SlideShare ist ein Scribd-Unternehmen logo
1 von 35
Rapid Response Launcher System
(RRLS)
Ramirez, Uriel
Johnson, Lindani
Gonzalez, Austin
Solomon-Williams, Cordarryl M.
Smith, Joseph
Knill, Christian
Problem Statement
A rocket system to set a network of Search & Rescue Satellites?
“
“In light of the MH 370 tragedy in the spring of 2014,
an interest has arisen to investigate the feasibility of
a rapid response launcher system for a constellation
of simple, lightweight search satellites with a
minimum orbital lifetime of 6 months.”
Payload - 100lb S&R Satellite
Orbit - Circular Sun Synchronous at an altitude of 165 km
Launch Location - Poker Flat Research Range, AK
65.1167° N Lat, 147.4612° W Lon, 436.7 m above sea level
Mission Requirements
Extraneous Requirements
Environmentally Friendly Propellant System
Total system weight less than 10,000kg
Minimum orbital lifetime 6 months
Missing Planes
Poker Flat Research Range, AK
MH 370
Orbital Elements from STK
Period 5267.32 sec
SemiMajor Axis 6543.14 km
Eccencenity 9.33702 e-018
Inclination 96.2587 deg
Argument of Perigee 0 deg
True Anomaly 359.924 deg
Ascending Node 126.994 deg
Satellite Tool Kit Simulation Verification
(2D Graphic of Earth)
Satellite Tool Kit Simulation Verification
(3D Graphic of Earth)
Preliminary Design?
ΔV Design 1
Burnout Velocity -
Velocity of Launch site -
ΔV Design 2
Velocity Needed -
Design Velocity -
Assuming losses of 0.9km/s
Three stages:
Stage 1 will produce a ΔV = 3.5 km/s
Stage 2 will produce a ΔV = 3.5 km/s
Stage 3 will produce a ΔV = 2.25 km/s
Orbit Design
Source: Delta II Payload Planners Guide December 2006
Three Stage Design
Pros
◇ Reasonable ISP will
meet our needs
◇ Better finert values
Cons
◇ More complicated due
to more staging
◇ Larger inert mass
System Level
Performance?
Propellant Choice
Choosing H202 and
HTPB allowed us to
have a reasonable
ISP and good finert
that will not be
technologically
challenging
F2/H2 and O2/H2 had
a large ISP, but too
toxic.
O2/RP-1- Needed
oxygen tanks
Propellant Trade Offs
An initial mass of about 5500
kg, ISP of 285s and finert of
0.28 was chosen.
The ISP of 285 allowed us to
account for pressure losses in
our system with the chosen
propellant.
Preliminary Sizing: Stage 1
Helium pressurizes the propellant
tanks to force the fuel and
oxidizer tanks to the combustion
chamber
Pros:
◇ Simple, due to less
components
◇ Easy to maintain
Cons:
◇ Extra weight added because
of the pressurant tanks
Pressure-fed engine
Injector in a liquid rocket engine mixes the
fuel with the oxidizer to produce efficient
and stable combustion
This figure shows an injector designed with
propellant valves (remote control)
Injector
Injector Types
AUTOCAD DRAWING
Nozzle efficiency 97 %
Nozzle Sizes
Our design conditions were best met by
ablative cooling
The ablative material absorbs the heat as it
ablates
Cooling Type
Pros:
◇ Simple
◇ Capable of stopping
and restarting the
engine, as long there is
ablative material left
Cons:
◇ Increase of weight
◇ Limited life in the
engine (usually less
than 2000 seconds)
Typical ablative materials: Silica, Quartz,
or Carbon Cloth and resin composites
Cooling Type Trade offs
Material Density (kg/m3) Ultimate Tensile
Strength (GPa)
Specific Ultimate
Tensile Strength
(Gpa/(kg/m3))
2219 Aluminum 2800 0.413 15.04
Titanium 4460 1.23 28.81
4130 Steel 7830 0.892 11.23
Graphite 1550 0.895 58.88
SOURCE: Space Propulsion Analysis and Design, Humble, Henry, and Larson
Pressure Tank Material
Titanium has the best
mechanical properties,
but is difficult to work
with and extremely
expensive.
Steel is cheap and easy
to work with, but does
not have the properties
required for our design.
Composites meet the
property requirements
and are lightweight.
Our rocket cost
increases, within
reason.
Material Trade
offs
Due to the addition of the pressurant tanks, composite
materials were chosen to minimize the mass and
therefore increase the ΔV
This increased the cost of our rocket.
Final Predicted Design
Results?
ISP (s)
(from
RPA
code)
Initial
Mass (kg)
Propellant
Mass (kg)
Thrust
(kN)
Burn time
(s)
ΔV (m/s)
(Actual)
Stage 1 287 5550 3904 2698 4 3348
Stage 2 287 900 637 53 33 3317
Stage 3 287 200 109 12 26 2798
Total 9463
The actual ΔV, considering all the actual masses, is 2.5% bigger than
design.
Final Predicted Results
Altitude Simulation
Velocity Simulation
Mass Simulation
Conclusion
Theoretically, it is feasible.?
Justifications
1. Small propulsion
system to achieve an
orbit
2. Uses current
technologies proven to
work
3. Performs a
meaningful and
desirable task
THE END

Weitere ähnliche Inhalte

Was ist angesagt?

Evaluation of the extreme and fatigue load measurements at alpha ventus
Evaluation of the extreme and fatigue load measurements at alpha ventusEvaluation of the extreme and fatigue load measurements at alpha ventus
Evaluation of the extreme and fatigue load measurements at alpha ventusRicardo Faerron Guzmán
 
Extreme engineering for fighting climate change and the Katabata project
Extreme engineering for fighting climate change and the Katabata projectExtreme engineering for fighting climate change and the Katabata project
Extreme engineering for fighting climate change and the Katabata projectUniversité de Liège (ULg)
 
Solutions manual chapter 7 (1)
Solutions manual   chapter 7 (1)Solutions manual   chapter 7 (1)
Solutions manual chapter 7 (1)Omar Corral
 
Back corona model
Back corona model Back corona model
Back corona model IRS srl
 
Environmentally neutralpropulsion
Environmentally neutralpropulsionEnvironmentally neutralpropulsion
Environmentally neutralpropulsionClifford Stone
 
Auris_Thermal_Presentation
Auris_Thermal_PresentationAuris_Thermal_Presentation
Auris_Thermal_PresentationCole Gingras
 
Chapter 1(terms and definition)
Chapter 1(terms and definition)Chapter 1(terms and definition)
Chapter 1(terms and definition)Yuri Melliza
 
Nika it consulting weekly update
Nika it consulting weekly update  Nika it consulting weekly update
Nika it consulting weekly update Rod Delwar
 
Giancarlo Lombardi_Summer2014_NASA_GSFC
Giancarlo Lombardi_Summer2014_NASA_GSFCGiancarlo Lombardi_Summer2014_NASA_GSFC
Giancarlo Lombardi_Summer2014_NASA_GSFCGiancarlo Lombardi
 
Sag tension calculations-a_tutorial_deve
Sag tension calculations-a_tutorial_deveSag tension calculations-a_tutorial_deve
Sag tension calculations-a_tutorial_deveRaghavTripathi11
 
2nd Heat Transfer class, Thursday, January 16, 2014
2nd Heat Transfer class, Thursday, January 16, 20142nd Heat Transfer class, Thursday, January 16, 2014
2nd Heat Transfer class, Thursday, January 16, 2014Raymond Adamic
 

Was ist angesagt? (18)

Evaluation of the extreme and fatigue load measurements at alpha ventus
Evaluation of the extreme and fatigue load measurements at alpha ventusEvaluation of the extreme and fatigue load measurements at alpha ventus
Evaluation of the extreme and fatigue load measurements at alpha ventus
 
Extreme engineering for fighting climate change and the Katabata project
Extreme engineering for fighting climate change and the Katabata projectExtreme engineering for fighting climate change and the Katabata project
Extreme engineering for fighting climate change and the Katabata project
 
Solutions manual chapter 7 (1)
Solutions manual   chapter 7 (1)Solutions manual   chapter 7 (1)
Solutions manual chapter 7 (1)
 
Back corona model
Back corona model Back corona model
Back corona model
 
Environmentally neutralpropulsion
Environmentally neutralpropulsionEnvironmentally neutralpropulsion
Environmentally neutralpropulsion
 
Physics 1.2a The SI Units
Physics 1.2a   The SI UnitsPhysics 1.2a   The SI Units
Physics 1.2a The SI Units
 
Auris_Thermal_Presentation
Auris_Thermal_PresentationAuris_Thermal_Presentation
Auris_Thermal_Presentation
 
Create ASTATE Ppt
Create ASTATE PptCreate ASTATE Ppt
Create ASTATE Ppt
 
Chapter 1(terms and definition)
Chapter 1(terms and definition)Chapter 1(terms and definition)
Chapter 1(terms and definition)
 
Nika it consulting weekly update
Nika it consulting weekly update  Nika it consulting weekly update
Nika it consulting weekly update
 
Giancarlo Lombardi_Summer2014_NASA_GSFC
Giancarlo Lombardi_Summer2014_NASA_GSFCGiancarlo Lombardi_Summer2014_NASA_GSFC
Giancarlo Lombardi_Summer2014_NASA_GSFC
 
ProjectReport
ProjectReportProjectReport
ProjectReport
 
ProductSpec.doc
ProductSpec.docProductSpec.doc
ProductSpec.doc
 
Fea
FeaFea
Fea
 
Sag tension calculations-a_tutorial_deve
Sag tension calculations-a_tutorial_deveSag tension calculations-a_tutorial_deve
Sag tension calculations-a_tutorial_deve
 
CO2 capture from offshore gas turbines using supersonic gas separation
CO2 capture from offshore gas turbines using supersonic gas separationCO2 capture from offshore gas turbines using supersonic gas separation
CO2 capture from offshore gas turbines using supersonic gas separation
 
CARNOT HEAR ENGINE Sandhya sharma BSC I 2018
CARNOT HEAR ENGINE Sandhya sharma BSC I 2018CARNOT HEAR ENGINE Sandhya sharma BSC I 2018
CARNOT HEAR ENGINE Sandhya sharma BSC I 2018
 
2nd Heat Transfer class, Thursday, January 16, 2014
2nd Heat Transfer class, Thursday, January 16, 20142nd Heat Transfer class, Thursday, January 16, 2014
2nd Heat Transfer class, Thursday, January 16, 2014
 

Ähnlich wie Rapid Response Launcher System

Materials Selection and Design Considerations
Materials Selection and Design ConsiderationsMaterials Selection and Design Considerations
Materials Selection and Design ConsiderationsRafael Manzano
 
Materials Selection and Design Considerations
Materials Selection and Design ConsiderationsMaterials Selection and Design Considerations
Materials Selection and Design ConsiderationsRafael Manzano
 
A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...
A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...
A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...ImranAnsari174
 
Free-form design of rotors - An overview
Free-form design of rotors - An overviewFree-form design of rotors - An overview
Free-form design of rotors - An overviewLuca Sartori
 
Cryogenic rocket engine.pptx
Cryogenic rocket engine.pptxCryogenic rocket engine.pptx
Cryogenic rocket engine.pptxSUJANSINGH25
 
2016 MRS Meeting Presentation Slides
2016 MRS Meeting Presentation Slides2016 MRS Meeting Presentation Slides
2016 MRS Meeting Presentation SlidesTianyu Liu
 
Design And Analysis Of Stirling Engine For Underwater Application
Design And Analysis Of Stirling Engine For Underwater ApplicationDesign And Analysis Of Stirling Engine For Underwater Application
Design And Analysis Of Stirling Engine For Underwater ApplicationIRJET Journal
 
637129main werka presentation
637129main werka presentation637129main werka presentation
637129main werka presentationClifford Stone
 
Clean Coal Technologies
Clean Coal TechnologiesClean Coal Technologies
Clean Coal TechnologiesArnab Mitra
 
LEGO Reactor - ICAPP 2008
LEGO Reactor - ICAPP 2008LEGO Reactor - ICAPP 2008
LEGO Reactor - ICAPP 2008jdbess
 
Senior Design Progress Report
Senior Design Progress ReportSenior Design Progress Report
Senior Design Progress ReportConnor McGuire
 
Advanced solarandlaserconcepts
Advanced solarandlaserconceptsAdvanced solarandlaserconcepts
Advanced solarandlaserconceptsClifford Stone
 
Compact Remote High Altitude Balloon Launcher
Compact Remote High Altitude Balloon Launcher�Compact Remote High Altitude Balloon Launcher�
Compact Remote High Altitude Balloon LauncherReetam Singh
 
Centurion - OTV Presentation
Centurion - OTV PresentationCenturion - OTV Presentation
Centurion - OTV PresentationJay Mulakala
 

Ähnlich wie Rapid Response Launcher System (20)

Tungsten
TungstenTungsten
Tungsten
 
Materials Selection and Design Considerations
Materials Selection and Design ConsiderationsMaterials Selection and Design Considerations
Materials Selection and Design Considerations
 
Materials Selection and Design Considerations
Materials Selection and Design ConsiderationsMaterials Selection and Design Considerations
Materials Selection and Design Considerations
 
312 r.j.basavaraj
312 r.j.basavaraj312 r.j.basavaraj
312 r.j.basavaraj
 
A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...
A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...
A Homopolar Inductor Motor/Generator and Six-step Drive Flywheel Energy Stor...
 
Free-form design of rotors - An overview
Free-form design of rotors - An overviewFree-form design of rotors - An overview
Free-form design of rotors - An overview
 
4 study of_small_scale_lng_carrier
4 study of_small_scale_lng_carrier4 study of_small_scale_lng_carrier
4 study of_small_scale_lng_carrier
 
Cryogenic rocket engine.pptx
Cryogenic rocket engine.pptxCryogenic rocket engine.pptx
Cryogenic rocket engine.pptx
 
Chandan me
Chandan meChandan me
Chandan me
 
2016 MRS Meeting Presentation Slides
2016 MRS Meeting Presentation Slides2016 MRS Meeting Presentation Slides
2016 MRS Meeting Presentation Slides
 
Design And Analysis Of Stirling Engine For Underwater Application
Design And Analysis Of Stirling Engine For Underwater ApplicationDesign And Analysis Of Stirling Engine For Underwater Application
Design And Analysis Of Stirling Engine For Underwater Application
 
1147 smith[1]
1147 smith[1]1147 smith[1]
1147 smith[1]
 
637129main werka presentation
637129main werka presentation637129main werka presentation
637129main werka presentation
 
Dsbr
DsbrDsbr
Dsbr
 
Clean Coal Technologies
Clean Coal TechnologiesClean Coal Technologies
Clean Coal Technologies
 
LEGO Reactor - ICAPP 2008
LEGO Reactor - ICAPP 2008LEGO Reactor - ICAPP 2008
LEGO Reactor - ICAPP 2008
 
Senior Design Progress Report
Senior Design Progress ReportSenior Design Progress Report
Senior Design Progress Report
 
Advanced solarandlaserconcepts
Advanced solarandlaserconceptsAdvanced solarandlaserconcepts
Advanced solarandlaserconcepts
 
Compact Remote High Altitude Balloon Launcher
Compact Remote High Altitude Balloon Launcher�Compact Remote High Altitude Balloon Launcher�
Compact Remote High Altitude Balloon Launcher
 
Centurion - OTV Presentation
Centurion - OTV PresentationCenturion - OTV Presentation
Centurion - OTV Presentation
 

Kürzlich hochgeladen

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 

Kürzlich hochgeladen (20)

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 

Rapid Response Launcher System

  • 1. Rapid Response Launcher System (RRLS)
  • 2. Ramirez, Uriel Johnson, Lindani Gonzalez, Austin Solomon-Williams, Cordarryl M. Smith, Joseph Knill, Christian
  • 3. Problem Statement A rocket system to set a network of Search & Rescue Satellites?
  • 4. “ “In light of the MH 370 tragedy in the spring of 2014, an interest has arisen to investigate the feasibility of a rapid response launcher system for a constellation of simple, lightweight search satellites with a minimum orbital lifetime of 6 months.”
  • 5. Payload - 100lb S&R Satellite Orbit - Circular Sun Synchronous at an altitude of 165 km Launch Location - Poker Flat Research Range, AK 65.1167° N Lat, 147.4612° W Lon, 436.7 m above sea level Mission Requirements
  • 6. Extraneous Requirements Environmentally Friendly Propellant System Total system weight less than 10,000kg Minimum orbital lifetime 6 months
  • 7. Missing Planes Poker Flat Research Range, AK MH 370
  • 8. Orbital Elements from STK Period 5267.32 sec SemiMajor Axis 6543.14 km Eccencenity 9.33702 e-018 Inclination 96.2587 deg Argument of Perigee 0 deg True Anomaly 359.924 deg Ascending Node 126.994 deg
  • 9. Satellite Tool Kit Simulation Verification (2D Graphic of Earth)
  • 10. Satellite Tool Kit Simulation Verification (3D Graphic of Earth)
  • 12. ΔV Design 1 Burnout Velocity - Velocity of Launch site -
  • 13. ΔV Design 2 Velocity Needed - Design Velocity - Assuming losses of 0.9km/s
  • 14. Three stages: Stage 1 will produce a ΔV = 3.5 km/s Stage 2 will produce a ΔV = 3.5 km/s Stage 3 will produce a ΔV = 2.25 km/s Orbit Design Source: Delta II Payload Planners Guide December 2006
  • 15. Three Stage Design Pros ◇ Reasonable ISP will meet our needs ◇ Better finert values Cons ◇ More complicated due to more staging ◇ Larger inert mass
  • 18. Choosing H202 and HTPB allowed us to have a reasonable ISP and good finert that will not be technologically challenging F2/H2 and O2/H2 had a large ISP, but too toxic. O2/RP-1- Needed oxygen tanks Propellant Trade Offs
  • 19. An initial mass of about 5500 kg, ISP of 285s and finert of 0.28 was chosen. The ISP of 285 allowed us to account for pressure losses in our system with the chosen propellant. Preliminary Sizing: Stage 1
  • 20. Helium pressurizes the propellant tanks to force the fuel and oxidizer tanks to the combustion chamber Pros: ◇ Simple, due to less components ◇ Easy to maintain Cons: ◇ Extra weight added because of the pressurant tanks Pressure-fed engine
  • 21. Injector in a liquid rocket engine mixes the fuel with the oxidizer to produce efficient and stable combustion This figure shows an injector designed with propellant valves (remote control) Injector
  • 24. Our design conditions were best met by ablative cooling The ablative material absorbs the heat as it ablates Cooling Type
  • 25. Pros: ◇ Simple ◇ Capable of stopping and restarting the engine, as long there is ablative material left Cons: ◇ Increase of weight ◇ Limited life in the engine (usually less than 2000 seconds) Typical ablative materials: Silica, Quartz, or Carbon Cloth and resin composites Cooling Type Trade offs
  • 26. Material Density (kg/m3) Ultimate Tensile Strength (GPa) Specific Ultimate Tensile Strength (Gpa/(kg/m3)) 2219 Aluminum 2800 0.413 15.04 Titanium 4460 1.23 28.81 4130 Steel 7830 0.892 11.23 Graphite 1550 0.895 58.88 SOURCE: Space Propulsion Analysis and Design, Humble, Henry, and Larson Pressure Tank Material
  • 27. Titanium has the best mechanical properties, but is difficult to work with and extremely expensive. Steel is cheap and easy to work with, but does not have the properties required for our design. Composites meet the property requirements and are lightweight. Our rocket cost increases, within reason. Material Trade offs Due to the addition of the pressurant tanks, composite materials were chosen to minimize the mass and therefore increase the ΔV This increased the cost of our rocket.
  • 29. ISP (s) (from RPA code) Initial Mass (kg) Propellant Mass (kg) Thrust (kN) Burn time (s) ΔV (m/s) (Actual) Stage 1 287 5550 3904 2698 4 3348 Stage 2 287 900 637 53 33 3317 Stage 3 287 200 109 12 26 2798 Total 9463 The actual ΔV, considering all the actual masses, is 2.5% bigger than design. Final Predicted Results
  • 34. Justifications 1. Small propulsion system to achieve an orbit 2. Uses current technologies proven to work 3. Performs a meaningful and desirable task

Hinweis der Redaktion

  1. Austin
  2. Austin
  3. Austin
  4. Austin
  5. Austin
  6. Austin
  7. Austin
  8. Cordarryl
  9. Cordarryl
  10. Cordarryl
  11. Austin
  12. Chris
  13. Chris
  14. Chris
  15. Chris
  16. Austin
  17. Uriel
  18. Uriel
  19. Uriel
  20. Uriel
  21. Cordarryl
  22. Cordarryl
  23. Lindani
  24. Uriel
  25. Joseph
  26. Joseph
  27. Joseph
  28. Lindani
  29. Lindani
  30. Lindani
  31. Austin