PHOTOGRAPHS - EACH NVPILAR 2008
  • 47. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART B - EARTHWORKS ITEM 800 – CLEARING & GRUBBING - CU. M. ITEM 801 – REMOVAL OF STRUCTURES & OBSTRUCTIONS - CU. M. ITEM 802 – EXCAVATION - CU. M. ITEM 803 – STRUCTURE EXCAVATION - CU. M. ITEM 804 – EMBANKMENT - CU. M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 48. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART C – TERMITE CONTROL & WOOD PRESERVATION ITEM 1000(A) – SOIL POISONING - LITER ITEM 1000(B) – WOOD PRESERVATION - LITER ITEM 1000(C) – POWDER TERMICIDE - KILOGRAMS NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 49. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART D – FOUNDATION WORKS ITEM 400(4) – PRECAST CONCRETE PILES, FURNISHED - METER ITEM 400(1) – UNTREATED TIMBER PILES, FURNISHED - METER ITEM 400(5) – PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED - METER ITEM 400(2) – TREATED TIMBER PILES, PRESERVATIVE, FURNISHED - METER ITEM 400(3) – STEEL H-PILES, FURNISHED - METER ITEM 400(9) – TREATED TIMBER PILES, DRIVEN - METER ITEM 400(8) – UNTREATED TIMBER PILES, DRIVEN - METER ITEM 400(6) – STRUCTURAL STEEL SHEET PILES, FURNISHED - METER ITEM 400(7) – PRECAST CONCRETE SHEET PILES, FURNISHED - METER ITEM 400(11) – STEEL PIPES PILES - METER ITEM 400(12) – STRUCTURAL STEEL SHEET PILES, DRIVEN - METER ITEM 400(10) – STEEL H-PILES, DRIVEN - METER NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 50. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 400(13) – PRECAST CONCRETE SHEET PILES, DRIVEN - METER ITEM 400(17) – CONCRETE PILES CAST IN DRILLED HOLES - METER ITEM 400(14) – PRECAST CONCRETE PILES, DRIVEN - METER ITEM 400(18) – CONCRETE PILES CAST IN STEEL SHELLS - METER ITEM 400(20) – PILE SHOES - METER ITEM 400(22) – LOAD TEST - METER ITEM 400(21) – SPLICES - METER ITEM 400(15) – PRECAST, PRESTRESSED CONCRETE PILES, DRIVEN - METER ITEM 400(19) – CONCRETE PILES CAST IN STEEL PIPES - METER ITEM 400(23) – BORED PILES (DIA___ M) - METER ITEM 400(24) – PERMANENT CASING (DIA___M) - METER ITEM 400(16) – TEST PILES, FURNISHED AND DRIVEN - METER NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 51. NVPILAR 2006 ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART E – DAMP PROOFING/MOISTURE CONTROL SPL (1) – POLYETHELENE SHEETS - SQ. M. SPL (2) – HYDROLITHIC WATER PROOFING - SQ. M. COST ESTIMATION SYSTEM FOR BUILDINGS
  • 52. NVPILAR 2008 PART F - CONCRETE WORKS ITEM 404 – REINFORCING STEEL - KGS. ITEM 406(1) – PRE STRESSED STRUCTURAL CONC. MEMBERS - EACH ITEM 406(2) – PRE STRESSED CONCRETE - L.S. ITEM 900 R. C. CONCRETE*** -CU.M. ***- Such prices and payment shall be full compensation for furnishing all materials, including metal water stops, joint fillers, weep holes, and rock backing and timber bumpers; for all form and false work; for mixing, placing, furnishing, and curing the concrete; and for all labor, materials, equipment, tools and incidentals necessary to complete the item… ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) COST ESTIMATION SYSTEM FOR BUILDINGS
  • 53. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART G – MASONRY WORKS ITEM 506(1)A- MASONRY UNIT (CHB) - SQ. M. PART H – CARPENTRY AND JOINERY WORKS ITEM 1OO3(A) – WOODEN CEILING - BD. FT. ITEM 1OO3(C) – WOODEN CABINETS - BD. FT. ITEM 1OO3(B) – WOODEN PARTITION - BD. FT. ITEM 1OO3(D) – WOODEN STAIRS & OTHERS AS SPECIFIED ON PLANS - BD. FT. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 54. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART I – FABRICATED MATERIALS & HARDWARE ITEM 1004 – HARDWARE - ITEM 1004.2.1 – ROUGH HARDWARE - PCS/KILO ITEM 1004.2.2 – FINISHING HARDWARE - PCS/SET ITEM 1005 – STEEL WINDOWS - ITEM 1005(A) – RESIDENTIAL CASEMENT - SQ.M. ITEM 1005(B) – HEAVY DUTY SIDE HINGED VENTILATOR - SQ.M. ITEM 1005(C) – PROJECTED VENTILATOR - SQ.M. ITEM 1005(D) – AWNING VENTILATOR - SQ.M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 55. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1006 – STEEL DOORS AND FRAMES - ITEM 1006(A) – HOLLOW STEEL DOORS - SQ.M./SET ITEM 1006(C) – GRILLE DOOR - SQ.M./SET ITEM 1006(B) – FLUSH DOOR - SQ.M./SET ITEM 1006(D) – STEEL LOUVER DOOR - SQ.M./SET ITEM 1007 – ALUMINUM GLASS DOOR, SLIDING TYPE, DESIGNATED AS D – ON THE SCHEDULE - SQ.M. ITEM 1007 – ALUMINUM GLASS DOORS - NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 56. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1008 – ALUMINUM GLASS WINDOWS - ITEM 1008(2) – ALUMINUM CASEMENT WINDOWS - SQ.M. ITEM 10O8(1) – ALUMINUM SLIDING WINDOWS - SQ.M. ITEM 1008(3) – ALUMINUM AWNING WINDOWS - SQ.M. ITEM 1009(1) – GLASS JALOUSIE WINDOWS - SQ.M. ITEM 1009 – JALOUSIE WINDOWS - ITEM 1009(2) – WOOD JALOUSIE WINDOWS - SQ.M. ITEM 1010(A) – FRAMES(JAMBS, SILLS, HEAD, TRANSOMS AND MULLIONS - SET ITEM 1010 – WOODEN DOORS AND WINDOWS - ITEM 1010(C) – WINDOW SACHES - SQ.M. ITEM 1010(B) – DOOR(FLUSH OR PANEL) - SQ.M. ITEM 1010(D) – DOOR LOCKS - NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 57. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1012 – GLASS AND GLAZING - ITEM 1011 – ROLLING UP DOORS - ITEM 1012(A) – FLOAT GLASS - SQ.M. ITEM 1011(A) – ROLLING UP DOOR(INDICATE METAL SIZE AND TYPE OF CURTAIN SLATE) - UNIT/SET ITEM 1012(B) – ORDINARY WINDOW & SHEET GLASS - SQ.M. ITEM 1012(C) – PLATE GLASS (MIRROR) - SQ.M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 58. NVPILAR 2008 PART J – ROOF FRAMING WORKS ITEM 402(2) – TIMBER TRUSSES - BD. FT. ITEM 402(1) – TIMBER STRUCTURES - SPAN ITEM 403(1) – STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED - KGS ITEM 403(2) – STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED - KGS ITEM 403(3) – STRUCTURAL STEEL ,FURNISHED & FABRICATED - KGS ITEM 403(4) – STRUCTURAL STEEL ,FURNISHED & FABRICATED - KGS ITEM 403(5) – STRUCTURAL STEEL ,ERECTED - KGS ITEM 403(6) – STRUCTURAL STEEL ,ERECTED - KGS ITEM 403(7) – STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED - KGS * - Where separate payment is to be made for certain metals or for certain particular components, other than under the general provision for structural steel, designations of those particular cases shall be inserted in the space provided in the pay names for Item 403(2), 403(4) or 403(6), as the case may be. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) COST ESTIMATION SYSTEM FOR BUILDINGS
  • 59. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART K – ROOFING WORKS ITEM 1013 – CORRUGATED METAL ROOFING - ITEM 1013(A) – ROOF INSULATION - SQ.M. ITEM 1013.2.1 – CORRUGATED ROOFING GAUGE 26 - SQ.M. ITEM 1013.2.2 – FABRICATED METAL ROOFING ACCESSORIES (A) – RIDGED/HIP ROLLS, FLASHING, GUTTER & DOWNSPOUT GAUGE 26 - L.M. (B) – VALLEYS, COUNTER FLASHING GUTTER & DOWNSPOUT GAUGE 24 - L.M. ITEM 1013.2.3 – ROOF VENTILATORS - EACH NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 60. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1014 – PRE-PAINTED METAL SHEETS - ITEM 1014(A) – PRE-PAINTED METAL SHEETS - SQ.M. ITEM 1015 – CLAY ROOF TILES - ITEM 1015(A) – CLAY ROOF TILES - SQ.M. ITEM 1017 – ROOF DRAINS WITH STRAINERS - PCS/SET NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 61. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART L - FINISHES ITEM 1018 – CERAMIC TILES ITEM 1018.2.1.1 – GLAZED TILES AND TRIMS - SQ.M. ITEM 1018.2.1.2 – UNGLAZED TILES - SQ.M ITEM 1019 – WOOD TILES ITEM 1019(A) – NARRA WOOD TILES - SQ.M. ITEM 1019(B) – TANGUILE WOOD TILES - SQ.M. ITEM 1019(C) – OTHER SPECIES AS SPECIFIED - SQ.M. ITEM 1020 – VINYL FLOOR TILES - SQ.M. OR L.M OR # OF PCS. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 62. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1021 - CEMENT FLOOR FINISH ITEM 1021(A) – PLAIN CEMENT FLOOR FINISH - SQ.M. ITEM 1021(B) – COLORED CEMENT FLOOR FINISH - SQ.M. ITEM 1021(A) – CEMENT FLOOR FINISH W/FLOOR HARDINER - SQ.M. ITEM 1022 - STUCCO FINISH ITEM 1022(A) - STUCCO FINISH - SQ.M. ITEM 1023 – GRANOLITHIC MARBLE WORKS ITEM 1023(A) – CORRIDORS - SQ.M. ITEM 1023(B) – STAIRS LANDING, RISERS, ETC. - SQ. M. OR L.M. ITEM 1023(C) – ROOMS AND OTHERS - SQ.M. ITEM 1024 – PEA GRAVEL WASHOUT FINISH - SQ.M. ITEM 1024(A) – PEA GRAVEL WASHOUT FINISH - SQ.M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 63. NVPILAR 2006 ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1025 – BUSH HAMMERED FINISH ITEM 1025(B) – FLUTED BUSH HAMMERED FINISH - SQ.M. ITEM 1025(A) – BUSH HAMMERED FINISH - SQ.M. ITEM 1026 – PEBBLE WASHOUT FINISH ITEM 1026(A) – PEBBLE WASHOUT FINISH - SQ.M. ITEM 1027 – CEMENT PLASTER FINISH ITEM 1027(A) – CEMENT PLASTER FINISH - SQ.M. ITEM 1027(B) – SIMULATED RED BRICKS, pn. 142 - SQ.M. ITEM 1028 – SYNTHETIC ADOBE ITEM 1028(A) – BUSH HAMMERED SYNTHETIC ADOBE FINISH - SQ.M. ITEM 1028(B) – FLUTTEDBUSH HAMMERED SYNTHETIC ADOBE FINISH - SQ.M. ITEM 1028(C) - PIQUETA TOOL FINISH / SYNTHETIC FINISH - SQ.M. COST ESTIMATION SYSTEM FOR BUILDINGS
  • 64. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1O29 – GRANATITE WASHOUT FINISH ITEM 1O29(1) – GRANATITE WASHOUT FINISH - SQ.M., LM ITEM 1030 – ACCOUSTICAL CEILING ITEM 1030(A) – ACCOUSTICAL CEILING PANEL - SQ.M OR # OF PCS. ITEM 1031 – ACCOUSTICAL TREATMENT ITEM 1031.2.1 – ACCOUSTICAL TILE/BOARD/PANEL - SQ.M. ITEM 1031.2.2 – SPRAYED-ON ACCOUSTICAL MATERIALS - SQ.M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 65. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART M – PAINTING, VARNISHING & OTHER RELATED WORKS ITEM 1032 A – PAINTING WOKS ITEM 1032 A(1) – PAINTING WOKS (MASONRY PAINT) - SQ.M. ITEM 1032 A(2) – PAINTING WOKS (WOOD PAINT) - SQ.M. ITEM 1032 A(1) – PAINTING WOKS (ROOF PAINT) - SQ.M. ITEM 1032 E – TEXTURE FINISH - SQ.M. ITEM 1032 D – DUCCO FINISH - SQ.M. ITEM 1032 C – SEA-MIST FINISH - SQ.M. ITEM 1032 B – VARNISHING - SQ.M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 66. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART N – WATERPROOFING WORKS ITEM 1016 - WATERPROOFING ITEM 1016(A) – CEMENT BASE WATERPROOFING - SQ.M. ITEM 1016(B) – LIQUID WATERPROOFING - SQ.M. ITEM 1016(C) – BUILT-UP AND PREFORMED MEMBRANE - SQ.M. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 67. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART O – SANITARY WORKS ITEM 1001 – STORM DRAINAGE AND SEWERAGE SYSTEM ITEM 1001.2(A) – PIPE (KIND AND SIZE) - METER ITEM 1001.2(B) – FITTINGS (KIND AND SIZE) - EACH ITEM 1001.2(C) – CONCRETE GUTTER - METER ITEM 1001.2(D) – CONCRETE CANAL - METER ITEM 1001.2(E) – W.I. GRATING - METER ITEM 1001.2(F) – CATCH BASIN - EACH ITEM 1001.2(G) – JUNCTION BOX - EACH NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 68. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART P – ELECTRICAL WORKS ITEM 1100 – CONDUITS, FOXES & FITTINGS (1)-RSC CONDUIT PIPE- MM DIA W/ COUPLING - LENGTH (2)-LOCKNUT & BUSHING - PAIRS (3)-CONDULET TYPE - PIECES (4)-CONDUIT PIPE ELBOW - PIECES (5)-CONNECTOR - PIECES (6)-CONDUIT CLAMP - PIECES (7)-PVC ADAPTER - PIECES (8)-G.I. WIRE G.A. #14 - KILOS (9)-HACKSAW BLADE - PIECES (10)-PVC TAPE 19MM DIA X 18MM - ROLLS (11)-RUBBER TAPE 19MM DIA X 227G - ROLLS (12)-PVC SOLVENT CEMENT @ 400 CC. - CANS (13)-PVC END BALL - PIECES (14)-OCTAGONAL JUNCTION BOX - PIECES (15)-UTILITY BOXES - PIECES (16)-METAL PULL BOX - PIECES (17)-SQUARE BOX - PIECES (18)-TELEPHONE CABINET - SET (19)-REINFORCED CONCRETE PEDESTAL POLE - LOT (20)-RED LEAD PAINT - LOT (21)-WEATHER HEAD W/ TYPE F CONDULET - PIECES (22)-GROUNDING ROD COPPERWELD 20MM DIA. X 3.00M -LENGTH (23)-APITONG OR APPROVED EQUAL CRESOTED WOOD POLE - PIECES (24)-ANCHOR ROD__ MM DIA - PIECES (25)-ANCHOR LOG__ MM DIA - PIECES (26)-POWERLOAD STUDS WITH NUTS - PIECES NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 69. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1101 – WIRES AND WIRING DEVICES (1)- ELECTRIC WIRE - METER OR ROLLS (2)- SINGLE POLE TUMBLER SWITCH - PIECES (3)- TWO-GANG TUMBLER SWITCH - PIECES (4)- THREE-GANG TUMBLER SWITCH - PIECES (5)- THREE-WAY TUMBLER SWITCH - PIECES (6)- DUPLEX CONVENIENCE RECEPTACLES - SET (7)- HEAVY DUTY CONVENIENCE RECEPTACLES - SET (8)- STD. TELEPHONE OUTLET BAKELITE COVER W/ 9.52 CENTER HOLE - PIECES (9)- WDO TYPE AIRCONDITIONING OUTLET 3- PRONG POLARIZED TYPE - PIECES (10)- BARE COPPER WIRE - METERS (11)- GROUNDING CLAMPS FOR ELECTRIC WIRES - PIECES (12)- MESSENGER WIRE - METERS (13)- GUY WIRE - METERS (14)- VIBRATING BELL - SET (15)- TRAFFIC LIGHT CONTROL PANEL - SET (16)- TRAFFIC LIGHT METAL ENCLOSURES COMPLET WITH RED & GREEN LIGHT PROVIDED WITH REFLECTORS & 152MM DIAMETER VIBRATING BELL - SET NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 70. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1102 – POWER LOAD CENTER, SWITCHGEAR & PANEL BOARDS (1)- PANEL BOARD (CIRCUIT BREAKER TYPE) - SET (2)- PANEL BOARD (SAFETY SWITCH TYPE) - SET (3)- LOW-VOLTAGE SWITCHGEAR (LVS) COMPLETE W/ METERING DEVICES AND ACCESSORIES - SET (4)- POWER FUSES - PIECES (5)- LIGHTING ARRESTERS - PIECES (6)- AIR BREAK SWITCH - SET (7)- ENCLOSED ACB NEMA TYPE 1 - SET (8)- ENCLOSED ACB NEMA TYPE 3R - SET (9)- AUTOMATIC TRANSFER SWITCH - SET (10)- MANUAL TRANSFER SWITCH WITHOUT FUSES - PIECES (11)- MOTOR CONTROLLER - SET NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 71. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART Q – MECHANICAL WORKS ITEM 1200 – AIR CONDITIONING AND REFRIGERATION SYSTEM (A)- COMPRESSOR, CONDENSER AND EVAPORATOR - SET (B)- DIFFUSSER, GRILLES AND VALVES - PIECES (C)- PIPES - LENGTH (D)- DUCTS AND INSULATIONS - SQ.M. (E)- PIPE INSULATIONS - METER ITEM 1201 – WATER PUMPING (A)- PUMP AND WATER TANK - SET (B)- AIR COMPRESSOR - SET (C)- PIPES - LENGTH (D)- VALVES AND FITTINGS - PIECE NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 72. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1202 – AUTOMATIC WATER SPRINKLER SYSTEM (A)- FIRE AND JOCKEY PUMPS - SET (B)- SPRINKLER HEAD, VALVES AND FITTINGS - PIECE (C)- PIPES - LENGHT ITEM 1203 – ELECTRIC ELEVATOR (A)- TRACTION OR HYDRAULIC MACHINE AND CAR - SET (B)- HOISTWAY DOORS, COUNTER WEIGHT, GUIDE RAILS, ANNUNCIATORS, AND HALL POSITION INDICATORS - PIECE (C)- ELECTRICAL WIRES AND CONDUITS - LENGTH ITEM 1204 – ELECTRIC DUMPWAITER (A)- MACHINE - SET (B)- CAR, DOOR AND CABLE - PIECE (C)- ELECTRICAL WIRES AND CONDUITS - LENGHT NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 73. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) ITEM 1205 – OXYGEN, NITROUS OXIDE, VACUUM & FUEL GAS SYSTEM (A)- OXYGEN, NITROUS OXIDE, GAS MANIFOLD AND DUPLEX VACUUM PUMP - SET (B)- HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES - PIECE (C)- PIPES AND TUBINGS - LENGHT ITEM 1206 – HEATING SYSTEM (A)- BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DAY TANK INCLUDING FOUNDATION - SET (B)- PIPES - LENGTH (C)- VALVES AND FITTINGS - PIECES ITEM 1207 - BOILERS (A)- STEAM BOILERS, AIR COMPRESSOR, HEAT EXCHANGER AND FUEL PUMP - SET (B)- PIPES WITH INSULATION - LENGTH (C)- VALVES AND FITTINGS - PIECE NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS
  • 74. ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.) PART R- CONSTRUCTION SAFETY AND HEALTH (DO 56) SPL -1 – PERSONAL PROTECTIVE EQUIPTMENT (PPE) - PCS. SPL -2 – SAFETY AND HEALTH PERSONNEL - NOS. SPL -3 – SIGNAGES AND BARRICADES - PCS. NVPILAR 2008 COST ESTIMATION SYSTEM FOR BUILDINGS