UNIT - II
MAINTENANCE POLICIES
PREVENTIVE MAINTENANCE
1
2
Maintenance Policies
Reliable plant capacity may be defined as an investment
in maintenance which helps in producing a profitable product
and makes a company cost competitive.
In general a company would prefer to have machines
that will run/perform well without any human intervention.
When any new machine is to be installed, it is needed to have
an intellectual group (Engineering and Construction) to work
in team, which is the first step in maintenance effectiveness.
The second step is to be proactive maintenance, once the
machine is installed and operating.
3
Basically there are two types of maintenance tasks. They are
i) Break Down Maintenance
ii) Planned Maintenance
Planned maintenance may further be classified into
(a) Preventive Maintenance
(b) Corrective Maintenance
(c) Predictive Maintenance
(d) Condition Based Maintenance
(e) Reliability Centered Maintenance
TYPES OF MAINTENANCE TASKS
4
Classification Of Maintenance Approach
5
BREAK DOWN MAINTENANCE (OR)
REACTIVE MAINTENANCE
In this category/program, less attention is given to the operating condition of critical
machinery, equipment or system. Here the equipment is allowed to function! operate till
no failure occurs i.e. no maintenance wo rk is carried o ut in advance to
prevent the failure. As long as the equipment is functioning at a minimum
acceptable level, it is
assumed to be effective. This means the people wait till the equipment fails and repair.
This approach of maintenance is ineffective and extremely expensive. The following
factors contribute to high maintenance costs.
i) Poor planning
ii) Incomplete repair
LIMITATION
a) Most repairs are poorly planned due to time constraint caused by reduction
and plant management. This will cost three to four times than the same repair when it
is well planned.
b) This approach focus only on repair or the symptoms of failure and not on
the root cause of failure. This results only in increase in the frequency of repair and
correspondingly the maintenance costs.
6
For example when a bearing fails, it leads to production stop. By this approach only the
bearing will be replaced with a new one, but no attempt will be made to study the cause
of failure or to prevent a recurrence of this failure. This may seriously affect the reliability
of the system.
Breakdown of an equipment or machine or station in a system will have a significant
effect on the production cost, quality and schedules. For each break down, one or more
operations that are to be performed by that particular machine/equipment are idled,
which in turn delays the completion time of the job. Meanwhile, parts waiting for this
equipment / machine are to be diverted and assigned to other competing machines.
Because of this the cost of manufacturing goes up.
7
CORRECTIVE MAINTENANCE
Corrective Maintenance is the program focused on regular planned tasks that will
maintain all critical machinery and system in optimum operating conditions. It is
proactive approach towards maintenance management. The main objective of this
programme
(i) Eliminate breakdowns
(ii) Eliminate deviations from optimum operating conditions.
(iii) Eliminate unnecessary repairs.
(iv) Optimize all critical plant systems.
As per this program, all the repairs are well planned and implemented by properly
trained people and the equipment or system is verified and returned to service.
Prerequisites of Corrective Maintenance
(i) Existence of trained full time maintenance planners for accurate identification of root
cause of all incipient problems.
(ii) Properly trained craftsmen with necessary skill to complete the repair of each
incipient problem.
(iii) Standard maintenance procedure for recurring repairs and maintenance task.
(iv) Allowing sufficient time to maintenance amidst tight production schedules and
management constraints.
(v) A thorough verification process to ensure the completion of repair.
8
Preventive Maintenance
It is a maintenance program which is committed to the elimination or
prevention of corrective and break down maintenance. A comprehensive
preventive maintenance program involves periodical evaluation of
critical equipment, machinery to detect problem and schedule
maintenance task to avoid degradation in operating conditions. It is
designed for day-to-day maintenance like cleaning, inspection,
lubricating, retightening etc. to retain the healthy condition of
equipments.
Benefits of Preventive Maintenance
In general the cost incurred towards breakdown maintenance is Usually higher than the
cost incurred on preventive maintenance.
a) It maintains the equipment in good condition to preventing them from bigger
problems.
b) Prolongs the effective life of the equipments.
c) Detects the problem at earlier stages.
d) Minimizes/eliminates the rework/scrap and helps in reducing the process variability.
e) Significantly reduces unplanned downtime.
9
PREDICTIVE MAINTENANCE
Predictive maintenance is a management technique that
uses regular evaluation of the actual operating conditions of plant equipment,
production systems and plant management functions to optimize total plant
operation. It is not a solution for all the factors that limit total plant performance.
Predictive Maintenance as regard to total plant management can
provide timely actual data that states the operating conditions, critical production
systems and the effectiveness of critical plant function such as purchasing,
engineering and production.
Predictive Maintenance as regard to Production Management is a
useful and an invaluable management tool. It supplies the necessary information
which helps to improve/increase
(i) the production capacity
(ii) product quality
(iii) overall effectiveness of production function
Benefits of Predictive Maintenance
i) Reduced breakdown losses
ii) Reduction of Quality defects
iii) Increased net operating profit
iv) Reduced maintenance cost
10
CONDITION BASED MAINTENANCE
TECHNIQUES
a) Vibration Monitoring- determines the actual
condition of equipments/machines by studying the noise or
vibration produced during functioning.
b) Thermography - determines the condition of plant
machinery, systems etc. by studying the emission of infra red
energy ie . temperature.
c) Tribology - determines the dynamic condition of
bearing Lubrication, rotor support structure of machinery etc. by
adopting anyone of the techniques like lubricating oil analysis,
Spectrographic analysis, ferrography and wear particle analysis.
d) Electrical Motor Analysis- determines the problem
within motors and other electrical equipments.
e) Visual inspection- determines the conditions of
working elements visually based on the experience.
LUBRICATION
• Lubrication involves adding a substance
between solid surfaces that are moving against each
other in order to reduce friction and wear.
OBJECTIVES OF LUBRICATION
 To reduce the oxidation and rust formation
 To provide insulation in transformer application
Transmit mechanical power in hydro fluid power
systems
 Seal against dust, dirt and water
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
11
PURPOSE OF LUBRICATION
 To prevent wear and premature fatigue by forming the
lubrication film on the surface of load transferring parts to
prevent contacts between metals.
 To enhance the favorable driving characteristics, such as low
noise or friction.
 To prevent overheating of bearings and to prevent lubricant s
own deterioration by radiating the generated heat to outside. It
works particularly well if the circulation lubrication method is
adopted.
 To prevent foreign material penetration, rust, and corrosion.
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
12
LUBRICANTS
Any material used to reduce friction between
wearing surfaces with high coefficient of friction
by establishing low viscous film are called
lubricants.
Types of lubricants
Liquid
Solid
Gaseous form
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
13
METHODS OF LUBRICATIONS
Hydrostatic lubrication
Hydrodynamic or fluid film lubrication
Boundary lubrication
Elasto hydrodynamic lubrication (EHD)
Extreme pressure (EP) lubrication
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
14
HYDROSTATIC LUBRICATION
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
15
HYDRODYNAMIC OR FLUID
FILM LUBRICATION
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
16
BOUNDARY LUBRICATION
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
17
ELASTO HYDRODYNAMIC LUBRICATION
(EHD)
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
18
EXTREME PRESSURE (EP) LUBRICATION
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
19
AUTOMATIC LUBRICATION
SYSTEM
An automatic lubrication system (ALS),  often 
referred to as a centralized lubrication system, 
is  a  system  that  delivers  controlled  amounts 
of lubricant to  multiple  locations  on  a  machine 
while  the  machine  is  operating.  Even  though 
these  systems  are  usually  fully  automated,  a 
system  that  requires  a  manual  pump  or  button 
activation  is  still  identified  as  a  centralized 
lubrication system.
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
20
TYPES OF AUTOMATIC
LUBRICATION SYSTEM
Single Line Parallel systems
Dual Line Parallel systems
Single Line Progressive systems (or Series 
Progressive)
Mist Lubrication systems
Multi port direct lubricators
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
21
SINGLE LINE PARALLEL SYSTEMS
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
22
DUAL LINE PARALLEL SYSTEMS
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
23
SINGLE LINE PROGRESSIVE SYSTEMS
(OR SERIES PROGRESSIVE)
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
24
MIST LUBRICATION SYSTEMS
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
25
MULTI PORT DIRECT LUBRICATORS
11/17/18
R.GANESA MOORTHY.
MAINTENANCE ENGG UNIT2
26

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Maintenance Autonomous
Maintenance AutonomousMaintenance Autonomous
Maintenance Autonomous
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion Economy
 
General Maintenance
General MaintenanceGeneral Maintenance
General Maintenance
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Maintenance work
Maintenance workMaintenance work
Maintenance work
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Unit-1 ME 6012
Unit-1 ME 6012Unit-1 ME 6012
Unit-1 ME 6012
 
Maintanance management
Maintanance managementMaintanance management
Maintanance management
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 
PPT ON PREVENTIVE MAINTENANCE
PPT ON PREVENTIVE MAINTENANCE PPT ON PREVENTIVE MAINTENANCE
PPT ON PREVENTIVE MAINTENANCE
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Maintenance
MaintenanceMaintenance
Maintenance
 

Ähnlich wie Unit 2

Maintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior classMaintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior classNegash Alemu
 
Heavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdfHeavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdfmussietilahungessess
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
maintenance engineering
maintenance engineeringmaintenance engineering
maintenance engineeringnagoorvali8
 
INTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxINTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxEkhwan Rahim
 
seminar on plant maintenance ENGINEERING
seminar on plant maintenance ENGINEERINGseminar on plant maintenance ENGINEERING
seminar on plant maintenance ENGINEERINGMonujBorah
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptxRASHMIPANWAR10
 
ME6012 M E 2 Marks & QB.pdf
ME6012 M E  2 Marks & QB.pdfME6012 M E  2 Marks & QB.pdf
ME6012 M E 2 Marks & QB.pdfSou Tibon
 
Standard Maintenance Practices , Types.ppt
Standard Maintenance Practices , Types.pptStandard Maintenance Practices , Types.ppt
Standard Maintenance Practices , Types.pptDivanshu Garg
 
Lecture 1 introduction to ME AND ME TYPES
Lecture 1 introduction to ME AND ME TYPESLecture 1 introduction to ME AND ME TYPES
Lecture 1 introduction to ME AND ME TYPESsshoaib1
 

Ähnlich wie Unit 2 (20)

Maintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior classMaintenance Lecture Notes for senior class
Maintenance Lecture Notes for senior class
 
Heavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdfHeavy Deuty automotive students Ch 5.pdf
Heavy Deuty automotive students Ch 5.pdf
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
maintenance engineering
maintenance engineeringmaintenance engineering
maintenance engineering
 
Maintenance
MaintenanceMaintenance
Maintenance
 
INTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxINTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptx
 
seminar on plant maintenance ENGINEERING
seminar on plant maintenance ENGINEERINGseminar on plant maintenance ENGINEERING
seminar on plant maintenance ENGINEERING
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
Maintenance strategies
Maintenance strategiesMaintenance strategies
Maintenance strategies
 
ARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdf
ARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdfARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdf
ARAGAW-MAINTENANCE LECTURE NOTE-FOR HIBRET.pdf
 
Plant maintenance
Plant maintenancePlant maintenance
Plant maintenance
 
Plant maintenance
Plant maintenancePlant maintenance
Plant maintenance
 
Rcm
RcmRcm
Rcm
 
ME6012 M E 2 Marks & QB.pdf
ME6012 M E  2 Marks & QB.pdfME6012 M E  2 Marks & QB.pdf
ME6012 M E 2 Marks & QB.pdf
 
MAINTENANCE - BALAJI.pdf
MAINTENANCE - BALAJI.pdfMAINTENANCE - BALAJI.pdf
MAINTENANCE - BALAJI.pdf
 
Maintenance managemant
Maintenance managemantMaintenance managemant
Maintenance managemant
 
Planned Maintenance
Planned MaintenancePlanned Maintenance
Planned Maintenance
 
Plannedmaintenance
PlannedmaintenancePlannedmaintenance
Plannedmaintenance
 
Standard Maintenance Practices , Types.ppt
Standard Maintenance Practices , Types.pptStandard Maintenance Practices , Types.ppt
Standard Maintenance Practices , Types.ppt
 
Lecture 1 introduction to ME AND ME TYPES
Lecture 1 introduction to ME AND ME TYPESLecture 1 introduction to ME AND ME TYPES
Lecture 1 introduction to ME AND ME TYPES
 

Mehr von DEVARAJMECH (10)

Unit II - Compression Ignition Engines
Unit   II - Compression Ignition EnginesUnit   II - Compression Ignition Engines
Unit II - Compression Ignition Engines
 
Unit 5
Unit 5Unit 5
Unit 5
 
Unit 4
Unit 4Unit 4
Unit 4
 
Unit 3
Unit 3Unit 3
Unit 3
 
Unit 1
Unit 1Unit 1
Unit 1
 
Unit III
Unit IIIUnit III
Unit III
 
Unit V
Unit VUnit V
Unit V
 
Unit IV
Unit IVUnit IV
Unit IV
 
Unit II
Unit IIUnit II
Unit II
 
Unit I
Unit IUnit I
Unit I
 

Kürzlich hochgeladen

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Kürzlich hochgeladen (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

Unit 2

  • 1. UNIT - II MAINTENANCE POLICIES PREVENTIVE MAINTENANCE 1
  • 2. 2 Maintenance Policies Reliable plant capacity may be defined as an investment in maintenance which helps in producing a profitable product and makes a company cost competitive. In general a company would prefer to have machines that will run/perform well without any human intervention. When any new machine is to be installed, it is needed to have an intellectual group (Engineering and Construction) to work in team, which is the first step in maintenance effectiveness. The second step is to be proactive maintenance, once the machine is installed and operating.
  • 3. 3 Basically there are two types of maintenance tasks. They are i) Break Down Maintenance ii) Planned Maintenance Planned maintenance may further be classified into (a) Preventive Maintenance (b) Corrective Maintenance (c) Predictive Maintenance (d) Condition Based Maintenance (e) Reliability Centered Maintenance TYPES OF MAINTENANCE TASKS
  • 5. 5 BREAK DOWN MAINTENANCE (OR) REACTIVE MAINTENANCE In this category/program, less attention is given to the operating condition of critical machinery, equipment or system. Here the equipment is allowed to function! operate till no failure occurs i.e. no maintenance wo rk is carried o ut in advance to prevent the failure. As long as the equipment is functioning at a minimum acceptable level, it is assumed to be effective. This means the people wait till the equipment fails and repair. This approach of maintenance is ineffective and extremely expensive. The following factors contribute to high maintenance costs. i) Poor planning ii) Incomplete repair LIMITATION a) Most repairs are poorly planned due to time constraint caused by reduction and plant management. This will cost three to four times than the same repair when it is well planned. b) This approach focus only on repair or the symptoms of failure and not on the root cause of failure. This results only in increase in the frequency of repair and correspondingly the maintenance costs.
  • 6. 6 For example when a bearing fails, it leads to production stop. By this approach only the bearing will be replaced with a new one, but no attempt will be made to study the cause of failure or to prevent a recurrence of this failure. This may seriously affect the reliability of the system. Breakdown of an equipment or machine or station in a system will have a significant effect on the production cost, quality and schedules. For each break down, one or more operations that are to be performed by that particular machine/equipment are idled, which in turn delays the completion time of the job. Meanwhile, parts waiting for this equipment / machine are to be diverted and assigned to other competing machines. Because of this the cost of manufacturing goes up.
  • 7. 7 CORRECTIVE MAINTENANCE Corrective Maintenance is the program focused on regular planned tasks that will maintain all critical machinery and system in optimum operating conditions. It is proactive approach towards maintenance management. The main objective of this programme (i) Eliminate breakdowns (ii) Eliminate deviations from optimum operating conditions. (iii) Eliminate unnecessary repairs. (iv) Optimize all critical plant systems. As per this program, all the repairs are well planned and implemented by properly trained people and the equipment or system is verified and returned to service. Prerequisites of Corrective Maintenance (i) Existence of trained full time maintenance planners for accurate identification of root cause of all incipient problems. (ii) Properly trained craftsmen with necessary skill to complete the repair of each incipient problem. (iii) Standard maintenance procedure for recurring repairs and maintenance task. (iv) Allowing sufficient time to maintenance amidst tight production schedules and management constraints. (v) A thorough verification process to ensure the completion of repair.
  • 8. 8 Preventive Maintenance It is a maintenance program which is committed to the elimination or prevention of corrective and break down maintenance. A comprehensive preventive maintenance program involves periodical evaluation of critical equipment, machinery to detect problem and schedule maintenance task to avoid degradation in operating conditions. It is designed for day-to-day maintenance like cleaning, inspection, lubricating, retightening etc. to retain the healthy condition of equipments. Benefits of Preventive Maintenance In general the cost incurred towards breakdown maintenance is Usually higher than the cost incurred on preventive maintenance. a) It maintains the equipment in good condition to preventing them from bigger problems. b) Prolongs the effective life of the equipments. c) Detects the problem at earlier stages. d) Minimizes/eliminates the rework/scrap and helps in reducing the process variability. e) Significantly reduces unplanned downtime.
  • 9. 9 PREDICTIVE MAINTENANCE Predictive maintenance is a management technique that uses regular evaluation of the actual operating conditions of plant equipment, production systems and plant management functions to optimize total plant operation. It is not a solution for all the factors that limit total plant performance. Predictive Maintenance as regard to total plant management can provide timely actual data that states the operating conditions, critical production systems and the effectiveness of critical plant function such as purchasing, engineering and production. Predictive Maintenance as regard to Production Management is a useful and an invaluable management tool. It supplies the necessary information which helps to improve/increase (i) the production capacity (ii) product quality (iii) overall effectiveness of production function Benefits of Predictive Maintenance i) Reduced breakdown losses ii) Reduction of Quality defects iii) Increased net operating profit iv) Reduced maintenance cost
  • 10. 10 CONDITION BASED MAINTENANCE TECHNIQUES a) Vibration Monitoring- determines the actual condition of equipments/machines by studying the noise or vibration produced during functioning. b) Thermography - determines the condition of plant machinery, systems etc. by studying the emission of infra red energy ie . temperature. c) Tribology - determines the dynamic condition of bearing Lubrication, rotor support structure of machinery etc. by adopting anyone of the techniques like lubricating oil analysis, Spectrographic analysis, ferrography and wear particle analysis. d) Electrical Motor Analysis- determines the problem within motors and other electrical equipments. e) Visual inspection- determines the conditions of working elements visually based on the experience.
  • 11. LUBRICATION • Lubrication involves adding a substance between solid surfaces that are moving against each other in order to reduce friction and wear. OBJECTIVES OF LUBRICATION  To reduce the oxidation and rust formation  To provide insulation in transformer application Transmit mechanical power in hydro fluid power systems  Seal against dust, dirt and water 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 11
  • 12. PURPOSE OF LUBRICATION  To prevent wear and premature fatigue by forming the lubrication film on the surface of load transferring parts to prevent contacts between metals.  To enhance the favorable driving characteristics, such as low noise or friction.  To prevent overheating of bearings and to prevent lubricant s own deterioration by radiating the generated heat to outside. It works particularly well if the circulation lubrication method is adopted.  To prevent foreign material penetration, rust, and corrosion. 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 12
  • 13. LUBRICANTS Any material used to reduce friction between wearing surfaces with high coefficient of friction by establishing low viscous film are called lubricants. Types of lubricants Liquid Solid Gaseous form 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 13
  • 14. METHODS OF LUBRICATIONS Hydrostatic lubrication Hydrodynamic or fluid film lubrication Boundary lubrication Elasto hydrodynamic lubrication (EHD) Extreme pressure (EP) lubrication 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 14
  • 16. HYDRODYNAMIC OR FLUID FILM LUBRICATION 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 16
  • 18. ELASTO HYDRODYNAMIC LUBRICATION (EHD) 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 18
  • 19. EXTREME PRESSURE (EP) LUBRICATION 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 19
  • 20. AUTOMATIC LUBRICATION SYSTEM An automatic lubrication system (ALS),  often  referred to as a centralized lubrication system,  is  a  system  that  delivers  controlled  amounts  of lubricant to  multiple  locations  on  a  machine  while  the  machine  is  operating.  Even  though  these  systems  are  usually  fully  automated,  a  system  that  requires  a  manual  pump  or  button  activation  is  still  identified  as  a  centralized  lubrication system. 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 20
  • 21. TYPES OF AUTOMATIC LUBRICATION SYSTEM Single Line Parallel systems Dual Line Parallel systems Single Line Progressive systems (or Series  Progressive) Mist Lubrication systems Multi port direct lubricators 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 21
  • 22. SINGLE LINE PARALLEL SYSTEMS 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 22
  • 23. DUAL LINE PARALLEL SYSTEMS 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 23
  • 24. SINGLE LINE PROGRESSIVE SYSTEMS (OR SERIES PROGRESSIVE) 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 24
  • 25. MIST LUBRICATION SYSTEMS 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 25
  • 26. MULTI PORT DIRECT LUBRICATORS 11/17/18 R.GANESA MOORTHY. MAINTENANCE ENGG UNIT2 26