One Storey Building Construction (Pre-Construction Process)
1.
2. Outline: One Storey Building
Construction
• Part I: Pre-Construction Process
• Part II: Construction Process
• Break Ground
• Excavation
• Foundation
• Utilities
• Framing
• Roofing
• Weather Resistant Barrier
3. Outline: One Storey Building
Construction
• Part II: Construction Process
• Rough Plumbing
• Mechanical Systems
• Lighting and Electrical
• Air Sealing
• Insulation
• Drywall
• Sliding
• Flooring
4. Outline: One Storey Building
Construction
• Part II: Construction Process
• Tiling
• Painting
• Cabinets, Shelving
• Finish Plumbing
• Finish Electrical and Lighting
• Certificate of Occupancy
• Moving In
7. • Site Survey
• provides us with information on land levels,
land contours, trees/vegetation, water/power
service, and footpath locations for accurate
drafting of plans.
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
8. • After a contract is awarded, the contractor has to:
• Determine the key personnel to supervise work
• Make provisions for the equipment to be used
• Determine the location and methods of
erecting temporary structures
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
9. • The job should be adequate, but not excessively
staffed, to ensure efficient execution of work
• The construction site should be maintained in strict
tidiness and in an orderly routine because it has
psychological effect on the staff and the workers.
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
10. • In carrying out the construction work, idle time and
unnecessary cost should be avoided
• Sufficient copies of the plan and specification
should be procured to be distributed.
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
11. • Project undergoes series of stages which includes:
• Planning
• Execution of Minor Activities
• Project Phase Out
Preliminaries in Organizing a
Construction Job
One Storey BuildingConstruction: Pre-Construction Process
12. • Organization of the work consist of making proper
assignments and sequence of the works in a
systematic order aimed at making the best use of
labour, materials and time
Organization of Work
One Storey BuildingConstruction: Pre-Construction Process
13. • The contractor has to determine the material
requirement and scheduled the sequence of its
deliveries
Material Supply
One Storey BuildingConstruction: Pre-Construction Process
14. • A purchasing order form should contain all the
information such as:
1. Description of the materials
2. Quantities required
3. Time and place of delivery
4. Unit price
5. Amount
Material Supply
One Storey BuildingConstruction: Pre-Construction Process
15. • The business must have sufficient capital structure
to sustain it’s growth
Financial and Budgeting
One Storey BuildingConstruction: Pre-Construction Process
16. • A budget properly planned and operated, may
have a constructive influence on the personnel of
an organization
Financial and Budgeting
One Storey BuildingConstruction: Pre-Construction Process
17. • It must serve as a means of bringing understanding
of the common goals of all who belong the
organization
• The budget will serve as a coordinating and
unifying influence to all concerned
Financial and Budgeting
One Storey BuildingConstruction: Pre-Construction Process
18. • It is important to get the right materials delivered
from the supplier to the site on time
Procurement Processes
One Storey BuildingConstruction: Pre-Construction Process
19. • The following major procurement factors must be
maintained:
1. QUALITY of materials
2. QUANTITY of materials
3. TIME of delivery
4. PRICE of materials
Procurement Processes
One Storey BuildingConstruction: Pre-Construction Process
20. • Effective inventory control is aimed at providing an
adequate but not excessive supply of materials at
hand at all times to meet operating requirements.
Inventory Control
One Storey BuildingConstruction: Pre-Construction Process
21. • Safety in the project construction must be given
primary consideration.
• The working place must be properly arranged and
maintained wherein equipment and the like are all
in safe operating conditions
Site Management of the Work
One Storey BuildingConstruction: Pre-Construction Process
22. • A complete safety program has to do with
promotion of workers health, with prevention of
such occupancy diseases and fire prevention.
Site Management of the Work
One Storey BuildingConstruction: Pre-Construction Process
23. • Effective maintenance of the plant and
construction equipment is a prerequisite to
efficient operation and uninterrupted construction
activities
Planned Maintenance
One Storey BuildingConstruction: Pre-Construction Process
24. • Planned maintenance is an organized attempt to
prevent sudden breakdown in equipment and
periodic shutdown for repairs.
Planned Maintenance
One Storey BuildingConstruction: Pre-Construction Process
25. • Renting equipment offers the advantages of no
capital outlay, no maintenance or servicing worries
for the user.
Equipment Rental
One Storey BuildingConstruction: Pre-Construction Process
26. Summary: Pre-Construction
Process
• Preliminaries and Site Management
• Preliminaries in Organizing a
Construction Job
• Organization of the Work
• Material Supply
• Financial and Budgeting
• The financial Budget
One Storey Building
Construction
One Storey BuildingConstruction: Pre-Construction Process
27. Summary: Pre-Construction
Process
• Procurement Process
• Quantity • Time
• Quality • Price
• Inventory Control
• Site Management of the Work
• Planned Maintenance
• Equipment Rental
One Storey Building
Construction
One Storey BuildingConstruction: Pre-Construction Process