SlideShare ist ein Scribd-Unternehmen logo
1 von 2
ARTHUR (DANE) WISE 
2002 West 600 North, Price, UT 84501 • 435-299-9854 • daneyzz2003@yahoo.com 
MANUFACTURING ENGINEER 
Improvement-focused, technically sophisticated engineering professional with a solid history of success in 
product and process development in world-class aerospace and industrial machining environments. 
AREAS OF EXPERTISE 
· Certified Six Sigma Greenbelt with over 20 years’ experience in Design for Manufacturing (DFM), Lean 
Manufacturing, and Process Failure Modes Effect Analysis (PFMEA). 
· Motivational, solutions-driven leader with proven expertise in full lifecycle project management including 
scheduling, workload delegation, and staff training, supervision, and evaluation. 
· History of delivering multimillion-dollar engineering and machining projects on time and within budget. 
· Demonstrated ability to generate up to $30 million in savings through Six Sigma, 5S, and Kaizen events. 
· Track record of increasing productivity, profitability, quality, and accuracy through rigorous data analysis. 
TECHNICAL PROFICIENCIES 
Equipment: Aerospace Equipment and Components, Flight Controls, CNC Machines, Gear Boring 
Machines, Gear Cases, Lathes, Honing Machines 
Applications: AutoCAD, Unigraphics, CATIA, MasterCAM, Minitab, SAP, JD Edwards, Microsoft 
Office Suite (Word, Excel, PowerPoint, Access) 
PROFESSIONAL EXPERIENCE 
JOHN DEERE, Waterloo, IA 
Manufacturing Engineer, April/2012–November/2013 
Developed and implemented new programs, processes, and continuous improvements to apply Lean 
Manufacturing principles and reduce throughput times. Provided shop support for multiple CNC machines. 
Conducted hard-turn gear finishing and bore grinding for engineering department. 
 Successfully delivered $2 million machine tool acquisition project. 
 Personally developed thermal expansion program for critical gear attributes as well as probing sequences for 
high-tolerance gear boring machines. 
JOY MINING MACHINERY, Price, UT 
Components & Hydraulics Supervisor / Lean Leader, February2011–April/2012 
Managed, supervised, and evaluated performance of 20 direct reports in components and hydraulics production 
departments. Met master production schedules by coordinating all requirements scheduled through components 
and hydraulics. Oversaw rebuilding of small and large mining equipment gear cases and hydraulics. Led and 
executed Lean Manufacturing Operational Excellence initiatives. 
 Provided expert leadership for Kaizen events through components and hydraulics departments. 
 Recommended and introduced use of MasterCAM programming software. 
 Wrote capital requests for acquisitions of Mazak 550 slant turn lathe and Sunnen honing machine. 
GRAYMONT WESTERN US, INC., Salt Lake City, UT 
Manufacturing / Reliability Engineer, October/2009–October/2010 
…Continued…
ARTHUR (DANE) WISE 
PAGE TWO 
Provided technical support, best practices, and training on inventory management and procurement to improve 
reliability for limestone manufacturing sites. Developed equipment reliability program and requirements. Conducted 
ongoing analyses to ensure equipment conformance to requirements. Offered root cause facilitation guidance for 
manufacturing reliability incidents. 
 Identified high-return improvement opportunities by evaluating site reliability data. 
 Led development, implementation, and updating of RCM-based equipment strategies. 
BARNES AEROSPACE, Ogden, UT 
Senior Manufacturing Engineer / Machining Manager, May/2004–September/2007 
Hired, trained, supervised, and assessed performance of subordinate staff. Coordinated master schedules, 
delegated assignments, and oversaw 15 CNC Machinists in daily production jobs. Instructed personnel in machine 
tool production, equipment / tool maintenance, and adherence to industry and safety standards. Created and 
coordinated preventive maintenance and cleaning schedules. Ordered, received, and inspected equipment, 
materials, and supplies. Evaluated all work for quality, accuracy, and completeness. 
 Achieved over $30 million in savings through implementation of Six Sigma Green Belt projects. 
 Directed New Product Introduction (NPI) in machining area while maintaining current processes and 
exceeding on-time delivery goals. 
EMERY HIGH SCHOOL, Castle Dale, UT 
Manufacturing Instructor, August/2003–May/2004 
Designed curriculum, developed lesson plans, and taught pre-engineering courses encompassing 3D modeling, 
AutoCAD, SPC, Lean Manufacturing, Six Sigma, and CNC machining. 
WOODWARD GOVERNOR, Ft. Collins, CO 
Manufacturing Engineer (Contract), June/2002–June/2003 
Served as NPI / Producability Engineer, creating and managing transition from design to development of 
manufacturing process. Designed machining processes and Part Process Approval Plans (PPAP). 
 Managed process development of $60 million Gas Wellhead Valve Project. 
 Generated $3 million in process improvements utilizing Six Sigma methods. 
PARKER HANNIFIN CONTROL SYSTEMS DIVISION, Ogden, UT 
Senior Manufacturing Engineer, February/1998–June/2002 
Conducted process planning for new programs while implementing continuous improvements, applying Lean 
Manufacturing principles, and decreasing throughput times. Provided shop floor support for multiple CNC 
machines. Ensured machining of complex hydraulic system components with tolerances of .0005. 
 Saved more than $1 million through use of Lean principles for processes and tooling. 
 Set record time for first flight testing on Embrear 170/190 flight controls. 
** *** ** 
Additional experience as Maintenance Engineer CertainTeed Gypsum, Maintenance Supervisor, Division of 
Construction and Facilities Maintenance, for State of Utah, as Senior Manufacturing Engineer with Sundstrand 
Aerospace, as Metal Fabrication Production Engineer with Raytheon/TI Systems, and as CNC Machinist (1994– 
1996) with J.D. Machine. 
EDUCATION AND TRAINING 
Master of Business Administration (MBA), 06/ 2002 – UTAH STATE UNIVERSITY, Logan, UT 
Bachelor of Science, Manufacturing Engineering Technology, 05/1996 – WEBER STATE UNIVERSITY, Logan, UT 
Certification: Dual Certified Six Sigma Greenbelt, Lean Manufacturing “Train the Trainer” Certificate

Weitere ähnliche Inhalte

Was ist angesagt?

Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15Peter Jones
 
Hedegaard Jens - Resume
Hedegaard Jens - ResumeHedegaard Jens - Resume
Hedegaard Jens - ResumeJens Hedegaard
 
My Resume updated 2013
My Resume updated 2013My Resume updated 2013
My Resume updated 2013Todd Jones
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad bhatti
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumeGassim Al-gassim
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumeGassim Al-gassim
 
Facilities maintenance _manager_resume
Facilities maintenance _manager_resumeFacilities maintenance _manager_resume
Facilities maintenance _manager_resumeParwez Alam
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-JuffrieJuffrie Cuevas
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVMOHAMMED ABDUL AZEEM
 
Paula Giordano - Master Scheduler
Paula Giordano - Master SchedulerPaula Giordano - Master Scheduler
Paula Giordano - Master Schedulerpaula giordano
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 

Was ist angesagt? (20)

Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15Peter Jones Resume 7-16-15
Peter Jones Resume 7-16-15
 
Hedegaard Jens - Resume
Hedegaard Jens - ResumeHedegaard Jens - Resume
Hedegaard Jens - Resume
 
Resume
ResumeResume
Resume
 
JKliethermesResume20171 (1)
JKliethermesResume20171 (1)JKliethermesResume20171 (1)
JKliethermesResume20171 (1)
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
My Resume updated 2013
My Resume updated 2013My Resume updated 2013
My Resume updated 2013
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
S Perkins 8 22-2021
S Perkins 8 22-2021S Perkins 8 22-2021
S Perkins 8 22-2021
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resume
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resume
 
Facilities maintenance _manager_resume
Facilities maintenance _manager_resumeFacilities maintenance _manager_resume
Facilities maintenance _manager_resume
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
res-16
res-16res-16
res-16
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
Paula Giordano - Master Scheduler
Paula Giordano - Master SchedulerPaula Giordano - Master Scheduler
Paula Giordano - Master Scheduler
 
JOSSY JACOB CV
JOSSY JACOB CVJOSSY JACOB CV
JOSSY JACOB CV
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 

Ähnlich wie Presentation_Resume.p164007.f1586933

0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resumeAndy Levine
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project ManagementJames Gilmore
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Logeais
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Ron Motonaga
 
JOHN HALPIN EHS MANAGER
JOHN HALPIN EHS MANAGERJOHN HALPIN EHS MANAGER
JOHN HALPIN EHS MANAGERJohn Halpin
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015Tim Gilliatt
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1John M. Smith
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeRené Rodríguez, Jr.
 
Jason van dongen resume 2013
Jason van dongen resume 2013Jason van dongen resume 2013
Jason van dongen resume 2013Jason_Van_Dongen
 
Resume 11 27-12 (no address)
Resume 11 27-12 (no address)Resume 11 27-12 (no address)
Resume 11 27-12 (no address)Joebethke
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 

Ähnlich wie Presentation_Resume.p164007.f1586933 (20)

Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
IS-Machinist2
IS-Machinist2IS-Machinist2
IS-Machinist2
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
 
JMK Resume 2
JMK Resume 2JMK Resume 2
JMK Resume 2
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
Resume Motonaga 10.20.16
Resume Motonaga 10.20.16Resume Motonaga 10.20.16
Resume Motonaga 10.20.16
 
JOHN HALPIN EHS MANAGER
JOHN HALPIN EHS MANAGERJOHN HALPIN EHS MANAGER
JOHN HALPIN EHS MANAGER
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
John smith 7.22.2015 1
John smith 7.22.2015 1John smith 7.22.2015 1
John smith 7.22.2015 1
 
Sat Singh Fac Mgt
Sat Singh Fac MgtSat Singh Fac Mgt
Sat Singh Fac Mgt
 
R.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_ResumeR.Rodriguez_CurrentCoverLetter_Resume
R.Rodriguez_CurrentCoverLetter_Resume
 
Jason van dongen resume 2013
Jason van dongen resume 2013Jason van dongen resume 2013
Jason van dongen resume 2013
 
Resume 11 27-12 (no address)
Resume 11 27-12 (no address)Resume 11 27-12 (no address)
Resume 11 27-12 (no address)
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
Resume' DWDobbs 2016a
Resume' DWDobbs 2016aResume' DWDobbs 2016a
Resume' DWDobbs 2016a
 

Presentation_Resume.p164007.f1586933

  • 1. ARTHUR (DANE) WISE 2002 West 600 North, Price, UT 84501 • 435-299-9854 • daneyzz2003@yahoo.com MANUFACTURING ENGINEER Improvement-focused, technically sophisticated engineering professional with a solid history of success in product and process development in world-class aerospace and industrial machining environments. AREAS OF EXPERTISE · Certified Six Sigma Greenbelt with over 20 years’ experience in Design for Manufacturing (DFM), Lean Manufacturing, and Process Failure Modes Effect Analysis (PFMEA). · Motivational, solutions-driven leader with proven expertise in full lifecycle project management including scheduling, workload delegation, and staff training, supervision, and evaluation. · History of delivering multimillion-dollar engineering and machining projects on time and within budget. · Demonstrated ability to generate up to $30 million in savings through Six Sigma, 5S, and Kaizen events. · Track record of increasing productivity, profitability, quality, and accuracy through rigorous data analysis. TECHNICAL PROFICIENCIES Equipment: Aerospace Equipment and Components, Flight Controls, CNC Machines, Gear Boring Machines, Gear Cases, Lathes, Honing Machines Applications: AutoCAD, Unigraphics, CATIA, MasterCAM, Minitab, SAP, JD Edwards, Microsoft Office Suite (Word, Excel, PowerPoint, Access) PROFESSIONAL EXPERIENCE JOHN DEERE, Waterloo, IA Manufacturing Engineer, April/2012–November/2013 Developed and implemented new programs, processes, and continuous improvements to apply Lean Manufacturing principles and reduce throughput times. Provided shop support for multiple CNC machines. Conducted hard-turn gear finishing and bore grinding for engineering department.  Successfully delivered $2 million machine tool acquisition project.  Personally developed thermal expansion program for critical gear attributes as well as probing sequences for high-tolerance gear boring machines. JOY MINING MACHINERY, Price, UT Components & Hydraulics Supervisor / Lean Leader, February2011–April/2012 Managed, supervised, and evaluated performance of 20 direct reports in components and hydraulics production departments. Met master production schedules by coordinating all requirements scheduled through components and hydraulics. Oversaw rebuilding of small and large mining equipment gear cases and hydraulics. Led and executed Lean Manufacturing Operational Excellence initiatives.  Provided expert leadership for Kaizen events through components and hydraulics departments.  Recommended and introduced use of MasterCAM programming software.  Wrote capital requests for acquisitions of Mazak 550 slant turn lathe and Sunnen honing machine. GRAYMONT WESTERN US, INC., Salt Lake City, UT Manufacturing / Reliability Engineer, October/2009–October/2010 …Continued…
  • 2. ARTHUR (DANE) WISE PAGE TWO Provided technical support, best practices, and training on inventory management and procurement to improve reliability for limestone manufacturing sites. Developed equipment reliability program and requirements. Conducted ongoing analyses to ensure equipment conformance to requirements. Offered root cause facilitation guidance for manufacturing reliability incidents.  Identified high-return improvement opportunities by evaluating site reliability data.  Led development, implementation, and updating of RCM-based equipment strategies. BARNES AEROSPACE, Ogden, UT Senior Manufacturing Engineer / Machining Manager, May/2004–September/2007 Hired, trained, supervised, and assessed performance of subordinate staff. Coordinated master schedules, delegated assignments, and oversaw 15 CNC Machinists in daily production jobs. Instructed personnel in machine tool production, equipment / tool maintenance, and adherence to industry and safety standards. Created and coordinated preventive maintenance and cleaning schedules. Ordered, received, and inspected equipment, materials, and supplies. Evaluated all work for quality, accuracy, and completeness.  Achieved over $30 million in savings through implementation of Six Sigma Green Belt projects.  Directed New Product Introduction (NPI) in machining area while maintaining current processes and exceeding on-time delivery goals. EMERY HIGH SCHOOL, Castle Dale, UT Manufacturing Instructor, August/2003–May/2004 Designed curriculum, developed lesson plans, and taught pre-engineering courses encompassing 3D modeling, AutoCAD, SPC, Lean Manufacturing, Six Sigma, and CNC machining. WOODWARD GOVERNOR, Ft. Collins, CO Manufacturing Engineer (Contract), June/2002–June/2003 Served as NPI / Producability Engineer, creating and managing transition from design to development of manufacturing process. Designed machining processes and Part Process Approval Plans (PPAP).  Managed process development of $60 million Gas Wellhead Valve Project.  Generated $3 million in process improvements utilizing Six Sigma methods. PARKER HANNIFIN CONTROL SYSTEMS DIVISION, Ogden, UT Senior Manufacturing Engineer, February/1998–June/2002 Conducted process planning for new programs while implementing continuous improvements, applying Lean Manufacturing principles, and decreasing throughput times. Provided shop floor support for multiple CNC machines. Ensured machining of complex hydraulic system components with tolerances of .0005.  Saved more than $1 million through use of Lean principles for processes and tooling.  Set record time for first flight testing on Embrear 170/190 flight controls. ** *** ** Additional experience as Maintenance Engineer CertainTeed Gypsum, Maintenance Supervisor, Division of Construction and Facilities Maintenance, for State of Utah, as Senior Manufacturing Engineer with Sundstrand Aerospace, as Metal Fabrication Production Engineer with Raytheon/TI Systems, and as CNC Machinist (1994– 1996) with J.D. Machine. EDUCATION AND TRAINING Master of Business Administration (MBA), 06/ 2002 – UTAH STATE UNIVERSITY, Logan, UT Bachelor of Science, Manufacturing Engineering Technology, 05/1996 – WEBER STATE UNIVERSITY, Logan, UT Certification: Dual Certified Six Sigma Greenbelt, Lean Manufacturing “Train the Trainer” Certificate