The document provides updates on construction activities for the Eglinton Crosstown LRT project from Brentcliffe Road to O'Connor Drive. It notes that vehicle testing is ongoing from Brentcliffe to Kennedy, and that landscaping will continue through the summer. It also summarizes specific utility works, platform works, traffic restrictions and closures taking place between April and May 2023 at various locations along the route. Photos show examples of construction progress such as Presto machine installations and work at Aga Khan Park Station.
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
1. May 4, 2023
Eglinton Crosstown LRT
Construction Liaison Meeting
Brentcliffe Road to Victoria Park Avenue
2. LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards meaningful
reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and value
the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and collaboration.
4. SECTION ONE AT-GRADE UPDATE
4
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing
Noise Barrier and Soil Nail Wall
removal
Brentcliffe intersection – SE side
As early as Monday, May 1, 2023, for
approximately two (2) months
Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Summer 2023
Brentcliffe Retaining Wall: Landscape
Restoration Works
North side of Eglinton Ave, east of
Brentcliffe Rd
Ongoing through Summer 2023
Multi-use path construction:
Landscaping works
Serena Gundy Park – West of Leslie St. Ongoing through late-Spring 2023
Architectural and Electrical Finishes Sunnybrook Park Stop Ongoing through Spring 2023
5. EAST TESTING & COMMISSIONING
5
• On May 25, 26, 27, 31 and June 1 and 2, 6 light
rail vehicles (LRVs) were delivered to the east end
of the alignment.
• Testing and commissioning activities will be
conducted between Brentcliffe Road and Kennedy
Road through 2023.
• Dynamic Testing began August 24, 2021, and will
last through 2023.
• The LRVs will run mainly on the surface along a
track in the center of Eglinton Avenue.
6. NOISE BARRIER AND SOIL NAIL WALL REMOVAL ON EGLINTON AVE EAST, EAST OF BRENTCLIFFE RD
6
As early as Monday, May 1, 2023, for approximately two (2) months
• As early as Monday, May 1, 2023,
crews will begin removing the
temporary noise barrier wall and soil
nail wall located on the south side of
Eglinton Ave E, east of Brentcliffe Rd.
• The temporary walls were erected in
2014 to facilitate the construction of
the east portal.
• Eastbound traffic on Eglinton Ave E will
be reduced to one lane between
Brentcliffe Rd and Leslie St.
• The sidewalk on the south side of
Eglinton Ave E between Brentcliffe Rd
and Leslie St will be restricted.
Pedestrians will be directed to use the
north sidewalk.
• Noise from construction activities can
be expected.
• Work will take place between 6am and
7pm.
7. LESLIE TRAFFIC CONFIGURATION
7
Through early 2023
• Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities
• Fencing will remain in place around the Station Entrances for security purposes
10. SCIENCE CENTRE STATION UPDATE
10
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing
Utility Work
Don Mills Road and Eglinton
Avenue East
As early as Monday, May 1, 2023, for
approximately two (2) weeks
Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Spring 2023
Finishing Activities:
• Electrical, mechanical, and
architectural finishes. Systems testing
and inspections, and station cleaning.
Station Box Underway through 2023
Finishing Activities:
• Ceiling tiling, cladding, sign band
installations, electrical and
architectural finishes, and station
cleaning.
Bus Terminal
Underway through 2023
Finishing Activities:
• Ceiling tiling, cladding, sign band
installations, and electrical and
architectural finishes. Station testing
and inspections and station cleaning.
Main Entrance
Underway through 2023
11. LANE CLOSURES AT SCIENCE CENTRE STATION FOR UTILITY WORKS
11
As early as Monday, May 1, 2023, for approximately two (2) weeks
• Crews at Science Centre Station are performing utility works on Don Mills Rd, north of Eglinton Ave E
• Southbound traffic on Don Mills Rd will be reduced to three lanes at Eglinton Ave E
• The crosswalk on the north side of the intersection will be restricted; all other crosswalks will be
maintained.
• The TTC bus stop located at the northwest corner will be temporarily relocated approximately 15
metres north.
• This work is expected to take place between 7:00 a.m. and 5:30 p.m.
12. SCIENCE CENTRE TRAFFIC CONFIGURATION
12
Through early 2023
• Periodic short-term lane closures will be required during this traffic stage to facilitate specific activities
• Fencing will remain in place around the Station Entrances for security purposes
15. SECTION TWO AT-GRADE UPDATE
15
Activity Location Approx. Date & Duration
Vehicle Testing Brentcliffe – Kennedy Ongoing
Landscaping along Eglinton Brentcliffe – Kennedy Ongoing through Summer 2023
Architectural and electrical finishes
Aga Khan Park & Museum Stop
Wynford Stop
Sloane Stop
O’Connor Stop
Underway through early 2023
Utility Works
Eglinton Avenue East and Wynford
Drive
As early as Monday, April 24, 2023, for
approximately two (2) weeks
Utility Works
Eglinton Avenue East, between
Wynford Drive and Credit Union
Drive
As early as Friday, March 27, 2023, for
approximately six (6) weeks
Platform Works Sloane Stop
As early as Friday, April 21, 2023, for approximately
one (1) month
Watermain Restoration Works Eglinton at Gervais Drive Ongoing until mid-May 2023
16. RESTRICTED ACCESS TO THE WESTBOUND LANES ON EGLINTON AVENUE EAST
FROM WYNFORD DRIVE FOR UTILITY WORKS
16
As early as Monday April 24, for approximately two (2) weeks
• Crews are currently
performing utility works on
the westbound ramp of
Wynford Drive at Eglinton
Avenue East.
• The westbound ramp on
Wynford Drive will be closed.
Access to the westbound lanes
on Eglinton Avenue East from
Wynford Drive will be
restricted.
• This work is expected to take
place on Monday – Friday,
between 6:00 a.m. and 7:00
p.m.
• Noise from construction
activities can be expected.
17. UTILITY WORKS ON EGLINTON AVENUE EAST BETWEEN WYNFORD DRIVE AND
CREDIT UNION DRIVE
17
As early as Monday March 27, for approximately six (6) weeks
• Crews are currently performing utility works on Eglinton Ave E at the Traction Power Substation (TPSS)
9 Building.
• Eastbound traffic on Eglinton Ave E will be reduced to one through lane between Wynford Dr and
Credit Union Dr.
• The sidewalk on the south side of Eglinton Ave E will be closed between the DVP off ramp and Credit
Union Dr. Pedestrians will be redirected to use the north sidewalk.
• This works is expected to take place between 6:00 a.m. to 7:00 p.m.
• Noise from construction activities can be expected.
18. PLATFORM WORKS AT SLOANE STOP ON EGLINTON AVENUE EAST
18
As early as Friday, April 21, 2023, for approximately one (1) month
• Crews are currently working to
repair an uneven layer of
concrete at the Sloane Stop on
Eglinton Avenue East.
• Noise from construction activities,
including chipping, hammering,
concrete breaking and pouring,
can be expected.
• No changes to the current
traffic or pedestrian routes are
expected.
• This works is expected to take
place on Monday – Friday
between 7:00 a.m. to 5:00
p.m.
19. WATERMAIN RESTORATION WORKS ON EGLINTON AVENUE EAST AT GERVAIS DRIVE
- CONTINUED
19
Ongoing until approx. mid-May 2023
• Northbound traffic to Gervais Drive
will be restricted.
• One lane of southbound traffic on
Gervais Drive will be maintained.
• The left turn from Gervais Drive
onto Eglinton Avenue East will
remain restricted.
• Work is expected to take place for
approx. 2 weeks
• Work is expected to take place
between 6:00 a.m. and 7:00 p.m.