SlideShare ist ein Scribd-Unternehmen logo
1 von 3
DALE LOCHHEAD
Box 266 Tel: (780) 835-0100
Wembley, AB
TOH 3S0 daleloch@telus.net
SUMMARY OF QUALIFICATIONS
35 years experience in oilfield construction: well-sites, roads, plant sites, and pipelines.
Project Management: coordinating activities between drilling, completions, and production facilities.
Experienced in designing and constructing access and drilling pads in mountainous terrain.
Developed an excellent working relationship with governing agencies of industry working with and
implementing new and improved concepts.
Very strong in cost efficiency, using a combination of analytical, communication and planning skills.
Familiar with both Alberta and BC regulations and reclamation requirements.
Experienced in Environmental Management of projects including developing and managing land
farms, reclamation of wellsites, decommissioning of facilities, pipeline breaks, and spills in 21 years
experience owning and managing our own environmental company.
Active player in ongoing access management issues.
SUMMARY OF EXPERIENCE
2013-2016 Brion Energy Corporation: Site Wide Services Coordinator for Road Maintenance, Borrow Pit
development and excavation, camps, bussing, all consumables(water, sewer, natural gas,
propane, fuel, waste management, courier service) to support the construction of the SAGD
facility as well as Winter Drilling and SAGD Drilling programs. Collaborate with management
to reduce an annual budget of $100M plus while improving site services.
Road Maintenance programs were developed to effectively improve road quality while
decreasing maintenance costs substantialy (35-40%/year. Coordinating effective
management and training of crews, as well as selection of better aggregates and dust
suppressant products road quality was enhanced to minimize maintenance requirements.
2009-2013 Cenovus Energy Inc, Construction supervisor: Pad design, optimization, and construction at
Christina Lakes and Foster Creek. Upgrade, widen and paving of the Ken Baker Road in to
the Cold Lake Air Weapons Range. Develop soil stabilization procedures utilizing Quicklime
(CaO). Coordinating the winter access project for Birch Field NW of Fort Mckay.
2004-2009 Supervised construction operations for Gibraltar Exploration Ltd. Dealt with all phases of
designing, surveying, applying for and constructing access roads and wellsites. Many of the
50+ wellsites and accesses were in difficult terrain where others had not drilled due to Govt
restrictions. 30+ kms of high grade access as well as 40+kms of restricted access were
created. Much of this was accomplished by developing an excellent relationship with
Regulatory bodies.
2003-2004 Invasion Energy Froze in 105 km of access on the East side of the Peace River. We were in
a month earlier than anyone had gotten in before and at half of the anticipated budget from
the last few years. Forestry very happy with the clean bridges and snow fills.
1999-2002 Supervised construction operations for Penn West Petroleum on their Wildboy Project in Helmet BC
Received a letter of commendation from the BC Oil & Gas Commission for our practises. We
constructed and drilled 105 wells on this project. Worked closely with Geology when surveying and
moved the majority of wells for a construction cost saving of about $30,000.00 per well the last
season.
1997-1999 Supervised construction operations for Blue Range in BC for 3 drilling rigs and access for 4-5
service rigs. Started taking responsibility for upgrading and maintaining the existing production
roads. The people, equipment and procedures are now utilized by the production people on an
ongoing basis.
This same year, Blue Range started using invert–drilling methods in the BC Beg area. Over the next
year, as I became involved with the cost control and environmental management, we brought these
costs down to less than half of their original. Designed and set up a system of land farms for handling
the invert wastes.
1996-1997 Provided assistance planning, designing and engineering the Tommy Lakes Project for Blue
Range(39 km of road and 5 well sites). Completed ($3.5 million) project cost efficiently in adverse
conditions.
1994-1995 Started consulting full time in North East BC for Blue Range Resources. Responsible for constructing
leases and access roads for up to 4 drilling and 6 to 7 service rigs at one time.
1989-1994 Reclamation work with own Environmental company (Trufax Environmental Services Ltd). Excellent
references for cost effective and efficient results in obtaining reclamation certificates.
1975-1988 Owned and operated Lochhead Contractors Ltd., an oilfield construction company.
EDUCATION & TRAINING
Formal
Ø Exploration Technology – NAIT (1971)
Ø Senior Matriculation – Honours, Fairview, AB (1969)
Ø Journeyman Heavy Duty Mechanic
Ø Journeyman Hoist and Crane Operator
Ø Licensed Land Agent (1993-2016)
Additional Technical Training/Courses
Ø PITS training courses (listed below) (1983 – 2005)
Ø Western Regions Soils Course (1988)
Ø Computer courses (developed program for daily reports and summaries)
Ø Alberta and BC Pesticide Applicators License
Ø Operated Heavy Equipment – 35 years
PITS Courses:
Ø Environmental Land Management (1983 & 1993)
Ø Reclamation Criteria for Well Sites (1993)
Ø Decommissioning Oil & Gas Facilities(1993)
Ø Spill Site Rehabilitation (1993)
Ø Reclamation Criteria (1995)
Ø Ground Disturbance Level II (2002)
Ø Lease Construction and Reclamation (2005)
Ø Environmental Field Reporting (EFR) (2005)
Ø All Cenovus LMS training in place (2010-2013)
DALE LOCHHEAD Reference Page
Jim Cholin Brent Bochon
Blue Range Resource Corporation Sustainable Resource Development
Fort St. John, BC Grande Prairie, AB
(250) 248 0213 (780) 538 8071
Richard Block John Bradley
Prospex Resources Sustainable Resource Development
Calgary, AB Grande Prairie, AB
(403) 233 3836 cell (780) 933 6288
Gordon Hill Dallas Martel
C N R L Anderson Energy Ltd.
Fort St. John BC Innisfail Alberta
(250) 785 3085 (403) 350 6333
Mike Williamson (Penn West Wildboy Project) Dean Sundquist
Momentum Energy Corp Petrobakken
Calgary, AB Calgary, AB
(403) 815 9623 403 318 1613
Bruce Cazes
Oil and Gas Commission
Fort St. John, BC Grant Kenny
(250) 261 – 5700 Cutpick Energy Ltd.
Calgary, AB
James Gladysz (403) 444 2818
Oil and Gas Commission
Fort St. John, BC
(250) 261 - 5700

Weitere ähnliche Inhalte

Was ist angesagt?

dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
Dave Hoover
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resume
Larry Dosher
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
Brad Young
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
Crosstown TO
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Crosstown TO
 
LinkedIn_Golder_Project_Experience
LinkedIn_Golder_Project_ExperienceLinkedIn_Golder_Project_Experience
LinkedIn_Golder_Project_Experience
Andrew Burton
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
Crosstown TO
 

Was ist angesagt? (20)

dave resume sept 2015
dave resume sept 2015dave resume sept 2015
dave resume sept 2015
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wells
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
larry_dosher opengr resume
larry_dosher opengr resumelarry_dosher opengr resume
larry_dosher opengr resume
 
DTavaers-noref-res
DTavaers-noref-resDTavaers-noref-res
DTavaers-noref-res
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
Actc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvementsActc ashby-i80-interchange-improvements
Actc ashby-i80-interchange-improvements
 
Innovation Valley Presentation March 2016
Innovation Valley Presentation March 2016Innovation Valley Presentation March 2016
Innovation Valley Presentation March 2016
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
Gallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue ImprovementsGallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue Improvements
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
 
Ken Roy Keighley Resume 2015
Ken Roy Keighley Resume 2015Ken Roy Keighley Resume 2015
Ken Roy Keighley Resume 2015
 
LinkedIn_Golder_Project_Experience
LinkedIn_Golder_Project_ExperienceLinkedIn_Golder_Project_Experience
LinkedIn_Golder_Project_Experience
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
 
ESV CV-764 (new)
ESV CV-764 (new)ESV CV-764 (new)
ESV CV-764 (new)
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 

Andere mochten auch

Como evitar los 6 paradigmas del e learning
Como evitar los 6 paradigmas del e learningComo evitar los 6 paradigmas del e learning
Como evitar los 6 paradigmas del e learning
Yoyi0520
 
Gigi Benson ACBF Brochure
Gigi Benson ACBF BrochureGigi Benson ACBF Brochure
Gigi Benson ACBF Brochure
Gigi Benson
 

Andere mochten auch (20)

Reino protista prof Ivanise Meyer
Reino protista prof Ivanise MeyerReino protista prof Ivanise Meyer
Reino protista prof Ivanise Meyer
 
The harrowing effects of heroin on newborns
The harrowing effects of heroin on newbornsThe harrowing effects of heroin on newborns
The harrowing effects of heroin on newborns
 
客人教會我的100個心法
客人教會我的100個心法客人教會我的100個心法
客人教會我的100個心法
 
Unidad 7: curvas, tema: curvas de segundo grado, esfera, hiperboloide de un m...
Unidad 7: curvas, tema: curvas de segundo grado, esfera, hiperboloide de un m...Unidad 7: curvas, tema: curvas de segundo grado, esfera, hiperboloide de un m...
Unidad 7: curvas, tema: curvas de segundo grado, esfera, hiperboloide de un m...
 
¿Qué es el paradigma humanista ?
¿Qué es el paradigma humanista ?¿Qué es el paradigma humanista ?
¿Qué es el paradigma humanista ?
 
14 Inspirations and Trends from Natural Products Expo West 2016
14 Inspirations and Trends from Natural Products Expo West 201614 Inspirations and Trends from Natural Products Expo West 2016
14 Inspirations and Trends from Natural Products Expo West 2016
 
Tribunal de contas da união Programa do Governo Dilma "Minha casa minha vida"
Tribunal de contas da união  Programa do Governo Dilma "Minha casa minha vida"Tribunal de contas da união  Programa do Governo Dilma "Minha casa minha vida"
Tribunal de contas da união Programa do Governo Dilma "Minha casa minha vida"
 
Taller 3 11-6
Taller 3 11-6Taller 3 11-6
Taller 3 11-6
 
3nd Pacific Rim International Conference 2016 leechin heng
3nd Pacific Rim International Conference 2016 leechin heng3nd Pacific Rim International Conference 2016 leechin heng
3nd Pacific Rim International Conference 2016 leechin heng
 
Como evitar los 6 paradigmas del e learning
Como evitar los 6 paradigmas del e learningComo evitar los 6 paradigmas del e learning
Como evitar los 6 paradigmas del e learning
 
E-learning
E-learningE-learning
E-learning
 
Paradigmas del e learning.
Paradigmas del e learning.Paradigmas del e learning.
Paradigmas del e learning.
 
Articulo 22 y 23
Articulo 22 y 23Articulo 22 y 23
Articulo 22 y 23
 
Sindicatos
SindicatosSindicatos
Sindicatos
 
Reinos dos fungos prof Ivanise Meyer
Reinos dos fungos prof Ivanise MeyerReinos dos fungos prof Ivanise Meyer
Reinos dos fungos prof Ivanise Meyer
 
感動70億人心才是好設計
感動70億人心才是好設計 感動70億人心才是好設計
感動70億人心才是好設計
 
Gigi Benson ACBF Brochure
Gigi Benson ACBF BrochureGigi Benson ACBF Brochure
Gigi Benson ACBF Brochure
 
Revised ark of the covenant talk
Revised ark of the covenant talkRevised ark of the covenant talk
Revised ark of the covenant talk
 
Hadoop application architectures - Fraud detection tutorial
Hadoop application architectures - Fraud detection tutorialHadoop application architectures - Fraud detection tutorial
Hadoop application architectures - Fraud detection tutorial
 
Trabajo colaborativo agroforesteria fase 2
Trabajo colaborativo agroforesteria fase 2Trabajo colaborativo agroforesteria fase 2
Trabajo colaborativo agroforesteria fase 2
 

Ähnlich wie Dale Lochhead Resume

Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
Jack Dickerson
 
Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1
Mark Rowell
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_August
David Neitsch
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
Mike Syslak
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
Robert Sleeman
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
Blase Townsing
 
Leisa Boos Resume 2016doc
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016doc
Leisa B
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
Timothy Nikolai
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
Michael Duffy
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
Ahmed Ali
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
Ahmed Ali
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
Ahmed Ali
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
Ahmed Ali
 

Ähnlich wie Dale Lochhead Resume (20)

Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1Resume_Mark_Rowell_Nov_2015.v1
Resume_Mark_Rowell_Nov_2015.v1
 
djn Resume 2015_August
djn Resume 2015_Augustdjn Resume 2015_August
djn Resume 2015_August
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
 
BBrownResume2
BBrownResume2BBrownResume2
BBrownResume2
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Dallas madson resume2
Dallas madson resume2Dallas madson resume2
Dallas madson resume2
 
Leisa Boos Resume 2016doc
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016doc
 
Leisa boos resume 2016doc
Leisa boos  resume 2016docLeisa boos  resume 2016doc
Leisa boos resume 2016doc
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
 
AHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CVAHMED MUBARAK MOHAMED ALI Engineering CV
AHMED MUBARAK MOHAMED ALI Engineering CV
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
Mathews Ian-CMS-
Mathews Ian-CMS-Mathews Ian-CMS-
Mathews Ian-CMS-
 

Dale Lochhead Resume

  • 1. DALE LOCHHEAD Box 266 Tel: (780) 835-0100 Wembley, AB TOH 3S0 daleloch@telus.net SUMMARY OF QUALIFICATIONS 35 years experience in oilfield construction: well-sites, roads, plant sites, and pipelines. Project Management: coordinating activities between drilling, completions, and production facilities. Experienced in designing and constructing access and drilling pads in mountainous terrain. Developed an excellent working relationship with governing agencies of industry working with and implementing new and improved concepts. Very strong in cost efficiency, using a combination of analytical, communication and planning skills. Familiar with both Alberta and BC regulations and reclamation requirements. Experienced in Environmental Management of projects including developing and managing land farms, reclamation of wellsites, decommissioning of facilities, pipeline breaks, and spills in 21 years experience owning and managing our own environmental company. Active player in ongoing access management issues. SUMMARY OF EXPERIENCE 2013-2016 Brion Energy Corporation: Site Wide Services Coordinator for Road Maintenance, Borrow Pit development and excavation, camps, bussing, all consumables(water, sewer, natural gas, propane, fuel, waste management, courier service) to support the construction of the SAGD facility as well as Winter Drilling and SAGD Drilling programs. Collaborate with management to reduce an annual budget of $100M plus while improving site services. Road Maintenance programs were developed to effectively improve road quality while decreasing maintenance costs substantialy (35-40%/year. Coordinating effective management and training of crews, as well as selection of better aggregates and dust suppressant products road quality was enhanced to minimize maintenance requirements. 2009-2013 Cenovus Energy Inc, Construction supervisor: Pad design, optimization, and construction at Christina Lakes and Foster Creek. Upgrade, widen and paving of the Ken Baker Road in to the Cold Lake Air Weapons Range. Develop soil stabilization procedures utilizing Quicklime (CaO). Coordinating the winter access project for Birch Field NW of Fort Mckay. 2004-2009 Supervised construction operations for Gibraltar Exploration Ltd. Dealt with all phases of designing, surveying, applying for and constructing access roads and wellsites. Many of the 50+ wellsites and accesses were in difficult terrain where others had not drilled due to Govt restrictions. 30+ kms of high grade access as well as 40+kms of restricted access were created. Much of this was accomplished by developing an excellent relationship with Regulatory bodies. 2003-2004 Invasion Energy Froze in 105 km of access on the East side of the Peace River. We were in a month earlier than anyone had gotten in before and at half of the anticipated budget from the last few years. Forestry very happy with the clean bridges and snow fills. 1999-2002 Supervised construction operations for Penn West Petroleum on their Wildboy Project in Helmet BC Received a letter of commendation from the BC Oil & Gas Commission for our practises. We constructed and drilled 105 wells on this project. Worked closely with Geology when surveying and moved the majority of wells for a construction cost saving of about $30,000.00 per well the last season. 1997-1999 Supervised construction operations for Blue Range in BC for 3 drilling rigs and access for 4-5 service rigs. Started taking responsibility for upgrading and maintaining the existing production roads. The people, equipment and procedures are now utilized by the production people on an
  • 2. ongoing basis. This same year, Blue Range started using invert–drilling methods in the BC Beg area. Over the next year, as I became involved with the cost control and environmental management, we brought these costs down to less than half of their original. Designed and set up a system of land farms for handling the invert wastes. 1996-1997 Provided assistance planning, designing and engineering the Tommy Lakes Project for Blue Range(39 km of road and 5 well sites). Completed ($3.5 million) project cost efficiently in adverse conditions. 1994-1995 Started consulting full time in North East BC for Blue Range Resources. Responsible for constructing leases and access roads for up to 4 drilling and 6 to 7 service rigs at one time. 1989-1994 Reclamation work with own Environmental company (Trufax Environmental Services Ltd). Excellent references for cost effective and efficient results in obtaining reclamation certificates. 1975-1988 Owned and operated Lochhead Contractors Ltd., an oilfield construction company. EDUCATION & TRAINING Formal Ø Exploration Technology – NAIT (1971) Ø Senior Matriculation – Honours, Fairview, AB (1969) Ø Journeyman Heavy Duty Mechanic Ø Journeyman Hoist and Crane Operator Ø Licensed Land Agent (1993-2016) Additional Technical Training/Courses Ø PITS training courses (listed below) (1983 – 2005) Ø Western Regions Soils Course (1988) Ø Computer courses (developed program for daily reports and summaries) Ø Alberta and BC Pesticide Applicators License Ø Operated Heavy Equipment – 35 years PITS Courses: Ø Environmental Land Management (1983 & 1993) Ø Reclamation Criteria for Well Sites (1993) Ø Decommissioning Oil & Gas Facilities(1993) Ø Spill Site Rehabilitation (1993) Ø Reclamation Criteria (1995) Ø Ground Disturbance Level II (2002) Ø Lease Construction and Reclamation (2005) Ø Environmental Field Reporting (EFR) (2005) Ø All Cenovus LMS training in place (2010-2013)
  • 3. DALE LOCHHEAD Reference Page Jim Cholin Brent Bochon Blue Range Resource Corporation Sustainable Resource Development Fort St. John, BC Grande Prairie, AB (250) 248 0213 (780) 538 8071 Richard Block John Bradley Prospex Resources Sustainable Resource Development Calgary, AB Grande Prairie, AB (403) 233 3836 cell (780) 933 6288 Gordon Hill Dallas Martel C N R L Anderson Energy Ltd. Fort St. John BC Innisfail Alberta (250) 785 3085 (403) 350 6333 Mike Williamson (Penn West Wildboy Project) Dean Sundquist Momentum Energy Corp Petrobakken Calgary, AB Calgary, AB (403) 815 9623 403 318 1613 Bruce Cazes Oil and Gas Commission Fort St. John, BC Grant Kenny (250) 261 – 5700 Cutpick Energy Ltd. Calgary, AB James Gladysz (403) 444 2818 Oil and Gas Commission Fort St. John, BC (250) 261 - 5700