3
SPECIFICATIONS
Length 62.3m
Beam 10.8m
Draft 3.3m
Builder Feadship
Year 2000
REFIT
Naval Architect Azure
Designer Steve Howard / Chahan Interior Design
Duration 6 months / 6 months
Exterior: Complete remodelling of sun deck including installation of
new carbon fibre swimming pool and sunbeds forward, lowering of aft
deck level, complete with new bar and furniture and a custom liferaft
launching system
Interior: Complete replacement of major guest areas including
salon, dining and owner’s areas as well as upgrade of major interior
systems
4 5
9
10 11
12 13
after
before
14 15
SPECIFICATIONS
Length before / after 65.6m / 68.7m
Beam 9.7m
Draft 3.7m
Builder Feadship
Year 1983
REFIT
Naval Architect Olesinski Design
Designer Olesinski Design
Duration 7 months
Exterior: Total remodelling of superstructure forward and aft on
every deck. 3m+ transom extension, 1m high modification to forward
sheerline up to bow, modifications to fashion plates, wing stations,
bulwarks and other superstructure details to totally modernise the
vessels profile leaving it complete unrecognisable from it’s previous
guises.
Interior: Replacement of VIP flooring, installation of beach club in
lazarette.
16 17
19
24 25
SPECIFICATIONS
Length 138.4m
Beam 18.5m
Draft 5m
Builder Lurssen
Year 2004
REFIT
Naval Architect Azure
Designer Beiderbeck
Duration 3 months
Exterior: Design, manufacture and installation of a self supporting
carbon fibre swimming pool to grace one of the worlds best know mega
yachts. With strict heating, water storage and pumping requirements
and a very short project duration it was a challenge described by
Lurssen themselves as impossible.....
26 27
30 31
32 33
SPECIFICATIONS
Length before / after 30m / 35.8m
Beam 7.3m
Draft 2.5m
Builder Inace
Year 2009
REFIT
Naval Architect Azure
Designer Stefano Pastrovich
Duration 5 months / 5 months
Exterior: Hull extension at stern area of yacht over 6m in length to
create a large aft deck dining/bar area, spacious swim platform and
new interior engineering and toy storage area complete with additional
ensuite crew cabin
Interior: Removal and replacement of all major guest areas with
modern African themed Pastrovich masterpiece. All exterior areas
modernised and co-ordinate with new interior
34 35
afterbefore
36 37
40 41
45
Compositeworks - recent major projects

Weitere ähnliche Inhalte

Ähnlich wie Compositeworks - recent major projects

R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdfRusty Baldwin
 
DESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxDESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxSOUMILSENAPATI2
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilionSakshi Singh
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemABDURRAB ANSARI
 
Holly Nichols Portfolio \'07-\'09
Holly Nichols Portfolio \'07-\'09Holly Nichols Portfolio \'07-\'09
Holly Nichols Portfolio \'07-\'09hollynichols1205
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxcpatriciarpatricia
 
Storm water storage tank
Storm water storage tankStorm water storage tank
Storm water storage tankIgnacio Reboto
 
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...RAJATJATAV1
 
LR1 75348 burger2005
LR1 75348 burger2005LR1 75348 burger2005
LR1 75348 burger2005Katie Ross
 
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht DolceneraYacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht DolceneraEast Coast Yacht Brokers
 
KYC Harbour Redevelopment - Town Hall No 3 Presentation
KYC	Harbour Redevelopment - Town Hall No 3 PresentationKYC	Harbour Redevelopment - Town Hall No 3 Presentation
KYC Harbour Redevelopment - Town Hall No 3 Presentationkingstonyc
 

Ähnlich wie Compositeworks - recent major projects (20)

Gherkin london
Gherkin londonGherkin london
Gherkin london
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdf
 
DESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxDESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptx
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilion
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
 
Holly Nichols Portfolio \'07-\'09
Holly Nichols Portfolio \'07-\'09Holly Nichols Portfolio \'07-\'09
Holly Nichols Portfolio \'07-\'09
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
 
Storm water storage tank
Storm water storage tankStorm water storage tank
Storm water storage tank
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
 
Floating Technology
Floating TechnologyFloating Technology
Floating Technology
 
ABTS 4th year pdf
ABTS 4th year pdfABTS 4th year pdf
ABTS 4th year pdf
 
LR1 75348 burger2005
LR1 75348 burger2005LR1 75348 burger2005
LR1 75348 burger2005
 
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht DolceneraYacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
KYC Harbour Redevelopment - Town Hall No 3 Presentation
KYC	Harbour Redevelopment - Town Hall No 3 PresentationKYC	Harbour Redevelopment - Town Hall No 3 Presentation
KYC Harbour Redevelopment - Town Hall No 3 Presentation
 

Compositeworks - recent major projects

  • 1.
  • 2.
  • 3.
  • 4.
  • 5. 3 SPECIFICATIONS Length 62.3m Beam 10.8m Draft 3.3m Builder Feadship Year 2000 REFIT Naval Architect Azure Designer Steve Howard / Chahan Interior Design Duration 6 months / 6 months Exterior: Complete remodelling of sun deck including installation of new carbon fibre swimming pool and sunbeds forward, lowering of aft deck level, complete with new bar and furniture and a custom liferaft launching system Interior: Complete replacement of major guest areas including salon, dining and owner’s areas as well as upgrade of major interior systems
  • 6. 4 5
  • 7.
  • 8. 9
  • 11. 14 15 SPECIFICATIONS Length before / after 65.6m / 68.7m Beam 9.7m Draft 3.7m Builder Feadship Year 1983 REFIT Naval Architect Olesinski Design Designer Olesinski Design Duration 7 months Exterior: Total remodelling of superstructure forward and aft on every deck. 3m+ transom extension, 1m high modification to forward sheerline up to bow, modifications to fashion plates, wing stations, bulwarks and other superstructure details to totally modernise the vessels profile leaving it complete unrecognisable from it’s previous guises. Interior: Replacement of VIP flooring, installation of beach club in lazarette.
  • 12. 16 17
  • 13. 19
  • 14.
  • 15.
  • 16. 24 25 SPECIFICATIONS Length 138.4m Beam 18.5m Draft 5m Builder Lurssen Year 2004 REFIT Naval Architect Azure Designer Beiderbeck Duration 3 months Exterior: Design, manufacture and installation of a self supporting carbon fibre swimming pool to grace one of the worlds best know mega yachts. With strict heating, water storage and pumping requirements and a very short project duration it was a challenge described by Lurssen themselves as impossible.....
  • 17. 26 27
  • 18.
  • 19. 30 31
  • 20. 32 33 SPECIFICATIONS Length before / after 30m / 35.8m Beam 7.3m Draft 2.5m Builder Inace Year 2009 REFIT Naval Architect Azure Designer Stefano Pastrovich Duration 5 months / 5 months Exterior: Hull extension at stern area of yacht over 6m in length to create a large aft deck dining/bar area, spacious swim platform and new interior engineering and toy storage area complete with additional ensuite crew cabin Interior: Removal and replacement of all major guest areas with modern African themed Pastrovich masterpiece. All exterior areas modernised and co-ordinate with new interior
  • 22. 36 37
  • 23.
  • 24. 40 41
  • 25.
  • 26. 45