3. Introduction
Ergon Engineering is active at a wide range of services, with a mission to deliver state
of the art technical solutions at Building, Energy and Industrial fields.
We aim at the continuous development of trust relationships with our customers,
counting on our executives proven expertise and solid experience, as well as our
organizational flexibility.
We have been active since 2010, bringing together people with substantial
experience in building and industrial project planning and realization. We work on
continuous development in engineering through planning and execution of best
available techniques, driven by our customer expectations and required deliverables.
Focusing on the delivery of turn-key solutions, we liaise with our customers from the
very beginning when a project is conceptually approached, through consultancy
and planning, to implementation and commisioning.
During the realization of every project, we always mobilize the appropriate team to
have on time and in full results and we liaise with local and international partners,
that are well acknowledged in delivering high quality products and services.
Sincerely
Christos Maniotis Konstantinos Chalikias
4. ΕSSENCE LIVING HOTEL, Ioannina, GR
http://www.essencehotel.gr/
5* Hotel Construction (70 beds capacity)
Duration: 24 months (2012-2015)
Budget: 3.500.000 €
Highlights:
State of the art electrical/mechanical installations:
• Geothermal system (HVAC- Hot Service Water)
• Solar system (Hot Service Water)
• Custom made Hotel Management Automation System (ΚΝΧ)
HOTELPROJECTS
5.
6.
7. MIR BOUTIQUE HOTEL, Ioannina, GR
http://www.hotel-mir.com/
3* Hotel Construction (30 beds capacity)
Duration: 8 months (2010-2011)
Budget: 1.600.000 €.
HOTELPROJECTS
8.
9. EPIRUS PALACE HOTEL, Ioannina, GR
http://www.epiruspalace.gr/en.html
5* Hotel Construction (400 beds capacity)
Duration: 12 months (2006-2007)
Budget: 11.000.000 €.
HOTELPROJECTS
10.
11.
12. IONIAN BLUE HOTEL, Lefkada, GR
http://www.ionianblue.gr/en/
5* Hotel Construction Supervision (capacity 260 beds)
Duration: 18 months (2002-2003)
Budget: 19.000.000 €
HOTELPROJECTS
13.
14. OTHER PROJECTS
PYRRION BOUTIQUE HOTEL, Zagori, Ioannina, GR
http://www.pirrion.gr
3* Hotel Electircal and Mechanical Installations (20 beds capacity)
Duration: 18 months (2009-2010)
Budget: 260.000 €
LAMUNTE HOTEL, Metsovo, GR
http://www.lamunte.gr
4* Hotel Construction (64 beds capacity)
Duration: 24 months (2008-2010)
Budget: 2.500.000 €
HOTEL AMFITHEA, Ioannina, GR
www.hotel-amfithea.gr
3* Hotel Construction (38 beds capacity)
Duration: 14 months (2007-2009)
Budget: 1.700.000 €
DOVITEL HOTEL, Ioannina, GR
http://www.dovitelhotel.gr
3* Hotel Renovation (68 beds capacity)
Duration: 7 months (2008)
Budget: 2.800.000 €
CEZARIA HOTEL, Ioannina, GR
http://www.hotelcezaria.gr
4* Hotel Construction (28 beds capacity)
Duration: 18 months (2007-2008)
Budget: 1.800.000 €
HOTELPROJECTS
15. Industrial Site Construction
"LPG Storage – Bottling – Containers Reconstruction”
http://www.fgas.eu
Duration: 18 months (2007-2009)
Budget: 2.100.000 €
Industrial site Renovation/Upgrade
"Precicion Rubber Fittings Production "
http://www.karipidis.gr
Duration: 24 months (2006-2008)
Budget: 6.200.000 €
Industrial Site Construction
"Frozen Goods Logistics"
Duration: 18 months (2006-2008)
Budget: 4.400.000 €
Industrial Site Construction
"CD/DVD Production"
Duration: 8 months (2006-2007)
Budget: 1.800.000 €
Industrial Site Construction
"Essential Oils and Extracts Production"
Duration: 10 months (2005-2006)
Budget: 1.400.000 €
INDUSTRIALPROJECTS
16. Hotel Waste Water Treatment Plant Upgrade
2014
Photovoltaic Roof System Planning- Installation (100 kWp)
2012
Hotel Solar Thermal System Planning for Hot Service Water Production
2011
Photovoltaic Ground System Planning- Installation (20 kWp)
2007
Photovoltaic Ground System Planning- Installation (5 kWp)
2007
ENERGYPROJECTS
17. Detached Villa Automation System (KNX)
Duration: 5 months (in progress)
Budget: 150.000 €
Bar Restaurant Renovation
www.medclubparga.gr
Duration: 4 months (2015)
Budget: 300.000 €
5-Storey Apartment Building Construction
Duration: 12 months (2009)
Budget: 1.200.000 €
Surgery Center - Ophthalmologists Clinic Construction
Duration: 4 months (2007)
Budget: 400.000 €
VARIOUSPROJECTS