SlideShare ist ein Scribd-Unternehmen logo
1 von 13
Downloaden Sie, um offline zu lesen
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
Christmas Day
New Year's Eve
nov 2015
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
jan 2016
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
Winter Solstice
ENGINEERED SOLUTIONS
2016It’s a NEW Year! With New
Tools, New Content and
a New Website. Now That’s
what we call responsive!
December 2015
www.ContechES.com
Emergency flood repairs were underway along the North Douglas Creek at Flying W Ranch to stabilize the
North Rockrimmon drainage channel after it experienced landslides due to unstable, oversaturated soils above.
To accomplish this, the drainage channel would have a large pipe installed in the creek bed behind a nearby
residential area. Given the recent flooding, they needed a pipe that would be able to handle high flow velocities
through it without backing into the basin as was recently experienced. Ultimately, Contech’s DuroMaxx steel
reinforced polyethylene (SRPE) pipe was selected for the installation given its hydraulic efficiencies and strength.
Pipe » DuroMaxx®
Steel Reinforced Polyethylene
»» Colorado Springs, Colorado
»» 1,296 LF of 96” DuroMaxx®
SRPE with
30 psi WC joints
»» Installation date – September 2015
Rockrimmon Creek Rehabilitation
January 2016
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
New Year’s Day
MartinLutherKing,Jr.Day
dec 2015
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
feb 2016
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29
31
STEEL REINFORCED PE TECHNOLOGY
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29
Valentine’s Day Presidents' Day
jan 2016
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
mar 2016
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
FebRuary 2016
Norfolk Southern (NS) Railway operates an east /west line through suburban Philadelphia, Pennsylvania. Bridge
MV 25.13 is a seven-cell stone arch structure that has been in service for approximately 150 years and was in
need of repair. Contech Engineered Solutions was approached by Jacobs Engineering due to the success Contech
has had with similar relining applications. After evaluating the existing conditions, Contech recommended its
BridgeCor®
structural plate product for the reline of the existing culvert arches. BridgeCor is a deep corrugation
(15” x 5 ½”) high performance product that was developed to meet the requirements of this large span / heavy
loading application.
Bridges » BridgeCor®
Structural Plate Reline
»» Flourtown, Pennsylvania
»» BridgeCor®
Structural Plate Arch
»» 48’-8” span x 24’-3” rise (4 cells)
»» Installation date - Februrary 2015
Norfolk Southern Railway – Wissahickon Creek Bridge Rehabilitation
Design Your Own bridge
DYOB®
Plate, Precast & Truss
www.conteches.com/dyob
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
feb 2016
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29
apr 2016
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Daylight Savings Begins
Easter Sunday
St. Patrick's Day
Spring Equinox
March 2016
Good Friday
Situated along the Los Angeles River, the 24-acre site known as Parcel C at Taylor Yard was being transformed
into a transit oriented mixed-use development. An UrbanGreen®
Rainwater Harvesting system was installed
consisting of two barrels, each made from 145’ long of 120” diameter DuroMaxx®
Steel Reinforced Polyethylene
(SRPE). DuroMaxx was chosen because of the ability to create a large diameter, economical, long lasting cistern
with watertight joints. The cistern is designed to hold 164,960 gallons of harvested rainwater. Contech also
provided the mechanical pumps and controls to deliver the captured water that will be used for drip irrigation.
Stormwater Management » UrbanGreen®
Rainwater Harvesting
»» Los Angeles, California	
»» UrbanGreen®
Rainwater Harvesting
System
»» 965 LF of 120” & 114” ALT2 CMP
»» Installation date – June 2013
Taylor Yard Transit Village
Stormwater Solutions from Contech®
STEEL REINFORCED PE TECHNOLOGY
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Tax Day
Earth Day
mar 2016
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
may 2016
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
April 2016
Area flooding caused damage to Vigo County’s Fowler Park Pioneer Village consisting of 18 historical park
structures, a log barn and a working gristmill and also weakened the overall integrity of the nearby earthen
dam structure. The existing emergency spillway was deemed undersized and an additional primary spillway
was constructed with ArmorFlex®
Class 40T BAH to pass the overtopping design event defined by the Indiana
Department of Natural Resources. Installing a green solution to continue the natural, historical setting was important
to the owner, while also having the robust protection of articulated concrete block systems.
Hard Armor » ArmorFlex®
Articulating Concrete Blocks
»» Terre Haute, Indiana
»» ArmorFlex®
40 Class Tapered Matresses
»» 11,156 SF
»» Installation date – Fall 2014
Fowler Park Dam Rehabilitation
The City of Paducah, Kentucky was in need of a solution to decrease the overall project cost to keep them
within budget for roadway improvements along Olivet Church Road. Working closely with Contech, the project
contractor, Jim Smith Contracting, was able to find a solution utilizing Contech’s E’GRID®
geogrid which helped to
decrease the overall project cost and speed construction due to avoiding delays that may have been caused with
lime stabilization. This particular project allowed for a direct substitution of E’GRID 3030 for the designed 8” of
lime stabilization. The combination of time and money savings offered by the E’GRID solution was a victory for the
contractor as well as the owner.
Geogrid » E’GRID®
Soil Stabilization
»» Paducah, Kentucky
»» E’GRID®
3030
»» 60,000 SY of 12.8’ x 246’ rolls
»» Installation date – October 2015
Olivet Church Road - KY 998 Roadway Improvements
easily Search for projects
the Case Study Tool
www.conteches.com/case-studies
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
Memorial Day
Mother’s Day
apr 2016
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
june 2016
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
May 2016
Henry County, Ohio needed a quick and efficient bridge to replace an aging, multi-span steel beam bridge
structure that crossed the Miami & Erie Canal. A 57’ clear span precast CON/SPAN®
O-Series®
bridge was
chosen by the Mannik Smith Group as the optimal solution because of its ability to provide a speedy, cost-
effective solution for the fast-track project.
This O-Series®
three-sided structure with detached headwalls and wingwalls, has an ashlar stone stained
formliner finish that provides an attractive solution that blends well with its surroundings.
Bridges » Precast Bridge Systems
»» Henry County, Ohio
»» CON/SPAN®
O-Series®
»» 57’ span x 10’8” rise x 40’ length
»» Installation date – August 2015
County Road 17C over Miami & Erie Canal
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
Father’s Day Summer Solstice
may 2016
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
july 2016
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
June 2016
Contech provided a stormwater detention system to Liberty Park, an elevated park in the new World Trade
Center in New York City. A detention system was needed to meet NYC Department of Environmental Protection
stormwater regulations. Since the park sits on the roof of the Vehicular Security Center, it is imperative the
detention system is watertight. Contech consulted with engineers at the Port Authority of New York & New
Jersey, who specified a detention system made from 197 LF of DuroMaxx®
Steel Reinforced Polyethylene (SRPE)
that will provide approximately 2,500 CF of stormwater storage.
Stormwater Management » DuroMaxx®
Detention System
»» New York City, New York
»» DuroMaxx®
Detention System
»» 2,500 CF of stormwater storage
»» Installation date – July 2015
World Trade Center Detention System
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Independence Day
aug 2016
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
STEEL REINFORCED PE TECHNOLOGY
june 2016
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30
July 2016
31
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 july 2016
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
sep 2016
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
August 2016
Situated right in the heart of the Bakken oil boom in North Dakota, Watford City’s population 1,400 in 2006 has
rapidly risen to nearly 3,000 according to the latest census. As part of this growth, the North Dakota Department
of Transportation (NDDOT) has gone to great lengths to accommodate the increase in traffic part of which was an
extensive roadway improvement project along Highway 23 which included a new storm drain system.
The general contractor selected Contech Engineered Solution’s MOBILE PIPE®
mill to manufacture a polymer-
coated ULTRA FLO®
storm drain system onsite, allowing for faster project turn around.
Pipe » MOBILE PIPE®
Mill Storm Sewer
»» Watford City, North Dakota
»» Polymeric ULTRA FLO®
CSP
»» 15” to 60” for 14,680 LF
»» On-site MOBILE PIPE®
production
»» Installation date - July 2015
ND Highway 23 Roadway Improvements
Questions? we’ve got answers.
The New Pipe Blog
www.ContechES.com/pipe-blog
PIPE SOLUTIONS
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
Labor Day
aug 2016
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
oct 2016
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
September 2016
U.S. Bank Stadium is a fixed-roof stadium that is being constructed in downtown Minneapolis, Minnesota.
The project is the new home of the Minnesota Vikings football team. The stadium is the anchor of substantial
redevelopment in the City of Minneapolis. Since the stadium is being built downtown, there is limited footprint for
a stormwater storage system. Engineers chose a large diameter CMP retention system that provided the required
amount of storage in a limited and constrained footprint. DuroMaxx SRPE was also used for stormwater drainage.
Stormwater Management » Corrugated Metal Pipe Detention
»» Minneapolis, Minnesota
»» 1,600 LF of 144” perforated CMP for
stormwater retention
»» 400 LF of 48” DuroMaxx®
for
stormwater drainage
»» Installation date - April 2015
US Bank Stadium (Home of the Minnesota Vikings)
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
Columbus Day
Halloween
sep 2016
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
nov 2016
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
October 2016
Village Center Station is the first phase of a planned three phase Transit Oriented Development (TOD). Phase I
features a six-level office tower over a three-level restaurant/retail “wrapper” structure. Also included is a seven-
level parking structure which can accommodate 785 cars. Spectacular pedestrian plazas offer direct access to the
Arapahoe Light Rail Station, as well as a gathering place for civic and cultural events.
A 10,000 SF Keystone Compac®
wall, comprised of Victorian-Scored and Half-Victorian units, was integral to the
development of the site; creating buildable space as well as visually enhancing the landscape.
Retaining Walls » Keystone Retaining Wall Systems®
»» Greenwood Village, Colorado
»» Keystone Compac®
»» 10,000 SF
»» Installation date – Spring 2015
Village Center Station
30 31
The Kissimmee Trail Bridge spans the John Young Parkway and connects the Lake Tivoli bike path to the
Kissimmee Trail Loop, giving pedestrians and cyclists a safer way to cross one of the city’s busiest traffic corridors.
Referred to as “the crown jewel of the trail system”, it serves as the cornerstone of the whole pedestrian bike
system, as well as provides a visual gateway into the city of Kissimmee. Four 40-foot towers and signage welcome
drivers below to the city. On either side of the bridge are spiral ramps, giving cyclists a wider and more convenient
way to enter and exit the Kissimmee Trail Bridge.
Bridges » Continental®
Pedestrian Truss
»» Kissimmee, Florida
»» Continental®
Pedestrian Truss	
»» 12.5’ width x 200’ span Gateway style
pedestrian painted truss
»» Installation Date – Spring 2014
Kissimmee Trail Bridge
NOvember 2016
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Veterans Day
Thanksgiving Day
oct 2016
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
dec 2016
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Daylight Savings Ends Election Day
The city of Sheridan, Wyoming’s maintenance department was having problems maintaining their existing
stormwater infrastructure. Components of the existing system where clogging, resulting in frequent maintenance
events and stormwater backups. Contech partnered with the city to install a CDS hydrodynamic separator to
test the system’s ability to screen, separate and trap trash, debris, sediment, and hydrocarbons from stormwater
runoff. The trial was a success, and the city is in the process of installing more CDS units to reduce the number of
maintenance events and improve the performance of its stormwater system.
Stormwater Management » CDS®
Hydrodynamic Separator
»» Sheridan, Wyoming	
»» CDS®
hydrodynamic separator
»» Installation date – September 2015
Sheridan Wyoming Stormwater Retrofit
December 2016
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
Christmas Day
Christmas Eve
New Year's Eve
nov 2016
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
jan 2017
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
ENGINEERED SOLUTIONS
ENGINEERED SOLUTIONS800-338-1122 | www.ContechES.com/calendar
MARKETS SERVED
•	 Agriculture / Irrigation
•	 Airports / Ports / Railway
•	 Commercial / Industrial / Residential
•	 DOT / Roads
•	 Energy / Mining / Natural Resources
•	 Government / Institutional
•	 Military
•	 Recreation / Parks / Golf Courses
•	 Rehabilitation / Relining
Solutions Provided
•	 Bridges & Structures
•	 Erosion Control
•	 Pipe
•	 Retaining Walls
•	 Stormwater Management
© 2015 Contech Engineered Solutions LLC
ENGINEERED SOLUTIONS
Winter Solstice
Design Your Own Hydrodynamic
Separator – DYOHDS™
www.conteches.com/dyohds

Weitere ähnliche Inhalte

Ähnlich wie 2016 Contech Calendar (8)

2015 Contech Calendar
2015 Contech Calendar2015 Contech Calendar
2015 Contech Calendar
 
2016 Calendar_1
2016 Calendar_12016 Calendar_1
2016 Calendar_1
 
MPTC South 2023 Calendar
MPTC South 2023 CalendarMPTC South 2023 Calendar
MPTC South 2023 Calendar
 
USBridge_Calendar
USBridge_CalendarUSBridge_Calendar
USBridge_Calendar
 
OXY May Pit
OXY May PitOXY May Pit
OXY May Pit
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Wall planner 2015
Wall planner 2015Wall planner 2015
Wall planner 2015
 
Portfolio Dec 22-min
Portfolio Dec 22-minPortfolio Dec 22-min
Portfolio Dec 22-min
 

Mehr von Contech Engineered Solutions

Mehr von Contech Engineered Solutions (15)

Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
CMP Solutions by Contech
CMP Solutions by ContechCMP Solutions by Contech
CMP Solutions by Contech
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Contech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced PolyethyleneContech DuroMaxx Steel Reinforced Polyethylene
Contech DuroMaxx Steel Reinforced Polyethylene
 
How Stormwater Treatment Trains Work
How Stormwater Treatment Trains WorkHow Stormwater Treatment Trains Work
How Stormwater Treatment Trains Work
 
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
 
How Rainwater Harvesting Works
How Rainwater Harvesting WorksHow Rainwater Harvesting Works
How Rainwater Harvesting Works
 
Maximizing Phosphorus Load Reduction
Maximizing Phosphorus Load ReductionMaximizing Phosphorus Load Reduction
Maximizing Phosphorus Load Reduction
 
Low Impact Developement Site Planner
Low Impact Developement Site Planner Low Impact Developement Site Planner
Low Impact Developement Site Planner
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP's
 
Rainwater Harvesting Answer Book
Rainwater Harvesting Answer BookRainwater Harvesting Answer Book
Rainwater Harvesting Answer Book
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 

Kürzlich hochgeladen

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
Health
 

Kürzlich hochgeladen (20)

Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 

2016 Contech Calendar

  • 1. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Christmas Day New Year's Eve nov 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 jan 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24/31 25 26 27 28 29 30 Winter Solstice ENGINEERED SOLUTIONS 2016It’s a NEW Year! With New Tools, New Content and a New Website. Now That’s what we call responsive! December 2015 www.ContechES.com
  • 2. Emergency flood repairs were underway along the North Douglas Creek at Flying W Ranch to stabilize the North Rockrimmon drainage channel after it experienced landslides due to unstable, oversaturated soils above. To accomplish this, the drainage channel would have a large pipe installed in the creek bed behind a nearby residential area. Given the recent flooding, they needed a pipe that would be able to handle high flow velocities through it without backing into the basin as was recently experienced. Ultimately, Contech’s DuroMaxx steel reinforced polyethylene (SRPE) pipe was selected for the installation given its hydraulic efficiencies and strength. Pipe » DuroMaxx® Steel Reinforced Polyethylene »» Colorado Springs, Colorado »» 1,296 LF of 96” DuroMaxx® SRPE with 30 psi WC joints »» Installation date – September 2015 Rockrimmon Creek Rehabilitation January 2016 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 New Year’s Day MartinLutherKing,Jr.Day dec 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 feb 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 STEEL REINFORCED PE TECHNOLOGY
  • 3. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Valentine’s Day Presidents' Day jan 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 mar 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 FebRuary 2016 Norfolk Southern (NS) Railway operates an east /west line through suburban Philadelphia, Pennsylvania. Bridge MV 25.13 is a seven-cell stone arch structure that has been in service for approximately 150 years and was in need of repair. Contech Engineered Solutions was approached by Jacobs Engineering due to the success Contech has had with similar relining applications. After evaluating the existing conditions, Contech recommended its BridgeCor® structural plate product for the reline of the existing culvert arches. BridgeCor is a deep corrugation (15” x 5 ½”) high performance product that was developed to meet the requirements of this large span / heavy loading application. Bridges » BridgeCor® Structural Plate Reline »» Flourtown, Pennsylvania »» BridgeCor® Structural Plate Arch »» 48’-8” span x 24’-3” rise (4 cells) »» Installation date - Februrary 2015 Norfolk Southern Railway – Wissahickon Creek Bridge Rehabilitation Design Your Own bridge DYOB® Plate, Precast & Truss www.conteches.com/dyob
  • 4. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 feb 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 apr 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Daylight Savings Begins Easter Sunday St. Patrick's Day Spring Equinox March 2016 Good Friday Situated along the Los Angeles River, the 24-acre site known as Parcel C at Taylor Yard was being transformed into a transit oriented mixed-use development. An UrbanGreen® Rainwater Harvesting system was installed consisting of two barrels, each made from 145’ long of 120” diameter DuroMaxx® Steel Reinforced Polyethylene (SRPE). DuroMaxx was chosen because of the ability to create a large diameter, economical, long lasting cistern with watertight joints. The cistern is designed to hold 164,960 gallons of harvested rainwater. Contech also provided the mechanical pumps and controls to deliver the captured water that will be used for drip irrigation. Stormwater Management » UrbanGreen® Rainwater Harvesting »» Los Angeles, California »» UrbanGreen® Rainwater Harvesting System »» 965 LF of 120” & 114” ALT2 CMP »» Installation date – June 2013 Taylor Yard Transit Village Stormwater Solutions from Contech® STEEL REINFORCED PE TECHNOLOGY
  • 5. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Tax Day Earth Day mar 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 may 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 April 2016 Area flooding caused damage to Vigo County’s Fowler Park Pioneer Village consisting of 18 historical park structures, a log barn and a working gristmill and also weakened the overall integrity of the nearby earthen dam structure. The existing emergency spillway was deemed undersized and an additional primary spillway was constructed with ArmorFlex® Class 40T BAH to pass the overtopping design event defined by the Indiana Department of Natural Resources. Installing a green solution to continue the natural, historical setting was important to the owner, while also having the robust protection of articulated concrete block systems. Hard Armor » ArmorFlex® Articulating Concrete Blocks »» Terre Haute, Indiana »» ArmorFlex® 40 Class Tapered Matresses »» 11,156 SF »» Installation date – Fall 2014 Fowler Park Dam Rehabilitation
  • 6. The City of Paducah, Kentucky was in need of a solution to decrease the overall project cost to keep them within budget for roadway improvements along Olivet Church Road. Working closely with Contech, the project contractor, Jim Smith Contracting, was able to find a solution utilizing Contech’s E’GRID® geogrid which helped to decrease the overall project cost and speed construction due to avoiding delays that may have been caused with lime stabilization. This particular project allowed for a direct substitution of E’GRID 3030 for the designed 8” of lime stabilization. The combination of time and money savings offered by the E’GRID solution was a victory for the contractor as well as the owner. Geogrid » E’GRID® Soil Stabilization »» Paducah, Kentucky »» E’GRID® 3030 »» 60,000 SY of 12.8’ x 246’ rolls »» Installation date – October 2015 Olivet Church Road - KY 998 Roadway Improvements easily Search for projects the Case Study Tool www.conteches.com/case-studies Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Memorial Day Mother’s Day apr 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 june 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 May 2016
  • 7. Henry County, Ohio needed a quick and efficient bridge to replace an aging, multi-span steel beam bridge structure that crossed the Miami & Erie Canal. A 57’ clear span precast CON/SPAN® O-Series® bridge was chosen by the Mannik Smith Group as the optimal solution because of its ability to provide a speedy, cost- effective solution for the fast-track project. This O-Series® three-sided structure with detached headwalls and wingwalls, has an ashlar stone stained formliner finish that provides an attractive solution that blends well with its surroundings. Bridges » Precast Bridge Systems »» Henry County, Ohio »» CON/SPAN® O-Series® »» 57’ span x 10’8” rise x 40’ length »» Installation date – August 2015 County Road 17C over Miami & Erie Canal Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Father’s Day Summer Solstice may 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 july 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 June 2016
  • 8. Contech provided a stormwater detention system to Liberty Park, an elevated park in the new World Trade Center in New York City. A detention system was needed to meet NYC Department of Environmental Protection stormwater regulations. Since the park sits on the roof of the Vehicular Security Center, it is imperative the detention system is watertight. Contech consulted with engineers at the Port Authority of New York & New Jersey, who specified a detention system made from 197 LF of DuroMaxx® Steel Reinforced Polyethylene (SRPE) that will provide approximately 2,500 CF of stormwater storage. Stormwater Management » DuroMaxx® Detention System »» New York City, New York »» DuroMaxx® Detention System »» 2,500 CF of stormwater storage »» Installation date – July 2015 World Trade Center Detention System Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Independence Day aug 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 STEEL REINFORCED PE TECHNOLOGY june 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 July 2016 31
  • 9. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 july 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 sep 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 August 2016 Situated right in the heart of the Bakken oil boom in North Dakota, Watford City’s population 1,400 in 2006 has rapidly risen to nearly 3,000 according to the latest census. As part of this growth, the North Dakota Department of Transportation (NDDOT) has gone to great lengths to accommodate the increase in traffic part of which was an extensive roadway improvement project along Highway 23 which included a new storm drain system. The general contractor selected Contech Engineered Solution’s MOBILE PIPE® mill to manufacture a polymer- coated ULTRA FLO® storm drain system onsite, allowing for faster project turn around. Pipe » MOBILE PIPE® Mill Storm Sewer »» Watford City, North Dakota »» Polymeric ULTRA FLO® CSP »» 15” to 60” for 14,680 LF »» On-site MOBILE PIPE® production »» Installation date - July 2015 ND Highway 23 Roadway Improvements Questions? we’ve got answers. The New Pipe Blog www.ContechES.com/pipe-blog PIPE SOLUTIONS
  • 10. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Labor Day aug 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 oct 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 September 2016 U.S. Bank Stadium is a fixed-roof stadium that is being constructed in downtown Minneapolis, Minnesota. The project is the new home of the Minnesota Vikings football team. The stadium is the anchor of substantial redevelopment in the City of Minneapolis. Since the stadium is being built downtown, there is limited footprint for a stormwater storage system. Engineers chose a large diameter CMP retention system that provided the required amount of storage in a limited and constrained footprint. DuroMaxx SRPE was also used for stormwater drainage. Stormwater Management » Corrugated Metal Pipe Detention »» Minneapolis, Minnesota »» 1,600 LF of 144” perforated CMP for stormwater retention »» 400 LF of 48” DuroMaxx® for stormwater drainage »» Installation date - April 2015 US Bank Stadium (Home of the Minnesota Vikings)
  • 11. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Columbus Day Halloween sep 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 nov 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 October 2016 Village Center Station is the first phase of a planned three phase Transit Oriented Development (TOD). Phase I features a six-level office tower over a three-level restaurant/retail “wrapper” structure. Also included is a seven- level parking structure which can accommodate 785 cars. Spectacular pedestrian plazas offer direct access to the Arapahoe Light Rail Station, as well as a gathering place for civic and cultural events. A 10,000 SF Keystone Compac® wall, comprised of Victorian-Scored and Half-Victorian units, was integral to the development of the site; creating buildable space as well as visually enhancing the landscape. Retaining Walls » Keystone Retaining Wall Systems® »» Greenwood Village, Colorado »» Keystone Compac® »» 10,000 SF »» Installation date – Spring 2015 Village Center Station 30 31
  • 12. The Kissimmee Trail Bridge spans the John Young Parkway and connects the Lake Tivoli bike path to the Kissimmee Trail Loop, giving pedestrians and cyclists a safer way to cross one of the city’s busiest traffic corridors. Referred to as “the crown jewel of the trail system”, it serves as the cornerstone of the whole pedestrian bike system, as well as provides a visual gateway into the city of Kissimmee. Four 40-foot towers and signage welcome drivers below to the city. On either side of the bridge are spiral ramps, giving cyclists a wider and more convenient way to enter and exit the Kissimmee Trail Bridge. Bridges » Continental® Pedestrian Truss »» Kissimmee, Florida »» Continental® Pedestrian Truss »» 12.5’ width x 200’ span Gateway style pedestrian painted truss »» Installation Date – Spring 2014 Kissimmee Trail Bridge NOvember 2016 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Veterans Day Thanksgiving Day oct 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 dec 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Daylight Savings Ends Election Day
  • 13. The city of Sheridan, Wyoming’s maintenance department was having problems maintaining their existing stormwater infrastructure. Components of the existing system where clogging, resulting in frequent maintenance events and stormwater backups. Contech partnered with the city to install a CDS hydrodynamic separator to test the system’s ability to screen, separate and trap trash, debris, sediment, and hydrocarbons from stormwater runoff. The trial was a success, and the city is in the process of installing more CDS units to reduce the number of maintenance events and improve the performance of its stormwater system. Stormwater Management » CDS® Hydrodynamic Separator »» Sheridan, Wyoming »» CDS® hydrodynamic separator »» Installation date – September 2015 Sheridan Wyoming Stormwater Retrofit December 2016 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Christmas Day Christmas Eve New Year's Eve nov 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 jan 2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 ENGINEERED SOLUTIONS ENGINEERED SOLUTIONS800-338-1122 | www.ContechES.com/calendar MARKETS SERVED • Agriculture / Irrigation • Airports / Ports / Railway • Commercial / Industrial / Residential • DOT / Roads • Energy / Mining / Natural Resources • Government / Institutional • Military • Recreation / Parks / Golf Courses • Rehabilitation / Relining Solutions Provided • Bridges & Structures • Erosion Control • Pipe • Retaining Walls • Stormwater Management © 2015 Contech Engineered Solutions LLC ENGINEERED SOLUTIONS Winter Solstice Design Your Own Hydrodynamic Separator – DYOHDS™ www.conteches.com/dyohds