Design Considerations for FPSO Redeployment –
FPSO Congress 2015
Presentation by - Noel Denton
Background to FPSO Redeployment
Challenges of FPSO Redeployment
Case Study: Front Puffin
Case Study: OSX-1
Case Study: Berantai
Conclusions
Design Considerations for FPSO Redeployment
Contents
Background FPSO Redeployment
History
FPSO East Fortune (Songa Floating Production) conversion to
FPSO Berantai (Petrofac Floating Production)
• FPSOs offered the industry a
technology that could provide a large
processing facility with the ability to
redeploy
• Redeployments have been achieved
successfully on a number of occasions
in the industry – but it is not always as
straightforward as it seems.
• There have been 24 redeployments in
the last 10 years
• Some vessels have been redeployed
on multiple occasions
• The range of modifications required
can be from minimal to extensive such
as new topsides and jumboisation of
the hull – this requires a lot of careful
planning at the start.
Background of FPSO Redeployment
From Crystal Sea (Crystal Production), to BW Carmen
(BWO) to BW Athena (BWO)
Background of FPSO Redeployment
Why an FPSO?
• Potentially fastest route to first oil when compared to other
equivalent topsides substructure options
• Leased option can improve project economics especially for
shorter field lifes
• Short field life or uncertain reservoir performance makes leasing
with extension options attractive
• Lack of infrastructure for export and flexibility to deliver product to
the global market
• Offers the option to be disconnectable in regions with adverse
weather
• Readily deployable in a range of water depths from shallow to
deepwater
• Large topsides carrying capacity
• Storage available to mitigate process interruptions
Background of FPSO Redeployment
Why redeploy?
• Shortened project execution schedule leading to earlier first oil
• Potential reduced day-rate when compared to fresh conversion /
new build
• Proven service history
Challenges for FPSO Redeployment
Technical
Hull
• Global strength and fatigue needs to be checked including stability check if new
modules are added;
• Steel replacement for life extension and coating repairs;
• Change of class / flag / regulatory regime can require modifications to the hull and
accommodation which are difficult to estimate until arrival at the shipyard.
Mooring
• Is the mooring type applicable for the new deployment:
• Is the water depth suitable for a disconnectable mooring?
• Does the FPSO require to be spread moored or turret moored?
• Is the turret suitable:
• Are the loads similar?
• Are the number of risers and umbilicals similar?
Challenges for FPSO Redeployment
Technical
Topsides:
• It is more than just checking the name plate capacities!
• Gas compression systems are sensitive to composition and changes to pressure
ratios;
• Material selection should be verified based on CO2 and H2S content. It is also
important to establish a baseline condition for the vessels and piping to establish
remaining life;
• Flare system design;
• Flow limitation through the turret and swivel paths including erosion issues for
sand content;
• Water cut;
• Is it a heavy crude?
• Increased power requirements
• Increased heat load
• Tertiary treatment required
Challenges for FPSO Redeployment
Technical
Topsides:
• Change in regulatory requirements:
• Are there additional requirements for the topsides?
• Is a safety case required?
Case Studies
FPSO Front Puffin
Background
• The FP was converted in 2007 from
Shuttle Tanker to FPSO and then
deployed as an FPSO for Puffin field
• FPSO Front Puffin was deployed at
AC/P22 Block North of Western
Australia
• FPSO Front Puffin is now to be
redeployed to the Aje Field in West
Africa
• The mooring and hull require minimal
modification despite moving from
Australia to West Africa
• The topsides require additional modules
to fulfill the field requirements
Case Study
FPSO Front Puffin (Rubicon Offshore International)
FPSO Front Puffin
Modifications
• Replacement of existing gas lift compressor
package with new package.
• Addition of gas dehydration package
• Addition of fiscal metering skid
• Addition of subsea chemical injection package
• Upgrade of methanol injection package
• Addition of subsea master control system
• Addition of subsea hydraulic power unit
• Upgrade of control system for new packages
• Upgrade of power distribution system for new
packages
• Integration piping
• FEED study for pre-engineering for future
upgrade scope (gas fuelled power generation)
Case Study
FPSO Front Puffin (Rubicon Offshore International)
FPSO Front Puffin
Challenges and solutions
• Gap analysis – At the earliest opportunity conduct a
gap analysis to quantify the scope and identify any
major hurdles.
• Gas compression – replace existing units and add
a gas dehydration unit
• Change in Fiscal Regime – New gas metering
required
• Congested deck area requiring careful analysis of
support locations and tie-in points – utilisation of
3D modelling to ensure efficient implementation
• Multiple contractors – Successful use of the
integrated team approach to minimise interface
issues
• Upgrade of existing facility – Close liaison with
operations to ensure as built information is robust
when being implements into new configuration
Case Study
FPSO Front Puffin (Rubicon Offshore International)
OSX-1 FPSO
Background
Case Study
FPSO: OSX-1 FPSO
Location: Brazil
Client: Keppel / BW Offshore
Upgrade of the new-build Nexus 1 FPSO to
make it suitable for the OSX Waimea heavy oil
field (API 17.6) offshore Brazil
Involves 7 new modules including
• Inlet Manifold
• Crude Heating
• Water Injection
• Fuel Gas Compression
• Power Module
OSX-1 FPSO
Background
• The Nexus-1 FPSO was developed as a
harsh environment generic FPSO
• Although it was never deployed, it can
be seen that even a generic FPSO
required extensive upgrade to make it
suitable for its eventual deployment
• The Nexus-1 FPSO became the OSX-1
• The heavy oil characteristics meant that
extensive heating and tertiary treatment
were required to achieve the crude
specification
Case Study
everything in pink is a change
OSX-1 FPSO
• Extensive modification was required to
the topsides
Modifications
Case Study
OSX-1 FPSO
Tertiary Treatment / Options for Treatment for Heavy Oil
• VIEC Internals – These can be
retrofitted to existing separators to
improve separation of oil and water
• Compact Electrostatic Coalescer – This
can be used upstream of existing
separation to promote increased droplet
sizes to improve separation
• Modified Internals for the Electrostatic
Coalescer – This can be used to
increase the allowable water cut and/or
to improve separation
• Centrifuge – An established technology
for treatment of heavy oils / tar
Case Study
FPSO: Berantai
Location: Malaysia
Client: Keppel / Petrofac / Petronas
Upgrade of the East Fortune FPSO to make it
suitable for Berantai Field in Malaysia
Includes 9 new modules
(approximately 5000 Te)upgrading
Berantai FPSO
Background
Berantai FPSO
Background
• FPSO Berantai was developed from the
FPSO East Fortune
• FPSO East Fortune was a generic
FPSO which was never deployed
• As with OSX-1 although it was a generic
FPSO it required extensive modification
for its eventual deployment
• The historic difficulty of successfully
employing the generic FPSO concept
demonstrates the fundamental difficulty
of matching the topsides to the field
(other economic factors also impacted
the success of the concept)
• The versatility of load bearing capacity
of the ship-shaped hull is demonstrated
by the dramatic increase in the topsides
between the two concepts.
Case Study
FPSO East Fortune (Songa Floating Production) conversion to
FPSO Berantai (Petrofac Floating Production)
Berantai FPSO
Before and After
FPSO before upgrade FPSO after upgrade
FPSO Redeployment
Conclusions
• The FPSO remains an attractive option for field development due to its inherent
ability to be redeployed
• When considering redeployment the entire FPSO needs to be examined through
thorough gap analysis – mooring, risers, hull, marine systems, safety systems,
accommodation and topsides.
• Although redeployment is not necessarily straightforward with careful planning
and robust engineering it can be achieved successfully
Noel Denton
T 96271998
n.denton@penspen.com
FPSO Redeployment

Weitere ähnliche Inhalte

Was ist angesagt?

FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfBnBn25
 
Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsGaurav Singh Rajput
 
Sesam - A Complete System for Strength Assessments of Fixed Structures
Sesam - A Complete System for Strength Assessments of Fixed StructuresSesam - A Complete System for Strength Assessments of Fixed Structures
Sesam - A Complete System for Strength Assessments of Fixed StructuresJoão Henrique Volpini Mattos
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-designRahul Ranakoti
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfAisyah Asyikin
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019UnitedLiftTechnologi
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020David Seow
 
C1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production TechC1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production TechDavid Seow
 
Offshore oil platform ppt
Offshore oil platform  pptOffshore oil platform  ppt
Offshore oil platform pptsoumikghosh49
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioningSevilay Can
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production SystemsSahyog Shishodia
 

Was ist angesagt? (20)

FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
FPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdfFPSO SYSTEMS-1.pdf
FPSO SYSTEMS-1.pdf
 
Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production Systems
 
Cerberus v5
Cerberus v5Cerberus v5
Cerberus v5
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
Sesam - A Complete System for Strength Assessments of Fixed Structures
Sesam - A Complete System for Strength Assessments of Fixed StructuresSesam - A Complete System for Strength Assessments of Fixed Structures
Sesam - A Complete System for Strength Assessments of Fixed Structures
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-design
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Offshore platform
Offshore platform Offshore platform
Offshore platform
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019Offshore platform ln1_au_06_12_2019
Offshore platform ln1_au_06_12_2019
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020
 
C1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production TechC1. Introduction to Offshore Production Tech
C1. Introduction to Offshore Production Tech
 
Offshore oil platform ppt
Offshore oil platform  pptOffshore oil platform  ppt
Offshore oil platform ppt
 
How to Import a Sacs Model into GeniE
How to Import a Sacs Model into GeniE How to Import a Sacs Model into GeniE
How to Import a Sacs Model into GeniE
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
FPSO Dynamic positioning
FPSO Dynamic positioningFPSO Dynamic positioning
FPSO Dynamic positioning
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 
212790628 fpso
212790628 fpso212790628 fpso
212790628 fpso
 

Andere mochten auch

SUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck Barge
SUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck BargeSUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck Barge
SUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck BargeJoão Henrique Volpini Mattos
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls IQPC
 
Fpso forum presentation sept 2011
Fpso forum presentation sept  2011Fpso forum presentation sept  2011
Fpso forum presentation sept 2011Endeavor Management
 
Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012swoolway
 
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated ContractsFPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated ContractsDavid Seah
 
Corrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOCorrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOPutu Indra Mahatrisna
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...IQPC
 

Andere mochten auch (9)

SUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck Barge
SUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck BargeSUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck Barge
SUC Brazil 2012 : Analysis of Equipment Foundations of a Laydeck Barge
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls
 
FPSO Requirements
FPSO RequirementsFPSO Requirements
FPSO Requirements
 
Fpso forum presentation sept 2011
Fpso forum presentation sept  2011Fpso forum presentation sept  2011
Fpso forum presentation sept 2011
 
Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012
 
SUC Brasil 2012 : The New Sesam Manager
SUC Brasil 2012 : The New Sesam ManagerSUC Brasil 2012 : The New Sesam Manager
SUC Brasil 2012 : The New Sesam Manager
 
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated ContractsFPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
FPSO Conference Workshop - Legal Risks in FPSO Conversion & Associated Contracts
 
Corrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOCorrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSO
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
 

Ähnlich wie FPSO Redeployment

C2. Functional Requirements of FPSO
C2. Functional Requirements of FPSOC2. Functional Requirements of FPSO
C2. Functional Requirements of FPSODavid Seow
 
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTAled Long
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU PresentationThomas Jeannin
 
Fpso floating structures
Fpso floating structuresFpso floating structures
Fpso floating structuresMohamadHassan64
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...Nick Bentley
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumJohn Glenning
 
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORMCOMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORMiQHub
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraProSIM R & D Pvt. Ltd.
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Torben Haagh
 
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...Abdulrahman Alkhowaiter
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 
Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Jerry Brown
 
000-GENERAL presentation_rev06
000-GENERAL presentation_rev06000-GENERAL presentation_rev06
000-GENERAL presentation_rev06Stefan Erents
 
Recovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfRecovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfAhmed133796
 

Ähnlich wie FPSO Redeployment (20)

C2. Functional Requirements of FPSO
C2. Functional Requirements of FPSOC2. Functional Requirements of FPSO
C2. Functional Requirements of FPSO
 
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU Presentation
 
Fpso floating structures
Fpso floating structuresFpso floating structures
Fpso floating structures
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
 
Mg Innovation Flng Cn 2010 R1
Mg Innovation Flng Cn 2010 R1Mg Innovation Flng Cn 2010 R1
Mg Innovation Flng Cn 2010 R1
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
 
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORMCOMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
COMPACT WATER REMOVAL FOR RE-INJECTION ON AN UNMANNED PLATFORM
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
Vattenfall: Challenges for next generation offshore WTGs from a developer’s p...
 
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
Specialty reciprocating-rod-pump-improves-reliability-in-sand-laden-oil-wells...
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin
 
Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system Connecting offshore platforms to a subsea cable system
Connecting offshore platforms to a subsea cable system
 
000-GENERAL presentation_rev06
000-GENERAL presentation_rev06000-GENERAL presentation_rev06
000-GENERAL presentation_rev06
 
Recovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdfRecovery_techniques__1674919213.pdf
Recovery_techniques__1674919213.pdf
 
Marginal oil fields
Marginal oil fieldsMarginal oil fields
Marginal oil fields
 

Kürzlich hochgeladen

457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 

Kürzlich hochgeladen (20)

457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 

FPSO Redeployment

  • 1. Design Considerations for FPSO Redeployment – FPSO Congress 2015 Presentation by - Noel Denton
  • 2. Background to FPSO Redeployment Challenges of FPSO Redeployment Case Study: Front Puffin Case Study: OSX-1 Case Study: Berantai Conclusions Design Considerations for FPSO Redeployment Contents
  • 3. Background FPSO Redeployment History FPSO East Fortune (Songa Floating Production) conversion to FPSO Berantai (Petrofac Floating Production) • FPSOs offered the industry a technology that could provide a large processing facility with the ability to redeploy • Redeployments have been achieved successfully on a number of occasions in the industry – but it is not always as straightforward as it seems. • There have been 24 redeployments in the last 10 years • Some vessels have been redeployed on multiple occasions • The range of modifications required can be from minimal to extensive such as new topsides and jumboisation of the hull – this requires a lot of careful planning at the start.
  • 4. Background of FPSO Redeployment From Crystal Sea (Crystal Production), to BW Carmen (BWO) to BW Athena (BWO)
  • 5. Background of FPSO Redeployment Why an FPSO? • Potentially fastest route to first oil when compared to other equivalent topsides substructure options • Leased option can improve project economics especially for shorter field lifes • Short field life or uncertain reservoir performance makes leasing with extension options attractive • Lack of infrastructure for export and flexibility to deliver product to the global market • Offers the option to be disconnectable in regions with adverse weather • Readily deployable in a range of water depths from shallow to deepwater • Large topsides carrying capacity • Storage available to mitigate process interruptions
  • 6. Background of FPSO Redeployment Why redeploy? • Shortened project execution schedule leading to earlier first oil • Potential reduced day-rate when compared to fresh conversion / new build • Proven service history
  • 7. Challenges for FPSO Redeployment Technical Hull • Global strength and fatigue needs to be checked including stability check if new modules are added; • Steel replacement for life extension and coating repairs; • Change of class / flag / regulatory regime can require modifications to the hull and accommodation which are difficult to estimate until arrival at the shipyard. Mooring • Is the mooring type applicable for the new deployment: • Is the water depth suitable for a disconnectable mooring? • Does the FPSO require to be spread moored or turret moored? • Is the turret suitable: • Are the loads similar? • Are the number of risers and umbilicals similar?
  • 8. Challenges for FPSO Redeployment Technical Topsides: • It is more than just checking the name plate capacities! • Gas compression systems are sensitive to composition and changes to pressure ratios; • Material selection should be verified based on CO2 and H2S content. It is also important to establish a baseline condition for the vessels and piping to establish remaining life; • Flare system design; • Flow limitation through the turret and swivel paths including erosion issues for sand content; • Water cut; • Is it a heavy crude? • Increased power requirements • Increased heat load • Tertiary treatment required
  • 9. Challenges for FPSO Redeployment Technical Topsides: • Change in regulatory requirements: • Are there additional requirements for the topsides? • Is a safety case required?
  • 11. FPSO Front Puffin Background • The FP was converted in 2007 from Shuttle Tanker to FPSO and then deployed as an FPSO for Puffin field • FPSO Front Puffin was deployed at AC/P22 Block North of Western Australia • FPSO Front Puffin is now to be redeployed to the Aje Field in West Africa • The mooring and hull require minimal modification despite moving from Australia to West Africa • The topsides require additional modules to fulfill the field requirements Case Study FPSO Front Puffin (Rubicon Offshore International)
  • 12. FPSO Front Puffin Modifications • Replacement of existing gas lift compressor package with new package. • Addition of gas dehydration package • Addition of fiscal metering skid • Addition of subsea chemical injection package • Upgrade of methanol injection package • Addition of subsea master control system • Addition of subsea hydraulic power unit • Upgrade of control system for new packages • Upgrade of power distribution system for new packages • Integration piping • FEED study for pre-engineering for future upgrade scope (gas fuelled power generation) Case Study FPSO Front Puffin (Rubicon Offshore International)
  • 13. FPSO Front Puffin Challenges and solutions • Gap analysis – At the earliest opportunity conduct a gap analysis to quantify the scope and identify any major hurdles. • Gas compression – replace existing units and add a gas dehydration unit • Change in Fiscal Regime – New gas metering required • Congested deck area requiring careful analysis of support locations and tie-in points – utilisation of 3D modelling to ensure efficient implementation • Multiple contractors – Successful use of the integrated team approach to minimise interface issues • Upgrade of existing facility – Close liaison with operations to ensure as built information is robust when being implements into new configuration Case Study FPSO Front Puffin (Rubicon Offshore International)
  • 14. OSX-1 FPSO Background Case Study FPSO: OSX-1 FPSO Location: Brazil Client: Keppel / BW Offshore Upgrade of the new-build Nexus 1 FPSO to make it suitable for the OSX Waimea heavy oil field (API 17.6) offshore Brazil Involves 7 new modules including • Inlet Manifold • Crude Heating • Water Injection • Fuel Gas Compression • Power Module
  • 15. OSX-1 FPSO Background • The Nexus-1 FPSO was developed as a harsh environment generic FPSO • Although it was never deployed, it can be seen that even a generic FPSO required extensive upgrade to make it suitable for its eventual deployment • The Nexus-1 FPSO became the OSX-1 • The heavy oil characteristics meant that extensive heating and tertiary treatment were required to achieve the crude specification Case Study
  • 16. everything in pink is a change OSX-1 FPSO • Extensive modification was required to the topsides Modifications Case Study
  • 17. OSX-1 FPSO Tertiary Treatment / Options for Treatment for Heavy Oil • VIEC Internals – These can be retrofitted to existing separators to improve separation of oil and water • Compact Electrostatic Coalescer – This can be used upstream of existing separation to promote increased droplet sizes to improve separation • Modified Internals for the Electrostatic Coalescer – This can be used to increase the allowable water cut and/or to improve separation • Centrifuge – An established technology for treatment of heavy oils / tar Case Study
  • 18. FPSO: Berantai Location: Malaysia Client: Keppel / Petrofac / Petronas Upgrade of the East Fortune FPSO to make it suitable for Berantai Field in Malaysia Includes 9 new modules (approximately 5000 Te)upgrading Berantai FPSO Background
  • 19. Berantai FPSO Background • FPSO Berantai was developed from the FPSO East Fortune • FPSO East Fortune was a generic FPSO which was never deployed • As with OSX-1 although it was a generic FPSO it required extensive modification for its eventual deployment • The historic difficulty of successfully employing the generic FPSO concept demonstrates the fundamental difficulty of matching the topsides to the field (other economic factors also impacted the success of the concept) • The versatility of load bearing capacity of the ship-shaped hull is demonstrated by the dramatic increase in the topsides between the two concepts. Case Study FPSO East Fortune (Songa Floating Production) conversion to FPSO Berantai (Petrofac Floating Production)
  • 20. Berantai FPSO Before and After FPSO before upgrade FPSO after upgrade
  • 21. FPSO Redeployment Conclusions • The FPSO remains an attractive option for field development due to its inherent ability to be redeployed • When considering redeployment the entire FPSO needs to be examined through thorough gap analysis – mooring, risers, hull, marine systems, safety systems, accommodation and topsides. • Although redeployment is not necessarily straightforward with careful planning and robust engineering it can be achieved successfully