Heat build-up in corridors or lobbies of residential and hotel buildings is a common problem with a
simple solution: use the smoke shafts already in place. These are typically positioned in a way that
also provides effective environmental ventilation, so they can serve a dual purpose of evacuating
smoke in case of fire and providing day-to-day ventilation. However, the design and controls need to
be well thought through and there are some pitfalls to avoid for the solution to deal with overheating
effectively. We have listed 3 key considerations below.

1. Inlet air will be required. Buildings with a two-shaft system can be configured to provide inlet
and extract air, however where does inlet air for a single smoke shaft come from? You could
look to provide this from the stair, but note that this would require a weathered roof smoke
vent for the stair and also fire rated smoke dampers between the stair and lobby/corridor.

2. Attenuation. When providing environmental ventilation, the fans will now be running more
often, so you will need to consider attenuating them to prevent noise complaints.
3. Controls and balancing the system. If all dampers open fully on all floors, then most of the
ventilation will come from the upper levels with insufficient ventilation on the lower levels.
Adding balancing dampers and a control system that can open either individual levels or
banks of levels will prevent this from happening. Modulating the fans to prevent the heat from
building up in the first place will also provide a more satisfactory result.
If you want to know more about preventing overheating in your building with a dual purpose
shaft system, you can attend our recorded webinar, which is available from this link:
https://www3.gotomeeting.com/register/220923814

© 2013 Colt International Licensing Ltd.

Weitere ähnliche Inhalte

Andere mochten auch (7)

PAS Service Request Implementation-08-03-11-webex
PAS Service Request Implementation-08-03-11-webexPAS Service Request Implementation-08-03-11-webex
PAS Service Request Implementation-08-03-11-webex
 
Snap - 7 Deadly Sins of Social Media Marketing
Snap - 7 Deadly Sins of Social Media MarketingSnap - 7 Deadly Sins of Social Media Marketing
Snap - 7 Deadly Sins of Social Media Marketing
 
Shuzana ciara ft enrique
Shuzana  ciara ft enriqueShuzana  ciara ft enrique
Shuzana ciara ft enrique
 
Proyecto personal "turismo de aventura"
Proyecto personal "turismo de aventura"Proyecto personal "turismo de aventura"
Proyecto personal "turismo de aventura"
 
el angel de la muerte- gollum
el angel de la muerte- gollumel angel de la muerte- gollum
el angel de la muerte- gollum
 
I am number four
I am number fourI am number four
I am number four
 
اليوم الثاني المدونات
اليوم الثاني  المدوناتاليوم الثاني  المدونات
اليوم الثاني المدونات
 

Mehr von Colt UK

Mehr von Colt UK (20)

Smoke and environmental ventilation of multi-storey buildings using shafts we...
Smoke and environmental ventilation of multi-storey buildings using shafts we...Smoke and environmental ventilation of multi-storey buildings using shafts we...
Smoke and environmental ventilation of multi-storey buildings using shafts we...
 
Seven good practices for pressurisation systems
Seven good practices for pressurisation systemsSeven good practices for pressurisation systems
Seven good practices for pressurisation systems
 
Can car park ventilation schemes be more energy efficient? Yes – and they sho...
Can car park ventilation schemes be more energy efficient? Yes – and they sho...Can car park ventilation schemes be more energy efficient? Yes – and they sho...
Can car park ventilation schemes be more energy efficient? Yes – and they sho...
 
Q&A from Dr John H Klotes webinar on design fires for smoke control
Q&A from Dr John H Klotes webinar on design fires for smoke controlQ&A from Dr John H Klotes webinar on design fires for smoke control
Q&A from Dr John H Klotes webinar on design fires for smoke control
 
CPD Presentation Evaporative cooling in data centres
CPD Presentation   Evaporative cooling in data centresCPD Presentation   Evaporative cooling in data centres
CPD Presentation Evaporative cooling in data centres
 
The top three considerations when specifying glass louvred ventilators
The top three considerations when specifying glass louvred ventilatorsThe top three considerations when specifying glass louvred ventilators
The top three considerations when specifying glass louvred ventilators
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...
 
CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtains
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvres
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: Pressurisation
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park Ventilation
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke Control
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocks
 

Avoid overheating in common areas of residential buildings and hotels: 3 key considerations

  • 1. Avoid overheating in common areas of residential buildings and hotels: 3 key considerations Heat build-up in corridors or lobbies of residential and hotel buildings is a common problem with a simple solution: use the smoke shafts already in place. These are typically positioned in a way that also provides effective environmental ventilation, so they can serve a dual purpose of evacuating smoke in case of fire and providing day-to-day ventilation. However, the design and controls need to be well thought through and there are some pitfalls to avoid for the solution to deal with overheating effectively. We have listed 3 key considerations below. 1. Inlet air will be required. Buildings with a two-shaft system can be configured to provide inlet and extract air, however where does inlet air for a single smoke shaft come from? You could look to provide this from the stair, but note that this would require a weathered roof smoke vent for the stair and also fire rated smoke dampers between the stair and lobby/corridor. 2. Attenuation. When providing environmental ventilation, the fans will now be running more often, so you will need to consider attenuating them to prevent noise complaints. 3. Controls and balancing the system. If all dampers open fully on all floors, then most of the ventilation will come from the upper levels with insufficient ventilation on the lower levels. Adding balancing dampers and a control system that can open either individual levels or banks of levels will prevent this from happening. Modulating the fans to prevent the heat from building up in the first place will also provide a more satisfactory result. If you want to know more about preventing overheating in your building with a dual purpose shaft system, you can attend our recorded webinar, which is available from this link: https://www3.gotomeeting.com/register/220923814 © 2013 Colt International Licensing Ltd.