Colby Brewer7416 S. Sunset Maple Dr.
West Jordan, Utah 84081
Phone: 801-455-8647
2RgrBn@Earthlink.net
Objective
To provide a summary of work experience
Work experience
10/2013-Present Western Refractory Construction SLC Utah
Project Manager / Mechanical Div.
• Complete installation of all piping systems within ASME code jurisdiction and
other piping systems for boiler new construction project located in Anderson Ca.
• Sinclair Oil Refinery shutdown services on multiple units located in Sinclair Wy.
(Night Shift).
• Wyoming Refinery Company, Plant wide shutdown services (Night Shift).
• Performed sales and estimating for mechanical projects company wide.
2/2012-10/2013 Brahma Group Inc. Corporate Office
Area Manager / Power Division
Development and implementation of a new “Power Division” specializing in coal fired
boiler shutdowns and ASME code projects.
10/2006-2/2012 Irwin Ind. Corporate Office
Estimator
Estimated project cost for projects ranging from 1.2 million to 120 million dollars
07/2005-09/2006 Wellons Inc. Multiple Sites
Project Manager
Ground up installation of 3 each complete boilers and associated fuel conveyance.
03/2005-05/2005 Irwin Ind. Jim Bridger Station
Superintendent
Drag chain conversion and associated piping systems.
02/2005-03/2005 Irwin Ind. Navajo Gen. Station
Superintendent
Complete replacement of the Hot Reheat Lines (Header to CRV) 30” X 1.75 MWT P22
piping.
01/2005-02/2005 Irwin Ind. Kyrene Gen. Station
Superintendent
Replaced Superheater / Desuperheater liners, various other pipe and rigging
11/2003-01/2005 Flowers Satellite Tulsa Ok.
Contractor
Installed various satellite systems.
09/2003-11/2003 Irwin Ind. Dave Johnston Station
Superintendent
Re-heater partial assembly replacement, water wall tube replacement, and bottom ash
modifications and restoration.
01/2003-04/2003 Irwin Ind. Navajo Gen. Station
Superintendent
Complete replacement (Header to CRV) of 30” X 1.75 MWT P22 piping
10/2002-12/2002 Irwin Ind. Rawhide Gen. Station
Superintendent
Complete reheat pendent and platen replacement, waterwall modifications, roof tube
alterations and repair, several piping systems.
02/2002-04/2002 Irwin Ind. Springerville Station
Superintendent
Air preheater repairs, expansion joint replacement, extensive fabrication and design
throughout the station.
04/2002-05/2002 Irwin Ind. Irvington Gen. Station
Superintendent
Coutant slope tube replacement, external Superheat casing, Superheat header repair and
repositioning.
05/2002-05/2002 Irwin Ind. Newmont Goldmine
Superintendent
Modifications and installation of air and material handling systems.
07/1986-02/2002 Various Companies Nationwide
Various
Jobs include: Estimator, Project Manager, Superintendent, Gen. Foreman, Foreman, Pipe
Welder, Pipe Fitter, Rigger, Boilermaker, Crane Operator, Electrical Apprentice, QC,
Safety, and Coal Miner
Companies include: T.I.C, HB Zachary, Brown & Root, BE&K, Repcon, Flyash Haulers,
Spectrum, Mid America, Bay, Northstar, Thunderbolt, Irwin Industries, CPM, PMCI, ST
Piping, MEI, Cust-O-Fab, Worldwide Welding and Wellons.
Projects include: steel mills, paper mills, processing plants, generating stations, refineries,
hospitals, mines, smelters, boilers and chemical plants.
Neither myself nor any individual under my supervision has had a recordable injury. In
addition we have never missed an end date deadline.
Throughout my career I have worked almost exclusively 80+ hours a week (shutdowns or
fast track new const.)
Education/Training
1989-1994 U.S. Army Ft. Lewis Wa.
Sergeant E-5 2/75 Ranger Regiment
Primary MOS 11B2V, Airborne, Ranger, PLDC, Basic and Advanced Demolitions,
Emergency Medical Technician, Numerous other Courses and Awards.
AutoCAD and Mechanical Drafting Certification
Certified Crane Operator, Oregon Class 6 Boiler Card, MSHA 40, OSHA 30
Certified Welder (gtaw, smaw) Pipe. Inconel, SS, Chrome
Proficient in Microsoft Word, Excel and Projects

Weitere ähnliche Inhalte

Was ist angesagt?

Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018Crosstown TO
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Project Description - Ben Oaks Sewage Pumping Station
Project Description - Ben Oaks Sewage Pumping StationProject Description - Ben Oaks Sewage Pumping Station
Project Description - Ben Oaks Sewage Pumping StationJahonn Naimi
 
Fielding Gary CV August 2015
Fielding Gary CV August 2015Fielding Gary CV August 2015
Fielding Gary CV August 2015Gary Fielding
 
Alan Sontag_resume_9-15-2012
Alan Sontag_resume_9-15-2012Alan Sontag_resume_9-15-2012
Alan Sontag_resume_9-15-2012Alan Sontag
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv Venkatesh -
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 

Was ist angesagt? (20)

Darren's CV
Darren's CVDarren's CV
Darren's CV
 
Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015Devin Howell's Resume December 1, 2015
Devin Howell's Resume December 1, 2015
 
resume mike 1
resume mike 1resume mike 1
resume mike 1
 
Trvl Tech
Trvl TechTrvl Tech
Trvl Tech
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
 
jamespickering
jamespickeringjamespickering
jamespickering
 
CoreCV
CoreCVCoreCV
CoreCV
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
Project Description - Ben Oaks Sewage Pumping Station
Project Description - Ben Oaks Sewage Pumping StationProject Description - Ben Oaks Sewage Pumping Station
Project Description - Ben Oaks Sewage Pumping Station
 
Fielding Gary CV August 2015
Fielding Gary CV August 2015Fielding Gary CV August 2015
Fielding Gary CV August 2015
 
Alan Sontag_resume_9-15-2012
Alan Sontag_resume_9-15-2012Alan Sontag_resume_9-15-2012
Alan Sontag_resume_9-15-2012
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - January 2018
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
SCOTTS CV
SCOTTS CVSCOTTS CV
SCOTTS CV
 
resume t atwood oper
resume t atwood operresume t atwood oper
resume t atwood oper
 

Andere mochten auch (18)

mgm
mgmmgm
mgm
 
Vijayababu-Resume
Vijayababu-ResumeVijayababu-Resume
Vijayababu-Resume
 
Anand Updated CV
Anand Updated CVAnand Updated CV
Anand Updated CV
 
April 2015 Resume
April 2015 ResumeApril 2015 Resume
April 2015 Resume
 
Repositorios web
Repositorios webRepositorios web
Repositorios web
 
Reference Letter
Reference LetterReference Letter
Reference Letter
 
Tax
TaxTax
Tax
 
Joel_Warren_Resume_REVE
Joel_Warren_Resume_REVEJoel_Warren_Resume_REVE
Joel_Warren_Resume_REVE
 
Stress on our pets (Carla Perrotta)
Stress on our pets (Carla Perrotta)Stress on our pets (Carla Perrotta)
Stress on our pets (Carla Perrotta)
 
Metric and Dashboard
Metric and DashboardMetric and Dashboard
Metric and Dashboard
 
Comparativo de lectivo 2013
Comparativo de lectivo 2013Comparativo de lectivo 2013
Comparativo de lectivo 2013
 
Recruitment Tour - Europe
Recruitment Tour - EuropeRecruitment Tour - Europe
Recruitment Tour - Europe
 
Talented@rosewood
Talented@rosewoodTalented@rosewood
Talented@rosewood
 
STC Certificate
STC CertificateSTC Certificate
STC Certificate
 
Lang Resume (1a)
Lang Resume (1a)Lang Resume (1a)
Lang Resume (1a)
 
Syahid Masyudin CV
Syahid Masyudin CVSyahid Masyudin CV
Syahid Masyudin CV
 
Perlawanan Goa
Perlawanan GoaPerlawanan Goa
Perlawanan Goa
 
complementos de google drive
complementos de google drivecomplementos de google drive
complementos de google drive
 

Ähnlich wie Resume C Brewer

Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14Jim Benge
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016Terry Evans
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinatorsteven french
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJames Stults
 

Ähnlich wie Resume C Brewer (20)

JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14
 
chris's CV
chris's CVchris's CV
chris's CV
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
F Bryce CV
F Bryce CVF Bryce CV
F Bryce CV
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
yusuf resume new
yusuf resume newyusuf resume new
yusuf resume new
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
Newest
NewestNewest
Newest
 
stevenfrench_coordinator
stevenfrench_coordinatorstevenfrench_coordinator
stevenfrench_coordinator
 
Resume
ResumeResume
Resume
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 

Resume C Brewer

  • 1. Colby Brewer7416 S. Sunset Maple Dr. West Jordan, Utah 84081 Phone: 801-455-8647 2RgrBn@Earthlink.net Objective To provide a summary of work experience Work experience 10/2013-Present Western Refractory Construction SLC Utah Project Manager / Mechanical Div. • Complete installation of all piping systems within ASME code jurisdiction and other piping systems for boiler new construction project located in Anderson Ca. • Sinclair Oil Refinery shutdown services on multiple units located in Sinclair Wy. (Night Shift). • Wyoming Refinery Company, Plant wide shutdown services (Night Shift). • Performed sales and estimating for mechanical projects company wide. 2/2012-10/2013 Brahma Group Inc. Corporate Office Area Manager / Power Division Development and implementation of a new “Power Division” specializing in coal fired boiler shutdowns and ASME code projects. 10/2006-2/2012 Irwin Ind. Corporate Office Estimator Estimated project cost for projects ranging from 1.2 million to 120 million dollars 07/2005-09/2006 Wellons Inc. Multiple Sites Project Manager Ground up installation of 3 each complete boilers and associated fuel conveyance. 03/2005-05/2005 Irwin Ind. Jim Bridger Station Superintendent Drag chain conversion and associated piping systems. 02/2005-03/2005 Irwin Ind. Navajo Gen. Station Superintendent Complete replacement of the Hot Reheat Lines (Header to CRV) 30” X 1.75 MWT P22 piping. 01/2005-02/2005 Irwin Ind. Kyrene Gen. Station Superintendent Replaced Superheater / Desuperheater liners, various other pipe and rigging 11/2003-01/2005 Flowers Satellite Tulsa Ok. Contractor Installed various satellite systems.
  • 2. 09/2003-11/2003 Irwin Ind. Dave Johnston Station Superintendent Re-heater partial assembly replacement, water wall tube replacement, and bottom ash modifications and restoration. 01/2003-04/2003 Irwin Ind. Navajo Gen. Station Superintendent Complete replacement (Header to CRV) of 30” X 1.75 MWT P22 piping 10/2002-12/2002 Irwin Ind. Rawhide Gen. Station Superintendent Complete reheat pendent and platen replacement, waterwall modifications, roof tube alterations and repair, several piping systems. 02/2002-04/2002 Irwin Ind. Springerville Station Superintendent Air preheater repairs, expansion joint replacement, extensive fabrication and design throughout the station. 04/2002-05/2002 Irwin Ind. Irvington Gen. Station Superintendent Coutant slope tube replacement, external Superheat casing, Superheat header repair and repositioning. 05/2002-05/2002 Irwin Ind. Newmont Goldmine Superintendent Modifications and installation of air and material handling systems. 07/1986-02/2002 Various Companies Nationwide Various Jobs include: Estimator, Project Manager, Superintendent, Gen. Foreman, Foreman, Pipe Welder, Pipe Fitter, Rigger, Boilermaker, Crane Operator, Electrical Apprentice, QC, Safety, and Coal Miner Companies include: T.I.C, HB Zachary, Brown & Root, BE&K, Repcon, Flyash Haulers, Spectrum, Mid America, Bay, Northstar, Thunderbolt, Irwin Industries, CPM, PMCI, ST Piping, MEI, Cust-O-Fab, Worldwide Welding and Wellons. Projects include: steel mills, paper mills, processing plants, generating stations, refineries, hospitals, mines, smelters, boilers and chemical plants. Neither myself nor any individual under my supervision has had a recordable injury. In addition we have never missed an end date deadline. Throughout my career I have worked almost exclusively 80+ hours a week (shutdowns or fast track new const.) Education/Training 1989-1994 U.S. Army Ft. Lewis Wa. Sergeant E-5 2/75 Ranger Regiment
  • 3. Primary MOS 11B2V, Airborne, Ranger, PLDC, Basic and Advanced Demolitions, Emergency Medical Technician, Numerous other Courses and Awards. AutoCAD and Mechanical Drafting Certification Certified Crane Operator, Oregon Class 6 Boiler Card, MSHA 40, OSHA 30 Certified Welder (gtaw, smaw) Pipe. Inconel, SS, Chrome Proficient in Microsoft Word, Excel and Projects