1. July 26, 2022
Eglinton Crosstown LRT
Pharmacy to Kennedy Station
Construction Liaison Committee
Meeting
2. LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful
reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value
the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
4. CONSTRUCTION ACTIVITIES
4
Location Activity Approx. Date & Duration
Brentcliffe – Kennedy
• Vehicle testing
• Landscaping and green track installation along Eglinton
• Ongoing through 2022
• Ongoing through Summer 2022
O’Connor – Ionview Stop
• Sidewalk and curb restoration
• Traffic Sign Installations
• Ongoing through Summer 2022
• O’Connor Stop (Victoria Park Ave)
• Pharmacy Stop
• Hakimi Lebovic Stop
• Golden Mile Stop (Warden Ave)
• Birchmount Stop
• Ionview Stop
• Architectural finishes / details
• Electrical finishes
• Ongoing through Summer 2022
5. EAST TESTING & COMMISSIONING
5
• On May 25, 26, 27, 31 and June 1 and 2, 6 light
rail vehicles (LRVs) were delivered to the east end
of the alignment.
• Testing and commissioning activities will be
conducted between Brentcliffe Road and Kennedy
Road through Summer 2022.
• Dynamic Testing began August 24, 2021, and will
last through Summer 2022.
• The LRVs will run mainly on the surface along a
track in the center of Eglinton Avenue.
6. CONSTRUCTION PROGRESS PHOTOS
6
PERMANENT TRAFFIC SIGNANGE
INSTALLATION ONGOING ALONG EGLINTON
PERMANENT LINE PAINTING
ONGOING ALONG EGLINTON FINAL PAVING BETWEEN IONVIEW
AND EAST OF KENNEDY DONE
8. KENNEDY STATION UPDATE
8
Location Activity Approx. Date & Duration
Brentcliffe – Kennedy Vehicle Testing • Ongoing
Kennedy Station Main Entrance
• Conduit installation, plumbing, TVS installations
• Tiling, glazing, painting, architectural finishes, and
station cleaning
• Elevator & escalator installation an inspections
• Masonry works and concrete pours
• Landscaping
• Ongoing through Summer 2022
Kennedy Station Box
• Tiling, painting, electrical, mechanical and architectural
finishes
• Station and systems testing and inspections and
station cleaning
• Ongoing through Summer 2022
Kennedy Station GO Entrance and
Platform
• Glazing
• East GO platform construction
• Mechanical and electrical works
• Ongoing through Summer 2022
Kennedy Station – East of GO
• Masonry works, tiling and painting
• Elevator installation
• Electrical and mechanical installations
• Parking lot construction
• Landscaping
• Ongoing through Summer 2022
9. GO WEST PLATFORM RELOCATION AND PEDESTRIAN DETOUR
9
• As part of GO Transit improvements at
Kennedy GO Station, crews at Kennedy
Station have temporarily relocated the west
GO Transit platform
• Pedestrians will be rerouted through the
Kennedy TTC Station
• This configuration will remain in place until
Summer 2022
August 17, 2020, and ongoing through Summer 2022
11. CONSTRUCTION PROGRESS PHOTOS
11
CONCRETE POURS ONGOING AT
THE MAIN ENTRANCE
GO PLATFORM SHELTER CEILING
INSTALLTION ONGOING
PLAZA CONSTRUCTION ONGOING
AT THE MAIN ENTRANCE
RESTROOM FINISHES BEING
INSTALLED THROUGHOUT THE
STATION